Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “scaled testing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Scale tests of the new DUNE data pipeline

In preparation for the second runs of the ProtoDUNE detectors at CERN (NP02 and NP04)[1], DUNE has established a new data pipeline for bringing the data from the EHN-1 experimental hall at CERN to primary tape storage at Fermilab and CERN, and then spreading it out to a distributed disk data store at many locations around the world. This system includes a new Ingest Daemon and a new Declaration Daemon. The Rucio[2] replica catalog, and FTS3 transport are used to transport all files. All file metadata is declared to the new MetaCat[3] metadata service. All of these new components have been successfully tested at a scale equal to the expected output of the detector data acquisition system (~2-4 GB/s), and the expected network bandwidth out of the experimental hall. We present the procedure that was used to test and the results of the test.

Timm, Steven↗

High Temperature Test Facility At Scale Testing, Validation, and Demonstration

Theses slides will be used to brief the Tribal DOE and Council Chairman for the project listed below. The High Temperature Test Facility (HTTF) is a demonstration-scale high temperature electrolysis (HTE) system that provides the ability to produce, process, store, and dispense electrolytically produced hydrogen. The system will be designed to accommodate electrolysis systems from various industry partners. The HTTF will be supplied up to 10 MW of power for electrolysis at 5 separate test article locations, each up to 2MW. The system will include post-processing and compression, storage, and capabilities to provide hydrogen for consumption by future end users. The HTTF will also provide the ability to test and demonstrate an HTE system in a configuration that would simulate the use of a nuclear generated steam supply for the high temperature heat source. The HTTF will be located at the Central Facilities Area (CFA) adjacent to CFA-686 on the INL site, 45 miles west of Idaho Falls.

08 HYDROGEN↗

Pilot Scale Testing of Lignite Adsorption Capability and the Benefits for the Recovery of Rare Earth Elements from Dilute Leach Solutions

Naturally occurring organic materials containing humic acids show a strong affinity towards rare earth elements (REE) and other critical elements. Leaching experiments on lignite coal waste produced from construction sand production revealed that the contained REEs were associated with the organic matter. Furthermore, adsorption studies revealed that the lignite waste was capable of extracting REEs from a model solution and increased the REE content of the lignite waste by more than 100%. As such, this study aimed to utilize the lignite waste to adsorb REEs from pregnant leach solutions and acid mine drainage sources having low REE concentrations and subsequently leach the lignite material to produce pregnant leach solutions containing relatively high amounts of REEs, which benefits the performance and economic viability of downstream separation and purification processes. An integrated flowsheet was developed based on this concept and tested at a pilot scale. The pregnant leachate solution (PLS) was generated from a heap leach pad containing 2000 tons of Baker seam coarse refuse. The pilot scale circuit was comprised of aluminum precipitation, adsorption using the waste lignite, and rare earth-critical metal (RE-CM) precipitation stages in succession. The results indicated that the aluminum precipitation stage removed over 88% and 99% of the Al and Fe, respectively. The adsorption stage increased the REE content associated with the waste lignite from 457 ppm to 1065 ppm on a whole mass basis. Furthermore, the heavy REE (HREE) content in the feedstock increased by approximately 250%, which raised the percentage of HREE in the REE distribution by 19 absolute percentage points. In addition to the REEs, concentrations of other critical elements such as Mn, Ni, and Zn also improved by 75%, 37%, and 250%, respectively. Bench-scale tests revealed that increasing the solids concentration in the waste lignite and PLS mix from 1% to 20% by weight enhanced the adsorption efficiency from 32.0% to 99.5%, respectively. As such, a new flowsheet was proposed which provides significantly higher REE concentrations in the PLS that can be fed directly to solvent extraction and/or oxalic acid precipitation and, thereby, enhancing process efficiency and economics.

58 GEOSCIENCES↗

Bench-Scale Testing of a High Efficiency, Ultra-Compact Process for Pre-Combustion CO 2 Capture (Final Report)

