Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “pump-and-treat”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Integrating Analytical Solutions and U-Net Model for Predicting Groundwater Contaminant Plumes in Pump-and-Treat Systems

Pump-and-treat (P&T) is a common technique for groundwater remediation involving the extraction and treatment of contaminated water above ground. Optimizing the design and operation of the P&T well network is essential for maximizing the system’s effectiveness and efficiency. However, this optimization often necessitates many model evaluations, leading to computationally demanding tasks. This study introduces a novel approach that integrates analytical solutions for groundwater dynamics with the U-Net (Ronneberger et al., 2015) deep learning framework to predict groundwater contaminant plume migration under dynamic pumping conditions. By incorporating the Thiem equation (Thiem, 1906) into the input preprocessing, the U-Net model transforms sparse well data into a continuous spatial field that captures the hydraulic impacts of pumping activities. This integration enables the model to leverage both deep learning capabilities and classical physics-based groundwater theories, enhancing prediction accuracy and computational efficiency. These advancements can facilitate rapid, large-scale evaluations of P&T optimization simulations, allowing for timely and effective decision-making in well placement and system management. We demonstrate the model's robust performance across both simplified transient 2D models and a more complex 3D heterogeneous site model at the 200 West P&T facility at the Hanford Site. The U-Net-based model offers substantial computational advantages, reducing simulation times significantly compared to full physics-based models and providing a powerful tool for rapid site evaluation and P&T system optimization, such as evaluating alternative P&T well network designs. Our findings highlight the potential of advanced machine learning models to significantly enhance the efficiency and sustainability of groundwater remediation efforts, offering a novel application of U-Net architecture in environmental science.

Pump-and-treat↗

Groundwater Remediation with Pump-and-Treat Technology

Pump-and-treat (P&T) is a widely used remediation technology that involves pumping groundwater from extraction wells in the subsurface, removing contaminants of concern from the groundwater in an aboveground treatment system, reintroducing treated water into the environment – often by injection back into the groundwater aquifer or by discharge to the surface–, and groundwater monitoring to evaluate performance. In this chapter we explore how the Hanford Site uses the P&T remediation approach to treat contaminated groundwater. Six P&T facilities currently operate at the Hanford Site; however, this chapter uses the 100 Area DX and HX P&T facilities' treatment of hexavalent chromium as a case study to discuss this remediation approach. Located in the River Corridor, HX and DX P&T facilities are much closer to reaching closure than the younger 200W P&T facility located in the Central Plateau’s 200W Area. As such, one can follow the historical design, operation, and optimization steps that have led these facilities closer to closure.

Saslow, Sarah A.↗

Web-Based Tools for Data-Informed Remedy Optimization: Software Theory and User Guide

This report documents the development and application of two web-based decision-support tools for pump-and-treat (P&T) groundwater remediation systems: PTOLEMY (Pump-and-Treat Optimized Location Evaluation to Maximize Yields) and OPTIMA (Optimization for Pump-and-Treat Implementation, Management, & Assessment). These tools enhance remedy design and management by leveraging advanced computational methods – specifically deep learning and multi-objective optimization – within a user-friendly platform. By integrating data-driven models with established hydrogeological knowledge, PTOLEMY and OPTIMA enable more efficient evaluation of well placement and operational strategies, helping site managers balance multiple remediation objectives under complex conditions. Both tools are implemented as modules within the SOCRATES (Suite Of Comprehensive Rapid Analysis Tools for Environmental Sites) web platform, which provides data access, visualization, and analytics to support remedy optimization across sites in the U.S. Department of Energy Office of Environmental Management complex. PTOLEMY is a rapid screening module designed to identify promising locations for new extraction wells. It employs a multi-channel three-dimensional convolutional neural network (MC3D-CNN) trained on high-fidelity simulation data to predict the relative performance (in terms of contaminant mass recovery) of potential well sites. Through an interactive web interface, PTOLEMY visualizes the probability of high performance across a site, highlighting areas where an extraction well is likely to yield above-threshold contaminant removal over a multi-year period. PTOLEMY’s map-based displays and exportable results support transparent communication of screening analyses. By focusing attention on the most favorable candidate locations, the tool augments traditional engineering judgment and physics-based modeling, providing a data informed basis for subsequent detailed evaluations. OPTIMA is a multi objective optimization module designed to find wellfield layouts and operating schedules that meet various cleanup goals. It quickly evaluates thousands of candidate setups – combinations of well locations, timing, and rates – and returns a small set of best trade-off options for comparison. At its core, OPTIMA uses a U-Net-based surrogate model – a deep-learning emulator of a groundwater flow and transport simulator – to dramatically accelerate scenario evaluations. Coupling this fast surrogate with the NSGA-II (Non-dominated Sorting Genetic Algorithm II) evolutionary algorithm, OPTIMA explores a wide decision space of well locations and schedules to identify Pareto-optimal solutions that trade off key objectives (e.g., minimizing cleanup time, maximizing contaminant mass removal, and minimizing plume extent). The tool outputs a family of optimal configurations and visualizes their trade-offs (Pareto frontiers of cleanup metrics and maps of optimized well placements). Site managers can use these results to understand the range of viable strategies and to select candidate designs for more detailed verification. OPTIMA is currently under active development and not yet fully released; this guide provides early documentation to support planning and gather user feedback.

