Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “risk”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Computational Tools and Workflows for Quantitative Risk Assessment and Decision Support for Geologic Carbon Storage Sites: Progress and Insights from the U.S. DOE’s National Risk Assessment Partnership

The 2005 Intergovernmental Panel on Climate Change (IPCC) Special Report on CCS raised the profile of CO2 capture and storage (CCS) as an important technology for reducing greenhouse gas (GHG) emissions. CCS is now recognized as a key component of most climate change mitigation scenarios. Since publication of that report the international research, development, and deployment (RD&D) community has advanced key technical aspects, clarified regulatory requirements, explored value chain and infrastructure solutions, and developed incentive paradigms to enable and promote large-scale deployment of CCS. These efforts have included research to better characterize geologic storage resources, to improve injection performance and storage efficiency, to assess and manage subsurface environmental risks, and to advance monitoring technologies to assure system conformance. These efforts have helped to build confidence in the viability of geologic carbon storage (GCS), but stakeholder concerns about long-term risks and liability associated with GCS remain a hurdle to broad acceptance and large-scale deployment of CCS. Since 2010, the U.S. DOE’s National Risk Assessment Partnership (NRAP) – a research collaboration between five contributing national laboratories – has worked to establish and demonstrate methods and tools to quantify and manage the subsurface environmental risks associated with GCS, amidst uncertainty. This work supports the Office of Fossil Energy and Carbon Management Carbon Transport and Storage Program’s goal of advancing safe and secure commercial-scale GCS deployment. To address the technical challenge of simulating the physical response of the GCS site to large-scale CO2 injection, NRAP has adopted an approach that relies on coupling computationally efficient reduced-order and/or data-driven proxy models of important system components (i.e., storage reservoir, sealing caprock, leakage pathways, intermediate formations, overlying groundwater aquifers, and the atmosphere) in integrated assessment framework. That integrated model of the physical system is complemented with fit-for purpose functionality to support site characterization and risk-related decisions. The recently released NRAP Phase II toolset includes the Open-Source Integrated Assessment Model (NRAP-Open-IAM) for evaluation of trends in leakage risk and potential impact, tools to support monitoring design optimization (Designs for Risk Evaluation and Management – DREAM v3.0 and Passive Seismic Monitoring Tool - PSMT), and tools for state of stress evaluation (State-of-Stress Analysis Tool - SOSAT) and forecasting induced seismicity risk. The NRAP team has also released a pair of reports describing conceptual workflows to incorporate physics-based, quantitative risk assessment into many of the design, planning, operation, and closure decisions for GCS projects. An online catalogue highlights published studies where these tools and methods are demonstrated. In this presentation, the utility of these products to assess risks and address key stakeholder questions will be highlighted through examples, and related insights about the safety and security of geologic carbon storage in qualified storage sites will be discussed. The prospect of rapid, large-scale deployment of GCS technology to aggressively reduce anthropogenic CO2 emissions requires careful consideration of interference between multiple commercial-scale storage projects within a basin. Going forward, NRAP is expanding and adapting site-scale risk quantification tools and methods to enable assessment of risks and inform management decisions for basin-scale deployment. Increasingly, this work will leverage next-generation approaches for surrogate modelling, fast prediction, and advanced visualization enabled by machine learning and artificial intelligence to promote virtual learning, scenario evaluation, and augment risk-based decision making.

