Integrating Systems Engineering Project Management and Quality Management.
Abstract not provided.
SEARCH · Engineering Papers
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Abstract not provided.
Abstract not provided.
Objective: The study presents the application of a simple concept of statistical process control (SPC) for pre-treatment quality assurance procedure analysis for planar dose measurements performed using 2D-array and a-Si electronic portal imaging device (a-Si EPID). Method: A total of 195 patients of four different anatomical sites: brain (n1=45), head & neck (n2=45), thorax (n3=50) and pelvis (n4=55) were selected for the study. Pre-treatment quality assurance for the clinically acceptable IMRT/VMAT plans was measured with 2D array and a-Si EPID of the accelerator. After the γ-analysis, control charts and the quality index Cpm was evaluated for each cohort. Results: Mean and σ of γ ( 3%/3 mm) were EPID γ %≤1= 99.9% ± 1.15% and array γ %<1 = 99.6% ± 1.06%. Among all plans γ max was consistently lower than for 2D array as compared to a-Si EPID. Fig.1 presents the X-bar control charts for every cohort. Cpm values for a-Si EPID were found to be higher than array, detailed results are presented in table 1. Conclusion: Present study demonstrates the significance of control charts used for quality management purposes in newer radiotherapy clinics. Also, provides a pictorial overview of the clinic performance for the advanced radiotherapy techniques.Higher Cpm values for EPID indicate its higher efficiency than array based measurements.
Responses of streamflow and nutrient export to changing climate conditions should be investigated for effective water quality management and pollution control. Using downscaled climate projections and the Soil and Water Assessment Tool (SWAT), we projected future streamflow, sediment export, and riverine nutrient export in the St. Croix River Basin (SCRB) during 2020-2099. Results show substantial increases in riverine water, sediment, and nutrient load under future climate conditions, particularly under the high greenhouse gas emission scenario. Intensified water cycling and enhanced nutrient export will pose challenges to water quality management and affect multiple Best Management Practices (BMPs) efforts, which are aimed at reducing nutrient loads in SCRB. In addition to the physical impacts of climate change on terrestrial hydrology, our analyses demonstrate significant reductions in ET under elevated atmospheric CO2 concentrations. Changes in plant physiology induced by climate change may markedly affect water cycling and associated sediment and nutrient export. Results of this study highlight the importance of examining climate change impacts on water and nutrient delivery for effective watershed management.
Current quality assurance and quality management guidelines provided by various professional organizations are prescriptive in nature, focusing principally on performance characteristics of planning and delivery devices. However, published analyses of events in radiation therapy show that most events are often caused by flaws in clinical processes rather than by device failures. This suggests the need for the development of a quality management program that is based on integrated approaches to process and equipment quality assurance. Industrial engineers have developed various risk assessment tools that are used to identify and eliminate potential failures from a system or a process before a failure impacts a customer. These tools include, but are not limited to, process mapping, failure modes and effects analysis, fault tree analysis. Task Group 100 of the American Association of Physicists in Medicine has developed these tools and used them to formulate an example risk-based quality management program for intensity-modulated radiotherapy. This is a prospective risk assessment approach that analyzes potential error pathways inherent in a clinical process and then ranks them according to relative risk, typically before implementation, followed by the design of a new process or modification of the existing process. Appropriate controls are then put in place to ensure that failures are less likely to occur and, if they do, they will more likely be detected before they propagate through the process, compromising treatment outcome and causing harm to the patient. Such a prospective approach forms the basis of the work of Task Group 100 that has recently been approved by the AAPM. This session will be devoted to a discussion of these tools and practical examples of how these tools can be used in a given radiotherapy clinic to develop a risk based quality management program. Learning Objectives: Learn how to design a process map for a radiotherapy process Learn how to perform failure modes and effects analysis analysis for a given process Learn what fault trees are all about Learn how to design a quality management program based upon the information obtained from process mapping, failure modes and effects analysis and fault tree analysis. Dunscombe: Director, TreatSafely, LLC and Center for the Assessment of Radiological Sciences; Consultant to IAEA and Varian Thomadsen: President, Center for the Assessment of Radiological Sciences Palta: Vice President of the Center for the Assessment of Radiological Sciences.
