Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “refueling schedule”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

Meta-RaPS Algorithm for the Aerial Refueling Scheduling Problem

The Aerial Refueling Scheduling Problem (ARSP) can be defined as determining the refueling completion times for each fighter aircraft (job) on multiple tankers (machines). ARSP assumes that jobs have different release times and due dates, The total weighted tardiness is used to evaluate schedule's quality. Therefore, ARSP can be modeled as a parallel machine scheduling with release limes and due dates to minimize the total weighted tardiness. Since ARSP is NP-hard, it will be more appropriate to develop a ppro~imate or heuristic algorithm to obtain solutions in reasonable computation limes. In this paper, Meta-Raps-ATC algorithm is implemented to create high quality solutions. Meta-RaPS (Meta-heuristic for Randomized Priority Search) is a recent and promising meta heuristic that is applied by introducing randomness to a construction heuristic. The Apparent Tardiness Rule (ATC), which is a good rule for scheduling problems with tardiness objective, is used to construct initial solutions which are improved by an exchanging operation. Results are presented for generated instances.

Kaplan, Sezgin↗

Aerial Refueling Process Rescheduling Under Job Related Disruptions

The Aerial Refueling Scheduling Problem (ARSP) can be defined as determining the refueling completion times for each fighter aircraft (job) on the multiple tankers (machines) to minimize the total weighted tardiness. ARSP assumes that the jobs have different release times and due dates. The ARSP is dynamic environment and unexpected events may occur. In this paper, rescheduling in the aerial refueling process with a time set of jobs will be studied to deal with job related disruptions such as the arrival of new jobs, the departure of an existing job, high deviations in the release times and changes in job priorities. In order to keep the stability and to avoid excessive computation, partial schedule repair algorithm is developed and its preliminary results are presented.

Kaplan, Sezgin↗

SLS Payload Launch Loads Analysis Using the NTRC Method

Norton-Thevenin Receptance Coupling (NTRC), as described in several NASA Engineering and Safety Center (NESC) papers shows promise in enabling loads development for payloads with less computational cost and analyst time as compared to a full integrated vehicle coupled loads analysis (CLA). NTRC allows the free vehicle responses and impedance (accelerance) at the payload to vehicle interface (derived from integrated vehicle CLA) to be used with a payload model in a payload CLA. Due to the NTRC damping differing from the full integrated vehicle damping, results are slightly different, so coverage factors were developed to ensure NTRC results enveloped results from a traditional CLA. NTRC results with coverage factors were very close to full CLA results. The Space Launch System (SLS) coupled loads team has developed an implementation of the NTRC method to enable support of co-manifested payloads with analysis needs that do not fit the primary SLS load cycle schedule. The NTRC method was successfully used to support the European System Providing Refueling, Infrastructure, and Communications (ESPRIT) module for Gateway planned to fly on Artemis V and has been adopted as the SLS approach for supporting payload CLA requests that do not align with vehicle load cycles.

SLS↗

Application of Norton-Thevenin Receptance Coupling (NTRC) to Space Launch System (SLS) Payload Coupled Loads Analysis (CLA)

Norton-Thevenin Receptance Coupling (NTRC), as described in several NASA Engineering and Safety Center (NESC) papers shows promise in enabling loads development for payloads with less computational cost and analyst time as compared to a full integrated vehicle coupled loads analysis (CLA). NTRC allows the free vehicle responses and impedance (accelerance) at the payload to vehicle interface (derived from integrated vehicle CLA) to be used with a payload model in a payload CLA. Due to the NTRC damping differing from the full integrated vehicle damping, results are slightly different, so coverage factors were developed to ensure NTRC results enveloped results from a traditional CLA. NTRC results with coverage factors were very close to full CLA results. The Space Launch System (SLS) coupled loads team has developed an implementation of the NTRC method to enable support of co-manifested payloads with analysis needs that do not fit the primary SLS load cycle schedule. The NTRC method was successfully used to support the European System Providing Refueling, Infrastructure, and Communications (ESPRIT) module for Gateway planned to fly on Artemis V and has been adopted as the SLS approach for supporting payload CLA requests that do not align with vehicle load cycles.