54 ENVIRONMENTAL SCIENCES↗

Part I: Predicting performance of Purolite A532E resins for remediation of comingled contaminants in groundwater

Ion exchange (IX) resins are used in pump-and-treat (P&T) facilities to remove soluble groundwater contaminants. However, natural anions present at concentrations orders of magnitude higher than contaminants can compete for IX sites and impact resin lifecycles. Here, the Hanford Site’s 200 West Area P&T facility (Washington State, USA) was selected as a case study because it currently uses two IX resins: Purolite® A532E (A532E) to remove pertechnetate (TcO 4 - ) and DOWEX 21K (DOWEX) to remove uranium from groundwater. Nitrate (NO 3 - ), sulfate (SO 4 2- ), chloride (Cl - ), and carbonate (CO 3 2- ) anions have been identified to potentially compete for A532E and DOWEX IX sites. Hanford-relevant anion groundwater concentrations were used to design a series of laboratory-scale batch experiments to evaluate the impact of competing anions on resin performance and potential kinetic effects. These data are then modeled to obtain Cl--normalized equilibrium exchange coefficients (K) needed to predict IX resin performance. The work is presented in two parts, with IX performance evaluated for A532E in Part I and DOWEX in Part II. Part I results demonstrate that TcO 4 - uptake is not impacted by NO 3 - , SO 4 2- , Cl - , CO 3 2- (as HCO 3 - ) and U(VI) carbonate anions, with K TcO4-/Cl- > 4,000, likely due to the high selectivity of A532E trihexylammonium sites for the large, weakly hydrated TcO 4 - anion. Other anion K values were K NO3-/Cl- = 20, K SO4--/Cl- = 0.2, K HCO3-/Cl- = 0.09, K U/Cl- = 370–1000. These K values provide conservative parameters for predicting A532E performance, and demonstrate that, under these test conditions, A532E will remove TcO 4 - from current and future influent streams to meet groundwater treatment objectives.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Part II: Predicting performance of $\mathrm{DOWEX 21K}$ resin for remediation of comingled contaminants in groundwater

The selectivity of ion exchange (IX) resins for aqueous contaminant removal can be impacted by changing concentrations of competing natural groundwater ions. In a two-part investigation, the Hanford Site 200 West Area pump-and-treat (P&T) facility in Washington State, USA is used as a case study to evaluate the performance of two IX resins for groundwater treatment: Purolite® A532E for pertechnetate (TcO 4 - ) removal, explored in Part I, and DOWEX 21K (DOWEX) for uranium (U) removal. In Part II, DOWEX selectivity for U, as uranyl carbonate species, and uptake kinetics is quantified in a series of laboratory-scale aqueous batch experiments containing Hanford-relevant concentrations of competing anions nitrate (NO 3 - ), sulfate (SO 4 2- ), chloride (Cl - ), and carbonate (CO 3 2- ), as well as co-mingled contaminant TcO 4 - . Here the results demonstrate that DOWEX trimethylammonium functional groups are highly selective for U carbonate species (85–100 % uptake) under all conditions investigated. Only NO 3 - concentrations of 100 mM were shown to decrease U removal, with the extent (85–99 %) depending on competing anion concentrations present in solution. However, at the highest NO 3 - concentrations reported for groundwaters treated at the P&T facility (25 mM), the effect on U uptake is minimal. The batch sorption results are modeled to obtain chloride normalized equilibrium exchange coefficients (K) for predicting DOWEX performance: K SO4--/Cl- = 2.0, K NO3-/Cl- = 5.0, K HCO3-/Cl- = 1.5, K TcO4-/Cl- = 2,000, and K U/Cl- = 50,000. These K values predict little effect of current and future influent chemistries on U removal by DOWEX, where both uranyl carbonate species and TcO 4 - are removed such that effluent concentrations meet groundwater treatment requirements.

