Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “queuing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Exploring filamentous fungi depolymerization of corn stover in the context bioenergy queuing operations

Recalcitrance of lignocellulosic feedstocks to depolymerization is a significant barrier for bioenergy production approaches that require conversion of monomeric carbohydrates to renewable energy sources. This study assesses how low-cost modifications in the feedstock supply chain can be transformed into targeted pretreatments in the context of the entire bioenergy supply chain. The aim of this research is to overcome the physiochemical barriers in corn stover that necessitate increased severity in conversion in terms of chemical loading, temperature, and residence time. Corn stover samples were inoculated with a selective (Ceriporiopsis subvermispora) and non-selective (Phaenarochaete chrysosporium) lignin degrading filamentous fungal strains, then stored aerobically to determine the working envelope for fungal pretreatment to achieve lignin degradation. Dry matter loss and gross chemical makeup of corn stover varied by the length of treatment (2 and 4 weeks) and by the moisture content of the treated corn stover samples (40 and 60%, wet basis). Dry matter loss in P. chrysosporium inoculated biomass was elevated compared to the C. subvermispora inoculated biomass; however, treatment also induced additional chemical composition changes suggestive of depolymerization. Scanning electron microscope images reveal hyphae attached within cell lumen and suggest structural changes within P. chrysosporium treated corn stover after 60% moisture storage. These results highlight that fungal treatment approaches must balance loss of convertible material with the potential for reduction in recalcitrance. Techno-economic assessment (TEA) of fungal pretreatment in a short-term queuing system indicated the viability of this approach compared to conventional queuing operations. The total queuing system cost was estimated at $\$$1.65/tonne of biomass stored. After applying the credit of $\$$1.48/tonne from energy savings in the conversion phase using fungal pretreated biomass, the total system cost was $0.80 lower than traditional biomass queueing approach. While the TEA results suggested that treating biomass with C. subvermispora is the most economically viable storage method in the designed fungal-assisted queuing system, future research should focus on additional fungal depolymerization such as those observed in the P. chrysosporium inoculated biomass.

09 BIOMASS FUELS↗

Enabling a Larger Deep Space Mission Suite: A Deep Space Network Queuing Antenna for Demand Access

The advent of deep space small spacecraft, as exemplified by the Mars Cubesat One (MarCO), Lunar Trailblazer, Janus, the Escape and Plasma Acceleration and Dynamics Explorers (EscaPADE), and the thirteen Artemis 1 missions, opens the possibility that a much larger number of deep space spacecraft may be launched over the next 10 years and beyond. While scientifically exciting, the prospect of a (much) larger mission suite raises significant challenges for the current approach to ground stations and mission operations. We have been investigating an integrated approach for ground stations and missions operations to enable new modes of operation while maintaining the capabilities of the current operational techniques. This integrated approach is built around three core capabilities: (1) A queuing antenna that enables monitoring the status of a much larger number of spacecraft, and allows spacecraft to transmit requests for telemetry with NASA’s Deep Space Network (DSN); (2) a flexible scheduling system that expands the current DSN scheduling services to enable allocating time on DSN antennas in near real-time; and (3) a cloud-based ground data system that can be spun up and down according to how tracks are assigned by the flexible scheduling system. We shall show that an 18 meter DSN queuing antenna equipped with cyrogenic receivers would enable use of the DSN Demand Access Service for small spacecraft throughout the inner Solar System, thus providing service to a large mission suite. We first discuss the architecture of the queuing antenna and its supporting systems, including, for instance, the service required to generate the schedule for the queueing antenna (which dictates how it slews to monitor multiple spacecraft in a day of operations). Next, we describe the signaling scheme used to encode a request, which is inherited from the already operational DSN Beacon Tone Service, and describe two alternative ways to detect the incoming tone at the ground station, one based on maximum likelihood estimation (MLE), and another one based on Fast-Fourier Transfer (FFT) processing. We then use these results to estimate the maximum range at which a request can be reliably detected as a function of the spacecraft and ground station communication capabilities. Finally, the last part of this part of this paper briefly describes the prototyping effort undertaken at Morehead State University (MSU) and JPL to demonstrate the viability of this new DSN demand access. In particular, we describe the suite of tests conducted using MSU’s 21 meter ground station to validate its use a queuing antenna.

