Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “scheduling and coordination”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Coordinated scheduling for dynamic real-time systems

In this project, we addressed issues in coordinated scheduling for dynamic real-time systems. In particular, we concentrated on design and implementation of a new distributed real-time system called R-Shell. The design objective of R-Shell is to provide computing support for space programs that have large, complex, fault-tolerant distributed real-time applications. In R-shell, the approach is based on the concept of scheduling agents, which reside in the application run-time environment, and are customized to provide just those resource management functions which are needed by the specific application. With this approach, we avoid the need for a sophisticated OS which provides a variety of generalized functionality, while still not burdening application programmers with heavy responsibility for resource management. In this report, we discuss the R-Shell approach, summarize the achievement of the project, and describe a preliminary prototype of R-Shell system.

Natarajan, Swaminathan↗

Coordinating, Scheduling, Processing and Analyzing IYA09

The IVS scheduled a special astrometric VLBI session for the International Year of Astronomy 2009 (IYA09) commemorating 400 years of optical astronomy and 40 years of VLBI. The IYA09 session is the most ambitious geodetic session to date in terms of network size, number of sources, and number of observations. We describe the process of designing, coordinating, scheduling, pre-session station checkout, correlating, and analyzing this session.

Gipson, John↗

Separation Assurance and Scheduling Coordination in the Arrival Environment

Separation assurance (SA) automation has been proposed as either a ground-based or airborne paradigm. The arrival environment is complex because aircraft are being sequenced and spaced to the arrival fix. This paper examines the effect of the allocation of the SA and scheduling functions on the performance of the system. Two coordination configurations between an SA and an arrival management system are tested using both ground and airborne implementations. All configurations have a conflict detection and resolution (CD&R) system and either an integrated or separated scheduler. Performance metrics are presented for the ground and airborne systems based on arrival traffic headed to Dallas/ Fort Worth International airport. The total delay, time-spacing conformance, and schedule conformance are used to measure efficiency. The goal of the analysis is to use the metrics to identify performance differences between the configurations that are based on different function allocations. A surveillance range limitation of 100 nmi and a time delay for sharing updated trajectory intent of 30 seconds were implemented for the airborne system. Overall, these results indicate that the surveillance range and the sharing of trajectories and aircraft schedules are important factors in determining the efficiency of an airborne arrival management system. These parameters are not relevant to the ground-based system as modeled for this study because it has instantaneous access to all aircraft trajectories and intent. Creating a schedule external to the CD&R and the scheduling conformance system was seen to reduce total delays for the airborne system, and had a minor effect on the ground-based system. The effect of an external scheduler on other metrics was mixed.

function allocation↗

Coordination between Federated Scheduling and Conflict Resolution in UAM Operations

This work proposes a federated scheduling algorithm and explores two mechanisms for coordinating federated scheduling and conflict resolution functions - two core traffic management functions in urban air mobility operations. A federated scheduling algorithm is first developed, together with data that needs to be shared among schedulers. Two mechanisms for coordinating scheduling and conflict resolution functions are then introduced and studied as conflicts in high-density operations may not be completely resolved by conflict resolution function alone. The first coordination mechanism is constructed based on the arrival scheduler at the destination and another one utilizes the departure scheduler at the origin. Experiments and trade space studies are conducted to compare these two mechanisms using fast-time traffic simulations. Results show that both mechanisms perform well in coordinating scheduling and conflict resolution functions and helping resolve all potential conflicts. Experiments also show that with proper parameter selection, both mechanisms can achieve better efficiency (less delay) while maintaining zero losses of separation.

Federated scheduling↗

Coordination between Federated Scheduling and Conflict Resolution in UAM Operations

This work proposes a federated scheduling algorithm and explores two mechanisms for coordinating federated scheduling and conflict resolution functions - two core traffic management functions in urban air mobility operations. A federated scheduling algorithm is first developed, together with data that needs to be shared among schedulers. Two mechanisms for coordinating scheduling and conflict resolution functions are then introduced and studied as conflicts in high-density operations may not be completely resolved by conflict resolution function alone. The first coordination mechanism is constructed based on the arrival scheduler at the destination and another one utilizes the departure scheduler at the origin. Experiments and trade space studies are conducted to compare these two mechanisms using fast-time traffic simulations. Results show that both mechanisms perform well in coordinating scheduling and conflict resolution functions and helping resolve all potential conflicts. Experiments also show that with proper parameter selection, both mechanisms can achieve better efficiency (less delay) while maintaining zero losses of separation.

