Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “project”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Project 1: COLLECTS Project and Project 2: M&V for Saputo Cheese Project: Cooperative Research and Development (Final Report)

Project 1: Combined Power's Hyperlight Energy and NLR will collaborate on the DOE Concentrating Optics for Lower Levelized Energy CosTS (COLLECTS) project, DE-FOA-0001268. COLLECTS funding opportunity announcement (FOA) seeks to further concentrated solar power (CSP) system technologies by soliciting disruptive, transformative projects for the concentrating solar collectors in the CSP plant. These innovative projects will seek to surpass the targets set out in the SunShot Vision Study, enabling CSP to be cost-competitive with conventional forms of electric power generation. Projects will target the design and manufacturing of novel solar collectors with the ability to significantly reduce the solar field contribution to the overall levelized cost of energy (LCOE) of the CSP plant, and which have not been previously specifically targeted by CSP FOAs. Project 2: Hyperlight will perform measurement and verification (M&V) of Green House Gases and NLR will evaluate energy consumption reduction.

14 SOLAR ENERGY↗

CONUS-wide Projected Flood Frequency and Uncertainty Estimates, Version 1.0

This dataset presents a large-ensemble of CONUS-wide projected flood frequency and uncertainty estimates across ~2.7 million NHDPlusV2 river reaches over the CONUS. The framework producing this dataset leverages a multi-model, uncertainty-aware modeling framework that allows evaluating shifts in flood frequences at the stream reach level across the CONUS. CONUS-wide ensemble streamflow projections generated from hydrologic simulations driven by downscaled and bias-corrected Coupled Model Intercomparison Project Phase 6 (CMIP6) outputs are used to derive these flood frequency and uncertainty estimates over the period 1980 - 2099. A spatially consistent regional L-moment algorithm is applied across clusters defined by the US Hydrologic Unit Code Subregions (HUC4s and HUC8s) and NHDPlusV2 stream orders to estimate flood frequencies. The dataset also includes at-site based flood estimates that allow for the comparison between local and regional approach-based estimates, assess projected changes, and characterize their uncertainties. For more reliable estimation of rare flood frequencies such as 500 and 1000-year return periods, super-ensemble based estimates are also included in the dataset. This dataset is derived to support the "Impact-Informed Dam Safety Risk Assessment for Securing Hydropower Assests" project for the US Department of Energy (DOE) Hydropower and Hydrokinetic Office (H2O). For further details, refer to Kao et al. (2022), Ghimire et al. (2023), Ghimire et al. (2025), and Hosking and Wallis (1997).

Ghimire, Ganesh [ORNL] (ORCID:0000000242843941)↗

Design Basis Document / Owner’s Technical Specification for Nitrate Salt Systems in CSP Projects: Volume 1 Specifications for Parabolic Trough Projects, Volume 2 - Specifications for Central Receiver Projects, Volume 3 - Narrative

Design Basis Documents / Owner’s Technical Specifications are developed for parabolic trough and central receiver power plants using nitrate salt as the heat transport fluid and the thermal storage medium. The goals were to 1) distill the successful experience with nitrate salt systems from as many commercial projects as possible, 2) provide technical bases for equipment design/selection that an owner can impose on an EPC contractor, 3) compile this information in one location to provide guidance on salt systems that is as broadly applicable to as many projects as possible, and 4) work toward an industry consensus on a Design Basis Document that reflects the lessons learned from earlier commercial projects. The document allows an owner to provide design guidance, and to impose a minimum set of requirements, above and beyond those in the normal Codes and Standards, on an EPC contractor in an effort to avoid a repeat of past mistakes. If successful, this would allow salt systems to achieve the same levels of reliability and availability as commercial parabolic trough plants using diphenyl oxide / biphenyl (i.e., Dowtherm A, Therminol VP-1) as the heat transfer fluid. The report consists of 3 volumes: • Volume 1 - Specifications for Parabolic Trough Projects • Volume 2 - Specifications for Central Receiver Projects • Volume 3 - Narrative Volumes 1 and 2 include discussions of the following topics: • Plant functional requirements for the salt systems • Plant operating states, and transitions between states, for the salt systems • Risk analysis of the principal salt components • Plant requirements for the salt systems to meet the functional and the operating requirements • Type of specification for the principal salt components: functional; or prescriptive • Current state of the art for salt systems. Volume 3 discusses a number of cases in which the salt equipment at commercial parabolic trough and central receiver projects has not met the projected levels of reliability and availability. Possible reasons for the sources of the problems are discussed, as is a range of possible alternate designs that could avoid the known problems.

