Project planning and design: getting it right the first time

This paper describes JPL's Project Formulation Support Team (PFST), which plays a central role in providing the institutional support tools and services for projects during their early formulation phases and ensure they get off to the right start.

project formulation support team↗

ART/Ada design project, phase 1: Project plan

The plan and schedule for Phase 1 of the Ada based ESBT Design Research Project is described. The main platform for the project is a DEC Ada compiler on VAX mini-computers and VAXstations running the Virtual Memory System (VMS) operating system. The Ada effort and lines of code are given in tabular form. A chart is given of the entire project life cycle.

Allen, Bradley P.↗

Tribal Revegetation Project Final Project Report: 92-Acre Area, Area 5 Radioactive Waste Management Complex, Nevada National Security Site, Nevada

Nuwu (Southern Paiute), Newe (Western Shoshone), and Nuumu (Owens Valley Paiute) are linguistically related, Numic-speaking peoples who are part of the broader Uto-Aztecan language group. Numic peoples view the land as a holistic, living, sentient being with feelings and purpose. The land is personified with human characteristics and it needs to be experienced to be understood through “learning by doing.” Numic peoples do not support ground disturbing activities within their ancestral lands, including activities tied to the storage of low-level radioactive waste or classified materials on the NNSS, which they view as culturally inappropriate. These deep-rooted ancestral connections are the impetus for reinforcing Numic responsibility for healing disturbed areas by integrating respect and patience with consistent Tribal interaction. Tribal Ecological Knowledge (TEK) is the science of describing Tribal approaches for understanding natural resources. Numic TEK is embedded in traditional teachings learned incrementally over time though experience and it evolves through lessons learned and responses to environmental changes over millennia. Therefore, TEK can broaden and enhance Western scientific knowledge associated with revegetation, especially in highly disturbed areas. The project blended TEK with Western scientific ecological methods to create a vegetative cover within test plots on the 92-Acre Area located at the Radioactive Waste Management Complex (RWMC) located in Area 5 on the Nevada National Security Site (NNSS). The vegetated test plots were systematically created for the Department of Energy (DOE) in tandem with the existing Federal Facilities Agreement and Consent Order (FFACO) with the Nevada Department of Environmental Protection (NDEP). Three previous contractor-lead attempts at revegetation, one targeting full cover revegetation and two targeting test plot revegetation, did not achieve the anticipated results at this location. When presented to the 16 American Indian Tribal nations and affiliated groups with cultural and historical ties to the NNSS, the group appointed a Tribal Revegetation Committee (TRC) that included six expert Tribal knowledge holders to collaborate with an ethnoecologist/cultural anthropologist and two biologists. Project design, planning, seed and outplant selection, spiritual land preparation, and methodology were guided by the TRC and an ethnoecologist/cultural anthropologist from Portland State University (PSU) and biologists from Desert Research Institute (DRI). Using TEK, the TRC recommended a specific seed mixture that contained nine native plant species and three species of outplants. The revegetation effort included preparing and planting thirty 10 m × 10 m (32.8 ft × 32.8 ft) seeded plots, twelve of which also included outplants; and eight 10 m × 100 m (32.8 ft × 328 ft) plots that only received outplants, all atop a waste cell cover. The TRC and the project team creatively adapted TEK with Western scientific methods so that the planned revegetation efforts could occur within the safety and security parameters of the RWMC. Test plots were subjected to one of five soil treatments with varying combinations of straw or mulch applications, soil amendment, and/or outplant planting and one of two watering treatments (watered or unwatered). Planting was divided into two events: one in the fall season and another during the subsequent spring season based on TEK and a corresponding recommendation from the TRC. Monitoring and spiritual management was conducted by the TRC to evaluate plant progress on a monthly basis (in conjunction with the biologist and anthropologist) during each respective growing season for a period of three years after planting. This approach allowed Tribal members the opportunity to conduct traditional blessings and other culturally appropriate activities to restore balance to the land in accordance with Tribal protocols. Following TEK-guided methods, successful plant establishment from seed stock and outplants was observed in many plots. Overall, plots planted in the spring, as recommended by the TRC, showed higher rates of outplant survival and native seedling emergence than those planted in the fall. This finding is significant because it is contrary to the original guidance and previous approaches provided for planting in this region. The TRC believes the frequent co-occurrence of native seedlings near surviving outplants indicates an important symbiotic relationship understood by Tribal communities and overlooked by others. Watered outplants displayed much higher survivability than unwatered plants, even after watering was reduced after the plants were established. Soil amendments and mulch created higher densities of native plants from seed. Many native seedlings showed significant delays in germination, which is considered a normal adaptation to desert climates. Some native plants did not germinate until the third growing year, whereas others germinated during the first growing year, which demonstrates the complexity of the desert environment. Evidence of native insects, reptiles, mammals, and birds, as well as native plants that were not part of the planted species, were noted and considered culturally significant. Despite the presence of non-native plants, native outplants continued to thrive and the incidence of native plant germination from seed increased over time. These successful revegetation results where previous efforts were unsuccessful reinforce the importance of integrating regionally appropriate, TEK-guided methodology with Western science to achieve positive results and the necessity of integrating Tribal involvement in all stages of the revegetation effort. Expanded approaches coupled with Tribal knowledge and tools from Western science addressed a complex problem tied to revegetating atop a low-level radioactive waste cell. The level of Tribal participation serves as a progressive model for building collaborative relationships and addressing ecological challenges on the NNSS.

