Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “project tracking”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

FY08 LDRD Final Report A New Method for Wave Propagation in Elastic Media LDRD Project Tracking Code: 05-ERD-079

The LDRD project 'A New Method for Wave Propagation in Elastic Media' developed several improvements to the traditional finite difference technique for seismic wave propagation, including a summation-by-parts discretization which is provably stable for arbitrary heterogeneous materials, an accurate treatment of non-planar topography, local mesh refinement, and stable outflow boundary conditions. This project also implemented these techniques in a parallel open source computer code called WPP, and participated in several seismic modeling efforts to simulate ground motion due to earthquakes in Northern California. This research has been documented in six individual publications which are summarized in this report. Of these publications, four are published refereed journal articles, one is an accepted refereed journal article which has not yet been published, and one is a non-refereed software manual. The report concludes with a discussion of future research directions and exit plan.

58 GEOSCIENCES↗

Application usability levels: a framework for tracking project product progress

The space physics community continues to grow and become both more interdisciplinary and more intertwined with commercial and government operations. This has created a need for a framework to easily identify what projects can be used for specific applications and how close the tool is to routine autonomous or on-demand implementation and operation. We propose the Application Usability Level (AUL) framework and publicizing AULs to help the community quantify the progress of successful applications, metrics, and validation efforts. This framework will also aid the scientific community by supplying the type of information needed to build off of previously published work and publicizing the applications and requirements needed by the user communities. In this paper, we define the AUL framework, outline the milestones required for progression to higher AULs, and provide example projects utilizing the AUL framework. This work has been completed as part of the activities of the Assessment of Understanding and Quantifying Progress working group which is part of the International Forum for Space Weather Capabilities Assessment.

79 ASTRONOMY AND ASTROPHYSICS↗

ALICE-USA Barrel Tracking Upgrade (Project Final Report)

The ALICE-USA Barrel Tracking Upgrade (BTU) project began in 2015 to participate in a major upgrade of the Time Projection Chamber (TPC) and the Inner Tracking System (ITS) of the ALICE Experiment at CERN in Geneva, Switzerland. This upgrade increased the maximum readout rate of the ALICE detector to accommodate the increased heavy ion interaction rates following Long Shutdown 2 of the Large Hadron Collider, and greatly improved the vertexing performance of the detector. The original scope was completed and reviewed in November 2019. The BTU project document BTU.19.v1 "ALICE Barrel Tracking Upgrade Project Closeout / Transition to Operations (2019)" from November 2019 describes the status in detail and is attached as Appendix 1 below. At that point, all delivery milestones had been met on time, all Key Performance Parameters (KPPs) of the project had been satisfied, and the project was under budget. Several subsequent No Cost Extensions (NCEs) supported integration and pre-commissioning of the BTU project deliverables at CERN, as well as study and assessment of performance with Pb-Pb collisions at 50 kHz. The BTU project was successfully completed on 30 September 2024.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Patterns of Precipitation Change and Climatological Uncertainty among CMIP5 Models, with a Focus on the Midlatitude Pacific Storm Track

Projections of modeled precipitation ( P ) change in global warming scenarios demonstrate marked intermodel disagreement at regional scales. Empirical orthogonal functions (EOFs) and maximum covariance analysis (MCA) are used to diagnose spatial patterns of disagreement in the simulated climatology and end-of-century P changes in phase 5 of the Coupled Model Intercomparison Project (CMIP5) archive. The term principal uncertainty pattern (PUP) is used for any robust mode calculated when applying these techniques to a multimodel ensemble. For selected domains in the tropics, leading PUPs highlight features at the margins of convection zones and in the Pacific cold tongue. The midlatitude Pacific storm track is emphasized given its relevance to wintertime P projections over western North America. The first storm-track PUP identifies a sensitive region of disagreement in P increases over the eastern midlatitude Pacific where the storm track terminates, related to uncertainty in an eastward extension of the climatological jet. The second PUP portrays uncertainty in a zonally asymmetric meridional shift of storm-track P , related to uncertainty in the extent of a poleward jet shift in the western Pacific. Both of these modes appear to arise primarily from intermodel differences in the response to radiative forcing, distinct from sampling of internal variability. The leading storm-track PUPs for P and zonal wind change exhibit similarities to the leading uncertainty patterns for the historical climatology, indicating important and parallel sensitivities in the eastern Pacific storm-track terminus region. However, expansion coefficients for climatological uncertainties tend to be weakly correlated with those for end-of-century change.