14 SOLAR ENERGY↗

Projected Urban Morphology of the Los Angeles Area by the Year 2100

This dataset provides projections of urban building morphologies for the Los Angeles urban area at 30-meter spatial resolution. It contains 192 raster files that detail two primary building attributes: building footprint fractions (ranging from 0 to 1) and average building heights (ranging from 0 to 75 meters). The projections account for a wide range of future pathways, covering two Shared Socioeconomic Pathway (SSP) scenarios (SSP3 and SSP5), two population scenarios, two developed land intensification scenarios, and four distinct levels of intensification. The dataset was created using dual Generative Adversarial Networks (GANs) trained on 2015 land cover and building properties from the National Land Cover Database (NLCD) and Model America datasets. Supporting information on the dataset has been described in the LAUrbanAreaMorphologyProjections2100_README.txt file.

Pandey, Bhartendu↗

Model reduction for hypersonic aerodynamics via conservative LSPG projection and hyper-reduction

High-speed aerospace engineering applications rely heavily on computational fluid dynamics (CFD) models for design and analysis due to the expense and difficulty of flight tests and experiments. This reliance on CFD models necessitates performing accurate and reliable uncertainty quantification (UQ) of the CFD models. However, it is very computationally expensive to run CFD for hypersonic flows due to the fine grid resolution required to capture the strong shocks and large gradients that are typically present. Furthermore, UQ approaches are “many-query” problems requiring many runs with a wide range of input parameters. One way to enable computationally expensive models to be used in such many-query problems is to employ projection-based reduced-order models (ROMs) in lieu of the (high-fidelity) full-order model. In particular, the least-squares Petrov–Galerkin (LSPG) ROM (equipped with hyper-reduction) has demonstrated the ability to significantly reduce simulation costs while retaining high levels of accuracy on a range of problems including subsonic CFD applications. This allows computationally inexpensive LSPG ROM simulations to replace the full-order model simulations in UQ studies, which makes this many-query task tractable, even for large-scale CFD models. This work presents the first application of LSPG to a hypersonic CFD application. In particular, we present results for LSPG ROMs of the HIFiRE-1 in a three-dimensional, turbulent Mach 7.1 flow, showcasing the ability of the ROM to significantly reduce computational costs while maintaining high levels of accuracy in computed quantities of interest.

Fluid Dynamics↗

Using Project Complexity Determinations to Establish Required Levels of Project Rigor

The concepts discussed in this paper 1) focus on using technical competencies and skills in making objective determinations regarding project complexity based on objective scoring criteria and 2) then using the complexity determinations to establish the level of rigor required in initiating, planning, executing, monitoring and controlling, and closing projects to maximize process efficiency. This paper presents a project complexity analysis methodology for defining the levels of project management process rigor a project team needs to employ to maximize project delivery efficiencies without compromising quality and performance. Methods for making project complexity determinations based on project lifecycle size, duration, organizational complexity, requirements, technology readiness, risk, and visibility are discussed. The paper correlates the levels of rigor needed by project management process groups given the determined level of project complexity. Next, the paper presents a graded approach to defining extent of team formation, planning documentation rigor, stakeholder communication rigor, requirements management rigor, acquisition planning, risk management, executing, and monitoring and controlling rigor dependent on project complexity determinations. Methods for integrating and aligning the project complexity determination methods into existing project management procedures and processes are also discussed as well as methods for training personnel in the use of the method and facilitating and monitoring effectiveness of implementation within an organization in which project delivery is a mission focus.

