Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “pump and treat”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Integrating Analytical Solutions and U-Net Model for Predicting Groundwater Contaminant Plumes in Pump-and-Treat Systems

Pump-and-treat (P&T) is a common technique for groundwater remediation involving the extraction and treatment of contaminated water above ground. Optimizing the design and operation of the P&T well network is essential for maximizing the system’s effectiveness and efficiency. However, this optimization often necessitates many model evaluations, leading to computationally demanding tasks. This study introduces a novel approach that integrates analytical solutions for groundwater dynamics with the U-Net (Ronneberger et al., 2015) deep learning framework to predict groundwater contaminant plume migration under dynamic pumping conditions. By incorporating the Thiem equation (Thiem, 1906) into the input preprocessing, the U-Net model transforms sparse well data into a continuous spatial field that captures the hydraulic impacts of pumping activities. This integration enables the model to leverage both deep learning capabilities and classical physics-based groundwater theories, enhancing prediction accuracy and computational efficiency. These advancements can facilitate rapid, large-scale evaluations of P&T optimization simulations, allowing for timely and effective decision-making in well placement and system management. We demonstrate the model's robust performance across both simplified transient 2D models and a more complex 3D heterogeneous site model at the 200 West P&T facility at the Hanford Site. The U-Net-based model offers substantial computational advantages, reducing simulation times significantly compared to full physics-based models and providing a powerful tool for rapid site evaluation and P&T system optimization, such as evaluating alternative P&T well network designs. Our findings highlight the potential of advanced machine learning models to significantly enhance the efficiency and sustainability of groundwater remediation efforts, offering a novel application of U-Net architecture in environmental science.

Pump-and-treat↗

Groundwater Remediation with Pump-and-Treat Technology

Pump-and-treat (P&T) is a widely used remediation technology that involves pumping groundwater from extraction wells in the subsurface, removing contaminants of concern from the groundwater in an aboveground treatment system, reintroducing treated water into the environment – often by injection back into the groundwater aquifer or by discharge to the surface–, and groundwater monitoring to evaluate performance. In this chapter we explore how the Hanford Site uses the P&T remediation approach to treat contaminated groundwater. Six P&T facilities currently operate at the Hanford Site; however, this chapter uses the 100 Area DX and HX P&T facilities' treatment of hexavalent chromium as a case study to discuss this remediation approach. Located in the River Corridor, HX and DX P&T facilities are much closer to reaching closure than the younger 200W P&T facility located in the Central Plateau’s 200W Area. As such, one can follow the historical design, operation, and optimization steps that have led these facilities closer to closure.

Saslow, Sarah A.↗

Analytical Functions for 200 West Pump-and-Treat SCADA Sensor Data

Historical operations at the U.S. Department of Energy’s Hanford Site included disposal of waste fluids to the subsurface in the 200 West Area on the Hanford Central Plateau. Subsequent infiltration of fluids has resulted in groundwater contamination with carbon tetrachloride, nitrate, uranium, technetium-99, and other contaminants. A pump-and-treat (P&T) system, with an extraction/injection well network and an aboveground treatment plant, was implemented as part of interim and final remedies in the 200 West area. The HYPATIA single-page web application (part of the SOCRATES suite) is being developed to provide access to and analysis of chemistry and treatment facility sensor data for this 200 West P&T system. For the web application, analytical algorithms were developed to perform summing, differencing, smoothing, outlier detection, change-point detection, mass flow rate, and injectivity calculations on the data. Candidate algorithms were identified and tested, with the best-performing algorithms then assembled for implementation in HYPATIA. Because HYPATIA is hosted on the Amazon Web Services (AWS) cloud computing platform, algorithms were implemented in a back-end AWS Lambda function that can be called by the HYPATIA front end. The Lambda function applies the requested data processing to specified data via functions written in R, Python, and JavaScript. Development, testing, and review of the data analysis algorithms was completed under an NQA-1 quality program. This new HYPATIA functionality will provide information to support site decisions regarding P&T system performance and optimization.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Pump-and-Treat Impacts on Aquifer Conditions and the Development of System-Wide Performance Strategies - 20377