54 ENVIRONMENTAL SCIENCES↗

Predicting future well performance for environmental remediation design using deep learning

Here in this study, we developed a deep learning (DL) framework with a multi-channel three-dimensional convolutional neural network (MC3D-CNN) to predict well performance and thereby assist future environmental remediation design. Such prediction of extraction well performance at designated locations is critical for configuring pump-and-treat (P&T) well network design and operation, setting reasonable target closure dates for overall remedying, and estimating remedy costs. The framework is developed with operational and monitoring data routinely collected during P&T remedy operations, including well extraction and injection rates as well as in situ contaminant concentrations. Traditionally, the collected data were rarely used for purposes other than assessing past well performance and the accuracy of the conceptual site model. However, recent advances in data-driven computational approaches enable better use of the large datasets to inform future well performance, enhance site characterization, and improve remediation planning. In this study, we established a DL framework to integrate transient three-dimensional contaminant plumes and multiple aquifer properties (e.g., hydraulic conductivity and hydrostratigraphic maps) to identify characteristic patterns controlling and representing extraction well mass recovery, aiming at providing future mass recovery estimates for existing wells and candidate wells at any proposed locations. We evaluated our framework by using a realistic synthetic dataset generated from a well-calibrated flow and transport model used in the 200 West Area of the U.S. Department of Energy’s Hanford Site in southeastern Washington state. The multi-channel feature in our framework allows integration of various types and temporal densities of training datasets for DL model development. Overall, we found that the trained DL model achieved an accuracy of over 90% in ranking extraction well performance in validation datasets, and over 80% in predicting high-performance-ranking well locations. This data-informed approach provides a flexible tool to support adaptive site management, streamline decision-making, and potentially reduce remediation time and costs. Our DL framework can be used as a filtering tool to improve the current P&T network optimization design by reducing the number of candidate well locations.

54 ENVIRONMENTAL SCIENCES↗

Vadose Zone Soil Flushing for Chromium Remediation: A Laboratory Investigation to Support Field‐scale Application

Cr(VI) flushing from the vadose zone to the groundwater (with subsequent Cr(VI) removal in groundwater by pump-and-treat system) is a promising remedial technique that has recently been used at field scale. This laboratory study was conducted to provide the technical basis to design a field soil flushing strategy. The objectives were to (1) quantify the relationship between sediment Cr(VI) and Cr(III) mass and release rates and subsequent Cr(VI) leaching; (2) investigate different methodologies to maximize Cr(VI) leaching, and (3) investigate methods to minimize leaching of remaining residual Cr. Characterization of Cr-contaminated sediments (Hanford Site, WA) exhibited Cr(VI) showed that leach rates that were correlated to different Cr surface phases. Sediments with low leachable Cr(VI) (<2 μg/g) leached Cr rapidly, so slow infiltration of water in a single pulse was sufficient to leach most Cr. In contrast, sediments with high Cr (2 to 200 μg/g) released some Cr(VI) quickly but 10 to 50% Cr(VI) slowly (tens to hundreds of hours). Efficient unsaturated leaching of these sediments required a different infiltration strategy that includes: multiple slow leach pulses with time between flushing cycles; the use of a surfactant to increase Cr leaching from low-permeability zones, and the use of a reductant (Na-dithionite or Ca-polysulfide) in the final leach water was highly effective at decreasing residual Cr leaching. This study clearly demonstrated that the methodology of basing laboratory Cr flushing on parameters such as Cr release mass and rates could be used to improve the efficiency of soil flushing at field scale.