complexity, project, determination, management, tr↗

Soft costs and EVSE – Knowledge gaps as a barrier to successful projects

There has been a recent push to increase access to electric vehicle (EV) charging infrastructure. The National Electric Vehicle Infrastructure (NEVI) program, part of the Bipartisan Infrastructure Law (BIL) has made significant funding available for major charging infrastructure projects along state thruways, and many state and local incentives exist for EV owners to install chargers in their homes. However, deployment of these chargers has not kept up with demand, primarily due to issues in project planning, permitting processes, and unforeseen delays. This paper serves as a review of the current understanding of these and other non-hardware costs in EV charging infrastructure projects (collectively known as “soft costs”). We found that soft costs in EV charging infrastructure projects are not well understood. Specifically, there is little agreement on how soft costs should be categorized and tracked, and less agreement still on best practices for controlling these costs and lowering barriers to infrastructure deployment. A broader review of EV charging infrastructure cost analyses shows that these costs can have significant impacts on project outcomes. EV charging infrastructure projects may be able to examine the success of the solar industry in lowering soft costs, and a similar effort may lower project costs significantly. Further work on standardizing and collecting data on EV charging infrastructure costs is required to begin addressing and controlling these costs.

32 - ENERGY CONSERVATION, CONSUMPTION, AND UTILIZA↗

Visual exploration of high-dimensional data through subspace analysis and dynamic projections

Here, we introduce a novel interactive framework for visualizing and exploring high-dimensional datasets based on subspace analysis and dynamic projections. We assume the high-dimensional dataset can be represented by a mixture of low-dimensional linear subspaces with mixed dimensions, and provide a method to reliably estimate the intrinsic dimension and linear basis of each subspace extracted from the subspace clustering. Subsequently, we use these bases to define unique 2D linear projections as viewpoints from which to visualize the data. To understand the relationships among the different projections and to discover hidden patterns, we connect these projections through dynamic projections that create smooth animated transitions between pairs of projections. We introduce the view transition graph, which provides flexible navigation among these projections to facilitate an intuitive exploration. Finally, we provide detailed comparisons with related systems, and use real-world examples to demonstrate the novelty and usability of our proposed framework.

97 MATHEMATICS AND COMPUTING↗

The Little Engine That Could: No Project is too Small for Sustainable Remediation Moab Uranium Mill Tailings Removal Project - 16427

Executive Order 13693, 'Planning for Federal Sustainability in the Next Decade', mandates the reduction of energy use and cost and greenhouse gas emissions, and the search for renewable or alternative energy solutions. DOE EM manages the Moab Uranium Mill Tailings Remedial Action Project in Utah that involves relocating a 16-million-ton uranium mill tailings pile and associated contaminated materials at the former Atlas mill site to a permanent disposal cell constructed near Crescent Junction, Utah, predominantly by rail. Project personnel strive to support the Executive Order in making preparations for the impacts of climate change. Meeting the goals of the Executive Order in light of the remote location and limited resources of the Project sites often requires an innovative approach and perseverance. The Moab Project is a 'Small Site' within EM and has a comparatively short-term completion date. As a result, large-scale sustainability projects, such as retrofits or remodels, do not offer a cost benefit over this period. Instead, less dramatic process changes are achievable. The Project purchases renewable wind energy through the local power provider to reduce Scope 2 (purchased electricity) greenhouse gas emissions. Toward its ambitious goal of achieving zero landfill waste, the Project has diverted over 50 percent of its nonhazardous solid waste from the local landfill through composting and recycling efforts. In particular, electronics must meet various sustainable criteria prior to purchase, and be recycled through donations and certified recyclers, diverting it from the waste stream. The Project has received multiple Green Buy Awards from DOE by reaching leadership goals for purchasing energy-efficient, water-efficient, bio-based, and recycled-content products. In fiscal year 2014, in response to President Obama's June 2014 memorandum, 'Sustainable Practices for Designed Landscapes and Supporting Pollinators on Federal Landscapes', the Project decided to take a proactive approach and work with a local pollinator group, hosting two beehives in a revegetation area on the Moab site. An increase in plant growth and blossoming plants in the revegetation area has been observed and is believed to be related to the added pollinators. The Project has previously seeded disturbed areas mainly with native drought-resistant species to reduce water usage. Storm water collected in sediment basins at the Crescent Junction site is used for dust control and compaction of mill tailings in the disposal cell. The Project worked with the U.S. Army Corps of Engineers and the U.S. Fish and Wildlife Service to gain support for re-contouring a remediated area adjacent to the Colorado River, which borders the Moab site on the east, to allow the area to flood at a lower river stage. This re-contouring promotes more varied vegetation growth and river water that tops the west bank brings soil nutrients to inundated areas of the site. Ponded floodwater has been pumped into revegetation plots for irrigation, reducing freshwater usage. Innovation in sustainable practices comes in many different fashions. The Moab Project demonstrates that no project is too small to implement sustainable practices. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Ocean acidification over the next three centuries using a simple global climate carbon-cycle model: projections and sensitivities