The pump-and-treat (P and T) system on the Hanford Site's Central Plateau currently treats multiple contaminants within the 200-ZP-1 operable unit, including nitrate through its biological treatment processes. Although it was initially designed to support the 200-ZP-1 Remedial Action Objectives, the P and T system has evolved in use to address contaminants from other regions of the aquifer as well. The P and T influents are biogeochemically distinct, treating groundwaters with elevated concentrations of cyanide, uranium, technetium-99, and nitrate. Given the varying geochemical signatures from current and potential future sources, operational conditions, and amendments considered for treatment processes, there is a need to identify the impacts that the P and T effluent has on the aquifer, and how the aquifer affects P and T performance. To this end, laboratory efforts have focused on characterizing P and T effluent and its biogeochemical effects on the sediments through a series repacked column experiments. The P and T effluent is rich in particulate matter. A systematic inspection of this particulate matter in the P and T effluent showed significant levels of manganese/iron oxides, calcite crystals, relatively large organic matter molecules, and biomass. Therefore, the column experiments were designed and conducted for four different treatment systems: artificial groundwater, filtered P and T effluent, non-filtered P and T effluent, and chlorinated P and T effluent. Different levels of microbiologically- and geochemically-induced changes in the columns occurred and modified the flow systems. For example, physical filtration occurred in the sediments where the particulate material had accumulated in the top portion of the column. Reactive transport modeling of the laboratory experiments is being carried out so that the reaction network can be extrapolated to the field scale. These simulations will provide predictive evaluations of system performance based on P and T operational changes and aquifer mass loading and capacity estimates. This information can be used to address combined subsurface and operational challenges, such as the need for frequent well redevelopment to maintain injection capacity. This information also provides the technical basis for decisions related to the P and T system operations that support remedy optimization efforts and short- and long-term remedy decisions related to multiple operable units on the Hanford Site Central Plateau. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Incorporation of Pump-and-Treat Data in the New Tracking Restoration and Closure (TRAC)Web-Based Mapping Tool - 20339

Groundwater pump-and-treat (P and T) systems are a common remediation strategy for sites with contaminated groundwater within the U.S. Department of Energy (DOE) Office of Environmental Management (EM). Currently, there are six DOE-EM sites with active P and T systems, but integrated information on individual systems is only primarily available in separate annual reports. To provide a broad view of both current and historical P and T operations, data has been collected on all of the P and T systems. This summary information not only includes capital and average annual costs, but also identifies contaminants treated and forecasted P and T closure dates. Principal contaminants of concern treated with P and T systems include trichloroethylene, chromium (VI), strontium-90, technetium-99, and uranium. DOE-EM is continuing to create a web-based mapping tool that compiles information on groundwater contaminants, remediation strategies and, current data related to plumes and cleanup progress within all DOE-EM sites. The information collected on P and T systems will be added to the TRAC (Tracking Restoration and Closure) tool using interactive maps to quickly access and share information. This information sharing supports the transition from active to passive remediation methods and long-term monitoring approaches. TRAC can ensure that managers, stakeholders, regulators, and contractors remain up to date on cleanup progress for all sites within the complex. The information on P and T systems expands the use of TRAC and can assist in project monitoring and budget planning and support potential shifts in management plans based on plume data. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Groundwater Pump and Treat System Optimization Report U.S. DOE NNSA Pantex Plant, Texas

This document details the approach and presents the results for the optimization of the perched groundwater pump and treat (P&T) systems at the Pantex Plant, located in the Texas panhandle (Figure 1.1). Recommendations from the second Five-Year Review (FYR) for the Pantex Plant (HGL, 2018) and objectives specified in the 2007 Record of Decision (ROD) are the basis of the optimization effort.

54 ENVIRONMENTAL SCIENCES↗

Characterization of Spent Purolite A530E Resin with Implications for Long-Term Radioactive Contaminant Removal

Direct removal of pertechnetate anion (TcO4-) from the subsurface contaminated plumes at legacy nuclear weapons production sites, is effective remediation strategy to prevent their spread to adjacent aquifers but is also challenging because TcO4- is a trace component of the contaminated groundwater typically containing large access of other anionic constituents, such nitrate, sulfate, chloride and others. It can be achieved through ion exchange treatment using Purolite A530E resin which to date however has only been evaluated under laboratory conditions and many questions regarding its long-term operational performance remain. To address this need, here we report comprehensive characterization of the spent Purolite A530E resin which processed over 5.38x109 L of contaminated groundwater and successfully removed about 3.78 Ci of Tc-99 during four years of operation at the 200 West Pump & Treat facility at the US DOE Hanford site. This Tc-99 loading constitutes however only about 0.034% of the theoretical capacity of the resin which retained significant amounts of sulfate. Among other radioactive contaminants, small quantities of U-238, Co-60, and I-129 were retained by the resin. The total loading of iodine (combined 1-127 and I-129) on the spent resin exceeded that of Tc-99. To elucidate the mechanism of iodine retention, ion exchange behavior of iodide and iodate was investigated. Purolite A530E resin exhibited highly efficient uptake of iodide and only moderate affinity for iodate in accord with their Gibbs energy of hydration. Sorption isotherms for both anions obeyed Freundlich model.