Accelerated Cr Flushing↗

Applied Science Investigations to Facilitate Closure of the F-Area and H-Area Seepage Basins

This report provides a roadmap of applied science studies that will facilitate reaching long term monitoring end state corrective actions for groundwater contamination at the F-Area Seepage Basins and the H-Area Seepage Basins at the Savannah River Site in Aiken, SC. The F-Area and H-Area Seepage Basins are waste units on the Savannah River Site in Aiken, SC at which low-level radioactive solutions were disposed into unlined basins, resulting in groundwater contamination. The current contaminants of interest in the groundwater are tritium, iodine-129, strontium-90, uranium isotopes and nitrate. Remediation at both sites has continued since 1988, consisting of closure and capping of the basins, operation of a groundwater pump-and-treat system from 1997 to 2004, and replacement of this system with a comprehensive in situ attenuation-based remedy. This report was requested by the U.S. Department of Energy - Office of Environmental Management in consultation with the Savannah River National Laboratory and Savannah River Nuclear Solutions - Area Completions Projects to provide a scientific basis for proactively addressing groundwater issues that may need to be resolved prior to final corrective actions at the F-Area and H-Area Seepage Basins.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Guidance for Monitoring Passive Groundwater Remedies Over Extended Time Scales

Passive remediation can be appropriate where natural processes and actions such as institutional controls mitigate exposure to contaminated groundwater, achieving remedial action objectives and protectiveness of human health and the environment. Monitored natural attenuation (MNA) is a prevalent passive remediation strategy supported by a regulatory framework and monitoring design guidance. MNA can also be used after active remediation has been completed (e.g., pump-and-treat) as a polishing step to reach ultimate remedial action objectives. However, MNA and existing monitoring guidance primarily target situations where the remedial action objectives are met within a few decades. When timescales for passive remediation extend to many decades, a corresponding change in monitoring strategy is needed to adapt to the extended time scale. This document provides guidance for implementing an extended-scale monitoring (ESM) approach appropriate for long-duration passive remediation. Extended-scale is defined in this document with respect to time (i.e., a long duration of remediation) and a large enough physical scale such that receptors will not be impacted within the remediation timeframe.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Spatiotemporal Analyses of Groundwater and Shoreline Cr(VI) Concentrations in the 100 Areas at Hanford

Cleanup efforts have been ongoing since the late 1990s to remediate contaminated waste sites and groundwater in the 100 Areas at the U.S. Department of Energy (DOE) Hanford Site. One of the primary contaminants of concern is hexavalent chromium (Cr(VI)), which was used as a corrosion inhibitor in cooling water for nuclear reactors that formerly operated along the shoreline of the Columbia River. Cleanup efforts have included 1) removal, treatment (as needed), and disposal of contaminated sediments; 2) in situ redox manipulation as a permeable reactive barrier; 3) pump-and-treat; 4) soil flushing; and 5) monitored natural attenuation. DOE’s annual groundwater monitoring reports document the significant reductions in Cr(VI) plume areas that have occurred over the past 10 years or more as a result of these cleanup efforts. The Record of Decision for the 100-HR-3 operable unit specified a cleanup level (CUL) for Cr(VI) in groundwater of 48 µg/L to protect human receptors, and a surface water CUL of 10 µg/L to protect aquatic organisms in the Columbia River. The Record of Decision did not specify point-of-compliance locations for the surface water CUL. Data for 2019 from the six groundwater operable units (OUs) in the 100 Areas indicate that the 48 μg/L groundwater CUL has been achieved in 100% of the wells in the 100-BC and 100-NR OUs, and in 89- 97% of the wells in the other OUs (100-KR, 100-HR-D, 100-HR-H, 100-FR). Data for 2019 indicate that 100% of the aquifer tubes monitored for Cr(VI) in the 100 Areas have concentrations below the 48 μg/L groundwater CUL. However, the 10 μg/L standard has not yet been consistently achieved for both inland groundwater monitoring wells and shoreline aquifer tubes. This report describes a series of data analyses performed to identify consistent relationships, if any, between inland well and shoreline Cr(VI) concentrations within the 100 Areas. To this end, select monitoring data for Cr(VI) measured in groundwater and aquifer tubes at the 100 Areas were analyzed for a 10-year period—2010 to 2019. Relationships between inland groundwater plumes and surface-water points of discharge in and along the Columbia River were examined through several analyses that included inland well and aquifer tube concentrations as a function of distance from the shoreline, evaluation of cumulative probability plots, trend analysis, correlation analysis, cluster analysis, and identification of plume trajectories for each of the 100 Areas. The analyses did not identify consistent relationships between inland groundwater Cr(VI) concentrations and shoreline concentrations within the 100 Areas due to several confounding factors influencing groundwater flow directions and Cr(VI) concentrations. The proximity of groundwater Cr(VI) plumes to the river, and the highly dynamic nature of the river, influence the transport behavior of the plumes and create challenges for quantifying attenuation of Cr(VI) between the inland monitoring wells and shoreline concentrations. Other factors contributing to temporal and spatial Cr(VI) concentrations, as supported by some of the data analyses, include the presence of vadose zone sources, variable sorption behavior, and complexities associated with Cr(VI) mass transfer between the upper and lower aquifers and their interactions with the river. Hence, monitoring to assess compliance with target CULs will need to be determined for each area individually since several factors influence Cr(VI) concentrations in the 100 Areas.

