Engineering PapersSearch

SEARCH · Engineering Papers

Results for “projects”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Project 1: COLLECTS Project and Project 2: M&V for Saputo Cheese Project: Cooperative Research and Development (Final Report)

Project 1: Combined Power's Hyperlight Energy and NLR will collaborate on the DOE Concentrating Optics for Lower Levelized Energy CosTS (COLLECTS) project, DE-FOA-0001268. COLLECTS funding opportunity announcement (FOA) seeks to further concentrated solar power (CSP) system technologies by soliciting disruptive, transformative projects for the concentrating solar collectors in the CSP plant. These innovative projects will seek to surpass the targets set out in the SunShot Vision Study, enabling CSP to be cost-competitive with conventional forms of electric power generation. Projects will target the design and manufacturing of novel solar collectors with the ability to significantly reduce the solar field contribution to the overall levelized cost of energy (LCOE) of the CSP plant, and which have not been previously specifically targeted by CSP FOAs. Project 2: Hyperlight will perform measurement and verification (M&V) of Green House Gases and NLR will evaluate energy consumption reduction.

14 SOLAR ENERGY

CONUS-wide Projected Flood Frequency and Uncertainty Estimates, Version 1.0

This dataset presents a large-ensemble of CONUS-wide projected flood frequency and uncertainty estimates across ~2.7 million NHDPlusV2 river reaches over the CONUS. The framework producing this dataset leverages a multi-model, uncertainty-aware modeling framework that allows evaluating shifts in flood frequences at the stream reach level across the CONUS. CONUS-wide ensemble streamflow projections generated from hydrologic simulations driven by downscaled and bias-corrected Coupled Model Intercomparison Project Phase 6 (CMIP6) outputs are used to derive these flood frequency and uncertainty estimates over the period 1980 - 2099. A spatially consistent regional L-moment algorithm is applied across clusters defined by the US Hydrologic Unit Code Subregions (HUC4s and HUC8s) and NHDPlusV2 stream orders to estimate flood frequencies. The dataset also includes at-site based flood estimates that allow for the comparison between local and regional approach-based estimates, assess projected changes, and characterize their uncertainties. For more reliable estimation of rare flood frequencies such as 500 and 1000-year return periods, super-ensemble based estimates are also included in the dataset. This dataset is derived to support the "Impact-Informed Dam Safety Risk Assessment for Securing Hydropower Assests" project for the US Department of Energy (DOE) Hydropower and Hydrokinetic Office (H2O). For further details, refer to Kao et al. (2022), Ghimire et al. (2023), Ghimire et al. (2025), and Hosking and Wallis (1997).

Ghimire, Ganesh [ORNL] (ORCID:0000000242843941)

Design Basis Document / Owner’s Technical Specification for Nitrate Salt Systems in CSP Projects: Volume 1 Specifications for Parabolic Trough Projects, Volume 2 - Specifications for Central Receiver Projects, Volume 3 - Narrative

Design Basis Documents / Owner’s Technical Specifications are developed for parabolic trough and central receiver power plants using nitrate salt as the heat transport fluid and the thermal storage medium. The goals were to 1) distill the successful experience with nitrate salt systems from as many commercial projects as possible, 2) provide technical bases for equipment design/selection that an owner can impose on an EPC contractor, 3) compile this information in one location to provide guidance on salt systems that is as broadly applicable to as many projects as possible, and 4) work toward an industry consensus on a Design Basis Document that reflects the lessons learned from earlier commercial projects. The document allows an owner to provide design guidance, and to impose a minimum set of requirements, above and beyond those in the normal Codes and Standards, on an EPC contractor in an effort to avoid a repeat of past mistakes. If successful, this would allow salt systems to achieve the same levels of reliability and availability as commercial parabolic trough plants using diphenyl oxide / biphenyl (i.e., Dowtherm A, Therminol VP-1) as the heat transfer fluid. The report consists of 3 volumes: • Volume 1 - Specifications for Parabolic Trough Projects • Volume 2 - Specifications for Central Receiver Projects • Volume 3 - Narrative Volumes 1 and 2 include discussions of the following topics: • Plant functional requirements for the salt systems • Plant operating states, and transitions between states, for the salt systems • Risk analysis of the principal salt components • Plant requirements for the salt systems to meet the functional and the operating requirements • Type of specification for the principal salt components: functional; or prescriptive • Current state of the art for salt systems. Volume 3 discusses a number of cases in which the salt equipment at commercial parabolic trough and central receiver projects has not met the projected levels of reliability and availability. Possible reasons for the sources of the problems are discussed, as is a range of possible alternate designs that could avoid the known problems.

