Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “repowering”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Repowering: The Other Side of the Reliability Coin

Extreme weather, cracked backsheets, severe PID, poorly built modules, and installation flaws - all can compromise a solar plant's health and force repowering long before end of life. With more than 70% of U.S. PV capacity less than seven years old, the fleet is young, but its rapid expansion has introduced new materials and system designs that are still being tested under real-world conditions. As a result, reliability - not economics - is what most often drives repowering decisions. Repowering is frequently assumed to be an economically motivated choice, but our work shows that reliability concerns are the real trigger. Drawing from industry interviews, case studies, and modeling, we highlight the physical, electrical, and policy barriers owners face when deciding whether to repair, repower, or decommission. At the same time, repowering can create opportunities: renewed interconnection periods, improved energy yields, and strategic upgrades to extend system value. We present a quantitative framework using NLR's System Advisor Model (SAM) and PV in Circular Economy (PV ICE) tool to evaluate trade-offs across financial, material, and energy impacts. These findings provide practical guidance for navigating the realities of repowering today and underscore the critical role of reliability in shaping the future performance and sustainability of the PV fleet.

14 SOLAR ENERGY↗

Multifaceted drivers for onshore wind energy repowering and their implications for energy transition

Wind energy is anticipated to become a backbone of the future energy system. Ageing wind turbine fleets, increasing land-use constraints and rising relevance of societal factors make the deployment of land-based (onshore) wind energy ever more complicated. Consequently, repowering is expected to become a rapidly growing point of focus for the wind industry. Here we propose a more holistic and socially informed project-level approach to analyse repowering activity that enables a more robust understanding of the process and potentials. We demonstrate that for wind pioneer in Denmark, only 67% of the capacity removed in repowering projects was related to the physical space needed for a new turbine. Other factors that drive repowering include regulation (for example, noise-related, 8–17%), development principles (for example, aesthetics, 7–20%) and political bargaining (4–13%). The recognition of repowering as a negotiated process between host communities and wind developers will probably be critical to unlock the full potential of wind energy in the future.

17 WIND ENERGY↗

Out With the Old: Empirical Trends in U.S. Land‐Based Wind Turbine Decommissioning and Repowering

A growing number of wind turbines (WTs) across the globe are now reaching or exceeding their expected service lifetime; WT decommissioning is on the rise. Accordingly, questions pertaining to WT end-of-life have risen in importance in policy and practice. Yet, research on the various factors relating to WT decommissioning is relatively sparse. Moreover, the key assumptions underpinning that prior research (e.g., the lifespan of WTs, characteristics of WTs being decommissioned, and whether the site is repowered with new WTs) have never been empirically tested across a large set of decommissioned WTs. Leveraging a uniquely comprehensive and spatially explicit dataset of decommissioned WTs in the United States, this research analyzes spatial, technological, and temporal trends in WT decommissioning and develops a novel predictive model for WT decommissioning. Our analysis pinpoints more than 12,400 WTs that have been fully decommissioned in the United States., the majority of which have been relatively old (> 30 years) and small (< 200 kW). While a WT's age alone is a good predictor of the likelihood of decommissioning, other factors such as the size of the WT and recent performance are also important and significant predictors. Most sites where decommissioning has occurred have seen subsequent repowering, with repowered plants featuring substantially fewer WTs (−86 on average) and higher rated plant capacity (+62 MW on average). Many existing WTs in the U.S. are approaching the end of their expected life with roughly 7500 being 20 or more years old. Findings can help policymakers and stakeholders begin preparing for this potential wave of future decommissioning and repowering.

Decommissioning / End-of-life↗

Optimizing Repowering and Lifecycle Decisions with PV ICE and SAM

Should you repower or extend the life of your PV system? Are high-efficiency modules, durable modules, or recyclable modules the best option for your site and goals? Evaluating the trade-offs in design and lifecycle strategies can be complex. The PV in Circular Economy (PV ICE) tool is an open-source model designed to help developers, modelers, and decision-makers assess material flows, energy return on investment (EROI), and financial viability of PV systems. Now integrated with the System Advisor Model (SAM), PV ICE enables site-specific comparisons of lifecycle strategies - such as repowering benefits, module selection for reliability and recyclability, among others. This interactive tutorial will provide hands-on experience with PV ICE using Google Collab, exploring scenario-based analyses on these topics.

