Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “rSOC”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

Superheavyweight missions SI versus DI: Ascent flight design options and recommendations

AFD has completed the trade study on Standard Insertion (SI) vs Direct Insertion (DI) for STS-50. RSOC Range Safety has developed acceptable DI targets from 130 n.mi. to 150 n.mi. and the corresponding performance assessment for these targets using STS-50 data has been completed. This mission has sufficient performance capability to perform this mission as a DI to 160 n.mi. A reduced OMS load corresponding to a DI mission is required for this option. The increase in altitude over the AFP baseline (SI to 145 n.mi.) is highly desirable for this mission. The orientation on orbit for the orbiter/USML-1 payload is such that orbital decay is maximized (maximum frontal cross-sectional area with vehicle normal to velocity vector). Increasing the operational altitude reduces the amount of vernier thruster firings necessary to maintain a constant gravity gradient. The results of this trade study can also be applied to other superheavyweight missions (EDO flights) and will allow for use of the DI technique for lower orbital altitudes, thereby eliminating the SI option for due east, low altitude missions. STSOC transmittal form no. 330-330-130, which documents the technical issues and assumptions used for this trade study effort in detail, should be referenced for further information. The main reason that a DI is desired for STS-50 and other superheavyweight flights (low altitude) is that ESMC range safety has expressed reservations about SI missions in general. The concern is that the current SI design underspeed exposes Africa and Madagascar to potential ET debris impact. In the past range safety has waived the requirement that these areas be protected in the event of an engine failure. With the advent of the pre-MECO OMS dump, the viability of DI and the high casualty expectations from the ACTA press to MECO hazard study, range safety has become more reluctant to approve SI flights. It is felt that to perform an SI mission there would have to be a large decrease in design underspeed to protect these landmasses, which would result in possible gaps between a late TAL and PTA. The assumed limit on a DI has been to altitudes greater than 160 n.mi. It was assumed that for altitudes less than 160 n.mi. the nominal ET impact envelope would overlap the Gilbert Islands.

Source record↗

The role of metrics and measurements in a software intensive total quality management environment

Paramax Space Systems began its mission as a member of the Rockwell Space Operations Company (RSOC) team which was the successful bidder on a massive operations consolidation contract for the Mission Operations Directorate (MOD) at JSC. The contract awarded to the team was the Space Transportation System Operations Contract (STSOC). Our initial challenge was to accept responsibility for a very large, highly complex and fragmented collection of software from eleven different contractors and transform it into a coherent, operational baseline. Concurrently, we had to integrate a diverse group of people from eleven different companies into a single, cohesive team. Paramax executives recognized the absolute necessity to develop a business culture based on the concept of employee involvement to execute and improve the complex process of our new environment. Our executives clearly understood that management needed to set the example and lead the way to quality improvement. The total quality management policy and the metrics used in this endeavor are presented.

Daniels, Charles B.↗