54 ENVIRONMENTAL SCIENCES↗

Ares I Crew Launch Vehicle Project: Forward Plan to Preliminary Design Review

The Exploration Launch Projects Office, located at NASA's Marshall Space Flight Center, conducted the Ares I Crew Launch Vehicle System Requirements Review (SRR) at the end of 2006, a mere year after the project team was assembled. In Ares' first year, extensive trade studies and evaluations were conducted to refine the design initially recommended by the Exploration Systems Architecture Study, conceptual designs were analyzed for fitness, and the contractual framework was assembled to enable a development effort unparalleled in American space flight since the Space Shuttle. Now, the project turns its focus to the Preliminary Design Review (PDR), scheduled for 2008. Taking into consideration the findings of the SRR, the design of the Ares I is being tightened and refined to meet the operability, reliability, and affordability goals outlined by the Constellation Program. As directed in NASA Procedure and Regulation (NPR) 7123, NASA Systems Engineering Procedural Requirements, the Ares I SRR examined "the functional and performance requirements defined for the system and the preliminary program or project plan and ensures that the requirements and the selected concept will satisfy the mission." The SRR was conducted to ensure the system- and element-level design and interface requirements are defined prior to proceeding into the project's design phase. The Exploration Launch Projects Control Board convened on December 19,2006, and accepted the findings of the SRR and the go-forward plan proceeding to PDR. Based upon these findings, the Ares project believes that operability must drive the vehicle's design, and that a number of design challenges, including system mass and reliability, must be addressed as part of the progress to PDR.

Dumbacher, Daniel L.↗

Pala Energy Options Analysis (Final Report)

The Pala Energy Options Project scope focused on assessing electric and thermal energy related options for the Pala Band of Mission Indians. Although the assessment also considered options for transportation fuels – including potential for electrification – and other energy uses, initial reviews with PED staff indicated that the most practical and substantial options likely would involve serving current building electric and thermal energy resources and uses. Assessment scope varies by specific options considered; some merited in-depth assessment for immediate action to initiate or advance implementation, while higher level assessments were more appropriate for options that would take longer to implement and would require updated in-depth assessments during project planning and design phases. The primary objectives of the Project were to 1) identify energy resources/loads, 2) assess energy needs and exports, 3) investigate and evaluate supply-side and demand side energy options, and 4) select and prioritize options in an implementation plan.