Federated scheduling↗

ATD-2 Phase 3 Scheduling in a Metroplex Environment Incorporating Trajectory Option Sets

The NASA Airspace Technology Demonstration 2 Phase 1 and 2 Field Evaluations have successfully demonstrated new technologies developed to manage the Integrated Arrival, Departure, and Surface traffic flows at a single airport. The Phase 3 Field Evaluation extends the capabilities to a Metroplex environment where multiple airports are interacting and sharing resources along the terminal boundary. This paper describes the scheduling algorithm enabling the coordinated scheduling and describes the interaction between airports within the Metroplex and the terminal boundary. We describe the metrics developed to inform flight operators about reroute opportunities and discuss the potential benefits to the rerouted flight and the system-wide aggregate benefits of a single reroute. We believe that the capabilities developed and the lessons learned during the Phase 3 Field Evaluation will set up the National Airspace System for future success.

Airspace Technology Demonstration 2↗

Scheduling Position, Navigation and Time Service Requests from Non-dedicated Lunar Constellations

This paper presents a centralized scheduler that satisfies user requests for Position, Navigation, and Time (PNT) services from an ad-hoc, non-dedicated orbital constellation around the Moon. Traditional, dedicated GNSS networks provide service 24/7, which allows users to acquire localization services at-will. For ad-hoc networks, a coordinated schedule is needed to ensure Quality of Service (QoS) guarantees for user localization, while satisfying non-dedicated assets’ usage constraints. This scheduler bridges this coordination gap by leveraging Mixed Integer-Linear Programming (MILP) to schedule this “as-needed” localization service while respecting the constraints on each asset. In upcoming decades there is expected to be a substantial increase in Lunar missions. Many of these missions will feature low-cost surface assets near the moon’s polar regions and small-sat science missions in orbit. Most missions need PNT capabilities to ensure safe operations and meet their science objectives, but low-cost missions may not be able to support the large power, mass, and weight that a weak GNSS or DSN based navigation solution would entail. Asset localization has been demonstrated using a decentralized extended Kalman Filter (DEKF) in the previously presented Lunar Autonomous PNT System (LAPS). Within the LAPS simulation environment, a module has been developed to generate the coordinated user-asset schedules described above; this Service Scheduler Module (SSM) allows for complete end-to-end testing of the entire system. Within SSM, a user service request consists of a location on the Lunar surface, a cumulative service duration, and a window in which service must occur. SSM takes as input these requests and the LAPS-predicted positional degree of precision as the QoS for each available set of orbital assets. A simple, baseline MILP model is formulated to provide the highest-precision service balanced across all requests. To reflect the non-dedicated nature of the constellation, this baseline model is augmented with additional asset-specific load capacity constraints or availability constraints. The load capacity constraints limit total time spent providing service, and the availability constraints reflect blockout times or availability windows when the assets are not otherwise occupied. SSM outputs two schedules: the user schedule to indicate their service times and expected QoS, and a satellite schedule to be transmitted to the orbiting constellation, describing when each non-dedicated asset provides PNT service. SSM is predominantly implemented in MATLAB and allows the use of any MILP solver to generate the resulting schedules. This paper describes the SSM - LAPS interface, how the output of LAPS is used to construct the MILP, and how SSM provides user localization service while satisfying constraints. It will also demonstrate the tool’s flexibility for formulating schedules for the end user and the constellation, focusing on scenarios that match real-world proposed missions. It will detail how SSM can be used to compare the addition of load capacity constraints, satellite availability constraints, and QoS guarantees for the users. Finally, we describe how SSM can be used to support the design of the ad-hoc constellation itself. The resulting integrated capability will support the design of future ad-hoc Lunar PNT networks, enabling high-quality, low-cost Lunar exploration

Swarm↗

Automated telescope scheduling

With the ever increasing level of automation of astronomical telescopes the benefits and feasibility of automated planning and scheduling are becoming more apparent. Improved efficiency and increased overall telescope utilization are the most obvious goals. Automated scheduling at some level has been done for several satellite observatories, but the requirements on these systems were much less stringent than on modern ground or satellite observatories. The scheduling problem is particularly acute for Hubble Space Telescope: virtually all observations must be planned in excruciating detail weeks to months in advance. Space Telescope Science Institute has recently made significant progress on the scheduling problem by exploiting state-of-the-art artificial intelligence software technology. What is especially interesting is that this effort has already yielded software that is well suited to scheduling groundbased telescopes, including the problem of optimizing the coordinated scheduling of more than one telescope.