54 ENVIRONMENTAL SCIENCES↗

Western Sector In-Situ Chemical Oxidation Project: Additional Injection Pilot Testing Supplemental Results (U)

Trichloroethylene (TCE) and tetrachloroethylene (PCE) are persistent at elevated concentrations in the Western Sector of the M-Area Hazardous Waste Management Facility (HWMF) groundwater plume. Migration of these chlorinated ethenes as Dense Non-Aqueous Phase Liquids (DNAPLs) occurred from the M-Area Settling Basin along geologic strata resulting in a high concentration groundwater plume in Western Sector. Pump-and-treat has been active for over 30 years at the M-Area HWMF to hydraulically contain the primary sources of the plume in addition to other remediation strategies throughout the contaminated zone, like soil vapor extraction, dynamic underground stripping, groundwater recirculation wells, and bioremediation. In-situ chemical oxidation (ISCO) has been identified as a viable treatment method for removal of these volatile organic compounds (VOCs) due to the complex lithology and high concentrations in this part of the aquifer. In addition to ISCO, a new recovery well (i.e., RWM018) was also installed in Western Sector to contain the high concentration VOC plume. The ISCO projects have utilized the gradient induced by RWM018 to help plan the injection and monitoring locations. The combination of ISCO and the additional pump and treat in Western Sector with the installation of RWM018 will help to control the plume and maximize remediation efforts.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Analysis of Microbial Communities as Indicators of Microbially Induced Corrosion Potential in Stainless Steel Piping

The 200 West Area Pump-and-Treat (200W P&T) facility is part of the final remedy decision for the 200 ZP-1 Operable Unit (OU) and is the interim remedial action for 200-UP-1 OU at the Hanford Site. The facility also treats water from other sources across the site, including 200-DV-1 OU perched water, groundwater from the 200-BP-5 OU, and leachate from the Environmental Restoration Disposal Facility. The facility originally operated a biological treatment process for nitrate that resulted in systemic biofouling and loss of injection well capacity, requiring frequent and costly well rehabilitation. Biofouling has also contributed to corrosion of welds and pitting of stainless-steel piping at the facility. The biological treatment for nitrate was suspended at the end of 2019 calendar year to eliminate negative impacts from biological treatments which improve facility operations and treatment of carbon tetrachloride. Evaluation of the 200W P&T facility’s response to operational improvements, specifically the suspension of the biological treatment, provides information on the potential for continued microbially induced corrosion (MIC). To this end, historical data sets (2015-2017) were compared with molecular biological analyses of 200W P&T water samples from 2018-2020 to quantify trends in total microbial biomass and specific microbial indicator species (iron, sulfate, nitrate, and manganese reducing bacteria) known to cause and enhance metal corrosion. Results showed unequivocal reductions (in excess of 90%) in all microbiological indicators measured following the suspension of the biological treatment. Although abundance measurements for all corrosive MIC populations initially declined after removal of the treatment system, nitrate-reducing bacteria (nirK) and sulfate-reducing bacteria remain highly abundant in the system, an order of magnitude higher than the number of cells present prior to the removal of the biological treatment system [5.14e (1.4) cells/L, vs. 1.14e (0.07) cells/L, reported as average (±SD) for n=3]. In addition, there was an unexpected inflection point in 2019 where all microbial indicators increased unexpectedly in abundance in 2020 by as much as two orders of magnitude compared to 2019 samples. Given the limited number of water samples available for this analysis, the cause of the increase in microbial indicators post-biological treatment has not yet been determined. Systematic sampling of the facility for continued monitoring is recommended so that the responses of MIC populations can be evaluated to ensure that further corrosion is avoided, allowing the 200W P&T facility to operate safely and efficiently at design capacity.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Adaptive Site Management Strategies for the Hanford Central Plateau Groundwater