The overarching objective of this bench-scale study is to field-validate the technical feasibility of a membrane- and adsorption-enhanced water gas shift (WGS) reaction process that employs a carbon molecular sieve (CMS) membrane reactor (MR) followed by an adsorption reactor (AR) for pre-combustion CO 2 capture while demonstrating progress towards achievement of the overall performance goals of CO 2 capture with 95% CO 2 purity at a cost of electricity (COE) of 30% less than the baseline capture approaches. The main goal of this bench-scale project is to advance the proposed MR-AR transformative CO 2 capture technology to a sufficient maturity level so that our present industrial partners (M&PT and Worley) can potentially adapt the technology for further small pilot-scale testing. The project began at TRL 4, as the system prototype had already been validated in the laboratory on simulated syngas (as part of project DE-FE0026423). The project ended at TRL 5, via scaling-up of the prototype system and testing it on actual syngas at a host site (CAER at the University of Kentucky (UKy)). The project was carried-out in two different phases: In Phase I (during BP1 of the project), the team designed, constructed, and assembled the bench-scale experimental MR-AR system, prepared the membranes, adsorbents, and catalysts, tested the bench-scale unit with simulated syngas to validate functionality, and prepared a preliminary TEA of the technology. In Phase II (during BP2 of the project), the team installed the unit at the test site at the UKy site and completed all utility connections and hookups, field-tested the novel MR-AR process in the bench-scale system using real syngas, collected and analyzed experimental data, and completed a detailed TEA of the technology. A key aim of the project was to identify and address the technical and process risks and to generate information to advance the technology to the next stage of development. All project milestones and success criteria were met. Specifically, the team: (i) designed, constructed and assembled a bench scale system that handled 1 – 5 scfm syngas and tested its functionality with simulated syngas; (ii) prepared high performance CMS membrane tubes (ID: 3.5 mm, OD: 5.7 mm, 30” long) that meet the target H 2 permeance ( > 1 m 3 /(m 2 .hr.bar) or (> 370.3 GPU)) and a target H 2 /CO selectivity >80 at the relevant temperature (up to 300oC) and pressure conditions (up to 25 bar) with a <10% decline in performance over each 250 hr. testing period (iii) procured commercial sour-shift catalyst in sufficient quantity and prepared up to 10 kg of pelletized adsorbent for use at relevant conditions (250oC 2.5wt.% and target sorbent attrition rate < 0.2; (iv) installed the bench-scale unit at the test site (UKy) and tested the MR-AR technology using real syngas for over 250 hr. for both static and flow experiments; (v) updated the TEA analysis based on bench-scale data and met CO 2 capture goals of 95% CO 2 purity at a cost of electricity 30% less than baseline capture approaches. The CMS membranes, HTC adsorbents and catalysts employed all exhibited very robust and stable performance during the long-term run (over a >250 hr live syngas run). Furthermore, the proposed MR-AR IGCC system achieved a LCOE with a N 2 sale price of $\$$ 30/ton, with N 2 compression (no N 2 compression) of 101.2 $\$$/MWh (95.3 $\$$/MWh), which represents a 29.8% (33.9%) LCOE reduction in the baseline IGCC with carbon capture of 144.2 $\$$/MWh. The proposed MR-AR IGCC delivers a CO 2 capture cost of 44.8 $\$$/tonne (39.9 $\$$/tonne) vs 98.1 $\$$/tonne of the baseline capture case and a net power production of 586 MWe (623 MWe) vs 556 MWe of the baseline capture case.

01 COAL, LIGNITE, AND PEAT↗

Engineering-Scale Test of a Water-Lean Solvent for Post-Combustion Capture

EPRI, Pacific Northwest National Laboratory, RTI International, and their project collaborators developed an engineering-scale test of a new water-lean solvent, N-(2-ethoxyethyl)-3-morpholinopropan-1-amine (EEMPA or 2-EEMPA) as a post-combustion CO 2 capture solvent for power plant applications. This test was conducted using the Pilot Solvent Test Unit at the National Carbon Capture Center. The primary objective of this test was to collect long-term data operating EEMPA with both coal- and natural gas-representative flue gases at the approximately 0.5 MW e -equivalent scale (5–10 metric tons CO 2 /day captured). This report details the activities preparing for that test, data collected during the test campaign, and analyses and interpretations of that data.

20 FOSSIL-FUELED POWER PLANTS↗

Bench-Scale Testing of Monolithic PPI Structured Contactors for Direct Air Capture of CO 2

