Engineering PapersSearch

SEARCH · Engineering Papers

Results for “procurement analysis tool”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

An interactive computer approach to performing resource analysis for a multi-resource/multi-project problem

New planning techniques and supporting computer tools are needed for the optimization of resources and costs for space transportation and payload systems. Heavy emphasis on cost effective utilization of resources has caused NASA program planners to look at the impact of various independent variables that affect procurement buying. A description is presented of a category of resource planning which deals with Spacelab inventory procurement analysis. Spacelab is a joint payload project between NASA and the European Space Agency and will be flown aboard the Space Shuttle starting in 1980. In order to respond rapidly to the various procurement planning exercises, a system was built that could perform resource analysis in a quick and efficient manner. This system is known as the Interactive Resource Utilization Program (IRUP). Attention is given to aspects of problem definition, an IRUP system description, questions of data base entry, the approach used for project scheduling, and problems of resource allocation.

Schlagheck, R. A.

Technical and investigative support for high density digital satellite recording systems

Recent results of dropout measurements and defect analysis conducted on one reel of Ampex 721 which was submitted for evaluation by the manufacturer are described. The results or status of other tape evaluation activities are also reviewed. Several changes in test interpretations and applications are recommended. In some cases, deficiencies in test methods or equipment became apparent during continued work on this project and other IITRI tape evaluation projects. Techniques and equipment for future tasks such as tape qualification are also recommended and discussed. Project effort and expenditures were kept at a relatively low level. This rate provided added development time and experience with the IITRI Dropout Measurement System, which is approaching its potential as a computer based dropout analysis tool. Another benefit is the expanded data base on critical parameters that can be achieved from tests on different tape types and lots as they become available. More consideration and effort was directed toward identification of critical parameters, development of meaningful repeatable test procedures, and tape procurement strategy.

Schultz, R. A.

Coal gasification systems engineering and analysis. Appendix H: Work breakdown structure

A work breakdown structure (WBS) is presented which encompasses the multiple facets (hardware, software, services, and other tasks) of the coal gasification program. The WBS is shown to provide the basis for the following: management and control; cost estimating; budgeting and reporting; scheduling activities; organizational structuring; specification tree generation; weight allocation and control; procurement and contracting activities; and serves as a tool for program evaluation.

Source record

HSCT Sector Combustor Evaluations for Demonstration Engine

In LET Task 10, critical development issues of the HSCT lean-burn low emissions combustor were addressed with a range of engineering tools. Laser diagnostics and CFD analysis were applied to develop a clearer understanding of the fuel-air premixing process and premixed combustion. Subcomponent tests evaluated the emissions and operability performance of the fuel-air premixers. Sector combustor tests evaluated the performance of the integrated combustor system. A 3-cup sector was designed and procured for laser diagnostics studies at NASA Glenn. The results of these efforts supported the earlier selection of the Cyclone Swirler as the pilot stage premixer and the IMFH (Integrated Mixer Flame Holder) tube as the main stage premixer of the LPP combustor. In the combustor system preliminary design subtask, initial efforts to transform the sector combustor design into a practical subscale engine combustor met with significant challenges. Concerns about the durability of a stepped combustor dome and the need for a removable fuel injection system resulted in the invention and refinement of the MRA (Multistage Radial Axial) combustor system in 1994. The MRA combustor was selected for the HSR Phase II LPP subscale combustor testing in the CPC Program.

Greenfield, Stuart

Subsystem Hazard Analysis Methodology for the Ares I Upper Stage Source Controlled Items

This article describes processes involved in developing subsystem hazard analyses for Source Controlled Items (SCI), specific components, sub-assemblies, and/or piece parts, of the NASA ARES I Upper Stage (US) project. SCIs will be designed, developed and /or procured by Boeing as an end item or an off-the-shelf item. Objectives include explaining the methodology, tools, stakeholders and products involved in development of these hazard analyses. Progress made and further challenges in identifying potential subsystem hazards are also provided in an effort to assist the System Safety community in understanding one part of the ARES I Upper Stage project.

Mitchell, Michael S.

Space Station Furnace Facility Management Information System (SSFF-MIS) Development