Mattle, Emily↗

Network Queuing System, Version 2.0

Network Queuing System (NQS) computer program is versatile batch- and device-queuing facility for single UNIX computer or group of computers in network. User invokes NQS collection of user-space programs to move batch and device jobs freely among different computers in network. Provides facilities for remote queuing, request routing, remote status, queue-status controls, batch-request resource quota limits, and remote output return. Revision of NQS provides for creation, deletion, addition, and setting of complexes aiding in limiting number of requests handled at one time. Also has improved device-oriented queues along with some revision of displays. Written in C language.

Walter, Howard↗

Kullback–Leibler Divergence of an Open-Queuing Network of a Cell-Signal-Transduction Cascade

Queuing networks (QNs) are essential models in operations research, with applications in cloud computing and healthcare systems. However, few studies have analyzed the cell’s biological signal transduction using QN theory. This study entailed the modeling of signal transduction as an open Jackson’s QN (JQN) to theoretically determine cell signal transduction, under the assumption that the signal mediator queues in the cytoplasm, and the mediator is exchanged from one signaling molecule to another through interactions between the signaling molecules. Each signaling molecule was regarded as a network node in the JQN. The JQN Kullback–Leibler divergence (KLD) was defined using the ratio of the queuing time (λ) to the exchange time (μ), λ/μ. The mitogen-activated protein kinase (MAPK) signal-cascade model was applied, and the KLD rate per signal-transduction-period was shown to be conserved when the KLD was maximized. Our experimental study on MAPK cascade supported this conclusion. This result is similar to the entropy-rate conservation of chemical kinetics and entropy coding reported in our previous studies. Thus, JQN can be used as a novel framework to analyze signal transduction.

97 MATHEMATICS AND COMPUTING↗

Balancing Charging Station Utilization and Throughput in Electric Vehicle Charging Stations with Queuing Theory

The rapid increase in electric vehicle (EV) adoption demands enhancements in the efficiency and adaptability of EV supply equipment (EVSE). Traditional EVSE systems often fail to optimize power delivery to meet the variable acceptance rates of EV batteries, resulting in significant energy wastage and reduced operational efficiency. This research addresses these challenges by integrating queuing theory with modular EVSE architectures, offering a dual strategy to optimize the operation of EV charging stations. A simulation model was developed to assess various configurations of charger capacities and outlet numbers. This model aimed to identify the optimal setup that maximizes station utilization while minimizing charging times and maximizing throughput. The model focused on charger capacities ranging from 50 to 250 kW and analyzed the different capacities’ effects on charging times and the number of vehicles served. The results indicate that a charger capacity of 125 kW is optimal, striking a balance between the charging time and the number of EVs served per hour, thus achieving the highest station utilization rate. This capacity allows for servicing a significant number of EVs with moderate increases in charging times. Lower capacities, although capable of serving more vehicles, lead to longer charging times and decreased throughput efficiency. The study underscores the effectiveness of combining queuing theory with flexible, modular charging systems that can dynamically adjust to EV charging demands.