Continued oceanic uptake of anthropogenic CO 2 is projected to significantly alter the chemistry of the upper oceans over the next three centuries, with potentially serious consequences for marine ecosystems. Relatively few models have the capability to make projections of ocean acidification, limiting our ability to assess the impacts and probabilities of ocean changes. In this study we examine the ability of Hector v1.1, a reduced-form global model, to project changes in the upper ocean carbonate system over the next three centuries, and quantify the model's sensitivity to parametric inputs. Hector is run under prescribed emission pathways from the Representative Concentration Pathways (RCPs) and compared to both observations and a suite of Coupled Model Intercomparison (CMIP5) model outputs. Current observations confirm that ocean acidification is already taking place, and CMIP5 models project significant changes occurring to 2300. Hector is consistent with the observational record within both the high- (> 55°) and low-latitude oceans (< 55°). The model projects low-latitude surface ocean pH to decrease from preindustrial levels of 8.17 to 7.77 in 2100, and to 7.50 in 2300; aragonite saturation levels (Ω Ar ) decrease from 4.1 units to 2.2 in 2100 and 1.4 in 2300 under RCP 8.5. These magnitudes and trends of ocean acidification within Hector are largely consistent with the CMIP5 model outputs, although we identify some small biases within Hector's carbonate system. Of the parameters tested, changes in [H + ] are most sensitive to parameters that directly affect atmospheric CO 2 concentrations – Q 10 (terrestrial respiration temperature response) as well as changes in ocean circulation, while changes in Ω Ar saturation levels are sensitive to changes in ocean salinity and Q 10 . We conclude that Hector is a robust tool well suited for rapid ocean acidification projections and sensitivity analyses, and it is capable of emulating both current observations and large-scale climate models under multiple emission pathways.

54 ENVIRONMENTAL SCIENCES↗

Assessment of online public opinions on large infrastructure projects: A case study of the Three Gorges Project in China

Public opinion becomes increasingly salient in the ex post evaluation stage of large infrastructure projects which have significant impacts to the environment and the society. However, traditional survey methods are inefficient in collection and assessment of the public opinion due to its large quantity and diversity. Recently, Social media platforms provide a rich data source for monitoring and assessing the public opinion on controversial infrastructure projects. This paper proposes an assessment framework to transform unstructured online public opinions on large infrastructure projects into sentimental and topical indicators for enhancing practices of ex post evaluation and public participation. The framework uses web crawlers to collect online comments related to a large infrastructure project and employs two natural language processing technologies, including sentiment analysis and topic modeling, with spatio-temporal analysis, to transform these comments into indicators for assessing online public opinion on the project. Based on the framework, we investigate the online public opinion of the Three Gorges Project on China's largest microblogging site, namely, Weibo. Assessment results present spatial-temporal distributions of post intensity and sentiment polarity, reveals major topics with different sentiments and summarizes managerial implications, for ex post evaluation of the world's largest hydropower project. The proposed assessment framework is expected to be widely applied as a methodological strategy to assess public opinion in the ex post evaluation stage of large infrastructure projects. - Highlights: • We developed a framework to assess online public opinion on large infrastructure projects with environmental impacts. • Indicators were built to assess post intensity, sentiment polarity and major topics of the public opinion. • We took the Three Gorges Project (TGP) as an example to demonstrate the effectiveness proposed framework. • We revealed spatial-temporal patterns of post intensity and sentiment polarity on the TGP. • We drew implications for a more in-depth understanding of the public opinion on large infrastructure projects.

