Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “scheduling software”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Dynamic force and stability prediction for milling using feed rate scheduling software and time-domain simulation

This paper describes: 1) the use of feed rate scheduling software to predict the radial depth of cut variation for three-axis milling toolpaths and; 2) the use of the radial depth profile in a time-domain simulation to predict dynamic cutting forces. The time-domain simulation, which also includes the tool tip frequency response functions and force model (which relates the cutting force components to the chip geometry) as inputs, enables dynamic force profiles to be predicted and parameter combinations that cause chatter to be identified. A ramp geometry is selected that provides constantly varying radial depth and force predictions are completed at multiple axial depths for comparison to measured forces. Both stable and unstable (chatter) milling conditions were observed with good agreement between time-domain simulation and measurement results. The value of combining the feed rate scheduling software and time-domain simulation is demonstrated.

42 ENGINEERING↗

Status Report on the Development of Micro-Scheduling Software for the Advanced Outage Control Center Project

The long-term viability of existing nuclear power plants (NPPs) in the United States (U.S.) is dependent upon a number of factors, including maintaining high capacity factors, maintaining nuclear safety, and reducing operating costs, particularly those associated with refueling outages. Refueling outages typically take 20-30 days, and for existing light water NPPs in the U.S., the reactor cannot be in operation during the outage. Furthermore, given that many NPPs generate between $1-1.5 million/day in revenue when in operation, there is considerable interest in shortening the length of refueling outages. Yet, refueling outages are highly complex operations, involving multiple concurrent and dependent activities that are difficult to coordinate. Finding ways to improve refueling outage performance while maintaining nuclear safety has proven to be difficult. The Advanced Outage Control Center project is a research and development (R&D) demonstration activity under the Light Water Reactor Sustainability (LWRS) Program. LWRS is a R&D program which works with industry R&D programs to establish technical foundations for the licensing and managing of long-term, safe, and economical operation of current NPPs. The Advanced Outage Control Center project has the goal of improving the management of commercial NPP refueling outages. To accomplish this goal, this INL R&D project is developing an advanced outage control center (OCC) that is specifically designed to maximize the usefulness of communication and collaboration technologies for outage coordination and problem resolution activities. This report describes specific recent efforts to develop a capability called outage Micro-Scheduling. Micro-Scheduling is the ability to allocate and schedule outage support task resources on a sub-hour basis. Micro-Scheduling is the real-time fine-tuning of the outage schedule to react to the actual progress of the primary outage activities to ensure that support task resources are optimally deployed with the least amount of delay and unproductive use of resources. The remaining sections of this report describe in more detail the scheduling challenges that occur during outages, how a Micro-Scheduling capability helps address those challenges, and provides a status update on work accomplished to date and the path forward.

99 GENERAL AND MISCELLANEOUS↗

Development of Improved Graphical Displays for an Advanced Outage Control Center, Employing Human Factors Principles for Outage Schedule Management