54 ENVIRONMENTAL SCIENCES↗

How large are projected 21st century storm track changes?

Projected changes in the extra–tropical wintertime storm tracks are investigated using the multi–model ensembles from both the third and fifth phases of the World Climate Research Programme's Coupled Model Intercomparison Project (CMIP3 and CMIP5). The aim is to characterize the magnitude of the storm track responses relative to their present–day year–to–year variability. For the experiments considered, the ‘middle–of–the–road’ scenarios in each CMIP, there are regions of the Northern Hemisphere where the responses of up to 40% of the models exceed half of the inter–annual variability, and for the Southern Hemisphere there are regions where up to 60% of the model responses exceed half of the inter–annual variability.

54 ENVIRONMENTAL SCIENCES↗

A Common Tracking Software Project

Abstract The reconstruction of the trajectories of charged particles, or track reconstruction, is a key computational challenge for particle and nuclear physics experiments. While the tuning of track reconstruction algorithms can depend strongly on details of the detector geometry, the algorithms currently in use by experiments share many common features. At the same time, the intense environment of the High-Luminosity LHC accelerator and other future experiments is expected to put even greater computational stress on track reconstruction software, motivating the development of more performant algorithms. We present here A Common Tracking Software (ACTS) toolkit, which draws on the experience with track reconstruction algorithms in the ATLAS experiment and presents them in an experiment-independent and framework-independent toolkit. It provides a set of high-level track reconstruction tools which are agnostic to the details of the detection technologies and magnetic field configuration and tested for strict thread-safety to support multi-threaded event processing. We discuss the conceptual design and technical implementation of ACTS, selected applications and performance of ACTS, and the lessons learned.

97 MATHEMATICS AND COMPUTING↗

Advances in Grid Computing for the FabrIc for Frontier Experiments Project at Fermialb

The FabrIc for Frontier Experiments (FIFE) project is a major initiative within the Fermilab Scientic Computing Division charged with leading the computing model for Fermilab experiments. Work within the FIFE project creates close collaboration between experimenters and computing professionals to serve high-energy physics experiments of diering size, scope, and physics area. The FIFE project has worked to develop common tools for job submission, certicate management, software and reference data distribution through CVMFS repositories, robust data transfer, job monitoring, and databases for project tracking. Since the projects inception the experiments under the FIFE umbrella have signicantly matured, and present an increasingly complex list of requirements to service providers. To meet these requirements, the FIFE project has been involved in transitioning the Fermilab General Purpose Grid cluster to support a partitionable slot model, expanding the resources available to experiments via the Open Science Grid, assisting with commissioning dedicated high-throughput computing resources for individual experiments, supporting the eorts of the HEP Cloud projects to provision a variety of back end resources, including public clouds and high performance computers, and developing rapid onboarding procedures for new experiments and collaborations. The larger demands also require enhanced job monitoring tools, which the project has developed using such tools as ElasticSearch and Grafana. in helping experiments manage their large-scale production work ows. This group in turn requires a structured service to facilitate smooth management of experiment requests, which FIFE provides in the form of the Production Operations Management Service (POMS). POMS is designed to track and manage requests from the FIFE experiments to run particular work ows, and support troubleshooting and triage in case of problems. Recently a new certicate management infrastructure called Distributed Computing Access with Federated Identities (DCAFI) has been put in place that has eliminated our dependence on a Fermilab-specic third-party Certicate Authority service and better accommodates FIFE collaborators without a Fermilab Kerberos account. DCAFI integrates the existing InCommon federated identity infrastructure, CILogon Basic CA, and a MyProxy service using a new general purpose open source tool. We will discuss the general FIFE onboarding strategy, progress in expanding FIFE experiments presence on the Open Science Grid, new tools for job monitoring, the POMS service, and the DCAFI project.