54 ENVIRONMENTAL SCIENCES↗

Designing a Successful Transportation Project: Lessons Learned from the Clean Cities American Recovery and Reinvestment Act Projects

The largest source of funding for alternative fuel vehicle and infrastructure projects in the U.S. Department of Energy's Clean Cities program's history came from the American Recovery and Reinvestment Act (Recovery Act). In 2009, the 25 cost-share projects totaled nearly $300 million in federal government investment. This effort included the involvement of 50 Clean Cities coalitions and their nearly 700 stakeholder partners who provided an additional $500 million in matching funds to support projects in their local communities. In total, those 25 projects established 1,380 alternative fueling stations and put more than 9,000 alternative fuel and advanced technology vehicles on the road. Together, these projects displaced 154 million gasoline gallon equivalents (GGE) of petroleum and averted 254,000 tons of greenhouse gas (GHG) emissions, while supporting U.S. energy independence and contributing to regional economic development. During post-project interviews, project leaders consistently cited a number of key components - ranging from technical and logistical factors, to administrative capabilities - for accomplishing an effective and impactful project. This report summarizes the high-level project design and administrative considerations for conducting a successful transportation project.

30 DIRECT ENERGY CONVERSION↗

Improving the SWAT forest module for enhancing water resource projections: A case study in the St. Croix River basin

Abstract Insufficiently calibrated forest parameters of the Soil & Water Assessment Tool (SWAT) may introduce uncertainties to water resource projections in forested watersheds. In this study, we improved SWAT forest parameterization and phosphorus cycling representations to better simulate forest ecosystems in the St. Croix River basin, and we further examined how those improvements affected model projections of streamflow, sediment, and nitrogen export under future climate conditions. Simulations with improved forest parameters substantially reduced model estimates of water, sediment, and nitrogen fluxes relative to those based on default parameters. Differences between improved and default projections can be attributed to the enhanced representation of forest water consumption, nutrient uptake, and protection of soil from erosion. Better representation of forest ecosystems in SWAT contributes to constraining uncertainties in water resource projections. Results of this study highlight the importance of improving SWAT forest ecosystem representations in projecting delivery of water, sediment, and nutrients from land to rivers in response to climate change, particularly for watersheds with large areas of forests. Improved forest parameters and the phosphorus weathering algorithms developed in this study are expected to help enhance future applications of SWAT to investigate hydrological and biogeochemical consequences of climate change.

Yang, Qichun↗

U.S. Department of Energy Fuels & Lubricants Project on Lubricant Technology - Innovation, Discovery, Design, and Engineering (Final Report)

In 2016, the Vehicle Technologies Office (VTO) of the Department of Energy (DOE) issued a solicitation for the AOP Lab Call research in FY2017 on a number of topics related to vehicles. Topic 6A of the Lab Call focused on research related to advanced lubricants: '...(in) support of the lubricants program goal to, by 2020, demonstrate novel formulations for powertrain and driveline lubricants, compatible with new and legacy vehicles, to achieve at least a 4 percent real-world fuel economy improvement.' Argonne National Laboratory (ANL) in collaboration with Oak Ridge National Laboratory (ORNL) and Pacific Northwest National Laboratory (PNNL) was awarded a 3-year multilab project on 'Lubricant Technology - Innovation, Discovery, Design, and Engineering.' Research on the project began in FY2017 at the three laboratories with industry participation; however, in FY2018, the project was terminated due to budgetary constraints. The following is the final report for the project and highlights progress made during the first year of research. The report is divided into sections that highlight the following: goals, objectives, milestones and deliverables; project highlights; outreach - publications, conferences, and reports; milestones accomplished; research progress.