36 MATERIALS SCIENCE↗

Catalina Repower Feasibility Study: NREL Phases I & II Summary Report

Engineers at the National Renewable Energy Laboratory (NREL) supported Southern California Edison (SCE) and the United States Environmental Protection Agency (EPA) by conducting technical and economic analyses for energy systems at Santa Catalina (Catalina) Island, which is located 22 miles off the coast of Long Beach, California. This effort was part of a broader Repower Catalina Feasibility Study that was also supported by NV5, an engineering consulting firm and project partner to NREL for this analysis. This document describes NREL’s techno-economic modeling and optimization analysis for the first two phases of this project which focus on supply-side generation and energy storage options for Catalina. SCE’s goal for this analysis is to determine a strategy for electricity generation on Catalina Island that results in lower energy costs, improved energy resiliency, and reduced air emissions. EPA goals for this effort are to reduce emissions of air pollution and encourage renewable energy development on contaminated and formerly contaminated lands when such development is aligned with the community’s vision for the site. Currently, an on-island SCE power plant serves the Catalina Island electrical load with 6 reciprocating diesel generators totaling 9.4 MW; 23 propane-fueled microturbines totaling 1.5 MW; and a 1-MW, 7.2-MWh sodium sulfur battery energy storage system (BESS). In 2017, the electricity consumption on the island was 29.1 GWh, with an average load of 3.3 MW and peak load of approximately 5.5 MW. Considering new environmental standards on diesel generator emissions from California’s South Coast Air Quality Management District, a 60% renewable energy target for 2030 laid out in California’s Senate Bill 100, SCE’s Clean Power Electrification Pathway, and the characteristics of the island’s existing diesel generators, SCE is seeking to evaluate the technical and economic implications of different energy technology options to determine a path forward. Phases I and II of the Repower Catalina Feasibility Study, summarized in this document, evaluated the following: Interconnection with the mainland via an undersea cable; On-island fossil fuel generation, including diesel, propane, and/or liquified natural gas (LNG); On-island renewable energy (RE) technologies, including solar photovoltaics (PV), wind turbines, and wave energy devices; BESS to support the above generation technologies; Initial analysis of the potential impacts of implementing energy efficiency measures. Results indicate strong techno-economic potential for a mix of on-island diesel and/or propane generators, solar PV, BESS, and energy efficiency measures to help SCE and Catalina achieve their goals compliant with California’s emissions and clean energy standards while minimizing electricity life cycle costs (LCC) over the 30-year analysis period. This document summarizes the considerations and findings of Phases I and II, focusing on high-level takeaways from Phase I and more detailed results from Phase II, and discusses a potential path forward for Phase III.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Coronado Generating Station Repowering Evaluation - Siting Evaluation

The purpose of this initial siting evaluation is to consider the suitability of the Salt River Project (SRP) owned land at/near Coronado Generating Station (CGS) for a nuclear generating station (including advanced light water reactors, light water small modular reactors, and non-light-water designs1) and to assess if there are any exclusionary or avoidance factors associated with coal to nuclear repowering at CGS. This initial siting evaluation considers several characteristics (e.g., environmental conditions, seismic concerns, site footprint, water use, etc.) and highlights favorable/preferred characteristics as well as potential risks to feasibility. The results are intended to inform SRP on the strengths and weaknesses associated with the CGS site and inform the selection of candidate nuclear technologies for the CGS site that align with SRP’s mission and business objectives. This report relies on industry-recognized siting guidance, including Electric Power Research Institute’s (EPRI’s) Siting Guide (Reference 1) 2 and Nuclear Regulatory Commission’s (NRC’s) Regulatory Guide (RG) 4.7 (Reference 3), as well as nuclear domain expertise within the Gateway for Accelerated Innovation in Nuclear (GAIN), MPR Associates, Inc. (MPR), and the Idaho National Laboratory (INL).