Adaptive site management (ASM) is a systematic and iterative management approach that can be used to expedite the remediation of large and/or complex sites. ASM is defined as a formal and systematic project or site management approach centered on rigorous site planning and a firm understanding of site conditions and uncertainties, using science and technology to routinely re-evaluate and prioritize site remedial actions and characterization activities. The goal of the approach is to create a framework of structured and continuous planning, implementation, and assessment processes that accommodates new information and changing site conditions to develop effective and efficient cleanup approaches that achieves the required outcome(s) while optimizing costs, cleanup timeframe, and performance. Central to ASM is an evolving conceptual site model (CSM). Over time, incremental reductions in uncertainty associated with the CSM will occur, while supporting continued progress toward site cleanup and closure through remedy optimization and evaluation. ASM has the potential to expedite cleanup for the Central Plateau area at Hanford through a planned and systematic approach for reducing uncertainty with targeted characterization activities, while continuing remediation activities that advance cleanup for key risk-driving contaminants. A core component of cleanup within the Central Plateau is the 200 West Pump-and-Treat (P&T) system. Even with an active P&T remedy, uncertainty exists with respect to plume distributions, total mass in the aquifer, and currently known continuing sources. Additional uncertainty is associated with multiple contaminant source locations in the vadose zone, which have the potential to create new groundwater plumes in the absence of any source control measures, although not all contaminant fluxes to groundwater will result in contaminant concentrations above cleanup levels. Collectively, these uncertainties need to be addressed in the CSM to support effective and efficient site progress toward cleanup goal(s). Other nontechnical factors that may warrant an ASM approach at the Hanford Central Plateau are associated with the formation of operable units (OUs) used to manage cleanup. With the exception of the 200-ZP-1 OU, the three remaining groundwater OUs only have interim action records of decision. Nine vadose zone source area OUs are also in the early stages of the remedial investigation and feasibility study process, with pending characterization and technology identification activities. A set of proposed site objectives for the Central Plateau are provided in this document as an initial consideration/example and basis for discussion for ASM implementation. These example site objectives were selected with the goal of maintaining protectiveness at the Columbia River through confinement of contaminant plumes within an administratively controlled area below existing surface waste sites and waste disposal facilities. Although site decision makers and regulators need to provide concurrence, these site objectives are used in this document to describe the elements of an ASM approach, including selection of interim objectives and a long-term adaptive management plan. Interim objectives are also defined to yield measurable incremental progress toward the overall site goals. This document identifies initial technical considerations for developing an ASM framework for the Central Plateau cleanup decisions. These considerations are intended to facilitate more specific decisions, such as objectives, near- and long-term actions, and performance metrics, to develop an overall approach that maintains protectiveness but recognizes the uncertainty, long timeframe, and technical challenges that need to be considered in selecting, implementing, and managing remediation at the Hanford Central Plateau.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

An Online Prototype Toolset for Predicting and Optimizing P&T Performance (FY23 Status Report)