SLS↗

NASA's Exploration and In-Space Services (NExIS) Division OSAM-1 Propellant Transfer Subsystem Progress 2020

National Aeronautics and Space Administration (NASA)’s Exploration and In-Space Services (NExIS) Division of Goddard Space Flight Center has been developing technology for the On-orbit Servicing, Assembly and Manufacturing Mission 1 (OSAM-1) to robotically refuel heritage and new satellites on-orbit. OSAM-1, formerly known as Restore-L, successfully passed an important NASA milestone called Key Decision Point-C (KDP-C), receiving agency-level approval for its implementation. The decision point also establishes the mission’s official schedule and budget. The OSAM-1 spacecraft, Servicing Payload and the Space Infrastructure Dexterous Robot (SPIDER) payload will refuel a satellite in space, assemble a communications antenna and manufacture a beam. By demonstrating these capabilities, the mission is advancing never-before tested technologies for use in future missions (by NASA and other government organizations and private industry). The mission is funded by the Technology Demonstration Missions program within NASA’s Space Technology Mission Directorate. This paper covers a review of servicing extensibility and critical technologies that are being developed within NExIS with a focus on the fluid transfer refueling technology within the framework of the Propellant Transfer Subsystem (PTS). An overview of the planned initial technology demonstration servicing mission via the OSAM-1 Space Vehicle is provided as an extension of the technology development progress reported in 20181, and 20192. The general objectives, challenges, and key technologies are presented as an introduction to the context of the OSAM-1 mission, and a precursor to the OSAM-1 PTS specific development status. Development and progress of the Hose Management Assembly (HMA) and Propellant Transfer Assembly (PTA) are discussed. HMA risk reduction test results including those of thermal vacuum testing are presented. Important analytical results are discussed and progress of drawings and procedures developed for the fabrication and testing phase are shown. A summary of the PTS overall verification status and design activities prepared for the critical design peer review are presented. Procurement progress is shown with status on long, medium, and short term efforts to acquire the hardware required to support the mission objectives. Technology development, challenges, and testing status are discussed with particular regard to the OSAM-1 specific key assemblies including the PTA and HMA along with the overall integrated flight mockup of the spacecraft to client fluid transfer testing conducted in the servicing testbeds. The paper concludes with key milestones leading to the goal of on-orbit refueling to be demonstrated in 2024. The overall mission Launch Readiness Date (LRD) has been realigned to accommodate budget profiles and incorporation of additional on-orbit assembly and manufacturing demonstration efforts.

Propellant transfer, satellite servicing↗

Solar power satellite. System definition study. Part 1, volume 3: Construction, transportation and cost analyses

Concepts developed for both LEO and GEO construction of photovoltaic and thermal engine satellites are analyzed. Topics discussed include: satellite construction; crew scheduling; crew jobs and organizations; operator productivity rating; constructability rating; transportation systems for cargo launch, refueling operations, personnel transport, and orbit transfer; collision analysis, cost analysis, and radiation evironment and effects.

Source record↗

Servicing of spacecraft in the geostationary arc

The possibility of servicing geosynchronous spacecraft in connection with the development of the Space Station and its associated infrastructure is discussed. The proposed servicing infrastructure is presented as well as the design of a serviceable spacecraft, and a servicing scenario for a geostationary earth observation platform. The scenario employs the space based OTV, OMV, remote servicer and remote refueling system. It is shown that servicing geostationary spacecraft provides the largest economic benefit when performed on a scheduled basis.

Russell, Paul K.↗

Development of medical electronic devices in the APL space department

Several electronic devices for automatically correcting specific defects in a body's physiologic regulation and allowing approximately normal functioning are described. A self-injurious behavior inhibiting system (SIBIS) is fastened to the arm of a person with chronic self-injurious behavior patterns. An electric shock is delivered into the arm whenever the device senses above-threshold acceleration of the head such as occur with head-bangers. Sounding a buzzer tone with the shock eventually allows transference of the aversive stimulus to the buzzer so shocks are no longer necessary. A programmable implantable medication system features a solenoid pump placed beneath the skin and refueled by hypodermic needle. The pump functions are programmable and can deliver insulin, chemotherapy mixes and/or pain killers according to a preset schedule or on patient demand. Finally, an automatic implantible defibrillator has four electrodes attached directly to the heart for sensing electrical impulses or emitting them in response to cardiac fibrillation.

Newman, A. L.↗

Satellite Servicing's Autonomous Rendezvous and Docking Testbed on the International Space Station

The Space Servicing Capabilities Project (SSCP) at NASA's Goddard Space Flight Center (GSFC) has been tasked with developing systems for servicing space assets. Starting in 2009, the SSCP completed a study documenting potential customers and the business case for servicing, as well as defining several notional missions and required technologies. In 2010, SSCP moved to the implementation stage by completing several ground demonstrations and commencing development of two International Space Station (ISS) payloads-the Robotic Refueling Mission (RRM) and the Dextre Pointing Package (DPP)--to mitigate new technology risks for a robotic mission to service existing assets in geosynchronous orbit. This paper introduces the DPP, scheduled to fly in July of 2012 on the third operational SpaceX Dragon mission, and its Autonomous Rendezvous and Docking (AR&D) instruments. The combination of sensors and advanced avionics provide valuable on-orbit demonstrations of essential technologies for servicing existing vehicles, both cooperative and non-cooperative.

