Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “readiness review”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

STS-121: Discovery Post Flight Readiness Review Briefing

This post Flight Readiness Review (FRR) briefing begins with NASA Press Secretary Dean Acosta, introducing the panel who consist of: NASA Administrator, Dr. Michael Griffin; Associate Administrator for Space Operations, Bill Gerstenmaier; Space Shuttle Program Manager, Wayne Hale; and NASA Launch director, Mike Leinbach. The discussion begins with Dr. Michael Griffin, who expresses his gladness to be a part of the FRR. Bill Gerstenmaier talks about how they were very thorough about the subjects reviewed and that they wanted to make sure that they were ready to fly. He discusses and presents two slides. The first slide is a description of the LO2 intertank and LH2 ice/frost ramps staging location and the second are the top ten LH2 Ice/Frost Ramp Foam Loss events. Wayne Hale gives his thoughts on the human element that came into play during the FRRs. He talks about the willingness of everyone to speak their mind, instead of giving short comments. He expressed that this element is a huge step forward for NASA. Mike Leinbach reports on the processing of the vehicle and expresses that everything is going well and there is nothing to prohibit the launch. He also gives a good report on Atlantis, in case there is a need to use the vehicle. This FRR briefing ends with a short question and answer period from the press on topics such as debris, foam loss, ice/frost ramp redesign, crew risks, and launch date.

Source record↗

Flight Rules Critical Readiness Review

The increment 23/24 Critical Readiness Review (CRR) flight rules are presented. The topics include: 1) B13-152 Acoustic Constraints; 2) B13-113 IFM/Corrective Action Prioritization Due to Loss of Exercise Capability; 3) B13-116 Constraints on Treadmill VIS Failure; 4) B13-201 Medical Management of ISS Fire/Smoke Response; 5) ARED and T2 Exercise constraints Flight rules (flight and stage specific); 6) FYI: B14 FR to be updated with requirement to sample crew sleep locations prior to receiving a "recommendation" from SRAG on where to sleep.

Kim, E.↗

UAS NAS IHITL Test Readiness Review (TRR)

Requesting release of IHITL test readiness review (TRR) charts to ensure UAS-NAS project primary stakeholders, the Federal Aviation Administration through the RTCA special committee -228 and the Office of the Secretary of Defense Sense and Avoid Science and Research Panel, are well informed on the IHITL test plan and expected outcomes as they relate to their needs to safely fly UAS in the NAS.

Unmanned↗

STS-114/Discovery Flight Readiness Review Press Briefing

This press briefing on Flight Readiness Review (FRR) for the STS-114 Discovery flight is shown. Dean Acosta, Deputy Associate Administrator for Public Affairs, introduces the panel. The panel consist of: Michael Griffin, NASA Administrator, William Readdy, Associate Administrator of Space Operations, Bill Parsons, Space Shuttle Program Manager, and Mike Leinbach, NASA Launch Director. Questions from the media includes the following topics: certification, countdown, ice on the external tank, debris, and safety of the Space Shuttle Discovery.

Source record↗

Expedition 23/24 - Critical Readiness Review

This slide presentation reports on the critical readiness review for Expeditions 23 and 24. It includes information on medical operations and environmental monitoring.

Hunter, Norwood↗

OIP/JMOIP Critical Readiness Review

This slide presentation reports on the OIP/JMOIP Critical Readiness Review. It includes information on the JMOIP, and the OIP documentation status.

Rosen, Carissa↗

SMARR (Safety and Mission Assurance Readiness Review)

This document from the Stennis Space Center Office of Safety and Mission Assurance rates flight preparation elements for Space Shuttle mission STS-114. All elements are rated with the status "Standard Open Work or Completed", and marked in green on the document, which contains a Certificate of Flight Readiness for STS-114.

Failla, David P.↗

Strength Analysis Report Flight Readiness Review (FRR) for SXI Stepper Motor/Encoder

The strength analysis report for FRR shall include only revisions to update the strength analysis reports for the flight design configuration. Since there have been no revisions to the design configuration since the PDR and the CDR this report shall consist of re-submitting the analysis previously performed. In addition the motors have been subjected to Sine vibration, Random vibration, and shock per the SM specification. Both motor/encoders have passed all three tests. There was no evidence of damage to the motor/encoder and the motor/encoder performed as required by the Acceptance test procedure. No degradation was seen between the before and after performance tests. The testing verified the analysis that there were adequate safety margins with regard to structural integrity. Separate reports are available from the test facility and are apart of the FRR submittal.

Source record↗

Radiation Critical Readiness Review

This slide presentation reviews the radiation preparedness and radiation monitors on the International Space Station (ISS). It includes information on the Tissue Equivalent Proportional Counter (TEPC), Radiation Area Monitors, Extra-Vehicular Charged Particle Directional Spectrometer (EV-CPDS), and the space radiation analysis group.

Misek, William↗

Increment 23/24 Critical Readiness Review Health Maintenance System

This slide presentation reviews the Health Maintenance System. It includes information on the carbon dioxide (CO2) and moisture removal system (CMRS), the variable oxygen system,rendevous station panels, and the crew contamination protection kit (CCPK).