30 DIRECT ENERGY CONVERSION↗

The Scenario Model Intercomparison Project (ScenarioMIP) for CMIP6

Projections of future climate change play a fundamental role in improving understanding of the climate system as well as characterizing societal risks and response options. The Scenario Model Intercomparison Project (ScenarioMIP) is the primary activity within Phase 6 of the Coupled Model Intercomparison Project (CMIP6) that will provide multi-model climate projections based on alternative scenarios of future emissions and land use changes produced with integrated assessment models. Here, we describe ScenarioMIP's objectives, experimental design, and its relation to other activities within CMIP6. The ScenarioMIP design is one component of a larger scenario process that aims to facilitate a wide range of integrated studies across the climate science, integrated assessment modeling, and impacts, adaptation, and vulnerability communities, and will form an important part of the evidence base in the forthcoming Intergovernmental Panel on Climate Change (IPCC) assessments. Furthermore, it will provide the basis for investigating a number of targeted science and policy questions that are especially relevant to scenario-based analysis, including the role of specific forcings such as land use and aerosols, the effect of a peak and decline in forcing, the consequences of scenarios that limit warming to below 2°C, the relative contributions to uncertainty from scenarios, climate models, and internal variability, and long-term climate system outcomes beyond the 21st century. In order to serve this wide range of scientific communities and address these questions, a design has been identified consisting of eight alternative 21st century scenarios plus one large initial condition ensemble and a set of long-term extensions, divided into two tiers defined by relative priority. Some of these scenarios will also provide a basis for variants planned to be run in other CMIP6-Endorsed MIPs to investigate questions related to specific forcings. Harmonized, spatially explicit emissions and land use scenarios generated with integrated assessment models will be provided to participating climate modeling groups by late 2016, with the climate model simulations run within the 2017–2018 time frame, and output from the climate model projections made available and analyses performed over the 2018–2020 period.

54 ENVIRONMENTAL SCIENCES↗

Designing a Successful Transportation Project: Lessons Learned from the Clean Cities American Recovery and Reinvestment Act Projects

The largest source of funding for alternative fuel vehicle and infrastructure projects in the U.S. Department of Energy's Clean Cities program's history came from the American Recovery and Reinvestment Act (Recovery Act). In 2009, the 25 cost-share projects totaled nearly $300 million in federal government investment. This effort included the involvement of 50 Clean Cities coalitions and their nearly 700 stakeholder partners who provided an additional $500 million in matching funds to support projects in their local communities. In total, those 25 projects established 1,380 alternative fueling stations and put more than 9,000 alternative fuel and advanced technology vehicles on the road. Together, these projects displaced 154 million gasoline gallon equivalents (GGE) of petroleum and averted 254,000 tons of greenhouse gas (GHG) emissions, while supporting U.S. energy independence and contributing to regional economic development. During post-project interviews, project leaders consistently cited a number of key components - ranging from technical and logistical factors, to administrative capabilities - for accomplishing an effective and impactful project. This report summarizes the high-level project design and administrative considerations for conducting a successful transportation project.

arra, doe, recovery act,clean cities, alternative ↗

A Practical Application of Integrated Systems Engineering and Project Management on a Complex EPC Project - 17207

This paper introduces how an integrated set of Systems Engineering (SE) and Project Management (PM) processes were applied in a practical way, to address the challenges on a complex, highly technical, Engineering Procurement Construction project within the nuclear field. This approach was inspired by: - the principles contained in a Community of Practice on Lean in Program Management jointly established in May 2012 by MIT, PMI and INCOSE; - an opportunity to apply international standard ISO/IEC 15288:2008(E) Systems and software engineering - System life cycle processes on a real-life situation; - and the belief that there is great value in applying Systems Engineering and Project Management in an integrated manner on a project. The project offering this opportunity was the Detail Engineering, Procurement, Construction and Cold Commissioning (EPC) of the Silo Direct-encapsulation Plant (SDP). This project was undertaken by the Joint Venture (JV) formed by Areva, Mace and Atkins (a.m.a. Nuclear Ltd). Unfortunately, early termination of the project, at a stage when only a part of the processes and tools were being implemented, did not allow this integrated approach to be demonstrated in full. However, the benefits achieved in the early stages in aligning and forming an integrated project execution team, showed potential for great benefits. This paper covers an introductory analysis of the situation, the successes and benefits achieved from implementing an integrated SE - PM approach up to the stage when the project was terminated, and possible path forward had the project continued. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