quantitative risk assessment, geologic carbon stor↗

Risk Analysis for Remote Operation of Microreactors

Microreactors are a subset of advanced nuclear reactors that can be factory fabricated, transportable, and self-regulating. They have the potential to be used in microgrids, rural and remote areas, or emergency response applications, replacing fossil fuel sources like diesel generators and enabling sustainable energy generation. In order to make microreactor operation cost-effective, it is likely that remote communications will be needed to reduce the number of personnel required to be on site. While remote operation of energy generation and other industrial control systems is common in other industries, it is not yet adopted in the nuclear community and has many perceived and actual risks. In this paper, the severity of the risks introduced by remote operations for microreactors are explored. The primary changes in the operations involve the addition of a remote communications network and a certification system for data and controls. These changes lend themselves to considerations of cyber risks, whether unintentional or adversarial, but the assessment considers not just cyber risks introduced, but also how physical and human factors-based risks will impact the remote operations system and change the overall risk profile. This initial assessment indicates that there are standard cyber and mitigation measures that can be put in place so the risk of doing remote operations does not dramatically increase compared to local operations. This evaluation is a critical step in the process of evaluating if remote operations of microreactors is a suitable solution to meet future sustainable grid needs

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

An Improved Risk Priority Measure for the Management of Project Risk

Monte Carlo-based project risk models are essential tools in project risk management, particularly for large, complex projects in which it is difficult to glean intuitively the importance of individual risks to the overall project. Conventional correlation-based methods for measuring the importance of contributing risks in such models are argued here to be both statistically flawed and unintuitive in the importance metrics they produce. Drawing on and adapting methods more traditionally associated with engineering risk models, Risk Reduction Worth (RRW) is introduced as an importance measure. RRW is shown to be statistically robust and provide an easily interpretable, quantitative measure of the importance of a risk to the overall performance of a project; specifically, measuring the extent to which removal of a risk would improve confidence in project outcomes. To ensure practicality of the method, an approach is described in which RRWs can be produced for all contributing risks based on a single Monte Carlo sample. This is demonstrated through application to a large, complex project risk model from which intuitive risk importance insights provide a robust, transparent basis for the allocation of risk management resources.

Risk↗

Risk Ratio and Risk Difference Estimation in Case-cohort Studies

Background: In case-cohort studies with binary outcomes, ordinary logistic regression analyses have been widely used because of their computational simplicity. However, the resultant odds ratio estimates cannot be interpreted as relative risk measures unless the event rate is low. The risk ratio and risk difference are more favorable outcome measures that are directly interpreted as effect measures without the rare disease assumption. Methods: We provide pseudo-Poisson and pseudo-normal linear regression methods for estimating risk ratios and risk differences in analyses of case-cohort studies. These multivariate regression models are fitted by weighting the inverses of sampling probabilities. Also, the precisions of the risk ratio and risk difference estimators can be improved using auxiliary variable information, specifically by adapting the calibrated or estimated weights, which are readily measured on all samples from the whole cohort. Finally, we provide computational code in R (R Foundation for Statistical Computing, Vienna, Austria) that can easily perform these methods. Results: Through numerical analyses of artificially simulated data and the National Wilms Tumor Study data, accurate risk ratio and risk difference estimates were obtained using the pseudo-Poisson and pseudo-normal linear regression methods. Also, using the auxiliary variable information from the whole cohort, precisions of these estimators were markedly improved. Conclusion: The ordinary logistic regression analyses may provide uninterpretable effect measure estimates, and the risk ratio and risk difference estimation methods are effective alternative approaches for case-cohort studies. These methods are especially recommended under situations in which the event rate is not low.

60 APPLIED LIFE SCIENCES↗

Task 12 PV Sustainability - Human Health Risk Assessment Methods for PV, Part 3: Module Disposal Risks