The overall project objective was to develop, optimize and bench-scale test the integrated embodiment of a leading direct air capture (DAC) sorbent composition, linear-poly(propylenimine) (l-PPI), in a structured material system, specifically a monolithic contactor for achieving low pressure drop, to justify its further scale-up in a subsequent program. The project team was led by CORMETECH, a leading monolithic gas/solid contactor manufacturer for environmental applications, and included Global Thermostat, a well-known DAC start-up, and Georgia Tech, a prominent US academic institution in carbon capture and DAC. The monolithic contactor for l-PPI in this project employed an advanced, cost-effective fabrication technique from CORMETECH, namely a porous monolith substrate directly impregnated with the amine, an approach contrasting to the traditional wash-coating methods used for activating monoliths. The l-PPI monolithic contractor is targeted for use in DAC systems such as the Global Thermostat DAC process, which involves the cyclic operation of ambient air flow over a monolithic amine contactor followed by steam-mediated thermal desorption and CO 2 collection, maximizing volumetric productivity while reducing the auxiliary power required to capture CO 2 from air. The Global Thermostat DAC process currently utilizes poly(ethyleneimine) (PEI) materials as baseline sorbents, which are subject to oxidative degradation and slow capacity fade at the elevated temperature required for efficient CO 2 removal. Georgia Tech, with Global Thermostat, had discovered in lab-scale efforts that l-PPI had superior resistance to oxidative degradation compared to PEI, with similar CO 2 adsorption capacity. While the novel l-PPI sorbent offers significant advantages over PEI for DAC, including potential design simplification and increased process efficiency, it is not commercially available, and prior to this project, had not yet been evaluated on the bench-scale in a structured contactor.

36 MATERIALS SCIENCE↗

Pilot-Scale Testing of an Integrated Circuit for the Extraction of Rare Earth Minerals and Elements from Coal and Coal Byproducts Using Advanced Separation Technologies