A new web-based toolset is being developed to support ongoing remediation optimization efforts and implementation of an adaptive site management strategy for the 200 West Area Pump-and-Treat (P&T) system at the Hanford Site. This toolset, comprising the well performance index tool and the well optimization pre-screening tool, will offer a user-friendly interface to predict and optimize the P&T well network’s performance at a preliminary level. Efforts in fiscal year (FY) 2023 focused on three main components: updating the existing deep learning model for predicting P&T performance, designing and developing a prototype of a web-based performance index tool, and initiating the conceptual design of the well optimization pre-screening tool. The well performance index tool is based on a pre-trained deep learning model that allows users to select a target contaminant and well screen length, then visualize the predicted performance of potential new wells across the site. The well optimization pre-screening tool includes two separate modules: the pre-computed scenario viewer, which organizes and visualizes offline optimization simulation results, and the quick analysis module, which provides real-time model prediction using user-specified well locations. In FY24, the plan is to add web-based applications to SOCRATES for both the well performance prediction tool and the optimization prescreening tool, with accompanying user and theory guides. These tools are intended to enable an accessible, easily applied, and transparent approach to remedy planning and decision-making.

97 MATHEMATICS AND COMPUTING↗

Online Analytics for Remedy Support at DOE Environmental Management Sites

Environmental data is important for managing environmental restoration/waste site remediation, planning of monitoring efforts, addressing climate resilience, and engaging with stakeholders and regulators. A major challenge is how to manage the many different types and the large volume of environmental data in a way that allows practitioners and site managers to understand data implications and support decisions. The Suite Of Comprehensive Rapid Analysis Tools for Environmental Sites (SOCRATES, https://www.pnnl.gov/projects/socrates) is a web application that provides data access, visualization, and rapid analytics to help make sense of environmental data, support remedy decisions, and communicate information. Development of SOCRATES has been funded through the DOE Richland Operations Office (RL) to support communication and decision making for the Hanford Site, thus is only tied into Hanford environmental data. However, the capabilities of SOCRATES are more broadly applicable to DOE-EM sites engaged in environmental remediation and management. This report describes the work to develop mechanisms for bringing non-Hanford data into SOCRATES so that other DOE-EM sites could make use of the visualization and analysis capabilities to support communication and decision making related to managing environmental restoration/waste site remediation, optimization/exit strategies for pump-and-treat systems, planning monitoring efforts, addressing climate resilience, and/or engaging with stakeholders and regulators. The background, approach, data transfer formats, examples, and next steps for this new SOCRATES-EM software are described in this report.

54 ENVIRONMENTAL SCIENCES↗

Guidance for Monitoring Passive Groundwater Remedies Over Extended Time Scales

Passive remediation can be appropriate where natural processes and actions such as institutional controls mitigate exposure to contaminated groundwater, achieving remedial action objectives and protectiveness of human health and the environment. Monitored natural attenuation (MNA) is a prevalent passive remediation strategy supported by a regulatory framework and monitoring design guidance. However, long-term passive remedies are usually selected in combination with at least one active remedy, such as source removal, in situ treatment, or pump-and-treat, functioning as a complementary method for achieving remediation objectives and meeting the applicable statutory and regulatory requirements. However, MNA and existing monitoring guidance primarily target situations where the remedial action objectives are met within a few decades. When time scales for passive remediation extend to many decades (50 years or more), a corresponding change in monitoring strategy is needed to adapt to the extended time scale. This document provides guidance for implementing an extended-scale monitoring (ESM) approach appropriate for long-duration passive remediation. Extended-scale is defined in this document with respect to time (i.e., a long duration of remediation) and a large enough physical scale such that downstream receptors will not be impacted within the remediation timeframe. ESM applies to slow-moving groundwater contaminant plumes and emphasizes monitoring primarily for potential exposure pathways. For this approach, the primary monitoring objective is to demonstrate that the plume diminishes before reaching the receptor zone or point of compliance and/or a receptor does not receive concentrations above the compliance limit. While the overall objectives of protecting human health and the environment are the same as for plumes where remediation can occur over a shorter time period, the time scales between decisions are longer and the dynamics of plume evolution are slower. To this end, a scenario-based strategy is described for different plume and source conditions, defining a containment and receptor zones. The containment zone is the area where the risk of exposure to groundwater contamination can be mitigated (e.g., through institutional controls) during the remediation time period. The receptor zone is defined as the area where exposure to groundwater contamination cannot be mitigated and compliance concentration standards must be met. Within the containment zone, slow plume migration may occur, leading to concentrations that exceed compliance standards. However, where distance to the receptor zone is large relative to plume migration and attenuation rate, this approach can be protective of the receptor zone. Selection of a long-duration passive remedy needs to be based on sufficient understanding of contaminant sources, hydrogeology, and contaminant plumes. A strong technical basis, supported by predictive analysis, is recommended to substantiate that contamination is expected to stay within the containment zone during the active remediation and attainment phase of the remedy, and diminish to meet compliance standards within the extended timeframe prior to reaching the receptor zone (e.g., many decades or even centuries). The ESM approach is based on verification of plume behavior and not on detailed plume dynamics. Monitoring is conducted to confirm expected behavior with an emphasis on exposure pathways to verify that plumes remain contained in areas where the protectiveness objectives can be met. ESM should not be adopted if there is significant risk of the plume extending beyond the containment zone. Given the slow movement within the containment zone, less frequent sampling is required relative to approaches used for conventional-scale remediation.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Aquifer Hydraulic Testing and Characterization Plan for the Ringold Formation Unit A in the Hanford 200-ZP-1 Groundwater Operable Unit and Vicinity