End-of-life management is important for addressing large future photovoltaic (PV) waste volumes and conserving raw materials for use in new PV modules. In regions without regulatory mandates for PV recycling, end-of-life PV modules can be disposed in accordance with general waste laws. Given the use of various metals as raw materials in semiconductor compounds and electrical contacts in commercial PV modules, some stakeholders have raised concerns regarding potential environmental impacts if PV modules are subject to improper disposal instead of being recycled or disposed in sanitary landfills, as is required in most world regions. To evaluate these concerns, screening-level risk assessment methods are developed herein that evaluate potential human health risks from groundwater and surface (air, soil, surface water) exposure pathways. The methods estimate potential impacts from disposal of end-of-life (EOL) PV modules in non-sanitary landfills under the following worst-case conditions: no leachate collection or groundwater monitoring, no liner for preventing leachate migration, uncovered waste, and lack of stormwater management. Examining worst-case conditions allows the exploration of maximum potential risk to attempt to ensure disposal does not increase health risk above regulatory thresholds. Specifically, this report presents an analysis of potential human health risks associated with non-sanitary landfill disposal for three PV technologies, focusing on release of the highest-prioritized chemical element for each: lead (Pb) in crystalline-silicon (c-Si) PV modules, cadmium (Cd) in thin film cadmium telluride (CdTe) PV modules, and selenium (Se) in thin film copper indium selenide (CIS) PV modules. The prioritization of these chemical elements for analysis is based on stakeholder interest. Because the methodology is chemical-specific, the risk assessment results for these chemicals cannot be directly generalized to other chemicals, although the risk assessment methodology can be applied to other chemicals. If the chemicals chosen are indeed the ones presenting greatest risk, then the results herein should represent the upper bound of health risk from exposure to a single constituent.

14 SOLAR ENERGY↗

Validation of a Proteomic Signature of Lung Cancer Risk from Bronchial Specimens of Risk-Stratified Individuals

A major challenge in lung cancer prevention and cure hinges on identifying the at-risk population that ultimately develops lung cancer. Previously, we reported proteomic alterations in the cytologically normal bronchial epithelial cells collected from the bronchial brushings of individuals at risk for lung cancer. The purpose of this study is to validate, in an independent cohort, a selected list of 55 candidate proteins associated with risk for lung cancer with sensitive targeted proteomics using selected reaction monitoring (SRM). Bronchial brushings collected from individuals at low and high risk for developing lung cancer as well as patients with lung cancer, from both a subset of the original cohort (batch 1: n = 10 per group) and an independent cohort of 149 individuals (batch 2: low risk (n = 32), high risk (n = 34), and lung cancer (n = 83)), were analyzed using multiplexed SRM assays. ALDH3A1 and AKR1B10 were found to be consistently overexpressed in the high-risk group in both batch 1 and batch 2 brushing specimens as well as in the biopsies of batch 1. Validation of highly discriminatory proteins and metabolic enzymes by SRM in a larger independent cohort supported their use to identify patients at high risk for developing lung cancer.

60 APPLIED LIFE SCIENCES↗

The dynamic nature of risk in DOE facilities in the surveillance and maintenance program–with observations for risk communications

Here, we explore three case studies of facilities at two US Department of Energy (DOE) former nuclear weapons research and production sites—the Oak Ridge National Laboratory and the Hanford site—whose risk profiles have changed during their long-term management under the DOE's surveillance and maintenance (S&M) program. These case studies provide examples of the challenges faced in communicating to external stakeholders, such as federal and state regulators, local communities surrounding the site, as well as the general public, the circumstances surrounding unexpected events or the emergence/discovery of new risk-important information at historically high-risk sites. We identify common topics of importance from these case studies and suggest a taxonomy for risk communicators to use in informing the dialogues with individuals and organizations that may not be technically oriented or fully informed on the subject matter. The taxonomy is based on technical insights from the quintessential definition of risk known as the Kaplan–Garrick “risk triplet” as well as insights from regulatory guidance documents on risk communication with external stakeholders originally developed for the commercial nuclear power industry.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Risk-Averse Bi-Level Stochastic Network Interdiction Model for Cyber-Security Risk Management

