Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “program fees”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

NASA Graduate Student Researchers Program Ronald E. McNair PhD Program

The NASA Ronald E. McNair PHD Program was funded in September 1995. Implementation began during the spring of 1996. The deferment of the actual program initial semester enabled the program to continue support through the fall semester of 1998. This was accomplished by a no-cost extension from August 15, 1998 through December 31, 1998. There were 12 fellows supported by the program in 1996, 15 fellows in 1997, and 15 fellows 1998. Current program capacity is 15 fellows per funding support. Support for the academic outreach component began in spring 1998. The program was named the "Good Enough" Crew Activity (GECA) in honor of Dr. McNair's philosophy of everyone being good enough to achieve anything they want bad enough. The program currently enrolls 65 students from the third through the eight grades. The program is held 12 Saturdays per semester. The time is 9:00 AM to 12:30 PM each Saturday Morning. Program direction and facilitation is jointly administered with the PHD fellows and the Saturday Academy staff. Dr. John Kelly, REM-PHD Principal Investigator serves in a program oversight and leadership capacity. Ms. Sunnie Howard, The NASA REM-PHD Administrative Coordinator serves in an administrative and logistical capacity. Mr. Aaron Hatch, the NASA-AMES Liaison Officer, serve@'in a consultative and curriculum review capacity. The first recognition activity will be held on December 12, 1998, with the students, parents, faculty, PHD fellows, and other local student support services persons. Program outreach efforts are jointly supported by the NASA REM-PHD Program and the National Space Grant College and Fellowship Program. The Ph.D. program reached its first milestone in May 1998. North Carolina A&T State University graduated the first Ph.D. fellows. The first three Ph.D. Alumni were Ronald E. McNair PHD Program Fellows. It is hoped that this is just the beginning of a highly acclaimed doctoral program. The ultimate program success will be recognized when the program begins to graduate 15 fellows per year. The Ph.D. Program is only three and a half years old and the expectations of graduating PH.D's in that timeframe, is a phenomenal accomplishment for any program in the country. Since inception of the NASA REM-PHD program, tuitions and fees have increased. Stipend support was increased to offer the Ph.D. program on a competitive basis. These increases will place allocation restraints on r_ the current level of funding. These issues are being addressed in the proposal and will bear their own merit.

Howard, Sunnie↗

Readings in program control

Under the heading of Program Control, a number of related topics are discussed: cost estimating methods; planning and scheduling; cost overruns in the defense industry; the history of estimating; the advantages of cost plus award fee contracts; and how program control techniques led to the success of a NASA development project.

Hoban, Francis T.↗

Motivational contracting in space programs - Government and industry prospectives

NASA's Marshall Space Flight Center has used incentive-free policies in contracting for Apollo's Saturn Launch vehicle hardware, as well as award-fee contracts for major development and early production programs in the case of the Space Shuttle Program. These programs have evolved to a point at which multiple incentive fees are useful in motivating cost reductions and assuring timely achievement of delivery requirements and flight mission goals. An examination is presently conducted of the relative success of these motivation-oriented techniques, drawing on the comments of both government and industry personnel.

Clough, D. R.↗

Ames Fitness Program

The Ames Fitness Program services 5,000 civil servants and contractors working at Ames Research Center. A 3,000 square foot fitness center, equipped with cardiovascular machines, weight training machines, and free weight equipment is on site. Thirty exercise classes are held each week at the Center. A weight loss program is offered, including individual exercise prescriptions, fitness testing, and organized monthly runs. The Fitness Center is staffed by one full-time program coordinator and 15 hours per week of part-time help. Membership is available to all employees at Ames at no charge, and there are no fees for participation in any of the program activities. Prior to using the Center, employees must obtain a physical examination and complete a membership package. Funding for the Ames Fitness Program was in jeopardy in December 1992; however, the employees circulated a petition in support of the program and collected more than 1500 signatures in only three days. Funding has been approved through October 1993.