14 SOLAR ENERGY

Projected Urban Morphology of the Los Angeles Area by the Year 2100

This dataset provides projections of urban building morphologies for the Los Angeles urban area at 30-meter spatial resolution. It contains 192 raster files that detail two primary building attributes: building footprint fractions (ranging from 0 to 1) and average building heights (ranging from 0 to 75 meters). The projections account for a wide range of future pathways, covering two Shared Socioeconomic Pathway (SSP) scenarios (SSP3 and SSP5), two population scenarios, two developed land intensification scenarios, and four distinct levels of intensification. The dataset was created using dual Generative Adversarial Networks (GANs) trained on 2015 land cover and building properties from the National Land Cover Database (NLCD) and Model America datasets. Supporting information on the dataset has been described in the LAUrbanAreaMorphologyProjections2100_README.txt file.

Pandey, Bhartendu

Soft costs and EVSE – Knowledge gaps as a barrier to successful projects

There has been a recent push to increase access to electric vehicle (EV) charging infrastructure. The National Electric Vehicle Infrastructure (NEVI) program, part of the Bipartisan Infrastructure Law (BIL) has made significant funding available for major charging infrastructure projects along state thruways, and many state and local incentives exist for EV owners to install chargers in their homes. However, deployment of these chargers has not kept up with demand, primarily due to issues in project planning, permitting processes, and unforeseen delays. This paper serves as a review of the current understanding of these and other non-hardware costs in EV charging infrastructure projects (collectively known as “soft costs”). We found that soft costs in EV charging infrastructure projects are not well understood. Specifically, there is little agreement on how soft costs should be categorized and tracked, and less agreement still on best practices for controlling these costs and lowering barriers to infrastructure deployment. A broader review of EV charging infrastructure cost analyses shows that these costs can have significant impacts on project outcomes. EV charging infrastructure projects may be able to examine the success of the solar industry in lowering soft costs, and a similar effort may lower project costs significantly. Further work on standardizing and collecting data on EV charging infrastructure costs is required to begin addressing and controlling these costs.

32 - ENERGY CONSERVATION, CONSUMPTION, AND UTILIZA

How to Grow Project Scientists: A Systematic Approach to Developing Project Scientists

The Project Manager is one of the key individuals that can determine the success or failure of a project. NASA is fully committed to the training and development of Project Managers across the agency to ensure that highly capable individuals are equipped with the competencies and experience to successfully lead a project. An equally critical position is that of the Project Scientist. The Project Scientist provides the scientific leadership necessary for the scientific success of a project by insuring that the mission meets or exceeds the scientific requirements. Traditionally, NASA Goddard project scientists were appointed and approved by the Center Science Director based on their knowledge, experience, and other qualifications. However the process to obtain the necessary knowledge, skills and abilities was not documented or done in a systematic way. NASA Goddard's current Science Director, Nicholas White saw the need to create a pipeline for developing new projects scientists, and appointed a team to develop a process for training potential project scientists. The team members were Dr. Harley Thronson, Chair, Dr. Howard Kea, Mr. Mark Goldman, DACUM facilitator and the late Dr. Michael VanSteenberg. The DACUM process, an occupational analysis and evaluation system, was used to produce a picture of the project scientist's duties, tasks, knowledge, and skills. The output resulted in a 3-Day introductory course detailing all the required knowledge, skills and abilities a scientist must develop over time to be qualified for selections as a Project Scientist.

Kea, Howard

The Characteristics of Project Managers: An Exploration of Complex Projects in the National Aeronautics and Space Administration

Study of characteristics and relationships of project managers of complex projects in the National Aeronautics and Space Administration. Study is based on Research Design, Data Collection, Interviews, Case Studies, and Data Analysis across varying disciplines such as biological research, space research, advanced aeronautical test facilities, aeronautic flight demonstrations, and projects at different NASA centers to ensure that findings were not endemic to one type of project management, or to one Center's management philosophies. Each project is treated as a separate case with the primary data collected during semi-structured interviews with the project manager responsible for the overall project. Results of the various efforts show some definite similarities of characteristics and relationships among the project managers in the study. A model for how the project managers formulated and managed their projects is included.

Mulenburg, Gerald M.