Security of cyber networks is crucial; recent severe cyber-attacks have had a devastating effect on many large organizations. The attack graph, which maps the potential attack paths of a cyber network, is a popular tool for analyzing cyber system vulnerability. In this study, we propose a bi-level stochastic network interdiction model on an attack graph to enable a risk-averse, resource constrained cyber network defender to optimally deploy security countermeasures that protect against attackers with an uncertain budget. This risk- averse conditional-value-at-risk (CVaR) model minimizes a weighted sum of the expected maximum loss over all scenarios and the expected maximum loss from the most damaging attack scenarios. We develop a customized constraint and column generation algorithm to solve our model as well as several acceleration techniques to improve the computational efficiency. Numerical experiments demonstrate that the acceleration techniques enable the solution of relatively large problems within a reasonable amount of time: applying all the acceleration techniques also reduces the average computation time of the basic algorithm by 71% for 100-node graphs. Using metrics called mean-risk value of stochastic solution and value of risk-aversion, computational results suggest that our stochastic risk-averse model significantly outperforms deterministic and risk-neutral models when 1) the distribution of attacker budget is heavy-right-tailed and 2) the defender is highly risk-averse.

Bhuiyan, Tanveer H.↗

Risk Management and Risk Aversion, from Benefit to Impediment

Risk management is a critical tool for improving the probability of project success by identifying, assessing, prioritizing, and attempting to control threats to project realization. For industries that require high operational reliability due to the potential consequences of off-normal events, such as the nuclear, aerospace, and chemical sectors, a major focus of risk management is the preservation of process safety. Due to the nature of the processes or systems under consideration, the associated process safety analyses (such as risk and safety assessments) and safety features can require significant resources. These costs are typically tolerated either due to the need to satisfy regulatory requirements or based on the assumption that they generally decrease the occurrence of unwanted events and therefore improve the probability of project success. However, as the level of acceptable or tolerable risk from unwanted events decreases, the required resources necessary for ensuring and demonstrating satisfaction of these criteria can grow and in turn can become one of the dominant impediments to project success. This paper outlines a high-level theoretical framework for the consideration of dominant project risks, which includes potential project failure from both the occurrence of high consequence off-normal events and the inability to achieve project completion due to the resource needs and innovation losses associated with extreme risk aversion. Utilizing such an integrated approach permits an attempt to optimize the probability of successful project realization while also providing valuable insight into the proper level of acceptable risk. The work is presented as a first step, in hopes of spurring additional discussion and analysis regarding appropriate levels of risk tolerance and the balance of project benefits.

Grabaskas, David↗

Dynamic probabilistic risk assessment and game theory for cyber security risk analysis in nuclear power plants

Nuclear Power Plants and energy systems have become more prone to cyber-attacks with their digitalization and the increased use of smart equipment. Hence, it is important to quantify the risk associated with cyber-attacks in such systems. Dynamic Probabilistic Risk Assessment which involves studying the evolution of a system due to random events and operator and attacker actions during a cyber-attack by employing a physics-based model of the system is a suitable framework to quantify cybersecurity risk in nuclear power plants. In addition to the plant dynamics, it is also important to model the strategies of the attackers and plant operators for an effective cybersecurity risk assessment. Game theory provides a set of necessary tools to model such strategic interactions. In this research, a framework that integrates dynamic probabilistic risk assessment with game theory for cybersecurity risk analysis in nuclear power plants is presented. The mathematical formulation is derived based on the theory of continuous event trees. We propose a game theory based action model, that utilizes physics-based rewards to define the strategies of attackers and operators at every decision epoch. As a case study, the risk associated with cyber-attacks on the digital components in the secondary side of a pressurized water reactor is studied using a reduced order model. A set of attacker actions and a set of operator actions are defined for the system. The operator and attacker interactions were modelled using simultaneous game, their action policies were computed using the concept of mixed strategy Nash equilibrium and the evolution of the system was studied.