Levitskaia, Tatiana G.↗

Electrical Resistivity Tomography Monitoring of In Situ Soil Flushing at the Hanford 100-K East Area: 100KE Soil Flushing Monitoring

Former operations in the 100-KE Area at the Hanford Site resulted in vadose zone hexavalent chromium that provides a source of groundwater contamination. Previous efforts to remediate vadose zone chromium involved excavation and offsite treatment of contaminated soils. Although much of the chromium was removed, contamination still exists in native soil between the water table and the bottom of the pit, which has since been backfilled. In-situ soil flushing was tested at the 100-KE Area to accelerate the removal of the remaining hexavalent chromium in the vadose zone. Soil flushing works by applying clean flush water at the surface, which mobilizes and transports chromium as it migrates downward to the water table. Once the chromium reaches the water table, it is hydraulically contained, extracted, and treated through pump and treat operations. The efficacy of soil flushing is directly related to the volume of clean water that infiltrates through contaminated soils. Therefore, performance monitoring requires and understanding of flush water migration through the vadose zone. It is challenging to comprehensively assess soil flushing performance via borehole access due to the limited volume of investigation afforded by a given wellbore. As an alternative, 3D time-lapse electrical resistivity tomography (ERT) was tested as a method of monitoring the distribution of flush water over time within the vadose zone. ERT is a method of imaging the bulk electrical conductivity of the subsurface, which is highly dependent on water saturation levels in unconsolidated and unsaturated sediments. Thus, the timing and location of changes in bulk conductivity caused by soil flushing can be used to infer flush water migration pathways. In this report we present results of 3D time-lapse ERT imaging during two separate soil flushing campaigns conducted during the spring and summer months of 2022 and 2023. Results show generally that: 1) Pit backfill materials appear to nominally have larger permeability than native soils. Consequently, the boundary between pit backfill and native soil had a significant impact on flush water migration, causing some flush water to migrate along the pit boundary to the bottom of the pit. 2) Non-uniform flows, likely caused by variations in hydrogeologic properties, developed in the pit backfill materials, resulting in uneven flush water distribution on the southern margin of the soil flushing zone. 3) Redistribution of water at the interface between backfill materials and Hanford formation materials likely facilitated elevated and uniform distribution of flush water within native soils beneath the deeper parts of the pit boundary beneath the center of the flush zone, which presumably overlie soils with elevated chromium contamination. These areas appear to have been infiltrated by higher volumes of flush water than the northern and southern margins of the flush zone. 4) In comparison to 2022, high flush water application rates significantly improved flush water distribution throughout the target flushing zone. 5) Imaging resolution was limited to a depth of approximate 20 meters below the land surface, due primarily to limitations on the lateral extent of the surface ERT array. The ~10 m region of the vadose zone between approximately 130 meters elevation and the water table at approximately 120 meters elevation was unresolved.

100 Area↗

Estimating Vadose Zone Flow Properties at the 100 K-East Soil Flushing Site Using ERT Monitoring Data: 2023 Interim Report - 100 KE Soil Property Estimation

In situ soil flushing is being using at the Hanford 100 K-East (100 KE) area to transport mobile chromium contamination in the vadose zone to the water table, where it can be collected and treat through pump and treat operations. The efficacy of soil flushing is directly related to the volume of clean water that infiltrates through contaminated soils. In practice, it is infeasible to comprehensively monitor which regions of the vadose zone are being infiltrated through direct sampling of pore water. Consequently, there can be significant uncertainty about which regions of the subsurface have been treated, especially if hydrogeologic conditions are favorable for the development of unstable flows and preferred flow pathways through the vadose zone (Jarvis, Koestel, and Larsbo 2016). Current approaches for quantitative monitoring of soil flushing performance rely on contaminant concentration measurements collected from extractions wells. There is no quantitative information on the volume of flush water delivered to targeted regions of the vadose zone at the Hanford Site, leading to significant uncertainty regarding source term removal and long-term impacts to groundwater. If the subsurface hydrogeologic properties at the 100 KE Area were adequately known, qualitative metrics of soil flushing performance could be simulated, thereby negating expenses required to obtain quantitative performance information through borehole drilling/sampling. However, estimating in situ hydrogeologic properties has long proven elusive, due primarily to a lack of sufficient information to constrain heterogeneous property estimates to a useful degree of certainty. Estimating vadose zone hydrogeologic properties is particularly challenging due the dependence of hydraulic conductivity on saturation. This report describes progress toward a first-of-its-kind demonstration using surface time-lapse 3D electrical resistivity tomography (ERT) monitoring data to estimate the hydrogeologic properties that control flush water transport at the 100 KE soil flushing site. The ultimate objective is (1) to verify sufficient information exists in the ERT monitoring data to adequately resolve vadose zone hydraulic properties, and (2) generate a “digital twin” (i.e., a numerical simulator) that can be used to simulate the amount of flush water that has been delivered to each targeted region of the vadose zone, and thereby assess the efficacy of flush water delivery. Resulting performance estimates can be used in leu of comprehensive borehole drilling and direct sampling (or wellbore logging) that would otherwise be required to obtain the same information.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Pantex Plant Ogallala Aquifer and Perched Groundwater Contingency Plan