14 SOLAR ENERGY↗

Pliocene Model Intercomparison Project Phase 3 (PlioMIP3) – Science Plan and Experimental Design

The Pliocene Model Intercomparison Project (PlioMIP) was initiated in 2008. Over two phases PlioMIP has helped co-ordinate the experimental design and publication strategy of the community, which has included an increasing number of climate models and modelling groups from around the world. It has engaged with palaeoenvironmental scientists to foster new data synthesis supporting the construction of new model boundary conditions, as well as to facilitate new data-model comparisons. The work has advanced our understanding of Pliocene climates and environments, enhanced our knowledge regarding the ability of complex climate and Earth System models to accurately simulate climate change, and helped to refine our estimates of how sensitive the climate system is to forcing conditions. In this community protocol paper, we outline the scientific plan for PlioMIP Phase 3 (PlioMIP3). This plan provides the required guidance to participating modelling groups from around the world to successfully set up and perform PlioMIP3 climate model experiments. The project is open to new participants from the scientific community (both from the climate modelling and geosciences communities). In PlioMIP3, we retain the PlioMIP2 Core experiments (Eoi 400 , E 280 ) and extend the Core requirements to include either an experiment focussed on the Early Pliocene or an alternative Late Pliocene simulation (or both). These additions (a) allow a comparison of Early and Late Pliocene warm intervals and help build research connections and synergy with the MioMIP (Miocene Model Intercomparison Project - also known as DeepMIP-Miocene) and PlioMioVAR projects (Pliocene-Miocene Variability Working Group), and (b) create an alternative time slice simulation for 3.205 Ma (MIS KM5c) through removal of some of the largest palaeogeographic differences introduced between PlioMIP1 and 2 resulting in minimal land-sea mask variations from the modern. In addition, we present ten optional experiments designed to enhance our assessment of climate sensitivity and to explore the uncertainty in greenhouse gas-related forcing. For the first time, we introduce orbital sensitivity experiments into the science plan, as well as simulations incorporating dynamic vegetation-climate feedbacks and an experiment designed to examine the potential significance of East Antarctic Ice Sheet boundary condition uncertainty. These changes enhance palaeo-to-future scientific connections and enable an exploration of the significance of palaeogeographic uncertainties on climate simulations.

Climate modelling↗

SPECs Early-Stage Decision Model: User Manual

The SPECs Early-Stage Decision (ESD) model is central to the SPECs procurement solutions toolkit. The ESD model is an Excel-based spreadsheet model, which provides information about the economic and strategic value of a proposed battery-storage project or solar-plus-storage (solar-plus) project. The model can be used to explore combinations of storage-related project value streams in order to define a potential project, while educating co-op decision-makers about project benefits and costs. A sensitivity analysis function speeds the development of "what-if" scenarios. A gap analysis function solves for top-priority metrics and supports the inclusion of hard-to-monetize strategic values, such as the value of storage to defer costly system upgrades in light of increasing distributed solar and other distributed energy resources (DERs). Model outputs include the utility data, assumptions, and use-case scenarios that are recommended content for the requests for proposals (RFPs). The model may also provide an initial "sanity check" for RFP responses, supporting further discussions among utility staff, vendors and stakeholders. The ESD is not a "finance-grade" modeling tool, and users are cautioned to be mindful of its limitations, but the model has been reviewed by users, who recommend it as a way to drive faster and better project design and planning, as well as to facilitate better communications with vendors, grid partners, and stakeholders.

14 SOLAR ENERGY↗

The ten-ecosystem study investigation plan

With the continental United States divided into ten forest and grassland ecosystems, the Ten Ecosystem Study (TES) is designed to investigate the feasibility and applicability of state-of-the-art automatic data processing remote sensing technology to inventory forest, grassland, and water resources by using Land Satellite data. The study will serve as a prelude to a possible future nationwide remote sensing application to inventory forest and rangeland renewable resources. This plan describes project design and phases, the ten ecosystem, data utilization and output, personnel organization, resource requirements, and schedules and milestones.