Nieschwitz, Linda↗

Countermeasures (iRED, ARED CEVIS, MEC, TVIS, T2, Periodic Fitness Evaluation, BP-ECG, HRM). Critical Readiness Review Increment 23 and 24

This slide presentation reviews attempts to counteract the effects of being in space. It includes information on the Resistive Exercise Device (RED), the Advanced Resistive Exercise Device (ARED), Cycle Ergometer with Vibration Isolation and Stabilization (CEVIS), Treadmill with Vibration Isolation and Stabilization (TVIS) and periodic fitness evaluation with specific information on BP/ECG, heart rate monitor 2 and data distribution.

Toder, Carly↗

Acoustics Critical Readiness Review

This presentation reviews the status of the acoustic equipment from the medical operations perspective. Included is information about the acoustic dosimeters, sound level meter, and headphones that are planned for use while on orbit. Finally there is information about on-orbit hearing assessments.

Ballard, Kenny↗

Critical Readiness Review EHS Water Quality and Microbiology

Presentation reviews the status in reference to the Environmental, Health and Safety (EHS) of the water quality and microbiology for the International Space Station. It includes information about crew training, hardware delivery, and those items that will be returned for study.

Woo, Cindy↗

Preparing GMAT for Operational Maneuver Planning of the Advanced Composition Explorer (ACE)

The General Mission Analysis Tool (GMAT) is an open-source space mission design, analysis and trajectory optimization tool. GMAT is developed by a team of NASA, private industry, public and private contributors. GMAT is designed to model, optimize and estimate spacecraft trajectories in flight regimes ranging from low Earth orbit to lunar applications, interplanetary trajectories and other deep space missions. GMAT has also been flight qualified to support operational maneuver planning for the Advanced Composition Explorer (ACE) mission. ACE was launched in August, 1997 and is orbiting the Sun-Earth L1 libration point. The primary science objective of ACE is to study the composition of both the solar wind and the galactic cosmic rays. Operational orbit determination, maneuver operations and product generation for ACE are conducted by NASA Goddard Space Flight Center (GSFC) Flight Dynamics Facility (FDF). This paper discusses the entire engineering lifecycle and major operational certification milestones that GMAT successfully completed to obtain operational certification for the ACE mission. Operational certification milestones such as gathering of the requirements for ACE operational maneuver planning, gap analysis, test plans and procedures development, system design, pre-shadow operations, training to FDF ACE maneuver planners, shadow operations, Test Readiness Review (TRR) and finally Operational Readiness Review (ORR) are discussed. These efforts have demonstrated that GMAT is flight quality software ready to support ACE mission operations in the FDF.

Trajectory analysis↗

Preparing General Mission Analysis Tool for Operational Maneuver Planning of the Advanced Composition Explorer Mission

The General Mission Analysis Tool (GMAT) is an open-source space mission design, analysis and trajectory optimization tool. GMAT is developed by a team of NASA, private industry, public and private contributors. GMAT is designed to model, optimize and estimate spacecraft trajectories in flight regimes ranging from low Earth orbit to lunar applications, interplanetary trajectories and other deep space missions. GMAT has also been flight qualified to support operational maneuver planning for the Advanced Composition Explorer (ACE) mission. ACE was launched in August, 1997 and is orbiting the Sun-Earth L1 libration point. The primary science objective of ACE is to study the composition of both the solar wind and the galactic cosmic rays. Operational orbit determination, maneuver operations and product generation for ACE are conducted by NASA Goddard Space Flight Center (GSFC) Flight Dynamics Facility (FDF). This paper discusses the entire engineering lifecycle and major operational certification milestones that GMAT successfully completed to obtain operational certification for the ACE mission. Operational certification milestones such as gathering of the requirements for ACE operational maneuver planning, gap analysis, test plans and procedures development, system design, pre-shadow operations, training to FDF ACE maneuver planners, shadow operations, Test Readiness Review (TRR) and finally Operational Readiness Review (ORR) are discussed. These efforts have demonstrated that GMAT is flight quality software ready to support ACE mission operations in the FDF.

mission design↗

Apollo experience report the command and service module milestone review process

The sequence of the command and service module milestone review process is given, and the Customer Acceptance Readiness Review and Flight Readiness Review plans are presented. Contents of the System Summary Acceptance Documents for the two formal spacecraft reviews are detailed, and supplemental data required for presentation to the review boards are listed. Typical forms, correspondence, supporting documentation, and minutes of a board meeting are included.

Brendle, H. L.↗

Summary DSG-RQMT-004, Gateway Electromagnetic Environmental Effects (E3) Requirements Document, Initial Baseline

The Baseline Readiness Review presentation for DSG-RQMT-004 at a high level summarizes the differences between the originating standards (publicly available) and the Gateway-tailored standards (publicly available per DAA 72653). All data in the presentations are either derived from either MIL-STD-461G, SSP 30237, or SL-E-002 (Shuttle EMI spec). The Baseline Readiness Review presentation identifies why a tailored standard was necessary for Gateway (summarizes the changes made from the originating standard). Communicating this information should lead to IP and vendor Level 3 responders proposing substitute standards more in line with the Gateway requirements.

MIL-STD-464↗