Naasz, Bo J.↗

Fluid Acquisition and Resupply Experiment (FARE-I) flight results

The Fluid Acquisition and Resupply Experiment, (FARE) is a Shuttle middeck-mounted experiment to demonstrate techniques for handling liquids in zero gravity for operations such as refueling spacecraft in orbit. The first flight took place on STS 53 launched December 2, 1992. Eight tests were performed during the mission and the experiment achieved 100 percent mission success. The second flight will be on STS 57, scheduled for launch in June 1993. The objective of FARE I was to demonstrate techniques for controlling the position of the liquid and gas within a tank during refilling and to better understand the operation of screen-type surface tension devices used to drain tanks in zero gravity. Tests were performed to demonstrate tank refilling, low gravity propellant slosh, and expulsion efficiency of the screen device. Expulsion efficiencies of 97 percent - 98 percent were demonstrated under a variety of flowrates and accelerations. Final fill levels of 60 percent to 80 percent were achieved during the vented fill tests.

Dominick, Sam M.↗

Robotic technologies of the Flight Telerobotic Servicer (FTS) including fault tolerance

The original FTS concept for Space Station Freedom (SSF) was to provide telerobotic assistance to enhance crew activity and safety and to reduce crew EVA (Extra Vehicular Activity) activity. The first flight of the FTS manipulator systems would demonstrate several candidate tasks and would verify manipulator performance parameters. These first flight tasks included unlocking a SSF Truss Joint, mating/demating a fluid coupling, contact following of a contour board, demonstrating peg-in-hole assembly, and grasping and moving a mass. Future tasks foreseen for the FTS system included ORU (Orbit Replaceable Unit) change-out, Hubble Space Telescope Servicing, Gamma Ray Observatory refueling, and several in-situ SSF servicing and maintenance tasks. Operation of the FTS was planned to evolve from teleoperation to fully autonomous execution of many tasks. This wide range of mission tasks combined with the desire to evolve toward fully autonomy forced several requirements which may seen extremely demanding to the telerobotics community. The FTS requirements appear to have been created to accommodate the open-ended evolution plan such that operational evolution would not be impeded by function limitations. A recommendation arising from the FTS program to remedy the possible impacts from such ambitious requirements is to analyze candidate robotic tasks. Based on these task analyses, operational impacts against development impacts were weighed prior to requirements definition. Many of the FTS requirements discussed in the following sections greatly influenced the development cost and schedule of the FTS manipulator. The FTS manipulator has been assembled at Martin Marietta and is currently in testing. Successful component tests indicate a manipulator which achieves unprecedented performance specifications.

Chladek, John T.↗

Concepts to Automate Fluid Transfer Capability of Low Impact Docking System (LIDS)

The capability to transfer mass between spacecraft is necessary for many mission scenarios. Docking and berthing operations have enabled fluid, electrical, crew and equipment transfers to some degree on all manned space operations since the Gemini program. The Apollo program performed some sophisticated docking maneuvers to land men on the moon and return them safely to Earth. These programs primarily transferred crew, equipment, and pressurized atmosphere between docked spacecraft. The International Space Station (ISS) U.S. modules are connected by Common Berthing Mechanism (CBM) portals. They provide many feed-through ports for electrical, and fluid transfer between modules, as well as a large diameter crew and equipment tunnel. Fluid and electrical jumpers are manually installed after the CBM sealing surfaces have been securely mated to maintain the pressurized cabin environment. CBM berthing and subsequent fluid transfer capability requires a lengthy manual process involving an active interface that mates with a passive half. The Androgynous Peripheral Attach System (MAS) a Russian technology that docked the Russian Zarya module to Unity, or Node 1, is a more complex system that also is capable of fuel transfer, enabling refueling of the Russian re-boost engines on ISS. For several years, a Low Impact Docking System (LIDS) has been under development at Johnson Space Center (JSC). This docking technology has a requirement to be androgynous in order to allow the fabrication of a single configuration that can dock with all other LIDS units. It is desired to make electrical and fluid coupling mating an automated process to enable routine docking and undocking operations to support future exploration missions. It is envisioned that modular design and vehicle assembly will require an efficient LIDS for fuel, electrical, crew, and equipment transfer. Marshall Space Flight Center (MSFC) has joined the LIDS development effort and plans to employ fluid transfer concepts and technology from previous development programs, such as the Automated Fluid Interface System (AFIS) and the Ohital Fluid Transfer System (OFTS) that were developed and tested by MSFC. Orbital Expressderived robotic satellite servicing technology is scheduled to fly soon to demonstrate fluid transfer technology developed for the Air Force. This paper will compare known technology against possible fluid transfer requirements for LIDS to develop design strategies for automated fluid transfer.

Miernik, Janie H.↗