At least 19 records

Wind ramp events validation in NWP forecast models during the second Wind Forecast Improvement Project (WFIP2) using the Ramp Tool and Metric (RT&M)

The second Wind Forecast Improvement Project (WFIP2) is a multi-agency field campaign held in the Columbia Gorge area (October 2015 - March 2017). The main goal of the project is to understand and improve the forecast skill of numerical weather prediction (NWP) models in complex terrain, particularly beneficial for the wind energy industry. This region is well-known for its excellent wind resource. One of the biggest challenges for wind power production is the accurate forecasting of wind ramp events (large changes of generated power over short periods of time). Poor forecasting of the ramps requires large and sudden adjustments in conventional power generation, ultimately increasing the costs of power. A Ramp Tool and Metric (RT&M) was developed during the first WFIP experiment, held in the U.S. Great Plains (September 2011 - August 2012). The RT&M was designed to explicitly measure the skill of NWP models at forecasting wind ramp events. Here we apply the RT&M to 80-m (turbine hub-height) wind speeds measured by 19 sodars and 3 lidars, and to forecasts from the High Resolution Rapid Refresh (HRRR), 3-km, and from the High Resolution Rapid Refresh Nest (HRRRNEST), 750-m horizontal grid spacing, models. The diurnal and seasonal distribution of ramp events are analyzed, finding a noticeable diurnal variability for spring and summer but less for fall and especially winter. Also, winter has fewer ramps compared to the other seasons. The model skill at forecasting ramp events, including the impact of the modification to the model physical parameterizations, was finally investigated.

Djalalova, Irina V.↗

What Is the Value of Alternative Methods for Estimating Ramping Needs?

Power system operators procure and deploy flexibility reserves or ramping products to address balancing needs caused by uncertainty and variability of load and generation. Existing methods estimate ramping needs using calendar information and historical forecast errors. Novel methods investigate if real-time weather information could inform ramping and other balancing requirements. This paper compares estimation methods for ramping requirements in theory and practice. The theoretical framework indicates when an alternative method could yield improved economic or reliability performance than existing methods by requiring lower or higher levels of ramping products. Preliminary simulations on a 118-bus test system for 4 days in May 2019 illustrate how system performance improves or deteriorates when ramping requirements are weather-informed (alternative) instead of calendar-based (baseline). Preliminary results suggest high variability in change of performance and underline the impact of additional factors, such as system conditions, on the realized performance change.

41 EE - Solar Energy Technologies Office (EE-4S)↗

Influence of growth temperature and temperature ramps on deep level defect incorporation in m-plane GaN

The dependence of deep level defect incorporation in m-plane GaN films grown by metal-organic chemical vapor deposition on bulk m-plane GaN substrates as a function of growth temperature (T{sub g}) and T{sub g} ramping method was investigated using deep level optical spectroscopy. Understanding the influence of T{sub g} on GaN deep level incorporation is important for InGaN/GaN multi-quantum well (MQW) light emitting diodes (LEDs) and laser diodes (LDs) because GaN quantum barrier (QB) layers are grown much colder than thin film GaN to accommodate InGaN QW growth. Deep level spectra of low T{sub g} (800 °C) GaN films grown under QB conditions were compared to deep level spectra of high T{sub g} (1150 °C) GaN. Reducing T{sub g}, increased the defect density significantly (>50×) through introduction of emergent deep level defects at 2.09 eV and 2.9 eV below the conduction band minimum. However, optimizing growth conditions during the temperature ramp when transitioning from high to low T{sub g} substantially reduced the density of these emergent deep levels by approximately 40%. The results suggest that it is important to consider the potential for non-radiative recombination in QBs of LED or LD active regions, and tailoring the transition from high T{sub g} GaN growth to active layer growth can mitigate such non-radiative channels.

36 MATERIALS SCIENCE↗

Solar Power Ramp Events Detection Using an Optimized Swinging Door Algorithm: Preprint

Solar power ramp events (SPREs) are those that significantly influence the integration of solar power on non-clear days and threaten the reliable and economic operation of power systems. Accurately extracting solar power ramps becomes more important with increasing levels of solar power penetrations in power systems. In this paper, we develop an optimized swinging door algorithm (OpSDA) to detection. First, the swinging door algorithm (SDA) is utilized to segregate measured solar power generation into consecutive segments in a piecewise linear fashion. Then we use a dynamic programming approach to combine adjacent segments into significant ramps when the decision thresholds are met. In addition, the expected SPREs occurring in clear-sky solar power conditions are removed. Measured solar power data from Tucson Electric Power is used to assess the performance of the proposed methodology. OpSDA is compared to two other ramp detection methods: the SDA and the L1-Ramp Detect with Sliding Window (L1-SW) method. The statistical results show the validity and effectiveness of the proposed method. OpSDA can significantly improve the performance of the SDA, and it can perform as well as or better than L1-SW with substantially less computation time.

14 SOLAR ENERGY↗

Analysis of Wind Ramping Product Formulations in a Ramp-Constrained Power Grid

Flexible ramping products are designed to compensate the variability and uncertainty of load and intermittent generation. Since their market implementation by the California Independent System Operator (CAISO) and Midcontinent System Operator (MISO), flexible ramping products have garnered much attention. However, it is still unclear how to best formulate wind power plants’ participation in the ramping requirement. This paper investigates different wind ramping product formulations and increasing wind power penetration in the context of a security-constrained unit commitment (SCUC) model. We demonstrate that the ramping model that captures both the intra- and inter-temporal output ramp capability of individual wind power plants reflects the true ramp contribution of the wind fleet. With increasing wind penetration, wind generation curtailments can support the grid’s ramping needs. In addition, we found that increased wind penetration has the potential of lowering ramping and production costs. Numerical case studies performed on the TAMU 2000-bus synthetic network support the findings.