The primary objective of this project was to develop and demonstrate an integrated pilot-scale circuitry for recovering high-value rare earth elements (REEs) from coal and coal byproducts. The target performance was to produce a mixed REE product with content of at least two percent by weight on a dry mass basis in a cost-effective and environmentally benign manner. During the first nine months of the project period (Phase 2 Budget Period 2), pilot plant construction was completed including all field site startup activities such as permitting, engineering design, procurement/bidding, unit fabrication, site construction, equipment installation, module assembly, safety training, and circuit shakedown. During the remaining 21 months of project period (Phase 2 Budget Period 3), detailed field-testing activities were performed including feedstock sample collection and preparation, exploratory testing, circuit modification, detailed parametric study, and performance optimization. A detailed techno-economic analysis was performed based on the pilot plant testing findings which provided various scenarios for REE production. The project successfully accomplished the proposed target performance by producing mixed rare earth oxide (REO) with greater than 90% purity by weight in a continuous pilot scale operation from two distinctly different coarse refuse materials (i.e., West Kentucky No. 13 and Fire Clay coal seams), and at least three secondary sources (i.e., heap leach process and naturally formed acid mine drainage system). Project partners included the University of Kentucky, Virginia Tech, West Virginia University, Alliance Coal, Blackhawk Mining, Mineral Refining Company, and Mineral Separation Technologies. The pilot scale test facility was constructed at a former mining complex owned by Alliance Natural Resource Partners (Alliance Coal). The site was rehabilitated to accommodate the equipment installation, construction and fabrication, electrical power requirement, water line management and containment. The process units constructed and installed included X-ray sorting unit, crushing and grinding unit, physical separation unit, acid leaching unit, solvent extraction unit, and wastewater management unit. A rare earth mineral concentration unit was constructed as a standalone unit for flexible operation. A detailed environmental assessment and control plan was carried out to identify and quantify any potential impacts of the pilot-scale processing circuitry on the human and eco-system health and well-being. Corresponding mitigation strategies and control measures were provided. A conceptual flowsheet was developed to effectively remove thorium and uranium from high purity rare earth oxide mix or any potential radionuclide enriched stream. The two distinct feedstock materials were secured from the Blackhawk Mining Complex in eastern Kentucky where the Fire Clay (Hazard No. 4) seam is processed. The West Kentucky No. 13 (Baker) coarse refuse material was collected from an active process stream at an Alliance coal preparation plant located in western Kentucky. Characterization analysis indicated that both of feed materials generated from the two sources contained >300 ppm of TREEs on a dry whole mass basis which met the requirements for a qualified feed stock. The two feedstocks were further upgraded using a dual x-ray sorter to prepare the feed material for hydrometallurgical circuit. Thermal treatment on feed material prior to leaching was found to: 1) improve the leaching recovery of REEs, 2) increase the leaching kinetics, and 3) allow the leaching reaction to occur at lower acidity. Roasting at 600°C was selected as the pre-treatment condition for both West Kentucky No. 13 and Fire Clay coarse refuse material. Over 40% of leaching recovery was achieved by roasting West Kentucky No. 13 material having a top particle size of 3 mm in the pilot scale operation using 1.2M sulfuric acid leaching at 75OC. Initial pilot scale testing involved continuous operation of the pilot plant for 94 hours. The leaching unit was operated at solid-to-liquid ratio of 1 to 10 (w/v) using 0.5M sulfuric acid solution at a temperature of 75°C. The continuous solvent extraction circuit utilized rougher and cleaner units with DEHPA and TBP as the extractants. An innovative stripping circuit was developed to accumulate the REE concentration in the stripping solution to a level above 600 ppm. A bleed stream from the recycled strip solution was treated using oxalic acid precipitation which produced a high grade rare earth oxalate. The oxalate product was roasted to remove the oxalate which produced a rare earth oxide product having a purity greater 90%. Due to high concentrations of contaminant ions in the pregnant leach solution (PLS), a modified flowsheet was developed that involved pre-concentration of the REEs using multiple stages of precipitation and redissolution. The advantage of this process was improved removal of contamination before the downstream purification process and a significant cost reduction relative to the circuit that utilized the solvent extraction process. The modified circuitry included processes involving leaching, multistage precipitation, redissolution, and oxalate precipitation followed by roasting of the oxalate product. The circuit produced a mixed REO that was 92.96% pure from the initial test. A detailed parametric test plan was carried out which involved varying key parameters including solids feed rate, acid flowrate, acid concentration, multistage precipitation pH, redissolution pH, oxalate precipitation dosage and pH. The response variables included REE recovery, contaminant recovery, REO product grade and overall chemical consumption. Test results indicated that the acid-to-solid ratio is the key parameter to leaching efficiency as performance deteriorated with an increase in solids concentration. The optimal pH determined for REE precipitation and redissolution was 6.5 and 2.5, respectively. Additional tests were conducted to further improve the flowsheet. Recirculating a portion of the PLS to the feed of the leach tanks improved the leaching performance by lowering the pH of the leaching system and reducing the contamination recovery by shortening the residence time. Moreover, the removal of Al prior to REE precipitation significantly reduced the oxalic acid consumption in the oxalate precipitation circuit. The modified circuit produced over 90% grade REO by weight from both West Kentucky No. 13 and Fire Clay coarse refuse material in pilot scale continuous test programs. A case analysis model was developed to project the REE and major contaminants concentration in each PLS stream based on the leaching condition, pH cut point, and oxalic acid dosage. A correlation was established using empirical and semi-empirical models. Using the models, chemical consumption required for each stage was predicted based on the projected performance of the hydrometallurgy circuit. After identifying the optimum conditions, validation tests were carried out for the treatment of both West Kentucky No. 13 and Fire Clay coarse refuse materials in the pilot plant. The actual circuit performance and chemical consumptions were very close to the model predictions. Other than the two coarse refuse sources, several secondary feedstocks were also tested in the pilot plant facility. A “heap leach” system was constructed using the coarse refuse material generated from cleaning the West Kentucky No. 13 seam coal. Using the two stage SX rougher and cleaner circuit, a concentrate with a grade >90% REO was produced while recovering >97% of the REEs from the heap leach PLS. Naturally generated acid mine drainage (AMD) from West Kentucky No.13 mine was processed using the multistage precipitation circuit in the pilot plant in a test conducted for a period of 32 hours. The final grade of the mix RE oxide produced from the AMD was 90.84% with an overall circuit recovery of 64%. The primary source of REE was the selective precipitation steps involving iron and aluminum rejection. The hydrophobic-hydrophilic separation (HHS) process was proven to effectively recover coal from fine waste materials. For REM recovery, the HHS process was able to produce concentrates at grades of approximately 1.8% REE on an ash basis; however, recovery values were typically low, <10%, under the optimal conditions determined in the laboratory-scale testing. Staged testing of the pilot-scale HHS process for coal recovery and semi-continuous laboratory testing for REM testing showed that a total concentration ratio of more than 15x was observed for the REM recovery process. A circuit simulation package was developed for REE extraction and purification using a spreadsheet-based platform (Microsoft Excel). The REESim circuit simulation package is configured to track the mass and volume flows of components passing through a series of unit operations specified and configured by the user. The mass rates can then be utilized by the user to determine important performance indicators such as product mass yields, concentrate purity levels, element-by-element recoveries, and so forth. The techno-economic analysis showed that the roasting and leaching operations were the most expensive capital items, each contributing approximately 30% to the total capital cost. One notable contributor to the high production costs was the low REE recovery observed in the pilot scale trials. The product basket price was shown to have a strong influence on the economic viability of the scenarios, with the scandium price being the most significant influencer. Operating cost was shown to be extremely sensitive to REE recovery, REE feed grade, and leaching acid consumption. An analysis of ten different scenarios for a 500 t/h commercial operation revealed that three were economically favorable, producing internal rates of return varying from 27.7% to 33.1% and payback periods of 4 to 5 years. The project successfully developed and demonstrated a process to recover REEs from coal and coal byproducts in a pilot-plant operation which consistently produced over 90% grade REO mix from varies types of feedstocks. Commercialization analysis showed that the technology readiness level successfully achieved TRL 6 at the end of the project and demonstrated the need and the potential for scaling the process to further advance the technologies toward the goal of providing a domestic supply of REEs at a commercial scale.