Johnston, Mark D.↗

Propulsion Control and Health Management (PCHM) Technology for Flight Test on the C-17 T-1 Aircraft

The C-I 7 T-l Globemaster III is an Air Force flight research vehicle located at Edwards Air Force Base. NASA Dryden and the C-17 System Program Office have entered into a Memorandum of Agreement to permit NASA the use of the C-I 7 T-I to conduct flight research on a mutually coordinated schedule. The C-17 Propulsion Control and Health Management (PCHM) Working Group was formed in order to foster discussion and coordinate planning amongst the various government agencies conducting PCHM research with a potential need for flight testing, and to communicate to the PCHM community the capabilities of the C-17 T-l aircraft to support such flight testing. This paper documents the output of this Working Group, including a summary of the candidate PCHM technologies identified and their associated benefits relative to NASA goals and objectives.

Simon, Donald L.↗

ATD-2 Field Evaluation of Pre-Departure Trajectory Option Set Reroutes in North Texas Metroplex

The NASA Airspace Technology Demonstration-2 Phase 3 capabilities extend Integrated Arrival, Departure and Surface scheduling to a Metroplex environment where multiple airports are interacting and sharing resources along the terminal boundary. The Phase 3 coordinated scheduling provides pre-departure reroute recommendations to flight operators which reduce delay caused by terminal restrictions. This paper reports results of the Phase 3 Stormy 2021 Field Evaluation conducted between November 2020 and September 2021 in the North Texas Metroplex. During the field evaluation NASA partnered with the FAA, American Airlines, Southwest Airlines, and Envoy Airlines to evaluate Phase 3 capabilities in an operational environment. The benefits results are provided as delay savings metrics measured in time and converted to fuel and emissions savings using detailed fuel flow models provided by flight operators.

ATD-2 Field Evaluation, Trajectory Option Set, Pre↗

ATD-2 Field Evaluation of Pre-Departure Trajectory Option Set Reroutes in North Texas Metroplex

The NASA Airspace Technology Demonstration-2 Phase 3 capabilities extend Integrated Arrival, Departure and Surface scheduling to a Metroplex environment where multiple airports are interacting and sharing resources along the terminal boundary. The Phase 3 coordinated scheduling provides pre-departure reroute recommendations to flight operators which reduce delay caused by terminal restrictions. This paper reports results of the Phase 3 Stormy 2021 Field Evaluation conducted between November 2020 and September 2021 in the North Texas Metroplex. During the field evaluation NASA partnered with the FAA, American Airlines, Southwest Airlines, and Envoy Airlines to evaluate Phase 3 capabilities in an operational environment. The benefits results are provided as delay savings metrics measured in time and converted to fuel and emissions savings using detailed fuel flow models provided by flight operators.

ATD-2↗

Multi-Time Scale Coordinated Control and Scheduling of Inverter-Based TCLs With Variable Wind Generation

To address microgrid tie flow errors caused by wind generation variability, here we propose and develop a multi-time scale coordinated control and scheduling strategy for inverter-based thermostatically controlled loads (TCLs). First, in hour-time scale, inverter-based TCLs with adjusting temperature set-point are modeled as virtual generators to compensate tie flow deviations in the day-ahead plan. Next, in minute-time scale, virtual batteries representing operating behaviors of inverter-based TCLs with frequency control are scheduled determined by the control of virtual generators in hour-time scale. The virtual batteries are scheduled to smooth out tie flow errors corresponding to day-ahead plan and hour-time scale schedules. The multi-time scale control methods are coordinated to employ the response potential of inverter-based TCLs and response curve-based methods are proposed to control inverter-based TCLs considering the customer privacy. The multi-time scale stochastic schedules which are based on response curves of inverter-based TCLs are coordinated to accommodate wind generation variability. Simulation results demonstrate that the microgrid tie flow errors are effectively mitigated by the proposed multi-time scale coordinated control and scheduling of inverter-based TCLs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Scheduling Earth Observing Satellites with Evolutionary Algorithms

We hypothesize that evolutionary algorithms can effectively schedule coordinated fleets of Earth observing satellites. The constraints are complex and the bottlenecks are not well understood, a condition where evolutionary algorithms are often effective. This is, in part, because evolutionary algorithms require only that one can represent solutions, modify solutions, and evaluate solution fitness. To test the hypothesis we have developed a representative set of problems, produced optimization software (in Java) to solve them, and run experiments comparing techniques. This paper presents initial results of a comparison of several evolutionary and other optimization techniques; namely the genetic algorithm, simulated annealing, squeaky wheel optimization, and stochastic hill climbing. We also compare separate satellite vs. integrated scheduling of a two satellite constellation. While the results are not definitive, tests to date suggest that simulated annealing is the best search technique and integrated scheduling is superior.