The long-term viability of existing nuclear power plants in the United States (U.S.) is dependent upon a number of factors, including maintaining high capacity factors, maintaining nuclear safety, and reducing operating costs, particularly those associated with refueling outages. Refueling outages typically take 20-30 days, and for existing light water NPPs in the U.S., the reactor cannot be in operation during the outage. Furthermore, given that many NPPs generate between $1-1.5 million/day in revenue when in operation, there is considerable interest in shortening the length of refueling outages. Yet refueling outages are highly complex operations, involving multiple concurrent and dependent activities that are somewhat challenging to coordinate; therefore, finding ways to improve refueling outage performance, while maintaining nuclear safety has proven to be difficult. The Advanced Outage Control Center (AOCC) project is a research and development (R&D) demonstration activity under the LWRS Program. LWRS is an R&D program that works closely with industry R&D programs to establish technical foundations for the licensing and managing of long-term, safe, and economical operation of current fleet of NPPs. As such, the LWRS Advanced Outage Control Center project has the goal of improving the management of commercial NPP refueling outages. To accomplish this goal, INL is developing an advanced outage control center (OCC) that is specifically designed to maximize the usefulness of communication and collaboration technologies for outage coordination and problem resolution activities. The overall focus is on developing an AOCC with the following capabilities that enables plant and OCC staff to; Collaborate in real-time to address emergent issues; Effectively communicate outage status to all workers involved in the outage; Effectively communicate discovered conditions in the field to the OCC; Provide real-time work status; Provide automatic pending support notifications; Provide real-time requirements monitoring; Maximize their collective situational awareness to improve decision-making; and Leverage macro data to better support resource allocation. INL has partnered with several commercial NPP utilities to develop a number of advanced outage management technologies. These outage management technologies have focused on both collaborative technologies for control centers and developing mobile technologies for NPP field workers. This report describes recent efforts made in developing a suite of outage technologies to support more effective schedule management. Currently, a master outage schedule is created months in advance using the plant’s existing scheduling software (e.g., Primavera P6). Typically, during the outage, the latest version of the schedule is printed at the beginning of each shift. INL and its partners are developing technologies that will have capabilities such as Automatic Schedule Updating, Automatic Pending Support Notifications, and the ability to allocate and schedule outage support task resources on a sub-hour basis (e.g., outage Micro-Scheduling). The remaining sections of this report describe in more detail the scheduling challenges that occur during outages, how the outage scheduling technologies INL is developing helps address those challenges, and the latest developments on this task (e.g., work accomplished to date and the path forward)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Mobility-On-Demand Transportation: A System for Microtransit and Paratransit Operations

New rideshare and shared-mobility services have transformed urban mobility in recent years. Therefore, transit agencies are looking for ways to adapt to this rapidly changing environment. In this space, ridepooling has the potential to improve efficiency and reduce costs by allowing users to share rides in high-capacity vehicles and vans. Most transit agencies already operate various ridepooling services including microtransit and paratransit. However, the objectives and constraints for implementing these services vary greatly between agencies. This brings multiple challenges. First, off-the-shelf ridepooling formulations must be adapted for real-world conditions and constraints. Second, the lack of modular and reusable software makes it hard to implement and evaluate new ridepooling algorithms and approaches in real-world settings. Therefore, we propose an on-demand transportation scheduling software for microtransit and paratransit services. This software is aimed at transit agencies looking to incorporate state-of-the-art rideshare and ridepooling algorithms in their everyday operations. We provide management software for dispatchers and mobile applications for drivers and users. Lastly, we discuss the challenges in adapting state-of-the-art methods to real-world operations.

Wilbur, Michael↗

VC3: Virtual Clusters for Community Computation (Final Technical Report)

A traditional HPC computing facility provides a large amount of computing power but has a fixed environment designed to satisfy local needs. This makes it very challenging for users to deploy complex applications that span multiple sites and require specific application software, scheduling middleware, or sharing policies. This project addressed many of these challenges by making it possible for researchers to easily aggregate and share resources, install custom software environments, and deploy clustering frameworks across multiple HPC facilities through the concept of “virtual clusters”. We designed and implemented a prototype virtual cluster facility that enabled unprivileged users to create dynamic aggregations of computing power across multiple sites, deployed with custom middleware and complex software dependencies.

97 MATHEMATICS AND COMPUTING↗

VC3: Virtual Clusters for Community Computation

A traditional HPC computing facility provides a large amount of computing power but has a fixed environment designed to satisfy local needs. This makes it very challenging for users to deploy complex applications that span multiple sites and require specific application software, scheduling middleware, or sharing policies. This project addressed many of these challenges by making it possible for researchers to easily aggregate and share resources, install custom software environments, and deploy clustering frameworks across multiple HPC facilities through the concept of “virtual clusters”. We designed and implemented a prototype virtual cluster facility that enabled unprivileged users to create dynamic aggregations of computing power across multiple sites, deployed with custom middleware and complex software dependencies. This service is hosted at the University of Chicago and available through the site virtualclusters.org.