01 COAL, LIGNITE, AND PEAT↗

Design of a Meso-Scale Test of a Fracture Thermal Energy Storage (FTES) System

This paper will present the characterization, scaling, and design of an intermediate-scale field test of a fracture thermal energy storage system (FTES). Seasonal storage of thermal energy has the potential to both significantly reduce the total energy requirements for heating and cooling of buildings, but also allow for the flexibility to store thermal energy from intermittent sources. With approximately half of global energy consumption currently being used for heating and cooling, this represents an important path to reducing greenhouse gas (GHG) emissions. The concept of FTES is to drill two or more wells into a low permeability formation, generally at a depth of less than a few hundred meters, and then generate hydraulic fractures to create flow paths for water to circulate between the wells. Hot or cold thermal energy can then be stored in the surrounding rock mass by circulating hot or cold water through the fractures, which will heat or cool the rock mass. To recover the stored energy, ambient temperature water can be then circulated through the fractures, which will then be heated or cooled by the rock mass. Fractures inherently have a very large ratio of surface area to volume. This allows for very high heat fluxes to and from the rock mass to be achieved despite the relatively low thermal conductivity of most geologic formations. Because large fractures can be made with low-cost equipment and with only inexpensive and environmentally safe materials such as water and sand, the cost to construct even large FTES systems is expected to be quite low. This paper will present what the performance requirements, size, and operating conditions of a full-scale system to operate a commercial building. The paper will describe how these full-scale system characteristics will be used as a design basis for an intermediate-scale FTES test to be conducted at the Sanford Underground Research Facility (SURF) in Lead, SD.

Burghardt, Jeffrey A.↗

Intermediate Scale Test Platform Conceptual Design and Hybrid Resin Performance Evaluation Recommendations

Recent laboratory evaluations demonstrated that further testing of alternative hybrid resins is warranted for their potential use as part of the 200 West Area (200W) pump-and-treat (P&T) remedy. 200W P&T has been treating technetium (Tc) since 2012 and uranium (U) since 2015 via two separate ion exchange (IX) treatment units: a single treatment train (i.e., a three-vessel system) for the removal of uranium utilizing a gel strong base anion (SBA) exchange resin, Dowex 21K; and two parallel treatment trains for the removal technetium using a gel SBA resin, Purolite® A532E. While these resins have been removing these contaminants effectively, new hybrid resins can provide additional benefits of further optimizing the IX treatment unit capacities and addressing additional treatment needs (e.g., Cr(VI)) by removing multiple contaminants simultaneously and/or through specific design configurations. Some of these resins also demonstrated some level of removal for I-129 which would be significant for expansion of the P&T into the 200 East Area. This document provides design recommendations for an intermediate scale test platform (ISTP) to evaluate alternative hybrid IX resin performance under conditions approaching field scale and using 200W P&T process groundwater. Results from the ISTP will provide the technical basis required to inform alternative IX resin selection in future 200W P&T facility operations where the treatment of multiple contaminants of concern may be required.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development and Bench-Scale Testing of a Novel Biphasic Solvent-Enabled Absorption Process for Post-Combustion Carbon Capture (Final Technical Report)

