At least 19 records

IDC Reengineering Phase 2 Project Scope

The Comprehensive Nuclear-Test-Ban Treaty Organization (CTBTO) operates the International Data Centre (IDC) to support treaty verification activities by Member States. The IDC collects, stores, processes, and distributes data from seismic, hydroacoustic, infrasound, and radionuclide stations. A significant component of the IDC is the seismic, hydroacoustic, and infrasound (SHI) processing system. The IDC has recognized the need to reengineer the SHI processing system and has defined a three-phase reengineering effort. IDC Reengineering Phase 1 (RP1) started in 2011 with the goal to significantly modernize SHI automatic and interactive data processing software, focusing on enhancements to individual components of the system. Reengineering Phase 2 (RP2), started in 2014, addresses the task of specifying a unified architecture for all SHI software, across processing stages, to pave the way for further software development and sustainment in the future. A key objective of RP2 is an architecture sufficient to provide a basis for a cost estimate for the development or enhancement of the software components and subsystems. This report provides a brief description of the scope of the IDC Reengineering Phase 2 project. It describes the goals and objectives of reengineering, the system definition, and the technical scope of the system.This report expands upon the “Scope for IDC Reengineering Phase 2”, July 2014, ECS-DIS-WGB-43-PTS-MATERIAL-12-ADD-1, produced by the IDC.

58 GEOSCIENCES↗

IDC Reengineering Phase 2 & 3 Rough Order of Magnitude (ROM) Cost Estimate Summary (Leveraged NDC Case).

Sandia National Laboratories has prepared a ROM cost estimate for budgetary planning for the IDC Reengineering Phase 2 & 3 effort, based on leveraging a fully funded, Sandia executed NDC Modernization project. This report provides the ROM cost estimate and describes the methodology, assumptions, and cost model details used to create the ROM cost estimate. ROM Cost Estimate Disclaimer Contained herein is a Rough Order of Magnitude (ROM) cost estimate that has been provided to enable initial planning for this proposed project. This ROM cost estimate is submitted to facilitate informal discussions in relation to this project and is NOT intended to commit Sandia National Laboratories (Sandia) or its resources. Furthermore, as a Federally Funded Research and Development Center (FFRDC), Sandia must be compliant with the Anti-Deficiency Act and operate on a full-cost recovery basis. Therefore, while Sandia, in conjunction with the Sponsor, will use best judgment to execute work and to address the highest risks and most important issues in order to effectively manage within cost constraints, this ROM estimate and any subsequent approved cost estimates are on a 'full-cost recovery' basis. Thus, work can neither commence nor continue unless adequate funding has been accepted and certified by DOE.

Harris, James M.↗

IDC reengineering Phase 2 & 3 US industry standard cost estimate summary

Sandia National Laboratories has prepared a ROM cost estimate for budgetary planning for the IDC Reengineering Phase 2 & 3 effort, using a commercial software cost estimation tool calibrated to US industry performance parameters. This is not a cost estimate for Sandia to perform the project. This report provides the ROM cost estimate and describes the methodology, assumptions, and cost model details used to create the ROM cost estimate. ROM Cost Estimate Disclaimer Contained herein is a Rough Order of Magnitude (ROM) cost estimate that has been provided to enable initial planning for this proposed project. This ROM cost estimate is submitted to facilitate informal discussions in relation to this project and is NOT intended to commit Sandia National Laboratories (Sandia) or its resources. Furthermore, as a Federally Funded Research and Development Center (FFRDC), Sandia must be compliant with the Anti-Deficiency Act and operate on a full-cost recovery basis. Therefore, while Sandia, in conjunction with the Sponsor, will use best judgment to execute work and to address the highest risks and most important issues in order to effectively manage within cost constraints, this ROM estimate and any subsequent approved cost estimates are on a 'full-cost recovery' basis. Thus, work can neither commence nor continue unless adequate funding has been accepted and certified by DOE.

97 MATHEMATICS AND COMPUTING↗

IDC Reengineering Phase 2 & 3 Project Scope

Sandia National Laboratories has prepared a cost estimate budgetary planning for the IDC Reengineering Phase 2 & 3 effort. This report provides the cost estimate and describes the methodology, assumptions, and cost model details used to create the cost estimate.

97 MATHEMATICS AND COMPUTING↗

IDC Reengineering Iteration I2 Architectural Prototype Reports

To fulfill the inception phase deliverable “Demonstration of architectural prototype“ the SNL IDC Reengineering project team is providing seven reports describing system prototyping work completed between October 2012 and October 2014as part of the SNL US NDC Modernization project.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

IDC Reengineering Phase 2 Risk List

This document contains the risk list for the IDC Reengineering Phase 2 project along with some background information related to the risk process.

42 ENGINEERING↗

IDC Reengineering Phase 2 Glossary

This document contains the glossary of terms used for the IDC Reengineering Phase 2 project. This version was created for Iteration I2.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

IDC Reengineering Phase 2: E3 UC Change Summary

SNL’s IDC Reengineering Phase 2 team developed 31 Use Cases (UCs) during the E3 Elaboration Iteration. This document describes the changes made to these UCs after their initial delivery to the IDC in October 2016.

97 MATHEMATICS AND COMPUTING↗

IDC Reengineering Phase 2: UCR Change Summary

SNL’s IDC Reengineering Phase 2 team developed 12 Use Case Realizations (UCRs) during the Elaboration phase. This document describes the changes made to these UCRs after their initial delivery to the IDC.

42 ENGINEERING↗

IDC Reengineering Phase 2 & 3 Cost Estimate Summary (Version 1.0.1)

Sandia National Laboratories has prepared a cost estimate budgetary planning for the IDC Reengineering Phase 2 & 3 effort. This report provides the cost estimate and describes the methodology, assumptions, and cost model details used to create the cost estimate.

42 ENGINEERING↗

IDC Reengineering Phase 2 Glossary

This document contains the glossary of terms used for the IDC Reengineering Phase 2 project. This version was created for Iteration I1.

42 ENGINEERING↗

Enhancing Cycling Stability and Capacity Retention of NMC811 Cathodes by Reengineering Interfaces via Electrochemical Fluorination

High-capacity cathodes (LiNi 0.8 Mn 0.1 Co 0.1 O 2 ) that can boost the energy density of lithium-ion batteries are promising candidates for vehicle electrification. However, several factors specific to high energy density materials entailing electrode reactions inhibit their application. Fluorination has shown a promising ability to combat the detrimental electrochemical performances of cathode materials, however, it remains difficult to achieve the desired functionality. In this work, a novel electrochemical fluorination (ECF) that demonstrates a promising electrochemical performance enhancement via stabilization of the cathode–electrolyte-interphase (CEI) by forming conformal LiF is proposed. Besides LiF surface layer formation, ECF reduces the degree of fluorination-induced Ni/Li disordering and enhances the layered structural stability as probed by X-ray diffraction. Because of the robust CEI, ECF-NMC811 cathodes deliver 203.0 mAh g -1 first discharge capacity at the current rate of C/10, with ≈98% capacity retention up to 100 cycles. Similarly, it delivers ≈180 mAh g -1 capacity at a 1 C rate with 86.4% capacity retention up to 200 cycles with average coulombic efficiency of > 99.5%. Comprehensive characterization with a multitude of probes reveals that ECF enhances the cycling stability of the electrode without altering bulk structure and morphology.

25 ENERGY STORAGE↗