Kumar, Praveen↗

A Queuing Theory Approach to Pilot-Controller Coordination for m:N Operations

In recent years, attention and interest by industry and researchers has grown in a control paradigm for remotely piloted aircraft termed “m:N operations.” In an m:N operation, a team of m remote pilots in command (RIPCs) collaboratively manage the flights of N aircraft. A consequence of an m:N concept of operations is that the RPICs will have to switch attention from one aircraft to another and from one task to another. Previous research in m:N operations has focused on the workload experienced by an RPIC and their level of situation awareness on their flights. Researchers have found that RPIC workload and situation awareness are generally sensitive to increasing N, although NASA’s Multi-Vehicle (m:N) Working Group has suggested that the driver of workload/situation awareness is the number of exceptions requiring human intervention as opposed to the value of N itself. In any case, a natural antecedent of workload is task load. In this paper, queueing theory is applied to a 1:N Urban Air Mobility (UAM) air taxi operation in order to estimate pilot task load for managing radio communications with air traffic controllers (ATCs) under increasing N. An M/M/1 queueing system is used to model the RIPC’s servicing of calls and clearance requests (e.g., departure, arrival, or airspace transition) to ATC for the N aircraft. Important parameters for the queueing model are the task arrival rate and the average service time for task completion. Radio communication times from past human-in-the-loop simulation studies are used to measure service times for a 1:4 and 1:12 UAM operation and to interpolate service times for 4 < N < 12. A Monte Carlo method is then employed, using the measured and interpolated service times, to estimate arrival rate and related queueing statistics. The paper concludes by considering the estimated queuing statistics, particularly the RPIC’s utilization (i.e., proportion of time actively servicing tasks), the length of the task queue over time, and the implications for task-balanced system design.

task load↗

Queued Up: 2025 Edition – Characteristics of Power Plants Seeking Transmission Interconnection As of the End of 2024 [Slides]

Electric transmission system operators (ISOs, RTOs, or utilities) require proposed power plants seeking to connect to the transmission grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. The lists of projects in this process are known as “interconnection queues”. In collaboration with interconnection.fyi, Berkeley Lab compiled, aggregated, and cleaned interconnection queue data from >50 transmission grid operators (7 ISO/RTOs and 49 non-ISO balancing areas), which collectively represent ~97% of currently installed U.S. electric generating capacity. The dataset includes requests submitted to queues through the end of 2024, and only includes requests seeking to connect to the transmission grid (not distribution-connected or behind-the-meter projects). The files below include both a PDF report and an Excel data file. The PDF report analyzes interconnection data and metrics through the end of 2024. The Excel data file includes (a) the full project-level interconnection queue dataset through 2024, (b) a codebook (data dictionary) describing each data field, and (c) 35 additional tabs featuring tables summarizing a range of interconnection metrics. Key highlights from the Queued Up: 2025 Edition (featuring data through 2024) include: • As of the end of 2024, there were ~10,300 projects actively seeking grid interconnection in the U.S., representing 1,400 GW of generation and approximately 890 GW of storage. • Historic withdrawal rates alongside relatively fewer new requests resulted in a 12% decrease in total active queue volume compared to the prior year. • Active natural gas capacity (136 GW, +72% year-over-year) increased in 2024, while solar (956 GW, -12%), storage (890 GW, -13%), and wind (271 GW, -26%) capacity decreased. • 408 GW of capacity already has a draft or executed interconnection agreement (IA) but has not yet reached commercial operations. • The time projects spend in queues before reaching COD is increasing. For the regions with available data, the median duration from IR to COD has doubled from <2 years for projects built in 2000-2007 to over 4 years for those built in 2018-2024. • Ultimately, most of this proposed capacity will not be built. Only 13% of capacity that submitted interconnection requests from 2000-2019 had reached commercial operations by the end of 2024; 77% of that capacity had been withdrawn and 10% was still active. • FERC Order 2023 and various other reforms are being implemented. These are important measures to reduce interconnection bottlenecks and enhance grid system reliability, but it is too early to measure and assess their full impact. • New additions for the 2025 edition include: (a) additional detail on data processing and gaps; (b) updates on interconnection reforms; (c) new analysis on interconnection agreements, and more.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Queuing register uses fluid logic elements

Queuing register /a multistage bit-shifting device/ uses a series of pure fluid elements to perform the required logic operations. The register has several stages of three-state pure fluid elements combined with two-input NOR gates.

Source record↗

Some queuing network models of computer systems

Queuing network models of a computer system operating with a single workload type are presented. Program algorithms are adapted for use on the Texas Instruments SR-52 programmable calculator. By slightly altering the algorithm to process the G and H matrices row by row instead of column by column, six devices and an unlimited job/terminal population could be handled on the SR-52. Techniques are also introduced for handling a simple load dependent server and for studying interactive systems with fixed multiprogramming limits.