Pratt, Randy↗

The advantages of cost plus award fee contracts

A Cost Plus Award Fee contract is the best procurement vehicle for the high-tech, one-of-a-kind, development projects that constitute most of NASA'S projects. The use of this type of contract requires more government and contractor effort than any other forms of contracts. An award fee contract is described as an arrangement whereby the government periodically awards a fee consistent with the cost, schedule and technical performance that is achieved by a contractor during a preset period with preset award fee pools. It's the only contracting method where both the government and contractor goals are closely linked. It also has a built-in mechanism to conveniently alter and emphasize program events in order to current external and internal situations. The award fee process also demands good communication between government and contractor participants.

Keathley, William C.↗

NASA program decisions using reliability analysis.

NASA made use of the analytical outputs of reliability people to make management decisions on the Apollo program. Such decisions affected the amount of the incentive fees, how much acceptance testing was necessary, how to optimize development testing, whether to approve engineering changes, and certification of flight readiness. Examples of such analysis are discussed and related to programmatic decisions.-

Steinberg, A.↗

Highligts of the contract year, 1 February 1974 to 31 January 1975

Two major marketing programs were initiated during 1974: (1) the unlimited search plan, and (2) the sales representative plan for northern California. The unlimited search plan was a six month program designed to offer clients multiple searches for a fixed fee. Although initial response was quite favorable, interest waned, and the plan was not renewed. Expansion and improvement of the on-line retrieval service continued. The ERIC thesaurus was added to the system. This thesaurus is an important acquisition as it gives the user greater flexibility in determining the best strategy for his search. Total terminal output time was reduced with a change to the direct access work file.

Source record↗

Issues in NASA program and project management

This volume is the third in an ongoing series on aerospace project management at NASA. Articles in this volume cover the attitude of the program manager, program control and performance measurement, risk management, cost plus award fee contracting, lessons learned from the development of the Far Infrared Absolute Spectrometer (FIRAS), small projects management, and age distribution of NASA scientists and engineers. A section on resources for NASA managers rounds out the publication.

Hoban, Francis T.↗

Issues in NASA program and project management

This volume is the third in an ongoing series on aerospace project management at NASA. Articles in this volume cover the attitude of the program manager, program control and performance measurement, risk management, cost plus award fee contracting, lessons learned from the development of the Far Infrared Absolute Spectrometer (FIRAS), small projects management, and age distribution of NASA scientists and engineers. A section on resources for NASA managers rounds out the publication.

Hoban, Francis T.↗

Laser Research

Eastman Kodak Company, Rochester, New York is a broad-based firm which produces photographic apparatus and supplies, fibers, chemicals and vitamin concentrates. Much of the company's research and development effort is devoted to photographic science and imaging technology, including laser technology. Eastman Kodak is using a COSMIC computer program called LACOMA in the analysis of laser optical systems and camera design studies. The company reports that use of the program has provided development time savings and reduced computer service fees.

Source record↗

Development requirements for a high-energy hybrid propulsion system Final report

This document presents the development requirements, costs, and schedule for a high-energy upper-stage hybrid propulsion system. High energy is achieved through the use of a lithium fuel formulation (solid) and fluorinated oxidizer (liquid). The propulsion system contains 3 2OO lb of propellant and may be used as a terminal stage for Atlas/Centaur or DSV-3M Delta launch vehicle. A program to develop a fluorinated hybrid propulsion system could be initiated with little risk. An extensive investigation revealed that the technology required to develop most of the components has either been demonstrated or is in progress. Further, it was found that there were no areas of critical technology. The cost to develop a hybrid propulsion system to a status where it could be integrated into a flight-test stage is about $17 million. This cost does not include the development of the stage astrionics. Length of the total development program is 34 months. A total recurring cost of $381 600 was estimated for the first unit (less astrionics and fee). This includes purchased hard\rare, manufacturing, material, assembly, and test costs.

M.B. Adams↗

Analysis of economics of a TV broadcasting satellite for additional nationwide TV programs

The influence of a TV broadcasting satellite, transmitting four additional TV networks was analyzed. It is assumed that the cost of the satellite systems will be financed by the cable TV system operators. The additional TV programs increase income by attracting additional subscribers. Two economic models were established: (1) each local network is regarded as an independent economic unit with individual fees (cost price model) and (2) all networks are part of one public cable TV company with uniform fees (uniform price model). Assumptions are made for penetration as a function of subscription rates. Main results of the study are: the installation of a TV broadcasting satellite improves the economics of CTV-networks in both models; the overall coverage achievable by the uniform price model is significantly higher than that achievable by the cost price model.