The Pantex Plant Ogallala Aquifer and Perched Groundwater Contingency Plan has been developed in accordance with the requirements identified in the: • Interagency Agreement for the Pantex Superfund Site, Article 8.5 Work to be Performed, • Compliance Plan Provision of Hazardous Waste Permit No. 50284, and • Record of Decision for Groundwater, Soil, and Associated Media, Pantex Plant. A Long‐Term Monitoring System Design has been designed to monitor conditions in the perched groundwater including changes in the perched aquifer as a result of implementing the response actions. Monitoring is required for verifying the effectiveness of perched groundwater response actions (i.e., conditions in the perched aquifer are being affected as intended) and for confirming that the perched aquifer and Ogallala Aquifer characterization as defined in the Resource Conservation and Recovery Act Facility Investigation Report and the Corrective Measure Studies/Feasibility Study remains accurate. If monitoring results obtained through the monitoring network identify an unexpected condition or deviation, contingent actions will be considered and implemented as necessary to ensure continued protection of the Ogallala Aquifer and human health and the environment. Potential deviations to expected technology performance may be encountered for each of the four primary response actions that compose the selected remedy for perched groundwater; Playa 1 Pump and Treat System, Southeast Area Pump and Treat System, Southeast Area In‐Situ Bioremediation System (comprised of the Southeast In‐Situ Bioremediation System Original System, Southeast Area In‐Situ Bioremediation System Extension System, Offsite In‐Situ Bioremediation System, Perchlorate/Chromium ISB, Northeast ISB and County Road 8 ISB), and Zone 11 In‐Situ Bioremediation System. Monitoring will also be conducted to determine if there are deviations to the expected characterization, e.g., contaminants not expected as a result of the RCRA Facility Investigation characterization. Deviations to expected conditions in the Ogallala Aquifer could also be encountered if the response actions in the perched groundwater are not performing as expected, i.e., preventing contaminants from migrating to the Ogallala Aquifer. Currently, Pantex has begun investigation of detections of high explosives above groundwater protection standards in wells on the Texas Tech University property and a plume that is moving to the northeast from that area. Due to those detections, this Plan recognizes the fact that future detections in the Ogallala will be focused on first‐ time detections of analytes. After a remedy is determined, this Plan will require modification to address-deviations and contingent actions. This Plan was developed to identify the contingent actions necessary to mitigate impacts resulting from deviations to site conditions or response action performance. The Plan defines the environmental problem being addressed by the response actions, clarifies the expected conditions and objectives of the response actions, and identifies the potential deviations to the response actions (due to site conditions or technology performance) that could be encountered. The deviations were evaluated to determine the likelihood of occurrence, potential impact, and time to respond to avoid impact. The Plan also identifies the monitoring outlined in the Long‐Term Monitoring System Design Report (Consolidated Nuclear Security, 2024) and Sampling Analysis Plan (PanTeXas Deterrence, 2024) that will be used to detect the deviations. Lastly, the Plan specifies the contingent actions that could be implemented in response to the deviations. Because each response focuses on a discrete portion of the perched aquifer and contaminant plume, each response action has a different set of expected conditions, and therefore differing impacts from deviations to the site and technology expectations. As a result, the contingent actions are identified for each response action and potential deviation including specific constituents, location, and conditions. If deviations are encountered that impact the ability of the response action to meet performance objectives, the contingent actions will be focused on ensuring the response action can meet the performance objective. Contingent actions may be implemented as interim actions (ISMs/removal actions) in accordance with the Record of Decision, Interagency Agreement, and Hazardous Waste Permit‐50284, if warranted by the specific circumstances. For deviations to site characterization expected conditions, the contingent action will focus on determination of the source of the deviation, determination of the appropriate response, and evaluation of additional work to be completed. However, if the deviation to characterization impacts the performance of the response action, the contingent action will again focus on ensuring performance objectives can be met. Early source term removals and cleanup actions have been implemented to protect the Ogallala Aquifer. Because of these actions and based on modeling results, the expected conditions in the Ogallala Aquifer are that constituents of concern will not be detected above the Groundwater Protection Standards (GWPSs) nor will they reach potential points of exposure above the GWPS. The primary deviation of concern for the Ogallala is if constituents are detected in the Ogallala Aquifer near or above GWPSs. If it occurs, this change in expected conditions would require further evaluation of site and contaminant characteristics to determine an appropriate course of action. The evaluation would include additional monitoring, source identification, implementation of interim protective measures (if necessary), and delineation of extent. These evaluations are necessary to determine an appropriate response action for the Ogallala. The primary goal of the Plan is to provide for the continued protection of the Ogallala Aquifer and the health of its consumers. In recognition, this Plan presents a flexible and rational approach for making future decisions associated with confirming the change in perched and Ogallala aquifer conditions and identifying a response (technical activities, changes to response actions, regulatory oversight, and public involvement).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Web-Based Tools for Data-Informed Remedy Optimization: Software Theory and User Guide