One of the goals of quality management in radiation therapy is to gain high confidence that patients will receive the prescribed treatment correctly. To accomplish these goals professional societies such as the American Association of Physicists in Medicine (AAPM) has published many quality assurance (QA), quality control (QC), and quality management (QM) guidance documents. In general, the recommendations provided in these documents have emphasized on performing device-specific QA at the expense of process flow and protection of the patient against catastrophic errors. Analyses of radiation therapy incidents find that they are most often caused by flaws in the overall therapy process, from initial consult through final treatment, than by isolated hardware or computer failures detectable by traditional physics QA. This challenge is shared by many intrinsically hazardous industries. Risk assessment tools and analysis techniques have been developed to define, identify, and eliminate known and/or potential failures, problems, or errors, from a system, process and/or service before they reach the customer. These include, but are not limited to, process mapping, failure modes and effects analysis (FMEA), fault tree analysis (FTA), and establishment of a quality management program that best avoids the faults and risks that have been identified in the overall process. These tools can be easily adapted to radiation therapy practices because of their simplicity and effectiveness to provide efficient ways to enhance the safety and quality of treatment processes. Task group 100 (TG100) of AAPM has developed a risk-based quality management program that uses these tools. This session will be devoted to a discussion of these tools and how these tools can be used in a given radiotherapy clinic to develop a risk based QM program. Learning Objectives: Learn how to design a process map for a radiotherapy process. Learn how to perform a FMEA analysis for a given process. Learn what Fault tree analysis is all about. Learn how to design a quality management program based upon the information obtained from process mapping, FMEA and FTA.
The South Coast Air Quality Management District (South Coast AQMD), California Air Resources Board (CARB) and Southern California Association of Governments (SCAG) — the agencies responsible for preparing the State Implementation Plan required under the federal Clean Air Act — have agreed that attainment of federal air quality standards for the region will require a transition to the broad use of zero and near-zero emission energy sources in cars, trucks and other equipment. Accordingly, the 2012 South Coast AQMD Air Quality Management Plan, the SCAG 2012 Regional Transportation Plan, and the “Vision for Clean Air: A Framework for Air Quality and Climate Control Planning” all identify the need to immediately enact a phasing in of zero and near-zero emission technologies to meet air quality goals. In 2014, South Coast AQMD was awarded grant funding under the US Department of Energy Zero Emission Cargo Transport (ZECT) II Demonstration program to develop and demonstrate zero-emission drayage trucks for goods movement operations between the Port of Los Angeles (POLA) and Port of Long Beach (POLB) near dock rail yards and warehouses: 1) development and demonstration of zero-emission fuel cell range extended electric drayage trucks and 2) development and demonstration of hybrid electric drayage trucks. The purpose of this project was to accelerate deployment of zero emission cargo transport technologies to reduce harmful diesel emissions, petroleum consumption and greenhouse gases in the surrounding communities along the goods movement corridors that are impacted by heavy diesel traffic and the associated air pollution. Between 2014 – 2024, six ZECT II zero-emission fuel cell drayage truck platforms, including fuel cell range extended and CNG hybrid trucks, were successfully designed, developed, integrated, built, tested, and demonstrated with drayage fleet operators in transportation corridors within areas of the South Coast AQMD jurisdiction in Southern California such as in and around POLA and POLB. Portable hydrogen refueling was deployed to support the fuel cell vehicles. The project had real-time improvement with on-going debugging and optimizations while the vehicles were under demonstration. All platforms demonstrated sufficient or excess power, torque, and energy to support 82,000lbs Gross Vehicle Weight Rating and gradeability to perform their daily duty cycles. Collectively, the trucks drove over 23,000 miles during their respective demonstration phases. The ZECT II project was the first of its kind to demonstrate the commercial viability that supported the additional technology breakthroughs for Class 8 zero emission trucks and validations as well as the regulatory basis for all the zero-emission regulation that we know today, such as the Innovative Clean Transit regulation, Advanced Clean Trucks and Clean Fleet regulations.