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Repowering and Retrofitting of Solar Inverters: A Field Case Study [Slides]

A handful of large-scale photovoltaic (PV) plants have undergone retrofitting and/or repowering of inverters for a variety of reasons, such as rapid product life-cycle innovations with lack of reverse compatibility, original equipment manufacturers (OEMs) exiting the inverter business, weather damage, more lucrative revenue opportunities driven by high contractual offtake price, and so on. Insights has been collected via expert elicitation and relevant staff involved in these retrofitting/repowering at the case study site. Selecting and installing inverters from a different OEM at the commercially operating PV plant provides a unique opportunity to thoroughly document inverter retrofitting/repowering. The case study describes compatibility of mechanical, electrical, communications, and other important aspects. The goal is to provide a public case study that improves the general knowledge of the solar industry about what is involved in repowering/retrofitting a PV plant and how others can best prepare.

14 SOLAR ENERGY↗

Multifaceted political and social drivers inform wind energy repowering decisions and potential

Wind energy repowering decisions are multifaceted and depend on the physical, political and social landscape, as factors such as noise regulation, aesthetics and political bargaining can significantly influence project development. In this work, policy should recognise that a technology perspective alone cannot inform implementation pathways and should be supplemented with an understanding of the political and social dimensions.

17 WIND ENERGY↗

Repowering Coal Plants as Pumped Thermal Energy Storage

This conference presentation presents the results from a DOE FE funded study on the integration of a Malta Pumped Heat Energy Storage system with a retiring coal-fired power plant, and the economic benefits to the asset owner and the local community.

20 FOSSIL-FUELED POWER PLANTS↗

Best Practices at the End of Photovoltaic System Performance Period

Responsible and cost-effective dissolution of photovoltaic (PV) system hardware at the end of the performance period has emerged as an important business and environmental consideration. Alternatives include extending the performance period and existing contracts for power purchase, lease, and utility interconnect; refurbishing the plant by correcting any deficiencies; repowering the plant with new PV modules and inverters; or decommissioning the plant and removing all the hardware from the site. Often key decisions are made very early in the project development and might require decommissioning by some certain date after the end of a power purchase agreement. To “abandon in place” is not an alternative acceptable to landowners and regulators, so any financial prospectus should include costs associated with decommissioning, even if those costs are deferred by extending operations, refurbishment, or repowering. Decommissioning costs are driven by regulations regarding the handling and disposal of waste, with reuse and recycling of PV modules and other components preferred as a way to reduce both costs and environmental impact. Each alternative is discussed with order-of-magnitude costs, and recommendations are provided considering site-specific details of that situation, such as estimated costs to refurbish or repower, projected revenue from continued operations, and tax considerations.

14 SOLAR ENERGY↗

A Systematic Review and Integrated Approach to Modeling of Aging Utility Scale PV Systems

The growing deployment of utility-scale photovoltaic (PV) systems has increased the importance of techno-economic modeling operational photovoltaic (PV) systems for predicting energy yield, optimizing asset management, and informing financial decisions. Through a systematic review of literature and current industry practices, we review the different common modeling practices of a system's configuration and age, performance and degradation, operation and maintenance (O&M), while also focusing on specific considerations for repowering, revamping, and decommissioning. Building on the synthesis, we develop a structured framework for techno-economic modeling of operating PV systems that integrate performance and degradation analysis, a decommissioning and repowering cost model that estimates the system's end-of-life costs to reduce uncertainty quantifications and improve consistency across the sector. This research contributes to improved modeling methodologies and potentially to reduced financial performance requirements by providing practitioners with input resources and practical approaches to estimate performance, degradation, and costs associated with continued operation, revamping, repowering, or decommissioning decisions.