49 EE - Wind and Water Power Program - Wind (EE-4W↗

On the Effect of Ramp Rate in Damage Accumulation of the CPV Die-Attach: Preprint

It is commonly understood that thermal cycling at high temperature ramp rates may activate unrepresentative failure mechanisms. Increasing the temperature ramp rate of thermal cycling, however, could dramatically reduce the test time required to achieve an equivalent amount of thermal fatigue damage, thereby reducing overall test time. Therefore, the effect of temperature ramp rate on physicaldamage in the CPV die-attach is investigated. Finite Element Model (FEM) simulations of thermal fatigue and thermal cycling experiments are made to determine if the amount of damage calculated results in a corresponding amount of physical damage measured to the die-attach for a variety of fast temperature ramp rates. Preliminary experimental results are in good agreement with simulations andreinforce the potential of increasing temperature ramp rates. Characterization of the microstructure and resulting fatigue crack in the die-attach suggest a similar failure mechanism across all ramp rates tested.

14 SOLAR ENERGY↗

Current ramp-up studies for NSTX-U in support of the development of non-inductive current ramp-up scenarios in STs

The Spherical Tokamak (ST) is a low-aspect-ratio tokamak projected to enable simultaneous operation at high normalized toroidal beta and high bootstrap current fraction. However, a compact ST reactor cannot be built with a full-sized solenoid. The remaining current required for sustained operation must be ramped up non-inductively. Sustained 100% non-inductive current drive at the MA level has not yet been demonstrated on an ST. Non-inductive current ramp-up is therefore a more challenging objective that the NSTX-U research program aims to address. In support of this development, free-boundary TRANSP simulations have been used to develop a current ramp-up scenario in which a significant fraction of the current is driven non-inductively by a combination of neutral-beam and bootstrap current drive. The resulting discharge has properties favorable for non-inductive current drive, such as a low normalized internal plasma inductance of approximately 0.45, a minimum safety factor exceeding 2, and a slightly reversed-shear q-profile. In these discharges, the plasma current ramps to 900 kA within 250 ms in an L-mode configuration, with varying electron density and density profiles. These discharges should be suitable for next-step NSTX-U experiments aimed at generating a robust L-mode fiducial scenario with low central solenoid flux consumption, which could be progressively improved as new NSTX-U experimental discharges are developed.

Raman, Roger [Univ. of Washington, Seattle, WA (Un↗

Ramping Up the Ramping Capability: India's Power System Transition

The Indian power system is going through a period of transformation with plans for renewable energy to be integrated at a large scale over the next decade. Increasing thrust is being given to flexible operation of existing generating resources. Ramping is one of the key attributes of flexibility. With implementation of national level security constrained economic dispatch (SCED), the national power system operator of India (POSOCO) has started to observe occasional constraints in ramping capability obtained from generators under SCED, which could get further aggravated with more variable renewable energy (VRE). This paper focuses on complexities of ramping and the challenges with high shares of renewables in the Indian context.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

PV Ramping in a Distributed Generation Environment: A Study Using Solar Measurements; Preprint

Variability in Photovoltaic (PV) generation resulting from variability in the solar radiation over the PV arrays is a topic of continuing concern for those involved with integrating renewables onto existing electrical grids. The island of Lanai, Hawaii is an extreme example of the challenges that integrators will face due to the fact that it is a small standalone grid. One way to study thisproblem is to take high-resolution solar measurements in multiple locations and model simultaneous PV production for various sizes at those locations. The National Renewable Energy Laboratory (NREL) collected high-resolution solar data at four locations on the island where proposed PV plants will be deployed in the near future. This data set provides unique insight into how the solar radiationmay vary between points that are proximal in distance, but diverse in weather, due to the formation of orographic clouds in the center of the island. Using information about each proposed PV plant size, power output was created at high resolution. The team analyzed this output to understand power production ramps at individual locations and the effects of aggregating the production from all fourlocations. Hawaii is a unique environment, with extremely variable events occurring on a daily basis. This study provided an excellent opportunity for understanding potential worst-case scenarios for PV ramping. This paper provides an introduction to the datasets that NREL collected over a year and a comprehensive analysis of PV variability in a distributed generation scenario.

14 SOLAR ENERGY↗

Measurement of transformer ratio from ramped beams in the blowout regime

We present the plans for a UCLA-Argonne collaborative plasma wakefield acceleration (PWFA) experiment aimed at demonstrating the dependence of transformer ratio - the relation between maximum acceleration observed in a plasma wake to the maximum deceleration of the driving beam - on beam shape. Utilizing the unique capabilities of the emittance exchange (EEX) beamline, we may obtain transformer ratios in excess of six in a 120 MeV/m PWFA. These experiments are a crucial step in enabling applications ranging from compact X-ray free electron laser (FEL) light sources to TeV-class linear colliders for high energy physics.

Linear↗

Tailored ramp-loading via shock release of stepped-density reservoirs

The concept of a gradient piston drive has been extended from that of a single component reservoir, such as a high explosive, to that of a multi-component reservoir that utilizes low density foams and large shocks to achieve high pressures ({approx}3.5 mbar) and controlled pressure vs. time profiles on a driven sample. Simulated and experimental drives shaped through the use of multiple component (including carbonized resorcinol formaldehyde and SiO{sub 2} foam) reservoirs are compared. Individual density layers in a multiple component reservoir are shown to correlate with velocity features in the measured drive which enables the ability to tune a pressure drive by adjusting the components of the reservoir. Pre-shot simulations are shown to be in rough agreement with the data, but post-shot simulations involving the use of simulated plasma drives were needed to achieve an exact match. Results from a multiple component reservoir shot ({approx}3.5 mbar) at the National Ignition Facility are shown.