Herner, K.↗

The Atmospheric River Tracking Method Intercomparison Project (ARTMIP): Quantifying Uncertainties in Atmospheric River Climatology

Atmospheric rivers (ARs) are now widely known for their association with high-impact weather events and long-term water supply in many regions. Researchers within the scientific community have developed numerous methods to identify and track of ARs—a necessary step for analyses on gridded data sets, and objective attribution of impacts to ARs. These different methods have been developed to answer specific research questions and hence use different criteria (e.g., geometry, threshold values of key variables, and time dependence). Furthermore, these methods are often employed using different reanalysis data sets, time periods, and regions of interest. The goal of the Atmospheric River Tracking Method Intercomparison Project (ARTMIP) is to understand and quantify uncertainties in AR science that arise due to differences in these methods. This paper presents results for key AR-related metrics based on 20+ different AR identification and tracking methods applied to Modern-Era Retrospective Analysis for Research and Applications Version 2 reanalysis data from January 1980 through June 2017. We show that AR frequency, duration, and seasonality exhibit a wide range of results, while the meridional distribution of these metrics along selected coastal (but not interior) transects are quite similar across methods. Furthermore, methods are grouped into criteria-based clusters, within which the range of results is reduced. AR case studies and an evaluation of individual method deviation from an all-method mean highlight advantages/disadvantages of certain approaches. For example, methods with less (more) restrictive criteria identify more (less) ARs and AR-related impacts. Finally, this paper concludes with a discussion and recommendations for those conducting AR-related research to consider.

Rutz, Jonathan J.↗

Deployment of ITS: A Summary of the 2010 National Survey Results (Final report)

This report presents summary results of the 2010 ITS Deployment Tracking survey, the most recent survey conducted by the ITS Deployment Tracking Project. The U.S. Department of Transportation and its member agencies, including the Research and Innovative Technology Administration, have pursued a research and development agenda, the Intelligent Transportation System (ITS) Program, designed to integrate the latest in information technologies to improve the safety, mobility, and reliability of surface transportation modes. Within metropolitan areas, implementation of these advanced technologies has been accomplished by a variety of state and local transportation and emergency management agencies as well as the private sector. In order to measure the rate of ITS deployment within the nation's largest metropolitan areas, the ITS Deployment Tracking Project has conducted a nationwide survey of state and local transportation and emergency management agencies nearly every year since 1997. The results presented in this report are intended to be a summary of the entire database from the 2010 survey. Access to the complete survey results and previous national surveys are available on-line at http://www.itsdeployment.its.dot.gov. The website also provides access to survey results in the form of downloadable reports, including a survey summary for each survey type and fact sheets. Nearly 1,600 surveys were distributed to state and local transportation agencies in 2010. A total of seven (7) survey types were distributed including: Freeway Management, Arterial Management, Transit Management, Transportation Management Center (TMC), Electronic Toll Collection (ETC), Public Safety Law Enforcement, and Public Safety Fire/Rescue. Among other things, the data collection results indicate that ITS has moved from being experimental to mainstream and interest in continuing investments in ITS continues to be very strong. When asked about future deployment plans, one-third to three-fourths of the different agency types report they will expand current deployments and about half are planning to invest in new technologies over the next three years.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Facilitation of the Estuary/Ocean Subgroup for Federal Research, Monitoring, and Evaluation, FY08 Annual Report