97 MATHEMATICS AND COMPUTING↗

Should All Low-risk Patients Now Be Considered for TAVR? Operative Risk, Clinical, and Anatomic Considerations

Purpose of Review: This article reviews the current data on TAVR in low-risk patients with severe, symptomatic aortic stenosis, highlights the results of the recently published Medtronic Low Risk Randomized Study and PARTNER 3 trials, and describes specific clinical, anatomic, and procedural considerations regarding the optimal treatment choice in this population. Recent Findings: In low-risk patients, the Medtronic Low Risk Randomized Study demonstrated TAVR to be non-inferior to surgery with respect to the composite endpoint of death or disabling stroke while PARTNER 3 trial proved TAVR to be superior to surgery with regard to the composite endpoint of death, stroke, or rehospitalization. Summary: Recent trials demonstrate the safety and efficacy of TAVR in low-risk patients and have led to an FDA indication for the use of TAVR in these patients. However, the lack of long-term data on the rate of transcatheter valve deterioration in the younger population, higher incidence of paravalvular leak and pacemaker implantation following TAVR, along with certain intrinsic anatomic factors remain potential challenges to generalize TAVR in all low surgical risk patients. We describe specific clinical, anatomic, and procedural considerations regarding the optimal treatment choice for low-risk patients with severe, symptomatic AS.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Increasing extreme hourly precipitation risk for New York City after Hurricane Ida

The remnants of Hurricane Ida caused major damage and death in the United States on September 1st, 2021, and 11 people drowned in flooded basement apartments within New York City (NYC). It was catastrophic because the maximum hourly precipitation intensity, recorded as 3.47 inches (88.1 mm) per hour at Central Park, was unprecedentedly high for the NYC region. The stormwater infrastructure in NYC is built for 1.75 inches (44.5 mm) per hour, and so understanding the dynamic risk associated with Ida can inform city planning efforts for climate change’s impact on short duration extreme precipitation events. We contextualize this storm’s record-breaking hourly intensity within the historical record as well as project its risk in the near- to medium-term future using nonstationary stochastic models. These models are conditioned on average temperature (T avg ) and cooling degree day (CDD) projections from three climate models as a covariate, each with a SSP 126 and SSP 370 scenario. The likelihood of such a storm was slowly increasing even before Ida happened, but the projected aggregate reoccurrence risk of an event of Ida’s magnitude over time from the non-stationary models ranges from 4 to 52 times higher than the risk given by the stationary model. Using CDD as a covariate resulted in risks that were more than twice the magnitude than when using T avg . Presenting both covariates provides a broader envelope of uncertainty, which highlights the importance and nuances in the choice of a regionally appropriate covariate for non-stationary risk analysis.

Mossel, Carolien↗

Application and Interpretation of Acumen Risk ® Schedule and Cost Risk Analysis

Schedule risk and cost risk analyses use statistical techniques to predict a level of confidence in meeting a program’s completion date and cost. This paper describes how to interpret key Schedule Risk Analysis (SRA) and Cost Risk Analysis (CRA) results to determine the likelihood that the program completion dates are met, how much management reserve (MR) is needed to provide the acceptable certainty of completion by a specific date, and the risks and activities that are most likely to delay or add cost to a project. The combined process is often called a Schedule/Cost Uncertainty and Risk Analysis or “SCURA.”

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Risk Communications and Risk Mitigation

This topical report summarizes risk communications and risk treatment (a.k.a. mitigation) aspects of risk management workflow for the Southwest Regional Partnership on Carbon Sequestration (SWP) Phase III Demonstration Project, located near the community of Farnsworth in northernmost Texas. Detail on risk communications previously provided in an internal project report is summarized here, while detail on risk treatment is presented for the first time. A principal message is that the effective development and execution of risk treatments depends on effective communications among project staff. Farnsworth Project relied primarily on internal communications; in contrast, projects that also rely heavily on public approval will be relatively more dependent upon effective information sharing with external stakeholders. The report documents work undertaken for Tasks 7.4.2 and 7.4.3 of U.S. Department of Energy

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Technical Background and Validation Report on the Residential Water Inhalation Risk Calculator Presented in the Risk Assessment Information System