Becker, D.↗

Shuttle Propulsion System Major Events and the Final 22 Flights

Numerous lessons have been documented from the Space Shuttle Propulsion elements. Major events include loss of the Solid Rocket Boosters (SRB's) on STS-4 and shutdown of a Space Shuttle Main Engine (SSME) during ascent on STS-51F. On STS-112 only half the pyrotechnics fired during release of the vehicle from the launch pad, a testament for redundancy. STS-91 exhibited freezing of a main combustion chamber pressure measurement and on STS-93 nozzle tube ruptures necessitated a low liquid level oxygen cut off of the main engines. A number of on pad aborts were experienced during the early program resulting in delays. And the two accidents, STS-51L and STS-107, had unique heritage in history from early program decisions and vehicle configuration. Following STS-51L significant resources were invested in developing fundamental physical understanding of solid rocket motor environments and material system behavior. And following STS-107, the risk of ascent debris was better characterized and controlled. Situational awareness during all mission phases improved, and the management team instituted effective risk assessment practices. The last 22 flights of the Space Shuttle, following the Columbia accident, were characterized by remarkable improvement in safety and reliability. Numerous problems were solved in addition to reduction of the ascent debris hazard. The Shuttle system, though not as operable as envisioned in the 1970's, successfully assembled the International Space Station (ISS). By the end of the program, the remarkable Space Shuttle Propulsion system achieved very high performance, was largely reusable, exhibited high reliability, and was a heavy lift earth to orbit propulsion system. During the program a number of project management and engineering processes were implemented and improved. Technical performance, schedule accountability, cost control, and risk management were effectively managed and implemented. Award fee contracting was implemented to provide performance incentives. The Certification of Flight Readiness and Mission Management processes became very effective. A key to the success of the propulsion element projects was related to relationships between the MSFC project office and support organizations with their counterpart contractor organizations. The teams worked diligently to understand and satisfy requirements and achieve mission success.

Owen, James W.↗

Ensuring US National Aeronautics Test Capabilities

U.S. leadership in aeronautics depends on ready access to technologically advanced, efficient, and affordable aeronautics test capabilities. These systems include major wind tunnels and propulsion test facilities and flight test capabilities. The federal government owns the majority of the major aeronautics test capabilities in the United States, primarily through the National Aeronautics and Space Administration (NASA) and the Department of Defense (DoD). However, changes in the Aerospace landscape, primarily the decrease in demand for testing over the last 20 years required an overarching strategy for management of these national assets. Therefore, NASA established the Aeronautics Test Program (ATP) as a two-pronged strategic initiative to: (1) retain and invest in NASA aeronautics test capabilities considered strategically important to the agency and the nation, and (2) establish a strong, high level partnership with the DoD. Test facility utilization is a critical factor for ATP because it relies on user occupancy fees to recover a substantial part of the operations costs for its facilities. Decreasing utilization is an indicator of excess capacity and in some cases low-risk redundancy (i.e., several facilities with basically the same capability and overall low utilization). However, low utilization does not necessarily translate to lack of strategic importance. Some facilities with relatively low utilization are nonetheless vitally important because of the unique nature of the capability and the foreseeable aeronautics testing needs. Unfortunately, since its inception, the customer base for ATP has continued to shrink. Utilization of ATP wind tunnels has declined by more than 50% from the FY 2006 levels. This significant decrease in customer usage is attributable to several factors, including the overall decline in new programs and projects in the aerospace sector; the impact of computational fluid dynamics (CFD) on the design, development, and research process; and the reductions in wind tunnel testing requirements within the largest consumer of ATP wind tunnel test time, the Aeronautics Research Mission Directorate (ARMD). Retirement of the Space Shuttle Program and recent perturbations of NASA's Constellation Program will exacerbate this downward trend. Therefore it is crucial that ATP periodically revisit and determine which of its test capabilities are strategically important, which qualify as low-risk redundancies that could be put in an inactive status or closed, and address the challenges associated with both sustainment and improvements to the test capabilities that must remain active. This presentation will provide an overview of the ATP vision, mission, and goals as well as the challenges and opportunities the program is facing both today and in the future. We will discuss the strategy ATP is taking over the next five years to address the National aeronautics test capability challenges and what the program will do to capitalize on its opportunities to ensure a ready, robust and relevant portfolio of National aeronautics test capabilities.