14 SOLAR ENERGY↗

Repurposing Fossil-Fueled Assets For Energy Storage

The annual retirement of U.S. coal-fired electricity generation units (CF-EGU) is at an all-time high and is expected to continue. This loss of reliable baseload generation, combined with predicted growth of variable renewable energy (VRE) generation, is expected to stress grid reliability as the number of load-following resources drops below the experienced load variability. Many regions are already experiencing challenges, and fossil retirement-related warnings by the North American Electric Reliability Corp. are becoming more dire. All CF-EGU retirements pose significant challenges to asset owners, local workforces, and their communities. Repurposing a retiring CF-EGU as a long-duration energy storage plant can address these challenges and offer a suite of additional benefits to asset owners, the grid, and society. This project performed a techno-economic evaluation and assessment of repurposing a Duke Energy fossil-fueled asset (in particular, a coal plant) into an energy storage system by integrating the retiring asset with a Malta long duration Pumped Heat Energy Storage (PHES) system. The project validated the technoeconomic benefits of repurposing retiring coal plants into long-duration energy storage using Malta’s PHES. Key findings for this project are summarized below: (1) Technical: (a) Retiring coal plants (and other steam turbine fossil generation) can be repurposed to enable the clean energy transition using Malta’s technology. (b) For older retiring coal plants, repurposing the site and electrical interconnection for a standalone PHES plant is the most economically favorable option. (c) For newer coal plants where there is also a local peaking capacity need, repowering the steam cycle into a hybrid integration with PHES is attractive. (d) A process was developed to assist fossil generation owners in choosing the best path for each plant’s circumstances. (2) Economic (a) Communities facing economic challenges caused by the retirement of fossil generation would benefit from repurposing the plant as long-duration energy storage using Malta’s PHES. (b) On a $/MW basis, repowering retiring coal units into Malta PHES plants can maintain the same number and types of jobs and economic activity. (c) For a 70% carbon reduction scenario, a 10-hour Malta PHES plant is more economic for the asset owner than similar-power 4-hour batteries. This project showed that repurposing a retiring coal unit into thermal energy storage, by integrating it with a Malta PHES system, makes techno-economic sense. At least two integration options are available, with the optimal solution depending on the coal plant and its location. Repurposing retiring coal plant into energy storage results in economic benefits for the plant owner and local communities.

20 FOSSIL-FUELED POWER PLANTS↗

Winding Down: End of Service and Recycling for Wind Energy [Slides]

In this webinar hosted by the U.S. Department of Energy's WINDExchange initiative, experts from the National Renewable Energy Laboratory introduce attendees to key concepts in end-of-service processes for wind energy technologies and infrastructure, including decommissioning, repowering, and recycling. As wind energy projects across the United States become older, decisions about end-of-service options and component processing are of growing importance to project owners and operators, state and local decision-makers, and neighboring communities. There is also concern about the blade waste that must be processed, with a number of recycling solutions being developed to meet this need. This webinar introduces the processes and activities involved at the end of a wind energy project's lifespan; discusses the impacts these activities have on communities, landowners, the wind energy industry, and other stakeholders; explains different blade recycling methods; and discusses the future of recycling in the wind energy industry.

17 WIND ENERGY↗

Accelerating Photovoltaic Market Entry with Module Replacement

Today's approach to deploying solar photovoltaics (PV) implicitly assumes that module technology is fixed. Solar panels are installed and expected to operate for the system life of 30 years or more. However, many PV technologies are improving rapidly along several dimensions, including cost, power conversion efficiency, and reliability. Periodic module replacement or planned repowering takes advantage of this technological improvement and counteracts predictable degradation. Here, we show that a module replacement strategy allows a competitive levelized cost of electricity to be achieved with an initial module lifetime of less than 15 years, assuming backward compatibility with the original system design. We also assess the life-cycle environmental impacts of module replacement and find that all commercial PV technologies offer benefits in the majority of impact categories, regardless of the replacement strategy, compared to today's electric generation mix. Module replacement can thus accelerate the market introduction and decarbonization impact of emerging PV technologies that have achieved a competitive module efficiency (=20%), cost (=$0.30/W), and lifetime (=10 years) and have the potential to improve further on all three metrics but lack decades-long field deployment experience.