97 MATHEMATICS AND COMPUTING↗

SmartTransit.AI: A Dynamic Paratransit and Microtransit Application

New rideshare and shared mobility services have transformed urban mobility in recent years. Such services have the potential to improve efficiency and reduce costs by allowing users to share rides in high-capacity vehicles and vans. Most transit agencies already operate various ridepooling services, including microtransit and paratransit. However, the objectives and constraints for implementing these services vary greatly between agencies and can be challenging. First, off-the-shelf ridepooling formulations must be adapted for real-world conditions and constraints. Second, the lack of modular and reusable software makes it hard to implement and evaluate new ridepooling algorithms and approaches in real-world settings. We demonstrate a modular on-demand public transportation scheduling software for microtransit and paratransit services. The software is aimed at transit agencies looking to incorporate state-of-the-art rideshare and ridepooling algorithms in their everyday operations. We provide management software for dispatchers and mobile applications for drivers and users and conclude with results from the demonstration in Chattanooga, TN.

Pavia, Sophie↗

Optimization of an aerostructural machining process using physics-guided Bayesian stability modelling

Existing algorithms for predicting milling chatter have not been widely adopted in industry since they require specialized instruments to measure the stability inputs. This study describes how the machining process for a meter-scale aluminum aerostructure was optimized using a physics-guided Bayesian stability model. The study was performed in collaboration with an industrial partner on production machines to evaluate the practicality of the proposed method under real-world conditions. For each cutting tool, the Bayesian approach automatically selected a small number of cutting tests, which were monitored using a microphone to observe the chatter frequency. The algorithm learned the system dynamics, cutting forces, and stability map from these test results. A novel algorithm for predicting tool bending stress was incorporated into the test selection algorithm to avoid tool breakage. On average, each set of optimized cutting parameters required less than six tests to identify and were 97% more productive than baseline parameters from the cutting tool manufacturer. The machining program was then further optimized using commercial feedrate scheduling software to remove cutting force spikes and reduce air cutting time. Five components were machined using the optimized process. These results demonstrate the potential for physics-guided Bayesian models to improve productivity in industrial settings.

Cornelius, Aaron [UT Knoxville]↗

Moore vs. Murphy: Tradeoffs between complexity and reliability in distributed energy system scheduling using software-as-a-service

Software-based optimization of building control strategies, including scheduling, has the potential to improve the performance of existing complex heating, ventilation, and air conditioning (HVAC), storage, and other systems—especially if temporally variable energy production, such as solar thermal or photovoltaics, is included. If reductions in energy bills can be achieved using optimized control strategies that take advantage of cost-saving opportunities, such as time-of-use pricing, the additional bill savings can cover further efficiency investment costs. As computer processing becomes cheaper over time (Moore's Law), opportunities to perform complex control optimization become more abundant, and these can be performed remotely as software-as-a-service (SaaS). However, by “perfecting” our control strategies, we run an increased risk that when something unexpected happens (Murphy's Law), the consequences of failure are greater. This study used simulation to explore the potential benefits of HVAC schedule optimization, delivery, and implementation using a SaaS paradigm, at various levels of complexity. Implementing optimal schedules in a model of an efficient building's HVAC system, the study predicts energy cost savings of up to 10% compared to the naïve reference control strategy. Optimizing more system control variables increases the potential energy cost savings; however, these savings could be compromised by failures in communication inherent in delivering schedules via SaaS. The additional cost of energy resulting from the risk of increased demand charges generally increased with increased communication failure to a much larger extent than the risk of increased energy use charges. This work suggests that moderate improvements in performance, achieved at low cost by simple means, may be more effective than highly optimized schemes, which are more susceptible to failure due to their dependence on complex interactions between systems.

42 ENGINEERING↗

Quantifying Scheduling Challenges for Exascale System Software

The move towards high-performance computing (HPC) ap- plications comprised of coupled codes and the need to dra- matically reduce data movement is leading to a reexami- nation of time-sharing vs. space-sharing in HPC systems. In this paper, we discuss and begin to quantify the perfor- mance impact of a move away from strict space-sharing of nodes for HPC applications. Specifically, we examine the po- tential performance cost of time-sharing nodes between ap- plication components, we determine whether a simple coor- dinated scheduling mechanism can address these problems, and we research how suitable simple constraint-based opti- mization techniques are for solving scheduling challenges in this regime. Our results demonstrate that current general- purpose HPC system software scheduling and resource al- location systems are subject to significant performance de- ciencies which we quantify for six representative applica- tions. Based on these results, we discuss areas in which ad- ditional research is needed to meet the scheduling challenges of next-generation HPC systems.