Kan, E. P.↗

Development and application of an environmental risk register for marine energy device and project developers

The marine energy industry is steadily advancing as more devices are deployed worldwide. However, several challenges and barriers remain, such as lingering uncertainty regarding the potential environmental effects of marine energy devices on marine animals, habitats, and ecosystems. Concerns have led to difficulty navigating permitting and consenting processes and receiving authorization to deploy devices in the marine environment, including extended timelines and costs. Based on existing risk registers, a novel marine energy environmental risk register was created to help the marine energy industry move beyond these barriers. This risk register aims to aid marine energy device and project developers identify and assess potential environmental risks early in device design or project planning, document and track potential environmental interactions, prioritize risks and determine risk responses, and make decisions throughout device or project development. It can also be used as a tool to assist in communicating with regulators and advisors during permitting processes and to inform stakeholder and community engagement efforts. This paper details the methods and process to develop a risk register specific to environmental effects of marine energy and describes two use cases (one for wave energy and another for tidal energy) to highlight example results. Due to the tool's novelty, the paper showcases its application for the marine energy industry and acknowledges limitations and possible future improvements. Overall, the environmental risk register shows promise to support marine energy developers when identifying, tracking, and addressing potential environmental risks and to help successfully navigate permitting and deploy marine energy devices responsibly.

Environmental effects↗

Snowmass 2021 CMB-S4 White Paper

This Snowmass 2021 White Paper describes the Cosmic Microwave Background Stage 4 project CMB-S4, which is designed to cross critical thresholds in our understanding of the origin and evolution of the Universe, from the highest energies at the dawn of time through the growth of structure to the present day. We provide an overview of the science case, the technical design, and project plan.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

ART/Ada design project, phase 1. Task 3 report: Test plan

The plan is described for the integrated testing and benchmark of Phase Ada based ESBT Design Research Project. The integration testing is divided into two phases: (1) the modules that do not rely on the Ada code generated by the Ada Generator are tested before the Ada Generator is implemented; and (2) all modules are integrated and tested with the Ada code generated by the Ada Generator. Its performance and size as well as its functionality is verified in this phase. The target platform is a DEC Ada compiler on VAX mini-computers and VAX stations running the VMS operating system.

Allen, Bradley P.↗

CalWave Design for PacWave - Preliminary Design Phase - Risk Management Plan

The project objectives for CalWave's deployment at PacWave are distinguished by the Preliminary Design Phase and the Detailed Design Phase. During the Preliminary Design Phase, the Risk Register was established to identify risks and mitigation strategies. The Risk Management Plan assesses potential risks of CalWave's technology and accompanying processes and describes the risk mitigation strategies for the project.

16 TIDAL AND WAVE POWER↗

Collaborative Mission Design at NASA Langley Research Center

NASA Langley Research Center (LaRC) has developed and tested two facilities dedicated to increasing efficiency in key mission design processes, including payload design, mission planning, and implementation plan development, among others. The Integrated Design Center (IDC) is a state-of-the-art concurrent design facility which allows scientists and spaceflight engineers to produce project designs and mission plans in a real-time collaborative environment, using industry-standard physics-based development tools and the latest communication technology. The Mission Simulation Lab (MiSL), a virtual reality (VR) facility focused on payload and project design, permits engineers to quickly translate their design and modeling output into enhanced three-dimensional models and then examine them in a realistic full-scale virtual environment. The authors were responsible for envisioning both facilities and turning those visions into fully operational mission design resources at LaRC with multiple advanced capabilities and applications. In addition, the authors have created a synergistic interface between these two facilities. This combined functionality is the Interactive Design and Simulation Center (IDSC), a meta-facility which offers project teams a powerful array of highly advanced tools, permitting them to rapidly produce project designs while maintaining the integrity of the input from every discipline expert on the project. The concept-to-flight mission support provided by IDSC has shown improved inter- and intra-team communication and a reduction in the resources required for proposal development, requirements definition, and design effort.

Gough, Kerry M.↗

Optimizing Alabama’s CO 2 Storage in Shelby County (Project OASIS) Milestone 3.4 Report: Complete Well Design and Drilling Plan

We are pleased to present the following materials, which serve as confirmation of the successful completion of Task 3.4 Complete Well Design and Drilling Plan Milestone, in accordance with the Project OASIS Project Management Plan. More specifically, the following provides confirmation of a team-wide call that was held on September 25, 2023, to discuss the CarbonSAFE Phase II drilling program, the well drilling prognosis, and an overview of risks associated with the program by category as well as probability and impact. A comprehensive Site-Specific Drilling Report will be provided to DOE-NETL 30 days after completion of drilling activities.