This report documents the development and application of two web-based decision-support tools for pump-and-treat (P&T) groundwater remediation systems: PTOLEMY (Pump-and-Treat Optimized Location Evaluation to Maximize Yields) and OPTIMA (Optimization for Pump-and-Treat Implementation, Management, & Assessment). These tools enhance remedy design and management by leveraging advanced computational methods – specifically deep learning and multi-objective optimization – within a user-friendly platform. By integrating data-driven models with established hydrogeological knowledge, PTOLEMY and OPTIMA enable more efficient evaluation of well placement and operational strategies, helping site managers balance multiple remediation objectives under complex conditions. Both tools are implemented as modules within the SOCRATES (Suite Of Comprehensive Rapid Analysis Tools for Environmental Sites) web platform, which provides data access, visualization, and analytics to support remedy optimization across sites in the U.S. Department of Energy Office of Environmental Management complex. PTOLEMY is a rapid screening module designed to identify promising locations for new extraction wells. It employs a multi-channel three-dimensional convolutional neural network (MC3D-CNN) trained on high-fidelity simulation data to predict the relative performance (in terms of contaminant mass recovery) of potential well sites. Through an interactive web interface, PTOLEMY visualizes the probability of high performance across a site, highlighting areas where an extraction well is likely to yield above-threshold contaminant removal over a multi-year period. PTOLEMY’s map-based displays and exportable results support transparent communication of screening analyses. By focusing attention on the most favorable candidate locations, the tool augments traditional engineering judgment and physics-based modeling, providing a data informed basis for subsequent detailed evaluations. OPTIMA is a multi objective optimization module designed to find wellfield layouts and operating schedules that meet various cleanup goals. It quickly evaluates thousands of candidate setups – combinations of well locations, timing, and rates – and returns a small set of best trade-off options for comparison. At its core, OPTIMA uses a U-Net-based surrogate model – a deep-learning emulator of a groundwater flow and transport simulator – to dramatically accelerate scenario evaluations. Coupling this fast surrogate with the NSGA-II (Non-dominated Sorting Genetic Algorithm II) evolutionary algorithm, OPTIMA explores a wide decision space of well locations and schedules to identify Pareto-optimal solutions that trade off key objectives (e.g., minimizing cleanup time, maximizing contaminant mass removal, and minimizing plume extent). The tool outputs a family of optimal configurations and visualizes their trade-offs (Pareto frontiers of cleanup metrics and maps of optimized well placements). Site managers can use these results to understand the range of viable strategies and to select candidate designs for more detailed verification. OPTIMA is currently under active development and not yet fully released; this guide provides early documentation to support planning and gather user feedback.

54 ENVIRONMENTAL SCIENCES↗

Results of a Soil Flushing Treatability Test for Hanford Site Hexavalent Chromium Removal - 20446

U.S. Department of Energy contractor CH2M Hill Plateau Remediation Company has made significant progress remediating hexavalent chromium in groundwater near the Columbia River through the operation of pump and treat facilities and source removal activities. To mitigate risks associated with hexavalent chromium contamination, which was identified in a CERCLA interim action record of decision as the primary groundwater contaminant of concern for the 100-KR-4 Operable Unit from discharging to the Columbia River, three ion-exchange pump and treat systems were installed between 1997 and 2009. Between 2010 and 2016, operation of the K West pump and treat system, located near the former 105K West plutonium production reactor, reduced concentrations below the groundwater remediation target for hexavalent chromium. In 2016, a rebound study was performed to evaluate the effectiveness of the pump and treat remedy and assess the potential for any residual hexavalent chromium sources continuing to contribute to groundwater contamination. As a result of the rebound study, a source of continued groundwater contamination was identified. To address this condition, a soil flushing treatability test was written and approved by the U.S. Department of Energy and the U.S. Environmental Protection Agency. The test included saturating about a 1-acre area of soil with treated water with the goal of forcing the residual hexavalent chromium to groundwater where existing extraction wells could remove it for treatment, accelerating the cleanup process. In spring and summer 2019, CH2M Hill Plateau Remediation Company installed and began operating a shallow underground leach system to support the treatability test. Preliminary sampling data show the test was effective in removing the residual contamination. Following further evaluation and analysis from the initial test, the process will be considered for implementation elsewhere on the Hanford Site, particularly at locations where there is a known or suspected continuing contamination source in the soil column. The paper will cover the goals of the study, as well as more details about the following: - Overview of pump and treat exit strategy (using U.S. Environmental Protection Agency guidance); - The design and installation of the soil flushing technology in the 100-K Area; - The testing process and results of sampling data; - Post-study evaluation and potential for implementation in other locations at the Hanford Site. Innovative solutions for cleanup, such as the soil flushing technology, have resulted in substantial progress in the removal of groundwater contaminants at the Hanford Site, potentially shortening the time frame required to meet cleanup goals and resulting in significant cost savings. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Composite Analysis for Low-Level Waste Disposal in the Hanford Site Central Plateau (FY 2020) (Rev. 2)