C.1.2 [Multiprocessors]: Parallel Processors↗

HyRAM Testing Strategy and Quality Design Elements

Strategy document and tentative schedule for testing of HyRAM, a software toolkit that integrates data and methods relevant to assessing the safety of hydrogen fueling and storage infrastructure. Because proposed and existing features in HyRAM that support testing are important factors in this discussion, relevant design considerations of HyRAM are also discussed. However, this document does not cover all of HyRAM desig n, nor is the full HyRAM software development schedule included.

Reynolds, John Thomas↗

IMMM-SFA/tempset

Generates new temperature set point schedules from base schedules. The software provides a systematic, automatic method to generate temperature setpoint schedules from a base schedule and a small set of modeling parameters. The software will be open-sourced, and can easily be accessed by energy modelers.

Vernon, Chris↗

The problem analysis of data processing performance in nuclear power plant computerized information and control system - 288

This paper is based on the data processing performance problems of operating command delay and system display not updating real-time for nuclear power plant computerized information and control system. The plant computerized information and control system is responsible for monitoring and controlling the plant operation, and it is a key part in the plant DCS system. Its data processing performance will affect the operation stability of nuclear power plant. The architecture, hardware configuration and data communication for plant computerized information and control system among the different levels in DCS are described. The main reasons affecting data processing performance in different signal channels are analyzed according to the plant load test results. The CPU load curves for real time server and central processing server are displayed, although the detailed cause for operating command delay and system display not updating realtime are not found, central processing server load is heavier than real time server which remind us to analyze the data processing of software resource scheduling deeply. So the resource distribution problem of software execution task is also analyzed according to CPU load test results. This paper provides the optimization analysis for data processing performance, and it is available and effective according to the latest test results. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Assessment of grid-friendly collective optimization framework for distributed energy resources

Distributed energy resources have the potential to provide services to facilities and buildings at lower cost and environmental impact in comparison to traditional electric-gridonly services. The reduced cost could result from a combination of higher system efficiency and exploitation of electricity tariff structures. Traditionally, electricity tariffs are designed to encourage the use of ‘off peak’ power and discourage the use of ‘onpeak’ power, although recent developments in renewable energy resources and distributed generation systems (such as their increasing levels of penetration and their increased controllability) are resulting in pressures to adopt tariffs of increasing complexity. Independently of the tariff structure, more or less sophisticated methods exist that allow distributed energy resources to take advantage of such tariffs, ranging from simple pre-planned schedules to Software-as-a-Service schedule optimization tools. However, as the penetration of distributed energy resources increases, there is an increasing chance of a ‘tragedy of the commons’ mechanism taking place, where taking advantage of tariffs for local benefit can ultimately result in degradation of service and higher energy costs for all. In this work, we use a scheduling optimization tool, in combination with a power distribution system simulator, to investigate techniques that could mitigate the deleterious effect of ‘selfish’ optimization, so that the high-penetration use of distributed energy resources to reduce operating costs remains advantageous while the quality of service and overall energy cost to the community is not affected.

Pensini, Alessandro↗

Same Data, Different Audiences: Using Personas to Scope a Supercomputing Job Queue Visualization

Domain-specific visualizations sometimes focus on narrow, albeit important, tasks for one group of users. This focus limits the utility of a visualization to other groups working with the same data. While tasks elicited from other groups can present a design pitfall if not disambiguated, they also present a design opportunity—namely, the development of visualizations that support multiple groups. This development choice presents a trade-off of broadening the scope but limiting support for the more narrow tasks of any one group, which in some cases can enhance the overall utility of the visualization. We investigate this scenario through a design study where we develop Guidepost, a notebook-embedded visualization of data that helps scientists assess compute wait times, machine learning researchers understand prediction accuracy, and system maintainers analyze usage trends. We adapt the use of personas for visualization design from existing literature in the HCI and design domains, applying them to categorize tasks based on their uniqueness across stakeholder personas. Under this model, tasks shared between all groups should be supported by interactive visualizations and tasks unique to each group can be deferred to scripting with notebook-embedded visualization design. We evaluate our visualization through real-world case studies and a task-focused evaluation with nine participants. We observe that together, Guidepost's visual encodings, interactions, and export capabilities support the tasks of our differing personas.