Globus, Al↗

Machine learning-enhanced MPC for demand flexibility in small commercial buildings: An experimental study

Small- and medium-sized commercial buildings (SMCBs) represent the majority of U.S. commercial building stock and a significant share of peak electricity demand, yet they often lack centralized building automation systems, representing a significant untapped resource for urban energy management. This infrastructure gap makes advanced control implementation challenging, limiting the potential for widespread demand flexibility. Model Predictive Control (MPC) has shown strong potential for load shifting, peak demand reduction, and cost savings, but its effectiveness is hindered by unmeasured disturbances such as internal heat gains. This paper presents a Hybrid MPC framework that integrates a physics-based gray-box building thermal model, identified using a lumped disturbance (LD) approach, with a machine learning (ML) model for forecasting unmeasured disturbances. The hybrid approach is designed for buildings with multiple individually controlled heat pump and thermostat pairs, common in SMCBs, and aims to optimize coordinated scheduling of multiple heat pumps under dynamic electricity pricing while respecting comfort constraints. The methodology is validated through both simulations of case study buildings and experimental studies at a highly-instrumented test facility. Simulation results show that the Hybrid MPC achieves substantial load shifting and peak demand reduction, approaching the performance of an ideal MPC with perfect disturbance knowledge, and outperforming a conventional MPC without disturbance forecasting. In experiments, the Hybrid MPC reduced daily HVAC energy costs by 8.7%, peak-price time load (load shifting) by 41.7%, and peak demand by 29.2% compared to baseline control, demonstrating comparable benefits to the 11.6% cost savings, 42.9% load shifting, and 23.2% peak reduction of the ideal MPC. These results demonstrate that the proposed hybrid modeling approach can significantly improve MPC performance in real-world SMCB applications without requiring additional disturbance measurements.

Demand Flexibility↗

Apollo experience report: Ground-support equipment

The experience gained in management of the ground-support-equipment and site-readiness activity for the Apollo Program is summarized. The design of equipment and facilities are examined as well as some operational aspects. The organization for ensuring site readiness and the maintenance of ground-support equipment are discussed. Recommendations for use in future programs are given in the areas of design considerations, cleanliness requirements, periodic evaluation of changing requirements, maintenance and overhaul, special test equipment, site-activation schedule coordination, and schematics for ground-support equipment.

Cooper, J. S.↗

West Antarctic Ice Sheet Initiative. Volume 1: Science and Implementation Plan

The Science and Implementation Plan of the West Antarctic Ice Sheet Initiative (WAIS) is described. The goal of this initiative is the prediction of the future behavior of this ice sheet and an assessment of its potential to collapse, rapidly raising global sea level. The multidisciplinary nature of WAIS reflects the complexity of the polar ice sheet environment. The project builds upon past and current polar studies in many fields and meshes with future programs of both the U.S. and other countries. Important tasks in each discipline are described and a coordinated schedule by which the majority of these tasks can be accomplished in 5 years is presented. The companion report (Volume 2) contains seven discipline review papers on the state of knowledge of Antarctica and opinions on how that knowledge must be increased to attain the WAIS goal.

Bindschadler, Robert A.↗

Application of Agile for Systems Engineering, Project Management and Modeling and Lessons Learned

The Systems Engineering team within the Human Research Program (HRP) Exploration Medical Capability (ExMC) Element has been transforming its development processes to be more efficient, robust,and responsive to change and to its stakeholders. To these ends, the Systems Engineering team trialed the integration of agile development techniques into existing and new processes. Agile development methods are well understood within the software development community. Outside ofsoftware development, however, how non-software project management (PM) and systems engineering (SE) teams implement agile development techniques is less well understood. In its transformation efforts, the ExMC SE team focused on three main areas: Improving the project communications among subsystem teams and stakeholders by adopting a scrum-like process, Changing the status and reporting mechanisms to improve schedule coordination between the subsystem team, SE leadership, and ExMC Element leadership, and Unifying the model-based SE workflow to improve understanding of Concepts of Operations across projects.This presentation highlights several of these transformations and what the SE team learned while undergoing the transformation.

S Lumpkins↗

Coordinated Science Campaign Scheduling for Sensor Webs

Future Earth observing missions will study different aspects and interacting pieces of the Earth's eco-system. Scientists are designing increasingly complex, interdisciplinary campaigns to exploit the diverse capabilities of multiple Earth sensing assets. In addition, spacecraft platforms are being configured into clusters, trains, or other distributed organizations in order to improve either the quality or the coverage of observations. These simultaneous advances in the design of science campaigns and in the missions that will provide the sensing resources to support them offer new challenges in the coordination of data and operations that are not addressed by current practice. For example, the scheduling of scientific observations for satellites in low Earth orbit is currently conducted independently by each mission operations center. An absence of an information infrastructure to enable the scheduling of coordinated observations involving multiple sensors makes it difficult to execute campaigns involving multiple assets. This paper proposes a software architecture and describes a prototype system called DESOPS (Distributed Earth Science Observation Planning and Scheduling) that will address this deficiency.

Edgington, Will↗