This document presents a plan for testing and characterizing the hydraulic properties of the Ringold Formation, member of Wooded Island – unit A (Rwia) in the 200-ZP groundwater operable unit. The testing approach includes multiple field methods and associated analyses designed to investigate and understand aquifer hydraulic properties over a range of scales. Testing was designed to achieve specific testing objectives identified previously in the 200 ZP-1 Groundwater Operable Unit Ringold Formation Unit A Characterization Sampling and Analysis Plan (Ringold A SAP). The test plan provides necessary technical and operational detail for writing subsequent field test instruction documents specific to each testing location. Hydraulic characterization activities will proceed in a phased manner focusing on areas identified to have knowledge gaps and also critical for remedy modifications and/or selection. These activities are designed to minimize impact to pump-and-treat (P&T) operations and to use existing P&T injection and extraction wells as stress wells, and include use of the new Rwia monitoring wells installed for Ringold A SAP activities. ZP-1 hydraulic testing will include slug testing in new Rwia wells, shutdown-recovery tests in multiple Rwia and composite Ringold Formation member of Wooded Island – unit E (Rwie)-Rwia aquifer test locations, installation of new Automated Water Level Network stations in Rwia monitoring wells, characterization of P&T and barometric responses, identifying the vertical distribution of hydraulic conductivity in the Rwia and Rwie units using electromagnetic borehole flowmeter tests, and single-well tracer testing in select Rwia monitoring wells. Slug testing to be conducted during drilling is described under the Ringold A SAP. The remaining testing activities are to be conducted after well drilling and completion and are described in this test plan.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Intermediate Scale Test Platform Conceptual Design and Hybrid Resin Performance Evaluation Recommendations

Recent laboratory evaluations demonstrated that further testing of alternative hybrid resins is warranted for their potential use as part of the 200 West Area (200W) pump-and-treat (P&T) remedy. 200W P&T has been treating technetium (Tc) since 2012 and uranium (U) since 2015 via two separate ion exchange (IX) treatment units: a single treatment train (i.e., a three-vessel system) for the removal of uranium utilizing a gel strong base anion (SBA) exchange resin, Dowex 21K; and two parallel treatment trains for the removal technetium using a gel SBA resin, Purolite® A532E. While these resins have been removing these contaminants effectively, new hybrid resins can provide additional benefits of further optimizing the IX treatment unit capacities and addressing additional treatment needs (e.g., Cr(VI)) by removing multiple contaminants simultaneously and/or through specific design configurations. Some of these resins also demonstrated some level of removal for I-129 which would be significant for expansion of the P&T into the 200 East Area. This document provides design recommendations for an intermediate scale test platform (ISTP) to evaluate alternative hybrid IX resin performance under conditions approaching field scale and using 200W P&T process groundwater. Results from the ISTP will provide the technical basis required to inform alternative IX resin selection in future 200W P&T facility operations where the treatment of multiple contaminants of concern may be required.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