97 MATHEMATICS AND COMPUTING↗

DeepSurveySim: Simulation Software and Benchmark Challenges for Astronomical Observation Scheduling

Modern astronomical surveys have multiple competing scientific goals. Optimizing the observation schedule for these goals presents significant computational and theoretical challenges, and state-of-the-art methods rely on expensive human inspection of simulated telescope schedules. Automated methods, such as reinforcement learning, have recently been explored to accelerate scheduling. However, there do not yet exist benchmark data sets or user-friendly software frameworks for testing and comparing these methods. We present DeepSurveySim -- a high-fidelity and flexible simulation tool for use in telescope scheduling. DeepSurveySim provides methods for tracking and approximating sky conditions for a set of observations from a user-supplied telescope configuration. We envision this tool being used to produce benchmark data sets and for evaluating the efficacy of ground-based telescope scheduling algorithms, particularly for machine learning algorithms that would suffer in efficacy if limited to real data for training.We introduce three example survey configurations and related code implementations as benchmark problems that can be simulated with DeepSurveySim.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Dynamic Multi-Sensor Multi-Mission Optimal Planning Tool

Remote sensing systems have firmly established a role in providing immense value to commercial industry, scientific exploration, and national security. Continued maturation of sensing technology has reduced the cost of deploying highly-capable sensors while at the same time increased reliance on the information these sensors can provide. The demand for time on these sensors is unlikely to diminish. Coordination of next-generation sensor systems, larger constellations of satellites, unmanned aerial vehicles, ground telescopes, etc. is prohibitively complex for existing heuristics-based scheduling techniques. The project was a two-year collaboration spanning multiple Sandia centers and included a partnership with Texas A&M University. We have developed algorithms and software for collection scheduling, remote sensor field-of-view pointing models, and bandwidth-constrained prioritization of sensor data. Our approach followed best practices from the operations research and computational geometry communities. These models provide several advantages over state of the art techniques. In particular, our approach is more flexible compared to heuristics that tightly couple models and solution techniques. First, our mixed-integer linear models afford a rigorous analysis so that sensor planners can quantitatively describe a schedule relative to the best possible. Optimal or near-optimal schedules can be produced with commercial solvers in operational run-times. These models can be modified and extended to incorporate different scheduling and resource constraints and objective function definitions. Further, we have extended these models to proactively schedule sensors under weather and ad hoc collection uncertainty. This approach stands in contrast to existing deterministic schedulers which assume a single future weather or ad hoc collection scenario. The field-of-view pointing algorithm produces a mosaic with the fewest number of images required to fully cover a region of interest. The bandwidth-constrained algorithms find the highest priority information that can be transmitted. All of these are based on mixed-integer linear programs so that, in the future, collection scheduling, field-of-view, and bandwidth prioritization can be combined into a single problem. Experiments conducted using the developed models, commercial solvers, and benchmark datasets have demonstrated that proactively scheduling against uncertainty regularly and significantly outperforms deterministic schedulers.

47 OTHER INSTRUMENTATION↗

Scheduler Modeling of IBR Plants for Providing Ancillary Services [SWR-25-16]

Inverter-based resources (IBRs) have been integral components of modern power systems and their capability in providing grid services have been widely studied. To promote the deployment of IBR grid services in real utility operation, this software proposes a scheduler model for IBRs. The energy and reserve are co-optimized in day-ahead, various ancillary services, including operating reserve provision, peak load reduction, voltage regulation and power factor control are integrated in the model.

Wang, Xiaofei [National Renewable Energy Laborator↗