Adapting Project Management Practices to Research-Based Projects

From dealing with the inherent uncertainties in outcomes of scientific research to the lack of applicability of current NASA Procedural Requirements guidance documentation, research-based projects present challenges that require unique application of classical project management techniques. If additionally challenged by the creation of a new program transitioning from basic to applied research in a technical environment often unfamiliar with the cost and schedule constraints addressed by project management practices, such projects can find themselves struggling throughout their life cycles. Finally, supplying deliverables to a prime vehicle customer, also in the formative stage, adds further complexity to the development and management of research-based projects. The Biomedical Research and Countermeasures Projects Branch at NASA Johnson Space Center encompasses several diverse applied research-based or research-enabling projects within the newly-formed Human Research Program. This presentation will provide a brief overview of the organizational structure and environment in which these projects operate and how the projects coordinate to address and manage technical requirements. We will identify several of the challenges (cost, technical, schedule, and personnel) encountered by projects across the Branch, present case reports of actions taken and techniques implemented to deal with these challenges, and then close the session with an open forum discussion of remaining challenges and potential mitigations.

Bahr, P.

Habitat Demonstration Unit Project: Leadership and Management Strategies for a Rapid Prototyping Project

This paper gives an overview of the National Aeronautics and Space Administration (NASA) led multi-center Habitat Demonstration Unit (HDU) project leadership and management strategies being used by the NASA HDU team for a rapid prototyping project. The HDU project team constructed and tested an analog prototype lunar surface habitat/laboratory called the Pressurized Excursion Module (PEM) during 2010. The prototype unit subsystems were integrated in a short amount of time, utilizing a tiger team rapid prototyping approach that brought together over 20 habitation-related technologies and innovations from a variety of NASA centers. This paper describes the leadership and management strategies as well as lessons learned pertaining to leading and managing a multi-center diverse team in a rapid prototype environment. The PEM configuration went from a paper design to an operational surface habitat demonstration unit in less than 12 months. The HDU project is part of the strategic plan from the Exploration Systems Mission Directorate (ESMD) Directorate Integration Office (DIO) and the Exploration Mission Systems Office (EMSO) to test destination elements in analog environments. The 2011 HDU-Deep Space Habitat (DSH) configuration will build upon the PEM work, and emphasize validity of crew operations (remote working and living), EVA operations, mission operations, logistics operations, and science operations that might be required in a deep space context for Near Earth Object (NEO) exploration mission architectures. The 2011 HDU-DSH will be field-tested during the 2011 Desert Research and Technologies Studies (DRaTS) field tests. The HDU project is a "technology-pull" project that integrates technologies and innovations from multiple NASA centers. This project will repurpose the HDU 2010 demo unit that was field tested in the 2010 DRaTS, adding habitation functionality to the prototype unit. This paper will describe the strategy of establishing a multi-center project management team that put in place the key multi-center leadership skills and disciplines to enable a successful tiger team approach. Advocacy was established with key stakeholders and NASA Headquarters (HQ) by defining a strategic vision, mission, goals and objectives for the project and team. As a technology-pull testbed capability the HDU project was able to collaborate and leverage the Exploration Technology Development Program (ETDP) and individual NASA center investments which capitalized on their respective center core competencies and skills. This approach enable the leveraging of over $7.5m of value to create an operational habitat demonstration unit 2010 PEM configuration.

Kennedy, Kriss J.

Space Projects: Improvements Needed in Selecting Future Projects for Private Financing

The Office of Management and Budget (OMB) and NASA jointly selected seven projects for commercialization to reduce NASA's fiscal year 1990 budget request and to help achieve the goal of increasing private sector involvement in space. However, the efforts to privately finance these seven projects did not increase the commercial sector's involvement in space to the extent desired. The General Accounting Office (GAO) determined that the projects selected were not a fair test of the potential of increasing commercial investment in space at an acceptable cost to the government, primarily because the projects were not properly screened. That is, neither their suitability for commercialization nor the economic consequences of seeking private financing for them were adequately evaluated before selection. Evaluations and market tests done after selection showed that most of the projects were not viable candidates for private financing. GAO concluded that projects should not be removed from NASA's budget for commercial development until after careful screening has been done to determine whether adequate commercial demand exists, development risks are commercially acceptable and private financing is found or judged to be highly likely, and the cost effectiveness of such a decision is acceptable. Premature removal of projects from NASA's budget ultimately can cause project delays and increased costs when unsuccessful commercialization candidates must be returned to the budget. NASA also needs to ensure appropriate comparisons of government and private financing options for future commercialization projects.

Source record

How Project Managers Really Manage: An Indepth Look at Some Managers of Large, Complex NASA Projects

This paper reports on a research study by the author that examined ten contemporary National Aeronautics and Space Administration (NASA) complex projects. In-depth interviews with the project managers of these projects provided qualitative data about the inner workings of the project and the methodologies used in establishing and managing the projects. The inclusion of a variety of space, aeronautics, and ground based projects from several different NASA research centers helped to reduce potential bias in the findings toward any one type of project, or technical discipline. The findings address the participants and their individual approaches. The discussion includes possible implications for project managers of other large, complex, projects.