This document provides an updated Hanford Site composite analysis (CA). A Hanford Site CA was prepared and issued in 1998 (PNNL-11800) with an addendum provided in 2002 (PNNL-11800 Addendum 1). The CA was approved in 2002 (Frei, 2002) and has been maintained (DOE/RL-2000-29 and subsequent revisions) to support low-level waste disposal performance assessments (PAs) and disposal authorizations for facilities at the Hanford Site, including the following: Continued operation of the Environmental Restoration Disposal Facility (ERDF) and the 200 East and 200 West Low-Level Burial Grounds; Construction of the Integrated Disposal Facility (IDF); Forthcoming closure of tank residual waste systems such as Waste Management Area (WMA) C. The CA maintenance program resulted in a determination in 2015 (DOE/RL-2015-66) that the Hanford Site CA needed an update for the following reasons: While the initial Hanford Site CA has been maintained since 2001, the accumulation of basis changes reported in the annual summary reports over the succeeding 14 years merit evaluation in an updated analysis; The U.S. Department of Energy (DOE) Headquarters requested in a memorandum in 2015 (Gilbertson and Marcinowski, 2015) that “as soon as the relevant PAs are complete, the CA will be revised to account for all of the new information.” This updated Hanford Site CA accounts for the following new information: 1. Inclusion of a detailed Hanford Site baseline disposition that projects remedial activities through site closure. There have been significant changes through decision making in the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) process that were not available when the original CA was produced; 2. Inclusion of an updated inventory basis, new modeling capabilities, and new decisions reached in the associated record of decision (ROD) that was provided by issuance of DOE/EIS-0391 in fiscal year (FY) 2013. Development of a Hanford Site groundwater model from the baseline provided in a technical transfer of models for the Final Tank Closure and Waste Management Environmental Impact Statement (DOE/EIS-0391) commenced in FY 2014 and resulted in the plateau-to-river (P2R) groundwater flow model that is used in this updated Hanford Site CA; 3. Accounting for pump and treat systems, which were not evaluated in the initial CA. Pump and treat systems have had significant impact on groundwater flow system behavior, contaminant transport, and contaminant removal from Hanford Site groundwater. This process is accounted for in the use of the P2R model for this updated Hanford Site CA; 4. Inclusion of water-level data collected since the initial CA was completed. Data collected as the unconfined aquifer water levels continue to recede since the cessation of large liquid discharges in the late 1990s have led to marked improvement in understanding of the flow system for future conditions, particularly regarding northward flow potential in the critical Gable Gap area. The calibration in the latest version of the P2R model accounts for this information; 5. Inclusion of results from the revised ERDF PA completed in 2013 (WCH-5209) that account for updated inventory and expansion of the ERDF facility to about twice the size that was evaluated in the original CA; 6. Use of updated geoframeworks to provide the structural basis for numerical fate and transport models in the groundwater pathway of this updated CA. The geologic basis for groundwater models has continued to improve with additional data collection and interpretation with the creation and maintenance of the Hanford South Geoframework and the Central Plateau Vadose Zone Geoframework tools; 7. Incorporation of updated tank residual inventory estimates. Tank residual inventory estimates have improved with the incorporation of tank retrieval inventory data for those tanks that have completed retrieval. The CA inventory data package includes this updated information; 8. Incorporation of WMA C PA results. Two additional PAs for tank farm closure decisions are in preparation during the period required to prepare an updated Hanford Site CA: WMA C (FY 2016) and WMA A-AX (in preparation). The WMA C PA results are incorporated into the updated Hanford Site CA, and its grouted residuals model is used as the basis for a release model to account for the other tank farm systems modeling in this updated CA; 9. An update to the IDF PA was submitted in FY 2017 and has been reviewed and approved. The results of the IDF PA are incorporated into this updated CA; 10. Updated risk assessment scenarios. The risk assessment scenarios currently in use for Hanford Site CERCLA and Resource Conservation and Recovery Act of 1976 (RCRA) analyses differ from those evaluated in the initial Hanford Site CA. The representative person exposure scenario evaluated in this updated Hanford Site CA is consistent with recent PAs and CERCLA and RCRA analyses as the Hanford Site. This updated Hanford Site CA provides the following: A comparison of the updated Hanford Site CA all-pathway dose results with the performance measures during the compliance period, which is assumed to begin with site closure in calendar 2070 with the last scheduled disposal action and continue for 1,000 years postclosure (to calendar year 3069); A comparison of Hanford Site CA all-pathway dose results with the performance measures during the postcompliance period to address potential peaks beyond the compliance period. This is accomplished by evaluating dose in the period for 9,000 years following the compliance period (i.e., from calendar year 3070 to 12070).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Conceptual Design of a Pumped Water Capsule for TREAT