14 SOLAR ENERGY↗

A novel approach for large-scale wind energy potential assessment

Increasing wind energy generation is central to grid decarbonization, yet methods to estimate wind energy potential are not standardized, leading to inconsistencies and even skewed results. This study aims to improve the fidelity of wind energy potential estimates through an approach that integrates geospatial analysis and machine learning (i.e., Gaussian process regression). We demonstrate this approach to assess the spatial distribution of wind energy capacity potential in the Contiguous United States (CONUS). We find that the capacity-based power density ranges from 1.70 MW/km2 (25th percentile) to 3.88 MW/km2 (75th percentile) for existing wind farms in the CONUS. The value is lower in agricultural areas (2.73 ± 0.02 MW/km2, mean ± 95 % confidence interval) and higher in other land cover types (3.30 ± 0.03 MW/km2). Notably, advancements in turbine manufacturing could reduce power density in areas with lower wind speeds by adopting low specific-power turbines, but improve power density in areas with higher wind speeds (>8.35 m/s at 120m above the ground), highlighting opportunities for repowering existing wind farms. Wind energy potential is shaped by wind resource quality and is regionally characterized by land cover and physical conditions, revealing significant capacity potential in the Great Plains and Upper Texas. The results indicate that areas previously identified as hot spots using existing approaches (e.g., the west of the Rocky Mountains) may have a limited capacity potential due to low wind resource quality. Improvements in methodology and capacity potential estimates in this study could serve as a new basis for future energy systems analysis and planning.

Dai, Tao↗

20% of US electricity from wind will have limited impacts on system efficiency and regional climate

Abstract Impacts from current and future wind turbine (WT) deployments necessary to achieve 20% electricity from wind are analyzed using high resolution numerical simulations over the eastern USA. Theoretical scenarios for future deployments are based on repowering (i.e. replacing with higher capacity WTs) thus avoiding competition for land. Simulations for the contemporary climate and current WT deployments exhibit good agreement with observed electricity generation efficiency (gross capacity factors (CF) from simulations = 45–48%, while net CF for WT installed in 2016 = 42.5%). Under the scenario of quadrupled installed capacity there is a small decrease in system-wide efficiency as indicated by annual mean CF. This difference is approximately equal to that from the two simulation years and may reflect saturation of the wind resource in some areas. WT modify the local near-surface climate in the grid cells where they are deployed. The simulated impact on near-surface climate properties at both the regional and local scales does not increase with increasing WT installed capacity. Climate impacts from WT are modest compared to regional changes induced by historical changes in land cover and to the global temperature perturbation induced by use of coal to generate an equivalent amount of electricity.

17 WIND ENERGY↗

Benchmarking Anticipated Wind Project Lifetimes: Results from a Survey of U.S. Wind Industry Professionals

This paper draws on a survey of wind industry professionals to clarify trends in the expected useful life of land-based wind power plants in the United States. The expected useful life of a project affects expectations about its profitability, the timing of possible decommissioning or repowering, and its levelized costs. We find that most wind project developers, sponsors and long-term owners have increased project-life assumptions over time, from a typical term of ~20 years in the early 2000s to ~25 years by the mid-2010s and ~30 years more recently. Current assumptions range from 25 to 40 years, with an average of 29.6 years. The estimated average levelized cost of energy (LCOE) for new wind projects built in 2018 is $\$ $40.4/MWh (real 2018$\$ $), assuming a 20-year project life. With a 25-year useful life and no change in assumed operations and maintenance (O&M) expenditures or wind plant performance over time, LCOE declines by 10%, to $\$ $36.2/MWh, because capital costs are recovered over five additional years of production. At the now-common 30-year assumed life, levelized costs decrease another 7%, to $\$ $33.5/MWh (under the same unaltered assumptions about O&M and performance). Even longer assumed lifetimes lead to further (but diminishing) LCOE reductions—e.g., to $\$ $31.7/MWh and $\$ $30.3/MWh for 35- and 40-year lives, respectively. The data and trends presented here may inform assumptions used by electric system planners, modelers and analysts. The results may also provide useful benchmarks to the wind industry, helping developers and assets owners to compare their expectations with those of their peers.

17 WIND ENERGY↗