Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “progress update”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Progress Update: Stack Project Complete

Progress update from the Savannah River Site. The 75 foot 293 F Stack, built for plutonium production, was cut down to size in order to prevent injury or release of toxic material if the structure were to collapse due to harsh weather.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Better Plants: Progress Update Fall 2013

This Progress Update summarizes the significant energy saving achievements and cumulative cost savings made by these industry leaders from 2010-2012. The update also shares the plans and priorities over the next year for the Better Plants Program to continue to advance energy efficiency in the industrial sector.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Progress Update: M Area Closure

A progress update of the Recovery Act at work at the Savannah River Site. The celebration of the first area cleanup completion with the help of the Recovery Act.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

SDAV Viz July Progress Update: LANL

SDAV Viz July Progress Update: (1) VPIC (Vector Particle in Cell) Kinetic Plasma Simulation Code - (a) Implemented first version of an in-situ adapter based on Paraview CoProcessing Library, (b) Three pipelines: vtkDataSetMapper, vtkContourFilter, vtkPistonContour, (c) Next, resolve issue at boundaries of processor domains; add more advanced viz/analysis pipelines; (2) Halo finding/merger trees - (a) Summer student Wathsala W. from University of Utah is working on data-parallel halo finder algorithm using PISTON, (b) Timo Bremer (LLNL), Valerio Pascucci (Utah), George Zagaris (Kitware), and LANL people are interested in using merger trees for tracking the evolution of halos in cosmo simulations; discussed possible overlap with work by Salman Habib and Katrin Heitmann (Argonne) during their visit to LANL 7/11; (3) PISTON integration in ParaView - Now available from ParaView github.

97 MATHEMATICS AND COMPUTING↗

Progress Update: TRU Waste Shipping

A progress update at the Savannah River Site. A continued effort on shipping TRU waste to WIPP in Carlsbad, New Mexico.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Progress Update: P-Reactor Grout

A progress update, the Recovery Act at work at the Savannah River Site. The new phase of work on the permanent closure of two cold war nuclear reactors.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Progress Update: P&R Reactor Stacks Demolition

October 2010 progress update of the Recovery Act at work at the Savannah River Site. The demolition of nuclear reactor stacks and filling the reactors with grout to reduce the site footprint.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Progress update of NASA's free-piston Stirling space power converter technology project

A progress update is presented of the NASA LeRC Free-Piston Stirling Space Power Converter Technology Project. This work is being conducted under NASA's Civil Space Technology Initiative (CSTI). The goal of the CSTI High Capacity Power Element is to develop the technology base needed to meet the long duration, high capacity power requirements for future NASA space initiatives. Efforts are focused upon increasing system power output and system thermal and electric energy conversion efficiency at least five fold over current SP-100 technology, and on achieving systems that are compatible with space nuclear reactors. This paper will discuss progress toward 1050 K Stirling Space Power Converters. Fabrication is nearly completed for the 1050 K Component Test Power Converter (CTPC); results of motoring tests of the cold end (525 K), are presented. The success of these and future designs is dependent upon supporting research and technology efforts including heat pipes, bearings, superalloy joining technologies, high efficiency alternators, life and reliability testing, and predictive methodologies. This paper will compare progress in significant areas of component development from the start of the program with the Space Power Development Engine (SPDE) to the present work on CTPC.

Dudenhoefer, James E.↗

Workplace Charging Challenge Progress Update 2016: A New Sustainable Commute

In the 2016 Workplace Charging Challenge annual survey, partners shared for the how their efforts were making an impact in their communities and helped identify best practices for workplace charging. The Workplace Charging Challenge Progress Update highlights the findings from this survey and recognizes leading employers for their workplace charging efforts.

33 ADVANCED PROPULSION SYSTEMS↗

PR100 One-Year Progress Update: Preliminary Modeling Results and High-Resolution Solar and Wind Data Sets

The Puerto Rico Grid Resilience and Transitions to 100% Renewable Energy Study (PR100) is a 2-year study by the U.S. Department of Energy's (DOE's) Grid Deployment Office and six national laboratories to comprehensively analyze stakeholder-driven pathways to Puerto Rico's clean energy future. In Year 1 of the study, the PR100 team rigorously modeled and analyzed scenarios that meet Puerto Rico's renewable energy targets and achieve short-term recovery goals and long-term energy resilience. This presentation will be showcased in the form of a public webinar, which summarizes PR100 progress in Year 1, provides considerations that can inform potential funding and implementation decisions by key federal and local agencies and stakeholders. The presentation follows the publication in July 2022 of a PR100 Six-Month Progress Update (in English and Spanish), as well as public webinars in February 2022 to kick off the study and in July 2022 to present the 6-month update. A final written report and web-based visuals will be published in late 2023. All publications and public events associated with the study will be available in Spanish and English. This report is also available in Spanish: https://www.nrel.gov/docs/fy23osti/85201.pdf.

100%↗

Goodrich Electro-Optical Systems AMSD Progress Update and Test Plans

The goal of the Advanced Mirror System Demonstrator (AMSD) program is to develop and demonstrate technology for low mass primary mirror systems that can be produced at low cost and with short manufacturing times. In addition, specific performance objectives must be demonstrated at ambient and cryogenic temperatures. The Goodrich approach for AMSD is based on a thin facesheet supported through an array of figure-control actuators by a passive, stiff reaction structure. The facesheet is fused silica figured to the desired sphere by a novel process referred to as Stressed Mirror Polishing and light-weighted by water jet milling. The mirror facesheet and the reaction structure are CTE-matched For cryogenic operation. Progress update on the design, the fabrication and the test plans, both ambient and cryogenic, will be presented.

Garcia, Enrique↗

Puerto Rico Grid Resilience and Transitions to 100% Renewable Energy Study (PR100): Six-Month Progress Update [Slides]

Puerto Rico has committed to meeting its electricity needs with 100% renewable energy by 2050, along with realizing interim goals of 40% by 2025, 60% by 2040, the phase-out of coal-fired generation by 2028, and a 30% improvement in energy efficiency by 2040, as established in Puerto Rico Energy Public Policy Act (Act 17). Since hurricanes Irma and Maria in September 2017, DOE and its national laboratories have provided Puerto Rico energy system stakeholders with tools, training, and modeling support to enable planning and operation of the electric power grid with more resilience against further disruptions. On February 2, 2022, DOE, FEMA, and six national laboratories launched the two-year Puerto Rico Grid Resilience and Transitions to 100% Renewable Energy Study (PR100) to conduct comprehensive analysis of stakeholder-driven pathways to Puerto Rico's energy future. The robust and objective energy analysis entails five activities, with an emphasis on power system reliability, resilience, and generation planning. This presentation provides a six-month progress update on the study, including presentation of four initial scenario frameworks defined with extensive stakeholder input.

14 SOLAR ENERGY↗

Better Buildings Challenge: Progress Update: Spring 2014

This report from the Better Buildings Challenge contains information about partner projects, energy and cost savings, and new program initiatives. The 2014 Progress Report also recognizes the latest group of Better Buildings Goal Achievers - organizations who have met their energy, water, and/or financing commitments under the Better Buildings or Better Plants Challenge.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