This study performed mechanical design, thermal hydraulic, and fuel performance investigations to determine whether an existing large water capsule design could be modified to create forced convection boundary conditions on nuclear fuel specimens in the Transient Reactor Test facility. This concept was found to be viable and offers several advantages compared to a static water environment for a variety of transient power shape categories. The pumped capsule is not foreseen to be superior to a past concept for a larger water loop, but the pumped capsule approach is recommended for further engineering and deployment based on its high cost-to-value ratio primarily as a stop gap capability until a larger water loop can be realized.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

The Use of Silver Chloride Injection in Remediation of Iodine-129 by In Situ Capture as Silver Iodide at the F-Area Seepage Basin - 20225

The Savannah River Site (SRS) produced tritium, plutonium, and special nuclear materials for national defense, medicine, and the space programs. As part of operations, the F-Area Seepage Basins operated until 1988 for the disposition of deionized acidic wastewater from the F Separations Facility. The wastewater contained dilute nitric acid and low concentrations of non-radioactive metals, and radionuclides, with the major isotopes being Cs-137, Sr-90, U-235, U-238, Pu-239, Tc-99, I-129, and tritium. The seepage basins were closed in 1988 and backfilled and capped by 1991. The groundwater emanating from beneath the closed and capped seepage basins is acidic and contains elevated levels of both chemical and radiological contaminants. Releases from the groundwater plumes sourced from the F-Area Seepage Basins have impacted the water quality of Fourmile Branch, which is a small tributary to the Savannah River, a regional water source. A large pump-and-treat system was constructed in 1997 and operated until 2003 in an attempt to capture the releases to Fourmile Branch. The system in F Area and a similar system in H Area were expensive (∼$1.3 M/month) to operate and produced large quantities of radioactive waste, with concentrations of I- 129 too high to be disposed of at the SRS. In 2004, SRS replaced pump-and-treat with a funnel and gate system that along with operation of a base injection system at the gates reduces the flux of contaminants to the wetlands adjacent to Fourmile Branch. The alkaline solution injected into the aquifer neutralizes the acidic plume and immobilizes many of the cationic constituents. However, base injection is not effective in managing the release of iodine-129, an anionic contaminant. To address iodine-129 SRS and the Savannah River National Laboratory developed an in situ technology that uses ultra-fine ground silver chloride (AgCl) as an injectable capture medium for the sequestration of iodine-129. The AgCl amendment has a very small particle size and is designed to be injected into the contaminated aquifer to capture iodine-129. Dissolved iodine-129 forms a stable and highly insoluble solid (silver iodide) upon contact with AgCl. Laboratory studies, a field scale pilot test (2009), and three deployments (2011, 2015 and 2019) of AgCl have been successfully performed at the F-Area Seepage Basins. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Western Sector In-Situ Chemical Oxidation Project: Additional Injection Pilot Testing Supplemental Results (U)

Trichloroethylene (TCE) and tetrachloroethylene (PCE) are persistent at elevated concentrations in the Western Sector of the M-Area Hazardous Waste Management Facility (HWMF) groundwater plume. Migration of these chlorinated ethenes as Dense Non-Aqueous Phase Liquids (DNAPLs) occurred from the M-Area Settling Basin along geologic strata resulting in a high concentration groundwater plume in Western Sector. Pump-and-treat has been active for over 30 years at the M-Area HWMF to hydraulically contain the primary sources of the plume in addition to other remediation strategies throughout the contaminated zone, like soil vapor extraction, dynamic underground stripping, groundwater recirculation wells, and bioremediation. In-situ chemical oxidation (ISCO) has been identified as a viable treatment method for removal of these volatile organic compounds (VOCs) due to the complex lithology and high concentrations in this part of the aquifer. In addition to ISCO, a new recovery well (i.e., RWM018) was also installed in Western Sector to contain the high concentration VOC plume. The ISCO projects have utilized the gradient induced by RWM018 to help plan the injection and monitoring locations. The combination of ISCO and the additional pump and treat in Western Sector with the installation of RWM018 will help to control the plume and maximize remediation efforts.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