Across the UK a variety of policies and legislation can apply to the management of land quality and several regulators are involved. The risk that such complexity could hamper or delay the delivery of decommissioning and clean-up at nuclear sites, has led to the UK regulators developing a suite of joint expectations for land quality management together with working-together arrangements to support the delivery of these. The UK regulators, in recognition of the complexity of the UK policy and legal framework applying to land contamination on nuclear sites, have collaborated to agree a set of 'joint expectations' for LQM. They address the prevention of contamination and the management of contaminated land and groundwater. They expectations are consistent with regulatory requirements, but provide a simple set of principles that can be applied to all sites and types of potential contamination. This has the advantage of supporting early dialogue with operators and land owners to allow priorities to be agreed and resourced. They also support wider communication with other stakeholders. The UK regulators have embarked on several follow up activities to build on the work in establishing the joint expectations and look for further areas where collaboration will be beneficial.
Building high performing homes (HPH) that are energy efficient, durable, comfortable, and safe to live in does not simply require knowledge of building science principles. It also requires the ability to properly design, specify, and install new technologies and systems. Quality management systems (QMS) provide the infrastructure necessary to ensure repeatability as well as manage continual improvement to increase first time quality, reduce warranty, and increase customer satisfaction. As a result, QMS is needed as the industry shifts from building conventional to HPH and ultimately state-of-the-art homes such those meeting the DOE’s Challenge Home. This guide is designed to help a builder understand quality management and its role in transitioning from conventional to HPH building and remodeling. It addresses the typical quality management systems for new home construction, and also provides context for the use of quality management in existing homes. It explains what quality means, the value of QMS, the unique need for QMS when building HPH, and the first steps to a implementing a comprehensive QMS.
To help SETO/DOE achieve its goals, the IBTS team proposed a project addressing system reliability by improving installation standards and quality management. The proposed approach was designed to help achieve measurable reductions in installation defect density and improvements in the performance of PV systems by optimizing design and installation of residential and commercial PV systems. This approach addressed the soft costs associated with installations and quality management. The project demonstrated improved system reliability and reduced PV system installation costs. The software developed improved operations, decreased risk, and increased the overall value of PV systems across their lifecycle. The project used several data collection methods, including extensive industry surveys, face-to-face high-level interviews at industry conferences, stakeholder teleconferences, and in-depth interviews conducted by IBTS staff. Results from the research found the industry needs a uniform assessment method for national providers to be more efficient; the software should support both code officials and installers; most industry stakeholders would find value in a centralized software system that allows them to collect, report, and review information on in-process and completed solar installations; and mobile solutions that bridge existing knowledge gaps with inspectors and integrate with existing methodologies (such as permitting software) are of great value. The software solution developed is web-based, allowing for national access, and is built on a Google Firebase platform that can handle significant users and data. It can be used onsite or remotely, allowing for code compliance to continue despite ongoing pandemic related delays or shutdowns for local economies. The information provided by the software tool allows users to uniformly assess a system for compliance and use that aggregated data to identify training topics or create internal process designed to improving issues and reducing occurrence. This solution has multiple benefits in managing quality at time of use and promoting an increase in future safety and quality through education. Perhaps most importantly, this software increases public safety by ensuring compliance of installed systems and allows for local AHJs to remotely engage specialized and qualified solar specific expertise for oversite of the installation in their jurisdictions. Data analysis provides the quality feedback loop identifying the root cause of failure and drives installation practices to improve through training and education, resulting in systems with higher performance, greater reliability, and reduced operations and maintenance costs. With the successful completion of this project, the industry can expect reduced soft costs and increased performance and safety and will ultimately benefit from longer performing systems that cost less to operate.