The Estuary/Ocean Subgroup (EOS) is part of the research, monitoring, and evaluation (RME) effort that the Action Agencies (Bonneville Power Administration, U.S. Army Corps of Engineers, U.S. Bureau of Reclamation) developed in response to obligations arising from the Endangered Species Act as applied to operation of the Federal Columbia River Power System (FCRPS). The goal of the EOS project is to facilitate activities of the estuary/ocean RME subgroup as it coordinates design and implementation of federal RME in the lower Columbia River and estuary. In fiscal year 2008 (FY08), EOS project accomplishments included 1) subgroup meetings; 2) participation in the estuary work group of the Pacific Northwest Aquatic Monitoring Partnership; 3) project management via the project tracking system, Pisces; 4) quarterly project status reports; and 5) a major revision to the Estuary RME document and its subsequent regional release (new version January 2008). Many of the estuary RME recommendations in this document were incorporated into the Biological Opinion on hydrosystem operations (May 2008). In summary, the FY08 EOS project resulted in expanded, substantive coordination with other regional RME forums, a new version of the federal Estuary RME program document, and implementation coordination. This annual report is a FY08 deliverable for the project titled Facilitation of the Estuary/Ocean Subgroup.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Facilitation of the Estuary/Ocean Subgroup for Federal Research, Monitoring and Evaluation FY08 Annual Report.

The Estuary/Ocean Subgroup (EOS) is part of the research, monitoring, and evaluation (RME) effort that the Action Agencies (Bonneville Power Administration (BPA), U.S. Army Corps of Engineers, U.S. Bureau of Reclamation) developed in response to obligations arising from the Endangered Species Act as applied to operation of the Federal Columbia River Power System (FCRPS). The goal of the EOS project is to facilitate activities of the estuary/ocean RME subgroup as it coordinates design and implementation of federal RME in the lower Columbia River and estuary. In fiscal year 2008 (FY08), EOS project accomplishments included (1) subgroup meetings; (2) participation in the estuary work group of the Pacific Northwest Aquatic Monitoring Partnership; (3) project management via BPA's project tracking system, Pisces; (4) quarterly project status reports; and (5) a major revision to the Estuary RME document and its subsequent regional release (new version January 2008). Many of the estuary RME recommendations in this document were incorporated into the Biological Opinion on FCRPS operations (May 2008). In summary, the FY08 EOS project resulted in expanded, substantive coordination with other regional RME forums, a new version of the federal Estuary RME program document, and implementation coordination. This annual report is a FY08 deliverable for the project titled Facilitation of the Estuary/Ocean Subgroup.

13 HYDRO ENERGY↗

Vehicle Technologies Program Implementation

The Vehicle Technologies Program takes a systematic approach to Program implementation. Elements of this approach include the evaluation of new technologies, competitive selection of projects and partners, review of Program and project improvement, project tracking, and portfolio management and adjustment.

competitive solicitations↗

Utility-Scale Solar: Empirical Trends in Project Technology, Cost, Performance, and PPA Pricing in the United States – 2018 Edition