A new class of biphasic solvents was developed, and the concept of the enabled carbon dioxide (CO 2 ) absorption process was tested for post-combustion carbon capture in our previous lab-scale research. The primary goals of this project were to advance the development of the novel biphasic CO 2 absorption process (BiCAP) and validate its technical advantages by testing the integrated technology at a 40 kWe bench-scale with actual coal-derived flue gas in a power plant environment. The project was led by the University of Illinois at Urban-Champaign (UIUC), and Trimeric Corporation served as a sub-awardee providing support in basic design and techno-economic studies. To achieve the project goals and objectives, solvent management studies, process modeling and optimization, bench-scale equipment design, construction and testing, and technical, economic and environmental assessments have been conducted. The two top-performing biphasic solvents developed in our previous research were used in this project. Biphasic solvent emissions and control were investigated in the laboratory. The emissions of the biphasic solvents from the absorber were comparable to or lower than the reference 30 wt% monoethanolamine (MEA) solution, while they could be more effectively removed in the water wash column. Lab-scale testing of solvent degradation reclamation has revealed that vacuum distillation was feasible for biphasic solvent reclamation. Aspen Plus models were used to optimize the BiCAP, and a CO 2 stripping configuration introducing a secondary cold solvent feed to the stripper was identified to be the most energy efficient. A 40 kWe bench-scale, integrated BiCAP system was successfully designed, fabricated, and installed at the UIUC’s Abbott Power Plant. Parametric testing with synthetic flue gas has demonstrated that the two biphasic solvents required a more than 40% lower heat duty for CO 2 desorption as compared to the reference MEA tested on the same bench-scale skid. Slipstream testing with actual coal flue gas for a total of 31 days in two test campaigns has further demonstrated stable operation of the bench-scale skid. During the first campaign targeting 90% CO 2 removal, the heat duty averaged at 2,183 MJ/tonne of CO 2 captured and during the second campaign targeting 95% removal, the heat duty averaged at 2,450 MJ/tonne of CO 2 captured. A techno-economic analysis has revealed that for integration of the BiCAP into a 650-MWe pulverized coal-fired power plant, the parasitic power loss was reduced by ~20%, and the cost of CO 2 capture was reduced by ~21% ($36.3/tonne on a December 2018 dollar basis) compared to the U.S. Department of Energy (DOE)’s baseline Case B12B. As progression from this bench-scale development effort, a new project “Engineering-Scale Testing of the Biphasic Solvent Based CO 2 Absorption Capture Technology at a Covanta Waste-to-Energy Facility” was awarded by the DOE, launched in February 2023, to allow the team to further test the technology and demonstrate its technical and economic advantages at a pilot scale.

20 FOSSIL-FUELED POWER PLANTS↗

Demo-scale testing of a hybrid membrane-sorbent system for post-combustion CO2 capture

TDA Research is developing a novel hybrid membrane-sorbent system for the post-combustion capture of carbon dioxide (CO 2 ) from supercritical pulverized coal (PC) power generation facilities or large point industrial emitters. Here, the novel design incorporates a 1st-stage continuous membrane separator developed by Membrane Technology and Research, Inc. (MTR) with a dual-bed radial-flow sorbent contactor (designed and developed at TDA). Testing of a pilot unit at 1 MWe scale has been conducted at the site for emerging technologies at the Technology Centre Mongstad (TCM) in Mongstad, Norway using residue fluid catalytic cracker (RFCC) flue gas from Equinor’s Mongstad refinery.

20 FOSSIL-FUELED POWER PLANTS↗

Continental Scale Hydrostratigraphy: Basin‐Scale Testing of Alternative Data‐Driven Approaches

Abstract Integrated hydrological modeling is an effective method for understanding interactions between parts of the hydrologic cycle, quantifying water resources, and furthering knowledge of hydrologic processes. However, these models are dependent on robust and accurate datasets that physically represent spatial characteristics as model inputs. This study evaluates multiple data‐driven approaches for estimating hydraulic conductivity and subsurface properties at the continental‐scale, constructed from existing subsurface dataset components. Each subsurface configuration represents upper (unconfined) hydrogeology, lower (confined) hydrogeology, and the presence of a vertical flow barrier. Configurations are tested in two large‐scale U.S. watersheds using an integrated model. Model results are compared to observed streamflow and steady state water table depth (WTD). We provide model results for a range of configurations and show that both WTD and surface water partitioning are important indicators of performance. We also show that geology data source, total subsurface depth, anisotropy, and inclusion of a vertical flow barrier are the most important considerations for subsurface configurations. While a range of configurations proved viable, we provide a recommended Selected National Configuration 1 km resolution subsurface dataset for use in distributed large‐and continental‐scale hydrologic modeling.