NASA Technology Evaluation for Environmental Risk Mitigation Remediation Technology Collaboration Development

NASA is committed to finding solutions to agency cleanup problems that are better, cheaper, and more effective than the status quo. Unfortunately, some potential solutions involve innovative technologies for which NASA remediation managers may not have a high level of understanding or confidence. Since 2004, NASA's Stennis Space Center (SSC) in Mississippi has been pumping groundwater contaminated with trichloroethylene (TCE) and other halogenated volatile organic compounds (HVOC) from their cleanup location designated "Area G" through extraction wells to an aboveground treatment system. Over time, however, the effectiveness of this treatment strategy has diminished and an alternative approach is needed. In 2012, professionals from NASA's Principal Center for Technology Evaluation for Environmental Risk Mitigation (TEERM) introduced SSC managers to an innovative technology for enhancing the performance of SSC's existing pump and treat system. The technology, generally referred to as in situ chemical oxidation (ISCO), involves slowly and continuously injecting a strong but safe chemical oxidant into the groundwater. Treatment is enhanced by a "surfactant-type effect" which causes residual contamination from saturated soil to be released into the dissolved-phase where it can be readily oxidized. Any dissolved-phase contamination that was not oxidized can be collected by the extraction well network and treated aboveground. SSC was not familiar with the technology so to increase their confidence, TEERM identified a contractor who was willing to demonstrate their product and process at a significantly reduced price. An initial, small-scale demonstration of ISCO began at sse in March 2012 and completed in August 2012. This successful demonstration was followed by three larger-scale ISCO demonstrations between August and December 2012. The contractor's innovative Continuous Injection System (CIS) incorporated "green" and sustainable technologies and practices. A slow injection rate was maintained autonomously by the CIS, eliminating the need for multiple mobilizations of personnel and powered equipment. The CIS was calibrated to deliver only as much reagent as the formation would accept without "short circuiting", minimizing material waste. Public utility water pressure was used to mix, dilute, and inject the reagent. NASA personnel were trained to operate and maintain the system and remote monitoring and injection control capabilities were developed, further reducing the need for contractor mobilizations to the site. An integrated solar photovoltaic panel was used to power the control valves and web monitoring telemetry. SSC provided hydrogen peroxide for the process using their existing supplier for the aboveground pump and treat systems. The only consumable required from the contractor was their proprietary activator to catalyze SSC's peroxide.

Romeo, James↗

Hybrid Sorbents for 129 I Capture from Contaminated Groundwater

Radioiodine ( 129 I) poses a risk to the environment due to its long half-life, toxicity, and mobility. It is found at the U.S. Department of Energy Hanford Site due to legacy releases of nuclear wastes to the subsurface where 129 I is predominantly present as iodate (IO 3 – ). To date, a cost-effective and scalable cleanup technology for 129 I has not been identified, with hydraulic containment implemented as the remedial approach. Here, novel high-performing sorbents for 129 I remediation with the capacity to reduce 129 I concentrations to or below the US Environmental Protection Agency (EPA) drinking water standard and procedures to deploy them in an ex-situ pump and treat (P&T) system are introduced. Furthermore, this includes implementation of hybridized polyacrylonitrile (PAN) beads for ex-situ remediation of IO 3 – -contaminated groundwater for the first time. Iron (Fe) oxyhydroxide and bismuth (Bi) oxyhydroxide sorbents were deployed on silica substrates or encapsulated in porous PAN beads. In addition, Fe–, cerium (Ce)–, and Bi–oxyhydroxides were encapsulated with anion-exchange resins. The PAN–bismuth oxyhydroxide and PAN–ferrihydrite composites along with Fe- and Ce-based hybrid anion-exchange resins performed well in batch sorption experiments with distribution coefficients for IO 3 – of >1000 mL/g and rapid removal kinetics. Of the tested materials, the Ce-based hybrid anion-exchange resin was the most efficient for removal of IO 3 – from Hanford groundwater in a column system, with 50% breakthrough occurring at 324 pore volumes. The functional amine groups on the parent resin and amount of active sorbent in the resin can be customized to improve the iodine loading capacity. These results highlight the potential for IO 3 – remediation by hybrid sorbents and represent a benchmark for the implementation of commercially available materials to meet EPA standards for cleanup of 129 I in a large-scale P&T system.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