20 FOSSIL-FUELED POWER PLANTS↗

Hydrogen Sustainable Infrastructure Guidelines (H2SIG)

Infrastructure interacts with major global challenges inclusive of climate change, resilience, equity and social justice, environmental protection and biodiversity, public health, and economic recovery. This effort directly addresses how to apply sustainability assessments to the unique aspects of hydrogen (H2) infrastructure projects using the Envision® sustainability framework developed by the Institute for Sustainable Infrastructure (ISI). Envision is a flexible system of criteria and performance objectives to aid decision makers and help project teams identify sustainable approaches during planning, design and construction of infrastructure projects that will continue throughout the project’s operations, maintenance, and end-of-life phases. The goal of this work is to support those interested in conducting sustainability assessments for hydrogen infrastructure projects. Through this work the team has developed hydrogen-specific guidelines and best practices to assist project developers, investors and regulators in straightforward application of the Envision framework to systematically enhance clarity and increase objectivity across hydrogen projects. Subject matter experts from 20 different organizations (industry, non-profits, municipalities, emissions regulators, national labs) were engaged through 7 focus groups to discuss the H2-prioritized Envision requirements and elements to be included in the guidelines. In addition to these guidelines, the team conducted case studies as a way of demonstrating and informing the guidelines and providing examples or ideas for implementing sustainability in future projects. Through this study, the authors found that hydrogen infrastructure projects can incorporate many sustainable practices including reducing GHG emissions affecting climate change, reducing air pollutant emissions affecting the health of communities, synergistically handling waste byproducts, integrating into existing infrastructure, incorporating renewable energy, and addressing equity and environmental justice. Additionally, hydrogen infrastructure projects could benefit from 2-way communication engagement and collaborative planning with stakeholders, educational awareness of hydrogen technology, tracking and reporting on water use and water quality, and including monetized environmental and social benefits in life-cycle cost estimates. This document is the final technical report for the Hydrogen Sustainability Assessment Methods for Project Development project. While the main focus of the report is to provide guidelines for applying sustainability to hydrogen infrastructure, there are sections within the appendix providing completed project tasks and methodology.

08 HYDROGEN↗

The telerobot workstation testbed for the shuttle aft flight deck: A project plan for integrating human factors into system design

The human factors design process in developing a shuttle orbiter aft flight deck workstation testbed is described. In developing an operator workstation to control various laboratory telerobots, strong elements of human factors engineering and ergonomics are integrated into the design process. The integration of human factors is performed by incorporating user feedback at key stages in the project life-cycle. An operator centered design approach helps insure the system users are working with the system designer in the design and operation of the system. The design methodology is presented along with the results of the design and the solutions regarding human factors design principles.

Sauerwein, Timothy↗

X-57 Traction Power and Command Systems Development

This paper describes the final, as-built design of the X‑57 Maxwell aircraft power and command system architecture that implements the electrified propulsion capability. The development of the traction power, command, and avionics power subsystems proceeded as planned at the initial project critical design review, but improvements to the design were identified following the development of detailed operations concepts and integrated subsystem and system testing. The redundant architecture with A‑side and B‑side buses provided a robust framework for a developmental system that would turn out to have a lower technology readiness than had been assumed upon project formulation. As the project team identified reliability or performance gaps in the electrified propulsion powertrain components and their interactions with the other vehicle systems, the traction power, command, and avionics architectures were modified to accommodate the modified systems. Following the publication of the planned design approach at the critical design review milestone [1], the project team developed the flight hardware and software, integrated the systems, and adjusted the design and qualification activities to address gaps in the components, system architecture, and requirements as the gaps were realized. In addition to inherent challenges in development of these subsystems, the integration of this new technology with adjacent critical systems in an aircraft configuration posed additional challenges that drove design considerations across the subsystem development and the other vehicle systems. Integration complications included electromagnetic compatibility, thermal performance, and tolerance of single-point failures internal and external to the powerplant. Development of a qualification program was required for the new motors, inverters, and batteries, and hardware performance during component qualification fed back into the development process and led lessons learned and redesign of key elements.