Indoor air quality (IAQ) is critical for human health. Poor IAQ is linked to respiratory issues, cardiovascular diseases, and cancer. Indoor pollutants are emitted by typical household items such as cleaning products, personal care items, building materials, and tap water - an understudied volatile organic compound (VOC) source. This document presents the Residential Water Inhalation Risk Calculator (RWIRC), which estimates daily VOC exposure concentrations from various household water uses, such as showering and dishwashing, to assess exposure risks for the most vulnerable occupant. Integrated into the Risk Assessment Information System (RAIS) and sponsored by the US Department of Energy (DOE), the calculator divides a house into three compartments: shower, bathroom, and other spaces, accounting for daily water usage patterns and calculating VOC concentrations. Exposure data generated using the calculator can assist health assessors in estimating excess lifetime cancer risk (ELCR) and hazard index (HI) from VOC inhalation. Unlike traditional exposure models that utilize Andelman’s constant, the RWIRC continuously assesses variability in VOC concentrations and environmental conditions using differential equations to track VOC concentrations and air exchange between compartments. The calculator also provides unique volatilization fractions for each chemical and appliance, enhancing accuracy of the exposure concentration estimation. The RWIRC is accessible online and allows users to customize parameters (i.e., number of bathrooms, water temperature, and exhaust fan conditions) and input VOC characteristics (i.e., tap water and ambient air concentrations). This document provides a step-by-step guide on implementing the calculator. It also provides comparisons with the ATSDR-SHOWER calculator, using eight VOCs with varying physicochemical properties to reveal differences in algorithms and output concentrations. Simulations also assess how bathroom door positions and exhaust fan usage affect VOC exposure. The calculator results can enhance EPA risk screening levels for inhalation exposure to VOCs from tap water, offering a sophisticated tool for assessing inhalation risks and improving public health protection.

54 ENVIRONMENTAL SCIENCES↗

Advanced Reactor Designs Security Analysis, Risk, and Recommendations: Risks, Consequences, and Possible by-Design Mitigation Approaches Associated with Select Advanced Reactors

Next-generation advanced reactors (ARs) incorporate enhanced safety systems, have smaller source terms, and feature compact modular designs, which should lessen their collective risk profiles. However, to fully evaluate risk, security needs to be a part of the equation. Without taking security into consideration, safety systems and components in the new ARs may be vulnerable to sabotage. These base attributes, coupled with enhanced security features specific to AR design through sound engineering and security-by-design (SeBD), should provide developers and operators with lower inherent security risk profiles. Building security early into the AR design may remove or passively secure potential critical targets from an adversary’s reach , thereby increasing overall safety and security. An integrated approach and diverse design team that includes engineering, operations, and security experts are fundamental to building security into the design without sacrificing fundamental operational efficiencies and principles. The objective of this project was to evaluate the security and safety interfaces for five classes of reactors, identify potential security vulnerabilities of structures, systems, and components (SSC), and underscore the need to consider security alongside safety in the design o f these concepts. The five reactor classes evaluated in this project and presented in this report are molten-salt reactors (MSR), high temperature gas reactors (HTGR), sodium-fast reactors (SFR), advanced light-water reactors (ALWR), and microreactors. These designs were selected because they reflect the concepts that are closest to market deployment and have received significant resource investments from the public and private sector. This project assesses the inherent security risks posed by common classes of ARs, provides a methodology and framework to assess security along with safety, and offers an analysis of potential mitigation strategies that could be incorporated. For each AR technology, the SSCs that relate to radionuclide source safety functions are discussed to understand the SSC contribution to safety and relative importance in the protective strategy for the design. The assumptions that went into evaluating each reactor concept originated from generic publicly available nonproprietary information and should not directly be used to qualify an absolute risk profile nor to rank specific AR designs. Instead, the purpose of the analysis is to understand and compare the generic inherent security risks of different AR technologies.

98 - NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL↗