Marshall, Timothy J.↗

Evolution and Reengineering of NASA's Flight Dynamics Facility (FDF)

The NASA Goddard Space Flight Center's Flight Dynamics Facility (FDF) is a multimission support facility that performs ground navigation and spacecraft trajectory design services for a wide range of scientific satellites. The FDF also supports the NASA Space Network by providing orbit determination and tracking data evaluation services for the Tracking Data Relay Satellite System (TDRSS). The FDF traces its history to early NASA missions in the 1960's, including navigation support to the Apollo lunar missions. Over its 40 year history, the FDF has undergone many changes in its architecture, services offered, missions supported, management approach, and business operation. As a fully reimbursable facility (users now pay 100% of all costs for FDF operations and sustaining engineering activities), the FDF has faced significant challenges in recent years in providing mission critical products and services at minimal cost while defining and implementing upgrades necessary to meet future mission demands. This paper traces the history of the FDF and discusses significant events in the past that impacted the FDF infrastructure and/or business model, and the events today that are shaping the plans for the FDF in the next decade. Today's drivers for change include new mission requirements, the availability of new technology for spacecraft navigation, and continued pressures for cost reduction from FDF users. Recently, the FDF completed an architecture study based on these drivers that defines significant changes planned for the facility. This paper discusses the results of this study and a proposed implementation plan. As a case study in how flight dynamics operations have evolved and will continue to evolve, this paper focuses on two periods of time (1992 and the present) in order to contrast the dramatic changes that have taken place in the FDF. This paper offers observations and plans for the evolution of the FDF over the next ten years. Finally, this paper defines the mission model of the future for the FDF based on NASA's current mission list and planning for the Constellation Program. As part of this discussion the following are addressed: the relevance and benefits of a multi-mission facility for NASA's navigation operations in the future; anticipated technologies affecting ground orbit determination; continued incorporation of Commercial Off-the-shelf (COTS) software into the FDF; challenges of a business model that relies entirely on user fees to fund facility upgrades; anticipated changes in flight dynamics services required; and considerations for defining architecture upgrades given a set of cost drivers.

Stengle, Thomas↗

Experimental design of an interlaboratory study for trace metal analysis of liquid fluids

The accurate determination of trace metals and fuels is an important requirement in much of the research into and development of alternative fuels for aerospace applications. Recognizing the detrimental effects of certain metals on fuel performance and fuel systems at the part per million and in some cases part per billion levels requires improved accuracy in determining these low concentration elements. Accurate analyses are also required to ensure interchangeability of analysis results between vendor, researcher, and end use for purposes of quality control. Previous interlaboratory studies have demonstrated the inability of different laboratories to agree on the results of metal analysis, particularly at low concentration levels, yet typically good precisions are reported within a laboratory. An interlaboratory study was designed to gain statistical information about the sources of variation in the reported concentrations. Five participant laboratories were used on a fee basis and were not informed of the purpose of the analyses. The effects of laboratory, analytical technique, concentration level, and ashing additive were studied in four fuel types for 20 elements of interest. The prescribed sample preparation schemes (variations of dry ashing) were used by all of the laboratories. The analytical data were statistically evaluated using a computer program for the analysis of variance technique.

Greenbauer-Seng, L. A.↗

Standardization in software conversion of (ROM) estimating

Technical problems and their solutions comprise by far the majority of work involved in space simulation engineering. Fixed price contracts with schedule award fees are becoming more and more prevalent. Accurate estimation of these jobs is critical to maintain costs within limits and to predict realistic contract schedule dates. Computerized estimating may hold the answer to these new problems, though up to now computerized estimating has been complex, expensive, and geared to the business world, not to technical people. The objective of this effort was to provide a simple program on a desk top computer capable of providing a Rough Order of Magnitude (ROM) estimate in a short time. This program is not intended to provide a highly detailed breakdown of costs to a customer, but to provide a number which can be used as a rough estimate on short notice. With more debugging and fine tuning, a more detailed estimate can be made.

Roat, G. H.↗