This report summarizes the chronology, results, and lessons learned from the development of the SSFF-MIS. This system has been nearly two years in development and has yielded some valuable insights into specialized MIS development. General: In December of 1994, the Camber Corporation and Science Applications International Corporation (SAIC) were contracted to design, develop, and implement a MIS for Marshall Space Flight Center's Space Station Furnace Facility Project. The system was to be accessible from both EBM-Compatible PC and Macintosh platforms. The system was required to contain data manually entered into the MIS as well as data imported from other MSFC sources. Electronic interfaces were established for each data source and retrieval was to be performed at prescribed time intervals. The SOW requirement that predominantly drove the development software selection was the dual-platform (IBM-PC and Macintosh) requirement. The requirement that the system would be maintained by Government personnel influenced the selection of Commercial Off-the-shelf software because of its inherent stability and readily available documentation and support. Microsoft FoxPro Professional 2.6 for Windows and Macintosh was selected as the development tool. This is a software development tool that has been in use for many years. It is stable and powerful. Microsoft has since released the replacement for this product, Microsoft Visual FoxPro, but at the time of this development, it was only available on the Windows platform. The initial contract included included the requirement for capabilities relating to the Work- and Organizational Breakdown Structures, cost (plan and actuals), workforce (plan and actuals), critical path scheduling, trend analysis, procurements and contracts, interface to manufacturing, Safety and Mission Assurance, risk analysis, and technical performance indicators. It also required full documentation of the system and training of users. During the course of the contract, the requirements for Safety and Mission Assurance interface, risk analysis, and technical performance indicators were deleted. Additional capabilities were added as reflected in the Contract Chronology below. Modification 4 added the requirement for Support Contractor manpower data, the ability to manually input data not imported from non-nal sources, a general 'health' indicator screen, and remote usage. Mod 6 included the ability to change the level of planning of Civil Service Manpower at any time and the ability to manually enter Op Codes in the manufacturing data where such codes were not provided by the EMPACS database. Modification 9 included a number of changes to report contents and formats. Modification 11 required the preparation of a detailed System Design Document.

Meade, Robert M.

Thermal Management Design for the X-33 Lifting Body

The X-33 Advantage Technology Demonstrator offers a rare and exciting opportunity in Thermal Protection System development. The experimental program incorporates the latest design innovation in re-useable, low life cycle cost, and highly dependable Thermal Protection materials and constructions into both ground based and flight test vehicle validations. The unique attributes of the X-33 demonstrator for design application validation for the full scale Reusable Launch Vehicle, (RLV), are represented by both the configuration of the stand-off aeroshell, and the extreme exposures of sub-orbital hypersonic re-entry simulation. There are several challenges of producing a sub-orbital prototype demonstrator of Single Stage to Orbit/Reusable Launch Vehicle (SSTO/RLV) operations. An aggressive schedule with budgetary constraints precludes the opportunity for an extensive verification and qualification program of vehicle flight hardware. However, taking advantage of off the shelf components with proven technologies reduces some of the requirements for additional testing. The effects of scale on thermal heating rates must also be taken into account during trajectory design and analysis. Described in this document are the unique Thermal Protection System (TPS) design opportunities that are available with the lifting body configuration of the X-33. The two principal objectives for the TPS are to shield the primary airframe structure from excessive thermal loads and to provide an aerodynamic mold line surface. With the relatively benign aeroheating capability of the lifting body, an integrated stand-off aeroshell design with minimal weight and reduced procurement and operational costs is allowed. This paper summarizes the design objectives of the X-33 TPS, the flight test requirements driven configuration, and design benefits. Comparisons are made of the X-33 flight profiles and Space Shuttle Orbiter, and lifting body Reusable Launch Vehicle aerothermal environments. The X-33 TPS is based on a design to cost configuration concept. Only RLV critical technologies are verified to conform to cost and schedule restrictions. The one-off prototype vehicle configuration has evolved to minimize the tooling costs by reducing the number of unique components. Low cost approaches such as a composite/blanket leeward aeroshell and the use of Shuttle technology are implemented where applicable. The success of the X-33 will overcome the ballistic re-entry TPS mindset. The X-33 TPS is tailored to an aircraft type mission while maintaining sufficient operational margins. The flight test program for the X-33 will demonstrate that TPS for the RLV is not simply a surface insulation but rather an integrated aeroshell system.

Bouslog, S.