This guide is designed to help Building America (BA) teams understand quality management and its role in transitioning from conventional to high performance home building and remodeling. It explains what quality means, the value of quality management systems, the unique need for QMS when building high performing homes, and the first steps to a implementing a comprehensive QMS. This document provides a framework and context for BA teams when they encounter builders and remodelers.
The increasing complexity of modern radiation therapy planning and delivery challenges traditional prescriptive quality management (QM) methods, such as many of those included in guidelines published by organizations such as the AAPM, ASTRO, ACR, ESTRO, and IAEA. These prescriptive guidelines have traditionally focused on monitoring all aspects of the functional performance of radiotherapy (RT) equipment by comparing parameters against tolerances set at strict but achievable values. Many errors that occur in radiation oncology are not due to failures in devices and software; rather they are failures in workflow and process. A systematic understanding of the likelihood and clinical impact of possible failures throughout a course of radiotherapy is needed to direct limit QM resources efficiently to produce maximum safety and quality of patient care. Task Group 100 of the AAPM has taken a broad view of these issues and has developed a framework for designing QM activities, based on estimates of the probability of identified failures and their clinical outcome through the RT planning and delivery process. The Task Group has chosen a specific radiotherapy process required for “intensity modulated radiation therapy (IMRT)” as a case study. The goal of this work is to apply modern risk-based analysis techniques to this complex RT process in order to demonstrate to the RT community that such techniques may help identify more effective and efficient ways to enhance the safety and quality of our treatment processes. The task group generated by consensus an example quality management program strategy for the IMRT process performed at the institution of one of the authors. This report describes the methodology and nomenclature developed, presents the process maps, FMEAs, fault trees, and QM programs developed, and makes suggestions on how this information could be used in the clinic. The development and implementation of risk-assessment techniques will make radiation therapy safer and more efficient.
This Top Innovation profile describes quality management system tools that were customized for residential construction by BSC, IBACOS, and PHI, for use by builders, trades, and designers to help eliminate mistakes that would require high-cost rework.
Purpose: Since 2008, over 700 patients received high dose rate (HDR) APBI treatment at Virginia Hospital Center. The complexity involved in the planning process demonstrated a broad variation between patient geometry across all applicators, in relation to anatomical regions of interest. A quality management program instituting various metrics was implemented in March 2013 with the goal of ensuring an optimal plan is achieved for each patient. Methods: For each plan, an in-house complexity index, geometric conformity index, and plan quality index were defined. These indices were obtained for all patients treated. For patients treated after the implementation, the conformity index and quality index were maximized while other dosimetric limits, such as maximum skin and rib doses, were strictly kept. Subsequently, all evaluation parameters and applicator information were placed in a database for cross-evaluation with similar complexity. Results: Both the conformity and quality indices show good correlation with the complexity index. They decrease as complexity increases for all applicators. Multi lumen type balloon applicators demonstrate a minimal advantage over single lumen applicators in increasingly complex patient geometries, as compared to SAVI applicators which showed considerably greater advantage in these circumstances. After the implementation of the in-house planning protocol, there is a direct improvement of quality for SAVI plans. Conclusion: Due to their interstitial nature, SAVI devices show a better conformity in comparison to balloon-based devices regardless of the number of lumens, especially in complex cases. The quality management program focuses on optimizing indices by utilizing prior planning knowledge based on complexity levels. The database of indices assists in decision making and has subsequently aided in balancing the experience level among planners. This approach has made APBI planning more robust for patient care, with a measurable improvement in the plan quality.