The utility-scale solar sector has led the overall U.S. solar market in terms of installed capacity since 2012. In 2017, the utility-scale sector accounted for nearly 60% of all new solar capacity, and is expected to maintain its market-leading position for at least another six years. Two-thirds of all states, representing all regions of the country, are now home to one or more utility-scale solar projects. This report—the sixth in an ongoing annual series—provides in-depth data-driven analysis of the utility-scale solar project fleet in the United States. Drawing on empirical project-level data from a wide range of sources, this report analyzes technology trends, installed project prices, operating costs, capacity factors, power purchase agreement ("PPA") prices, the levelized cost of solar energy (LCOE), and the market value of solar. Given its current preeminence in the market, utility-scale PV also dominates much of this report, though data from CPV and CSP projects are also presented where appropriate. Highlights from this year's edition include: -Installation and Technology Trends: The use of solar trackers dominated 2017 installations with nearly 80% of all new capacity. In a reflection of the ongoing geographic expansion of the market beyond California and the high-insolation Southwest, the median insolation level at newly built project sites declined again in 2017. While new fixed-tilt projects are now seen predominantly in less-sunny regions, tracking projects are increasingly pushing into these same regions. The median inverter loading ratio grew to 1.32 in 2017, allowing the inverters to operate closer to full capacity for a greater percentage of the day. -Installed Prices: Median installed PV project prices have steadily fallen by two-thirds since the 2007-2009 period, to $2.0/WAC (or $1.6/WDC) for projects completed in 2017. The lowest 20th percentile of projects within our 2017 sample were priced at or below $1.8/WAC, with the lowest-priced projects around $0.9/WAC. Overall price dispersion across the entire sample has decreased steadily every year since 2013; similarly, price variation across regions decreased in 2017. -Operation and Maintenance ("O&M") Costs: PV O&M costs were in the neighborhood of $16/kWAC-year, or $8/MWh, in 2017. These numbers include only those costs incurred to directly operate and maintain the generating plant. -Capacity Factors: The cumulative net AC capacity factors of individual projects vary widely, from 14.3% to 35.2%, with a sample median of 26.3%. This project-level variation is based on a number of factors, including the strength of the solar resource at the project site, whether the array is mounted at a fixed tilt or on a tracking mechanism, the inverter loading ratio, degradation, and curtailment. Changes in at least the first three of these factors drove mean capacity factors higher from 2010-vintage to 2013-vintage projects, where they've remained fairly steady among more-recent project vintages as an ongoing increase in the prevalence of tracking has been offset by a build-out of lower resource sites. -PPA Prices and LCOE: Driven by lower installed project prices and improving capacity factors, levelized PPA prices for utility-scale PV have fallen dramatically over time, by $20-$30/MWh per year on average from 2006 through 2012, with a smaller price decline of ~$10/MWh per year evident from 2013 through 2016. Most recent PPAs in our sample—including many outside of California and the Southwest—are priced at or below $40/MWh levelized (in real 2017 dollars), with a few priced as aggressively as ~$20/MWh. The median LCOE among operational PV projects in our sample has followed PPA prices lower, suggesting a relatively competitive market for PPAs. -Solar's Wholesale Energy Market Value: Falling PPA prices have been offset to some degree by a decline in the wholesale energy market value of solar within higher-penetration markets like California, where solar earned just 79% of the average price across all hours within CAISO's real-time wholesale energy market in 2017 (down from 125% back in 2012). In other markets with less solar penetration, however, solar's hourly generation profile still earns more than the average wholesale price (e.g., 127% in ERCOT, 112% in PJM). -Solar+Storage: Adding battery storage is one way to at least partially restore the value of solar, and three recent PV+storage PPAs in Nevada (each using 4-hour batteries sized at 25% of PV nameplate capacity) suggest that the incremental PPA price adder for storage has fallen to ~$5/MWh, down from ~$15/MWh just a year ago for a similarly configured project. As PV plus battery storage becomes more cost-effective, a number of developers are regularly offering it as a viable upgrade to standalone PV. At the end of 2017, there were at least 188.5 GW of utility-scale solar power capacity within the interconnection queues across the nation. The 2017 growth within these queues is widely distributed across all regions of the country, but is most pronounced in the up-and-coming Midwest region, which accounts for 27% of the 99.2 GW of new queue capacity. The widening geographic distribution is as clear of a sign as any that the utility-scale market is maturing and expanding outside of its traditional high-insolation comfort zones.

14 SOLAR ENERGY↗

Atmospheric River Tracking Method Intercomparison Project (ARTMIP): project goals and experimental design

The Atmospheric River Tracking Method Intercomparison Project (ARTMIP) is an international collaborative effort to understand and quantify the uncertainties in atmospheric river (AR) science based on detection algorithm alone. Currently, there are many AR identification and tracking algorithms in the literature with a wide range of techniques and conclusions. ARTMIP strives to provide the community with information on different methodologies and provide guidance on the most appropriate algorithm for a given science question or region of interest. All ARTMIP participants will implement their detection algorithms on a specified common dataset for a defined period of time. The project is divided into two phases: Tier 1 will utilize the Modern-Era Retrospective analysis for Research and Applications, version 2 (MERRA-2) reanalysis from January 1980 to June 2017 and will be used as a baseline for all subsequent comparisons. Participation in Tier 1 is required. Tier 2 will be optional and include sensitivity studies designed around specific science questions, such as reanalysis uncertainty and climate change. High-resolution reanalysis and/or model output will be used wherever possible. Proposed metrics include AR frequency, duration, intensity, and precipitation attributable to ARs. Here, we present the ARTMIP experimental design, timeline, project requirements, and a brief description of the variety of methodologies in the current literature. Furthermore, we also present results from our 1-month proof-of-concept trial run designed to illustrate the utility and feasibility of the ARTMIP project.