Probabilistic Modeling of a Three-Stage Human Landing System Architecture

Space Policy Directive-1 has led to NASA partnerships with commercial entities on procurement which includes the development of the Human Landing System (HLS) [1]. With the goal of delivering human crew to the lunar surface by 2024, system uncertainties become an important obstacle to the maturation of multiple new, driving technologies and mission concepts of the HLS program. As unmitigated uncertainties have previously led to failed development programs, these risks and their impacts must be understood and handled to ensure program success [2]. Sources of uncertainty include novel engine designs and configurations, increased reliance on cryogenic fluid management(CFM), and refueling technologies—which propagate as high-level performance metrics such as overall propellant mass and engine performance. Also, the occurrence of operational uncertainties—e.g. launch conditions or need to abort during the mission—can cause cascading effects on the rest of the mission that are difficult to definitively quantify, and are outside the scope of control. These concrete examples and other occurrences can be categorized as either epistemic or aleatory uncertainties.Epistemic uncertainty arises due to a lack of knowledge and can be alleviated with design and program maturation. Aleatory uncertainty is due to the inherent randomness of the system and cannot be directly reduced, unlike epistemic uncertainty. Robust design and probabilistic methods can compensate for aleatory effects. A taxonomy of uncertainty is referred to for this work [3]. In this paper, a probabilistic methodology to handle uncertainties has been demonstrated on a three-element HLS concept [1, 4], which allows tracking of current best estimates of the concept and assessment of concept design robustness against uncertainties. A sample case has been completed for this abstract, and an expansion on the methodology will be included in the final paper. This methodology has two key parts: first, the creation of a dynamic architecture model of a three-element HLS concept; and second, its use with surrogate modeling and range estimating techniques to capture and propagate uncertainties. This abstract will cover the basics of the approach used, and further details and justifications will be in the final paper.The mission profile associated with this three-element concept (Fig 1) was modeled as a set of mission events that facilitated mass changes, idles, or spacecraft maneuvers. The mission profile scope starts with each element’s NRHO orbit insertion and aggregation and ends at post-sortie rendezvous with Orion. More detail on the mission profile will be in the final paper. The DYnamic Rocket EQuation Tool (DYREQT), a space systems synthesis and sizing framework used by NASA, was used as the physics framework to model the HLS architecture for applying the probabilistic methodology [5, 6]. Specifically, a parametric representation of the lander, ascent, and transfer elements and the mission profile of each element was established, with vehicle and mission parameters available as inputs to allow for a dynamic model. Each vehicle stage was modeled with high-level performance metrics, using Isp and propellant mass fraction (PMF) to remain parametric. For the probabilistic analysis, uncertainties of interest within the HLS concept were enumerated and represented as parameters within the DYREQT model as inputs for vehicle stages or mission profile events. These parameters were frozen at their nominal values for the purposes of baselining architecture performance and sizing the vehicle appropriately based on reference documentation [1]. Range estimating—a probabilistic method that combines Monte Carlo sampling, focus on critical parameters, and heuristics to assess risk and opportunities—is traditionally used with Mass Equipment Lists (MELs), but has been adapted with operational parameters as well as vehicle parameters in theDYREQT model to capture mission uncertainty alongside vehicle uncertainty [7, 3]. This method was selected due to its application and insight on a system from a bottom-up perspective, independence from historical rules of thumb, and ability to generate sensitivities based on design decisions and uncertainties. As a sample case for the abstract, the boiloff rates of the vehicle elements and the loiter times during the mission (simulating launch time variations and changing window of opportunities) were used with range estimating to provide preliminary results. To perform the range estimation portion of this methodology (depicted in Fig. 3, further details in final paper), the DYREQT model was sampled using a Design of Experiments (DoE) to efficiently explore the architecture design space with respect to the sample set of uncertainty parameters; 5,000 cases via Latin Hypercube Sampling were computed on the DYREQT architecture model. Then, the results were used to create surrogate models, multivariate regressions that can visualize hypercube trends in the design space, of the architecture with respect to the uncertainty parameters. Range estimating was applied to the surrogates instead of the actual models, which saves computational expense due to the bulk of cases needed for the Monte Carlo simulation as part of range estimating. Uncertainty parameters were sampled independently from triangular distributions using the DoE ranges as ‘min’ and ‘max’, and the nominal value as ‘most likely’. Based engineering intuition, some uncertainty parameters are correlated—e.g. if the main propellant has a high boil-off rate, the oxidizer should follow suit as both are related to CFM technology.While a Monte Carlo simulation samples all inputs as independent, the results would show model correlations; thus, it is efficient to sample the inputs as correlated. Using a correlation matrix constructed for the uncertainty parameters, previously independent samples were transformed to perform a Correlated Monte Carlo. A table for the DoE ranges and probability distribution parameters is shown in Table 1, and more details on Correlated Monte Carlo Simulations will be discussed in the final paper. The model’s resulting DoE showed that multivariate polynomial equations fit via least squares method captured its behavior accurately for the sample case. For the Correlated Monte Carlo Simulation, a positive correlation between fuel and oxidizer boiloff rates was used as a demonstration. 10,000 cases were computed with the surrogates and the launched masses for each vehicle element was collated. The results can be displayed in a probability density function (PDF), showing the impact of the uncertainty parameters chosen. Integrating the PDFs will yield a cumulative distribution function (CDF) that shows the cumulative probability of a given value on the x-axis. For the sample case, the elements’ launch mass margin was calculated and represented in as CDFs, as a demonstrated representation of figures of merit for the HLS concept. For the lander and ascent elements, the NRHO mass insertion limit is 16t; the transfer element has a limit of 30t [1]. It can be seen with Figure 2 that this probabilistic methodology can provide insight into mass margin with respect to the uncertainties being modeled. Currently, the results show that the lander (descent) vehicle element has the most restrictive design space; it is the only element to show a 10% probability of negative margin. Further analysis on the Monte Carlo results will show sensitivities for driving constraints and parameters for architecture feasibility, which can lead to establishing potential mission rules.The combination of range estimating with a parametric architecture model for HLS demonstrated the capability of this probabilistic methodology in a sample case. As the HLS development progresses, this methodology has the potential for keeping current best estimates of architecture performance for awarded concepts due to the flexibility in DYREQT’s modeling framework and its parametric nature. Concept maturation and increased epistemic knowledge can be injected into the model probabilistic modeling, and thus continue to track probability of mission success.

Stephanie Y Zhu