54 ENVIRONMENTAL SCIENCES↗

Bench Scale Testing of Next Generation Hollow Fiber Membrane Modules

This project seeks to develop a next generation membrane material (PI-2) for application in Air Liquide’s (AL) hybrid process. Combining the cold membrane operation with an integrated CO 2 Compression and Purification Unit (CPU) significantly reduces the overall cost of CO 2 capture. The proposed work will accelerate the membrane bundle fabrication, scale-up and performance validation of this new material. The proposed novel membrane development, combined with the results of the previous Cold Membrane Project, will provide the best opportunity for AL to meet the long term development targets of the DOE with respect to timing, cost, and performance for CO 2 capture. Our previous field test program (DE-FE0013163) showed promising results for the hybrid process utilizing the existing commercial AL membrane bundles (PI-1 material). The project work has also shown the potential for significant improvements through initial laboratory tests with the novel material (PI-2). The initial PI-2 results show a step-change in membrane permeance. This will enable further reduction in the cost of CO 2 capture by reducing the number of membrane modules and associated equipment in the system. In order to capture this value, however, the new material needs to be validated by field testing of large bundles, representative of commercial production. Lastly, a comprehensive evaluation of novel hybrid processes and costs needs to be completed to ensure optimal use of this improved material performance. The current project seeks to develop this next generation membrane to TRL 5 (approximately 600 - 1,000 Nm3/h flue gas, 350 - 600 scfm, 0.2 - 0.3 MWe equivalent). Air Liquide manufacturing methodology will be applied to fabricate prototype (4”) membrane modules from PI-2 material. Once the manufacturing methods prove reliable with the new material, and performance is demonstrated in line with expectation, 6” commercial scale bundles will be fabricated. Recognizing that a low cost membrane solution by itself may not meet DOE’s LCOE target for CO 2 capture, we will also perform simulation studies of novel hybrid processes in combination with the next generation membrane technology. This approach has the best potential for exceeding the DOE targets. The best evaluation of the new commercial units will be performance testing under real flue gas at the NCCC. Finally, a rigorous TEA, which incorporates the novel process studies and field performance, will be completed.

36 MATERIALS SCIENCE↗

Field-Scale Testing of a High-Efficiency Membrane Reactor (MR)—Adsorptive Reactor (AR) Process for H2 Generation and Pre-Combustion CO2 Capture

The study objective was to field-validate the technical feasibility of a membrane- and adsorption-enhanced water gas shift reaction process employing a carbon molecular sieve membrane (CMSM)-based membrane reactor (MR) followed by an adsorptive reactor (AR) for pre-combustion CO2 capture. The project was carried out in two different phases. In Phase I, the field-scale experimental MR-AR system was designed and constructed, the membranes, and adsorbents were prepared, and the unit was tested with simulated syngas to validate functionality. In Phase II, the unit was installed at the test site, field-tested using real syngas, and a technoeconomic analysis (TEA) of the technology was completed. All project milestones were met. Specifically, (i) high-performance CMSMs were prepared meeting the target H2 permeance (>1 m3/(m2.hbar) and H2/CO selectivity of >80 at temperatures of up to 300 °C and pressures of up to 25 bar with a <10% performance decline over the testing period; (ii) pelletized adsorbents were prepared for use in relevant conditions (250 °C < T < 450 °C, pressures up to 25 bar) with a working capacity of >2.5 wt.% and an attrition rate of <0.2; (iii) TEA showed that the MR-AR technology met the CO2 capture goals of 95% CO2 purity at a cost of electricity (COE) 30% less than baseline approaches.

42 ENGINEERING↗

Field Scale Testing of the Thermocatalytic Ethylene Production Process Using Ethane and Actual Coal Fired Flue Gas Co 2

This report provides a summary of the work performed and results obtained from a project supported by the US DOE (DE-FE0031713). In this study, Southern Research (SR) completed field-scale demonstration of a rationally designed novel nano-engineered catalyst driven thermochemical process to produce high yield of ethylene by using CO 2 derived from actual coal-fired flue gas and ethane. This process, referred to here as “CO 2 -ODH” due to CO 2 use via oxidative dehydrogenation (ODH) mechanism, follows a modified pathway to classical steam cracking (SC) process of ethylene production thus paving the way for significantly reduced CO 2 footprint, marginally improved thermodynamics, higher product selectivity and lower reaction temperatures.

01 COAL, LIGNITE, AND PEAT↗

Findings from Large Bench-Scale Testing of Denitration Electrolyzers for the EDCGe Project