58 GEOSCIENCES↗

FY2007 Laboratory Directed Research and Development Annual Report

The Laboratory Directed Research and Development (LDRD) annual report for fiscal year 2007 (FY07) provides a summary of LDRD-funded projects for the fiscal year and consists of two parts: An introduction to the LDRD Program, the LDRD portfolio-management process, program statistics for the year, and highlights of accomplishments for the year. A summary of each project, submitted by the principal investigator. Project summaries include the scope, motivation, goals, relevance to Department of Energy (DOE)/National Nuclear Security Administration (NNSA) and Lawrence Livermore National Laboratory (LLNL) mission areas, the technical progress achieved in FY07, and a list of publications that resulted from the research in FY07. Summaries are organized in sections by research category (in alphabetical order). Within each research category, the projects are listed in order of their LDRD project category: Strategic Initiative (SI), Exploratory Research (ER), Laboratory-Wide Competition (LW), and Feasibility Study (FS). Within each project category, the individual project summaries appear in order of their project tracking code, a unique identifier that consists of three elements. The first is the fiscal year the project began, the second represents the project category, and the third identifies the serial number of the proposal for that fiscal year.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Laboratory Directed Research and Development FY2008 Annual Report

The Laboratory Directed Research and Development (LDRD) Program, authorized by Congress in 1991 and administered by the Institutional Science and Technology Office at Lawrence Livermore, is our primary means for pursuing innovative, long-term, high-risk, and potentially high-payoff research that supports the full spectrum of national security interests encompassed by the missions of the Laboratory, the Department of Energy, and National Nuclear Security Administration. The accomplishments described in this annual report demonstrate the strong alignment of the LDRD portfolio with these missions and contribute to the Laboratory's success in meeting its goals. The LDRD budget of $91.5 million for fiscal year 2008 sponsored 176 projects. These projects were selected through an extensive peer-review process to ensure the highest scientific quality and mission relevance. Each year, the number of deserving proposals far exceeds the funding available, making the selection a tough one indeed. Our ongoing investments in LDRD have reaped long-term rewards for the Laboratory and the nation. Many Laboratory programs trace their roots to research thrusts that began several years ago under LDRD sponsorship. In addition, many LDRD projects contribute to more than one mission area, leveraging the Laboratory's multidisciplinary team approach to science and technology. Safeguarding the nation from terrorist activity and the proliferation of weapons of mass destruction will be an enduring mission of this Laboratory, for which LDRD will continue to play a vital role. The LDRD Program is a success story. Our projects continue to win national recognition for excellence through prestigious awards, papers published in peer-reviewed journals, and patents granted. With its reputation for sponsoring innovative projects, the LDRD Program is also a major vehicle for attracting and retaining the best and the brightest technical staff and for establishing collaborations with universities, industry, and other scientific and research institutions. By keeping the Laboratory at the forefront of science and technology, the LDRD Program enables us to meet our mission challenges, especially those of our ever-evolving national security mission. The Laboratory Directed Research and Development (LDRD) annual report for fiscal year 2008 (FY08) provides a summary of LDRD-funded projects for the fiscal year and consists of two parts: A broad description of the LDRD Program, the LDRD portfolio-management process, program statistics for the year, and highlights of accomplishments for the year. A summary of each project, submitted by the principal investigator. Project summaries include the scope, motivation, goals, relevance to Department of Energy (DOE)/National Nuclear Security Administration (NNSA) and Lawrence Livermore National Laboratory (LLNL) mission areas, the technical progress achieved in FY08, and a list of publications that resulted from the research in FY08. Summaries are organized in sections by research category (in alphabetical order). Within each research category, the projects are listed in order of their LDRD project category: Strategic Initiative (SI), Exploratory Research (ER), Laboratory-Wide Competition (LW), and Feasibility Study (FS). Within each project category, the individual project summaries appear in order of their project tracking code, a unique identifier that consists of three elements. The first is the fiscal year the project began, the second represents the project category, and the third identifies the serial number of the proposal for that fiscal year.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