Herndon, E. S.↗

Priority Queuing On A Parallel Data Bus

Queuing strategy for communications along shared data bus minimizes number of data lines while always assuring user of highest priority given access to bus. New system handles up to 32 user demands on 17 data lines that previously serviced only 17 demands.

Wallis, D. E.↗

Queuing theory models for computer networks

A set of simple queuing theory models which can model the average response of a network of computers to a given traffic load has been implemented using a spreadsheet. The impact of variations in traffic patterns and intensities, channel capacities, and message protocols can be assessed using them because of the lack of fine detail in the network traffic rates, traffic patterns, and the hardware used to implement the networks. A sample use of the models applied to a realistic problem is included in appendix A. Appendix B provides a glossary of terms used in this paper. This Ames Research Center computer communication network is an evolving network of local area networks (LANs) connected via gateways and high-speed backbone communication channels. Intelligent planning of expansion and improvement requires understanding the behavior of the individual LANs as well as the collection of networks as a whole.

Galant, David C.↗

Spreadsheet Analysis Of Queuing In A Computer Network

Method of analyzing responses of computer network based on simple queuing-theory mathmatical models via spreadsheet program. Effects of variations in traffic, capacities of channels, and message protocols assessed.

Galant, David C.↗

Queuing Models of Tertiary Storage

Large scale scientific projects generate and use large amounts of data. For example, the NASA Earth Observation System Data and Information System (EOSDIS) project is expected to archive one petabyte per year of raw satellite data. This data is made automatically available for processing into higher level data products and for dissemination to the scientific community. Such large volumes of data can only be stored in robotic storage libraries (RSL's) for near-line access. A characteristic of RSL's is the use of a robot arm that transfers media between a storage rack and the read/write drives, thus multiplying the capacity of the system. The performance of the RSL's can be a critical limiting factor for the performance of the archive system. However, the many interacting components of an RSL make a performance analysis difficult. In addition, different RSL components can have widely varying performance characteristics. This paper describes our work to develop performance models of an RSL in isolation. Next we show how the RSL model can be incorporated into a queuing network model. We use the models to make some example performance studies of archive systems. The models described in this paper, developed for the NASA EODIS project, are implemented in C with a well defined interface. The source code, accompanying documentation, and also sample JAVA applets are available at: http://www.cis.ufl.edu/~ted/

Johnson, Theodore↗

Modeling Air Traffic Management Technologies with a Queuing Network Model of the National Airspace System

This report describes an integrated model of air traffic management (ATM) tools under development in two National Aeronautics and Space Administration (NASA) programs -Terminal Area Productivity (TAP) and Advanced Air Transport Technologies (AATT). The model is made by adjusting parameters of LMINET, a queuing network model of the National Airspace System (NAS), which the Logistics Management Institute (LMI) developed for NASA. Operating LMINET with models of various combinations of TAP and AATT will give quantitative information about the effects of the tools on operations of the NAS. The costs of delays under different scenarios are calculated. An extension of Air Carrier Investment Model (ACIM) under ASAC developed by the Institute for NASA maps the technologies' impacts on NASA operations into cross-comparable benefits estimates for technologies and sets of technologies.

Long, Dou↗

A Multiple Constraint Queuing Model for Predicting Current and Future Terminal Area Capacities

A new queuing model is being developed to evaluate the capacity benefits of several new concepts for terminal airspace operations. The major innovation is the ability to support a wide variety of multiple constraints for modeling the scheduling logic of several concepts. Among the constraints modeled are in-trail separation, separation between aircraft landing on parallel runways, in-trail separation at terminal area entry points, and permissible terminal area flight times.

Meyn, Larry A.↗

Modeling information flow in a computer processor with a multi-stage queuing model

In this paper, we introduce a nonlinear stochastic model to describe the propagation of information inside a computer processor. In this model, a computational task is divided into stages, and information can flow from one stage to another. The model is formulated as a spatially-extended, continuous-time Markov chain where space represents different stages. This model is equivalent to a spatially-extended version of the M/M/s queue. The main modeling feature is the throttling function which describes the processor slowdown when the amount of information falls below a certain threshold. We derive the stationary distribution for this stochastic model and develop a closure for a deterministic ODE system that approximates the evolution of the mean and variance of the stochastic model. In conclusion, we demonstrate the validity of the closure with numerical simulations.