This report highlights the key findings and outcomes relevant to the processability of waste supernatant at Hanford using a denitration electrolyzer. The Electrosynthesis Company issued a Phase 1 report to the Savannah River National Laboratory (SRNL), summarizing the evaluation of large bench-scale denitration electrolyzers to support the electrochemical denitration and caustic generation (EDCGe) project. The Electrosynthesis Company’s report (attached as Appendix A) provides insights into the initial steps required to implement an electrolyzer system at Hanford. Phase 1 experiments focused on validating the denitration electrolyzer’s performance, operating parameters, and reaction products. The robustness of the electrochemical denitration process was demonstrated by two electrolyzer flow cell systems (a 100 cm 2 ElectroCell MP and a 150 cm 2 NESI NS01 cell), both of which achieved significant nitrate and nitrite removal (>50%) with a current efficiency of ~95% for both systems. Higher current densities (500 mA cm –2 ) improved nitrate and nitrite removal rates compared to lower current densities (333 mA cm –2 ), while maintaining a current efficiency of ~94%. The NS01 cell achieved a nitrate species removal rate of ~0.41 mol h –1 at 5 kA m –2 (equiv. to 500 mA cm –2 ). The primary reaction product was ammonia (NH 3 ), constituting 78.3–91.6% of the products (excluding OH – formation). NH 3 was predominantly retained in the catholyte liquid phase rather than being off-gassed. Additionally, the NS01 cell reported an NH 3 generation rate of ~0.36 mol h –1 at 5 kA m –2 . Other gas formation included ~7% N 2 , ~7% H 2 , and trace amounts of N 2 O. The estimated power requirement (extrapolated from the 0.015 m 2 cell data) for a full-scale denitration electrolyzer is approximated to be ~1.6 MW (DC-only) to treat 50% of nitrate and nitrite in a waste stream and generates ~2.1 kmol h –1 of NH 3 with an initial concentration of 4 M NO 3 – /NO 2 – at 300 gal h –1 . Simulated waste containing aluminate, carbonate, oxalate, and halogens exhibited no adverse effects on denitration performance. A preliminary experiment comparing alkaline anolyte (5 M NaOH) with a nickel based anode to acidic media (2 M H 2 SO 4 ) with a DSA-O 2 anode showed a lower operating voltage and generated less H 2 than the acid media. Maintaining a stable 5 M OH – concentration in the anolyte through periodic additions of caustic did not significantly impact denitration performance. This operational mode will be required for long-term experiments. All the experiments demonstrated that electrochemical denitration is a promising approach for treating nitrate and nitrite in simulated waste streams, achieving significant conversion and robustness across varying experimental conditions and electrochemical cell configurations. Lastly, the ability to generate a nearly pure NH 3 stream may prove advantageous for processing at other locations within the Hanford site.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Bubble Mass Transport Measurement in the Large-Scale Test Loops at Oak Ridge National Laboratory

Molten salts are complex fluids that incorporate multi-phase behavior depending on the chemistry and the physical properties of the entrained components. These components include the carrier salt, the actinide fuel, and fission, activation, and corrosion products, the concentrations of which depends on the burnup history of the salt. Radionuclide transport from the salt into the cover gas / off-gas system depends on volatility as predicted by thermochemistry, but data from the Molten Salt Reactor Experiment (MSRE) conducted in the late 1960s suggest that bubble formation and transport are also important. Anomalously high fractions of noble metals were found in the off-gas system and were attributed to transportation with parent salt aerosols and their association with rising noble gas bubbles. The prediction of such phenomena requires coupled neutronic, thermal hydraulic, and chemical equilibrium calculations, the framework of which is being developed within the Nuclear Energy Advanced Modeling and Simulation (NEAMS) program supported by the US Department of Energy (DOE) Office of Nuclear Energy (NE). However, separate effects tests and models of experiments using tools such as SAM and Thermochimica can guide model developers through important processes. Conversely, model development guides the choice of experiments and systems to provide data that are relevant for validation. This report describes several experiments that tracked gas transport in molten salts, ranging from small-scale systems to large-scale loops. Gas transportation in a molten salt, LiCl-KCl, has been studied using the shadowgraph technique. Sensors such as residual gas analysis, Raman spectroscopy, and laser-induced breakdown spectroscopy have been tested for off-gas measurements. These data were used to interpret how the gases move through the upstream salt / cover gas and the interface between them. Differential pressure measurements were able to detect individual gas bubbles as they popped at the liquid–gas interface. Salt aerosols were collected on a cascade impactor. Their formation was also observed directly via the shadowgraph method, and most of these aerosols were launched ballistically into the cover gas. Fine mists could also be observed. Convection currents through the salt were visualized and can be used to calculate the thermophysical properties of the salt itself. The apparatuses described in this report and in a previous work (McFarlane et al. 2023) have been commissioned and are available for use in making further measurements of salt/surrogate fission product behavior. Novel approaches using neutron imaging are planned for the study of fluoride salts, which cannot be contained in quartz, so shadowgraph visualization is not available. Bubble transport in convective flow and in a slow-moving salt column are planned. The mobile laser-induced breakdown spectroscopy (LIBS) system is available for several applications, including iodine capture in a molten hydroxide scrubber, H2 transport though molten salts to complement Raman analysis, and online tracking of salt aerosol generation, transport, and deposition. This report summarizes the findings from FY24 and the plans for FY25. The work completes milestone M2AT-24OR0702013 of the DOE-NE Advanced Reactor Technology, Molten Salt Reactor Campaign, DOE-NE-5.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