Mulenburg, Gerald M.

An “EPIIC” Vision to Evolve Project Integration, Innovation, and Collaboration with Broad Impact for How NASA Executes Complex Projects

Evolving Project Integration, Innovation, and Collaboration (EPIIC) is a vision defined to transform the way projects manage information to support real-time decisions, capture best practices and lessons learned, perform assessments, and manage risk across a portfolio of projects. The foundational project management needs for data and information will be revolutionized through innovations on how we manage and access that data, implement configuration control, and certify compliance. The embedded intelligence of new interactive data interfaces integrate technical and programmatic data such that near real time analytics can be accomplished to more efficiently and accurately complete systems engineering and project management tasks. The system-wide data analytics that are integrated into customized data interfaces allows the growing team of engineers and managers required to develop and implement major NASA missions the ability to access authoritative source(s) of system information while greatly reducing the labor required to complete system assessments. This would allow, for example, much of what is accomplished in a scheduled design review to take place as needed, between any team members, at any time. An intelligent data interface that rigorously integrates systems engineering and project management information in near real time can provide substantially greater insight for systems engineers, project managers, and the large diverse teams required to complete a complex project. System engineers, programmatic personnel (those who focus on cost, schedule, and risk), the technical engineering disciplines, and project management can realize immediate benefit from the shared vision described herein. Implementation of the vision also enables significant improvements in the performance of the engineered system being developed.

Moreland, Robert J.

Comparisons of Montane Snow Water Equivalent Projections: Calculating Total Snow Mass in Regions with Projection Agreement and Divergence in the Western United States

Montane snowpack is a vital source of water in the western United States. Here, we use a large-ensemble approach to evaluate the agreement across 124 snow water equivalent (SWE) projections with statistically downscaled forcing between end-of-century (2076–95) and early twenty-first century (2106–35) periods. Comparisons were performed on dates corresponding with the end of winter (15 April) and midspring snowmelt (15 May) in five western U.S. domains. Using 1) the percent change to end-of-century SWE across different ensembles of snow projections and 2) the shift between early twenty-first century and end-of-century SWE distributions for each snow projection, we identified relationships between projections that were consistent across each domain. In low to midelevations, end-of-century SWE decreases were 48% and larger on 15 April. These regions had projected changes to SWE that were both high confidence and in relative agreement across projections. Despite this, the majority of 15 April SWE volume existed in higher elevations where the magnitude and direction (positive or negative) of SWE changes were most uncertain. The results of this study show that large-ensemble approaches can be used to measure coherence between snow projections and identify 1) the highest confidence changes to future snow water resources and 2) the locations and periods where and when improvements to snow projections would most benefit estimates of future snow water resources.

Climate models

The project scientist's role in scientific spacecraft project management

The project scientists is in a position which rates very high in terms of behavioral study recommendations. His influence over objectives is generally considered to be important. He is highly autonomous in a moderately coordinated environment. He has diverse managerial and technical functions and the performance of these functions require him to grow beyond his role as an experimenter. However, the position within the line organization for those interviewed is also very stimulating, rating almost as high by the same criteria. The role of project scientist may not be the dominant means of professional growth for the experienced scientific investigators. The influence which the project scientist exerts on the project and the stimulation of that position for him are determined largely by his position outside the defined project scientist role. The role of the project scientist is changing because the environment of those who become project scientists is changing.

Eller, E. L.

Terrestrial laser scanning data (Levels 0 and 1) from Urban Biogeochemistry Pilot Project sites, Knoxville, Tennessee, Jul 2024 - Jul 2025