97 MATHEMATICS AND COMPUTING↗

Queued Up: Characteristics of Power Plants Seeking Transmission Interconnection As of the End of 2020

Proposed large-scale electric generation and storage projects must apply for interconnection to the bulk power system via interconnection queues. While many projects that apply for interconnection are not subsequently built, data from these queues nonetheless provide a general indicator for mid-term trends in developer interest. Berkeley Lab compiled and analyzed data from all seven ISOs/RTOs in concert with 35 non-ISO utilities, representing an estimated 85% of all U.S. electricity load. We include all "active" projects in these generation interconnection queues through the end of 2020, as well as data on "completed" and "withdrawn" projects for five of the ISOs (CAISO, ISO-NE, MISO, NYISO, PJM). We find that the total capacity active in the queues is growing year-over-year, with over 750 GW of generation and an estimated 200 GW of storage capacity as of the end of 2020. Solar (462 GW) accounts for a large – and growing – share of generator capacity in the queues. Substantial wind (209 GW) capacity is also in development, 29% of which is for offshore projects (61 GW). In total, about 680 GW of zero-carbon capacity is currently seeking transmission access, as is 74 GW of natural gas capacity. Hybrids now comprise a large – and increasing – share of proposed projects, particularly in CAISO and the non-ISO West. 159 GW of solar hybrids (primarily solar+battery) and 13 GW of wind hybrids are currently active in the queues. However, much of this proposed capacity will not ultimately be built. Among a subset of queues for which data are available, only 24% of the projects seeking connection from 2000 to 2015 have subsequently been built. Completion percentages appear to be declining, and are even lower for wind and solar than other resources. Additionally, wait times are on the rise: in four ISOs, the typical duration from connection request to commercial operation increased from ~1.9 years for projects built in 2000-2009 to ~3.5 years for those built in 2010-2020. There are growing calls for queue reform to reduce cost, lead times, and speculation.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Queued Up: Characteristics of Power Plants Seeking Transmission Interconnection As of the End of 2021 [Slides]

Proposed large-scale electric generation and storage projects must apply for interconnection to the bulk power system via interconnection queues. While most projects that apply for interconnection are not subsequently built, data from these queues nonetheless provide a general indicator for mid-term trends in developer interest. Berkeley Lab compiled and analyzed data from all seven ISOs/RTOs in concert with 35 non-ISO utilities, representing an estimated 85% of all U.S. electricity load. We include all "active" projects in these generation interconnection queues through the end of 2021, as well as data on "operational" and "withdrawn" projects where those data are available. We find that the amount of new electric capacity in these queues is growing dramatically, with over 1,400 gigawatts (GW) of total generation and storage capacity now seeking connection to the grid (over 90% of which is for zero-carbon resources like solar, wind, and battery storage). Solar (676 GW) and battery storage (~420 GW) are – by far – the fastest growing resources in the queues; combined they accounted for nearly 85% of new capacity entering the queues in 2021. Substantial wind (247 GW) capacity is also seeking interconnection, 31% of which is for offshore projects (77 GW). In total, about 930 GW of zero-carbon generating capacity is currently seeking transmission access, as is 74 GW of natural gas capacity. Hybrids now comprise a large – and increasing – share of proposed projects, particularly in CAISO and the non-ISO West. 286 GW of solar hybrids (primarily solar+battery) and 19 GW of wind hybrids are currently active in the queues; nearly half of battery storage in the queues is paired with generation. However, much of this proposed capacity will be withdrawn from the queues and not built. Among a subset of queues for which data are available, only 23% of the projects seeking connection from 2000 to 2016 have subsequently been built. Completion percentages appear to be declining and are even lower for wind and solar than other resources. Additionally, wait times are on the rise: for the regions with available data, the typical duration from connection request to commercial operation increased from ~2.1 years for projects built in 2000-2010 to ~3.7 years for those built in 2011-2021.

24 POWER TRANSMISSION AND DISTRIBUTION↗