This article examines the concepts of quality management (QM) and quality assurance (QA), as well as the current state of QM and QA practices in radiotherapy. A systematic approach incorporating a series of industrial engineering-based tools is proposed, which can be applied in health care organizations proactively to improve process outcomes, reduce risk and/or improve patient safety, improve through-put, and reduce cost. This tool set includes process mapping and process flowcharting, failure modes and effects analysis (FMEA), value stream mapping, and fault tree analysis (FTA). Many health care organizations do not have experience in applying these tools and therefore do not understand how and when to use them. As a result there are many misconceptions about how to use these tools, and they are often incorrectly applied. This article describes these industrial engineering-based tools and also how to use them, when they should be used (and not used), and the intended purposes for their use. In addition the strengths and weaknesses of each of these tools are described, and examples are given to demonstrate the application of these tools in health care settings.
The majority of transports of radioactive materials are carried out in packages which don't need a package design approval of a competent authority. Low active radioactive materials are transported in such kind of packages e.g. in the medical and pharmaceutical industry and in the nuclear industry as well. In Germany the decision to phase out nuclear energy leads to a strong demand for packages to transport low and middle active radioactive waste due to the dismantling and decommissioning of nuclear power plants. According to IAEA regulations the 'non-competent authority approved package types' are the excepted packages and the industrial packages of Type IP-1, IP-2 and IP-3 and of Type A. For the packages of Type IP-2, IP-3 and Type A an assessment by the German competent authority is required for the quality management for the design, manufacture, testing, documentation, use, maintenance and inspection. In general a compliance audit of the manufacturer of the packaging is required during this assessment procedure. Their regulatory level in the IAEA regulations is not comparable with the regulatory density for packages requiring competent authority design approval. The countries apply different approaches within the assessment of the quality assurance measures in the management system as well as in the quality assurance program of a special package design. To use the package or packaging in a safe manner and in compliance with the regulations a management system for each phase of the life of the package or packaging is necessary. In order to help manufactures, which measurements and documents are needed for the assessment procedure, BAM developed a guideline. The guideline BAM-GGR 016 [5] describes the needed quality management for the design, manufacture, testing, documentation, use, maintenance and inspection of a packaging and the package. The poster to be presented will explain the different requirements of the quality assurance measures and give examples. (authors)
This Hands-on Workshop will be focused on providing participants with experience with the principal tools of TG 100 and hence start to build both competence and confidence in the use of risk-based quality management techniques. The three principal tools forming the basis of TG 100’s risk analysis: Process mapping, Failure-Modes and Effects Analysis and fault-tree analysis will be introduced with a 5 minute refresher presentation and each presentation will be followed by a 30 minute small group exercise. An exercise on developing QM from the risk analysis follows. During the exercise periods, participants will apply the principles in 2 different clinical scenarios. At the conclusion of each exercise there will be ample time for participants to discuss with each other and the faculty their experience and any challenges encountered. Learning Objectives: To review the principles of Process Mapping, Failure Modes and Effects Analysis and Fault Tree Analysis. To gain familiarity with these three techniques in a small group setting. To share and discuss experiences with the three techniques with faculty and participants. Director, TreatSafely, LLC. Director, Center for the Assessment of Radiological Sciences. Occasional Consultant to the IAEA and Varian.
Data quality assessment, management and improvement is integral part of any big data intensive scientific research to ensure accurate, reliable and reproducible science discoveries. The task of maintaining the quality of data, however, is non-trivial and pose a challenge for a program like Department of Energy’s Atmospheric Radiation Measurement (ARM) that collects data from hundreds of instruments across the world,and distributes thousands of streaming data products that are continuously growing in near-real-time in an archive 1.7 Petabyte in size and growing. We present a computational data processing workflow to collect the data quality issue via an easy and intuitive web-based portal that allows reporting of any quality issues for any site, facility or instruments at a granularity down to individual variable in the data files. Portal allows instrument specialists and scientists to provide corrective actions in form of symbolic equation. A parallel processing framework applies the data improvement to large volume of data in efficient parallel environment, while optimizing data transfer and file I/O operations. Corrected files are systematically versioned and archived. A provenance tracking module tracks and records any change made to the data during its entire life cycle which are communicated transparently to the scientific users. Developed in Python using open source technologies, software architecture enables efficient and fast management and improvement of data in an operational data center environment.