This data package contains data from terrestrial laser scanning (TLS) at five urban park sites in Knoxville, Tennessee, USA. All parks include open-grown and/or closed-canopy trees and mixed nearby land use. These study sites were established as part of the Urban Biogeochemistry Pilot Project, which has an overall goal of better understanding how hydrobiogeochemical cycling is altered within the human environment. These five sites represent a gradient of urbanization, and were instrumented to understand hydrological and biogeochemical cycling (e.g., soil moisture, soil physical properties and biogeochemistry, tree transpiration, species type). The TLS data archived here were collected to provide detailed, three-dimensional information about forest structure. Specifically, data were collected to allow tree- and stand-level characterization of woody structure and leaf area. TLS scans were placed to capture the area around trees with sap flow sensors, and as much of a 50 m radius area around the meteorological station as possible given site property limits. Derived products will allow upscaling of water content and transpiration data. This data package contains the following data: - High-level files document further details of the campaign and data package: 1_CampaignSummary.csv provides details about the campaign and study site, 2_ScanAreasDetail.csv provides details about each separate scan area (groups of scans post-processed into a single point cloud), 3_TerrestrialLidarSensor.csv provides further technical details about the Riegl VZ-400i TLS sensor, TLS_CSV_dd.csv is a CSV Data Dictionary providing information about the fields in CSV files following the ESS-DIVE CSV File Formatting Guidelines Reporting Format, TLS_flmd.csv is a File Level Metadata file providing information about each file in the data package following the ESS-DIVE File Level Metadata Reporting Format, and README.txt is a text file describing the overall project and file structure. - Level 0 data are the raw data (.PROJ folders) as recorded by the Riegl VZ-400i TLS instrument before scan co-registration and post-processing with the Riegl's proprietary RiSCAN PRO software, which requires a license. - Level 1 data contain post-processed, co-registered data from each scan area. The "PointClouds" folder for each scan area contains a .las file with 1 cm resolution point cloud data exported from RiSCAN PRO. These are the main files likely to be of interest to most users and can be further processed with any software capable of manipulating .las files (e.g. Python, R CloudCompare). The "Project Information" folder contains log files from post-processing in RiSCAN PRO that may be of interest to users who want to see detailed records of post-processing, including all PDF reports generated by RiSCAN PRO. The "ScanPositions" folder contains information about the final position of all TLS scans, after post-processing, in multiple formats. The file ScanPositions_*.csv provides final geo-referenced scan positions, and the file SOP_backup_*.csv can be used in RiSCAN PRO to restore the co-registered scan positions if users wish to re-process raw data (Level 0 .PROJ folders) with RiSCAN PRO software (e.g., subsample to a different resolution, exclude a certain scan position, or apply different filters on reflectance or deviation values) without redoing time-consuming co-registration steps.

54 ENVIRONMENTAL SCIENCES

CMIP6-based Multi-model Hydropower Projection over the Conterminous US, Version 1.1

This dataset presents a suite of hydropower projections for the conterminous United States (CONUS), derived from multiple downscaled and bias-corrected Global Climate Models (GCMs) from the Coupled Model Intercomparison Project Phase 6 (CMIP6). The CMIP6 GCMs are downscaled using either statistical (DBCCA) or dynamical (RegCM) approaches, based on two meteorological reference datasets (Daymet and Livneh). The resulting downscaled precipitation, temperature, and wind speed data are then used to drive two calibrated hydrologic models (VIC and PRMS), enabling simulations of projected future hydrologic responses across the CONUS. Simulated total runoff is subsequently employed to drive two hydropower models (WMP, now implemented as mosartwmpy-power, and WRES) to evaluate how climate change may affect future hydropower production for both federal and non-federal hydropower fleets. This dataset was developed to support the SECURE Water Act Section 9505 Assessment for the U.S. Department of Energy (DOE) Water Power Technologies Office (WPTO). For further details, see Broman et al. (2024), Thurber et al. (2024), Kao et al. (2022), and Zhou et al. (2023).

Voisin, Nathalie [Pacific Northwest National Labor

E2C Successful Project Implementation Cohort: Overview of Solar, Microgrid and Resilience Project Development [Slides]

The Energy to Communities (E2C) peer-learning cohort program provides technical assistance to groups of 15 community entities around a common energy topic over the course of 6 months. Every month, participants join a virtual meeting where they hear from experts and exchange strategies and best practices with their peers. This cohort, "Successful Energy Project Implementation" will explore common challenges in implementing energy projects and learn strategies to turn project plans into reality. Each participant will focus on a local energy project or priority as a cornerstone for their learning throughout the series. This presentation overviews the basics of developing solar, microgrid and resilience projects with emphasis on understanding the project development process.

14 SOLAR ENERGY

Flat-plate solar array project. Volume 8: Project analysis and integration

Project Analysis and Integration (PA&I) performed planning and integration activities to support management of the various Flat-Plate Solar Array (FSA) Project R&D activities. Technical and economic goals were established by PA&I for each R&D task within the project to coordinate the thrust toward the National Photovoltaic Program goals. A sophisticated computer modeling capability was developed to assess technical progress toward meeting the economic goals. These models included a manufacturing facility simulation, a photovoltaic power station simulation and a decision aid model incorporating uncertainty. This family of analysis tools was used to track the progress of the technology and to explore the effects of alternative technical paths. Numerous studies conducted by PA&I signaled the achievement of milestones or were the foundation of major FSA project and national program decisions. The most important PA&I activities during the project history are summarized. The PA&I planning function is discussed and how it relates to project direction and important analytical models developed by PA&I for its analytical and assessment activities are reviewed.

Mcguire, P.