Engineering PapersSearch

SEARCH · Engineering Papers

Results for “process oriented calibration”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

MODIS Solar Calibration Simulation Assisted Refinement

A detailed optical radiometric model has been created of the MODIS instruments solar calibration process. This model takes into account the orientation and distance of the spacecraft with respect to the sun, the correlated motions of the scan mirror and the sun, all of the optical elements, the detector locations on the visible and near IR focal planes, the solar diffuser and the attenuation screen with all of its hundreds of pinholes. An efficient computational scheme, takes into account all of these factors and has produced results which reproduce the observed time dependent intensity variations on the two focal planes with considerable fidelity. This agreement between predictions and observations, has given insight to the causes of some small time dependent variations and how to incorporate them into the overall calibration scheme. The radiometric model is described and modeled and actual measurements are presented and compared.

Waluschka, Eugene

Results of an Automated GPS Tracking System in Support of Topex/Poseidon and GPSMet

A fully automated near real-time GPS tracking system has been developed around JPL's GIPSY/OASIS II software. The system produces <25 cm (3D rms) GPS orbits and one-half nanosecond (15 cm) clock estimates. The process starts automatically when a favorable global distribution of ground data from the IGS network (International GPS Service for Geodynamics) becomes available. Ionospherically corrected phase and pseudorange data are optimally combined to remove satellite and ground receiver clock errors, including selective availability. After the GPS orbits are determined within the data arc, they are then propagated with empirically determined dynamic force models. Real-time <2 meter (3D rms) GPS orbits are always available. As a by-product of this process, other calibration estimates such as station clocks, troposphere estimates, and Earth orientation parameters are also produced. For daily arc fits, the process requires 7-8 hours of CPU time on an HP9000/735 workstation.

GPS

System for Automated Calibration of Vector Modulators

Vector modulators are used to impose baseband modulation on RF signals, but non-ideal behavior limits the overall performance. The non-ideal behavior of the vector modulator is compensated using data collected with the use of an automated test system driven by a LabVIEW program that systematically applies thousands of control-signal values to the device under test and collects RF measurement data. The technology innovation automates several steps in the process. First, an automated test system, using computer controlled digital-to-analog converters (DACs) and a computer-controlled vector network analyzer (VNA) systematically can apply different I and Q signals (which represent the complex number by which the RF signal is multiplied) to the vector modulator under test (VMUT), while measuring the RF performance specifically, gain and phase. The automated test system uses the LabVIEW software to control the test equipment, collect the data, and write it to a file. The input to the Lab - VIEW program is either user-input for systematic variation, or is provided in a file containing specific test values that should be fed to the VMUT. The output file contains both the control signals and the measured data. The second step is to post-process the file to determine the correction functions as needed. The result of the entire process is a tabular representation, which allows translation of a desired I/Q value to the required analog control signals to produce a particular RF behavior. In some applications, corrected performance is needed only for a limited range. If the vector modulator is being used as a phase shifter, there is only a need to correct I and Q values that represent points on a circle, not the entire plane. This innovation has been used to calibrate 2-GHz MMIC (monolithic microwave integrated circuit) vector modulators in the High EIRP Cluster Array project (EIRP is high effective isotropic radiated power). These calibrations were then used to create correction tables to allow the commanding of the phase shift in each of four channels used as a phased array for beam steering of a Ka-band (32-GHz) signal. The system also was the basis of a breadboard electronic beam steering system. In this breadboard, the goal was not to make systematic measurements of the properties of a vector modulator, but to drive the breadboard with a series of test patterns varying in phase and amplitude. This is essentially the same calibration process, but with the difference that the data collection process is oriented toward collecting breadboard performance, rather than the measurement of output from a network analyzer.

Lux, James

Calibration of the Geosar Dual Frequency Interferometric SAR

GeoSAR is an airborne, interferometric Synthetic Aperture Radar (INSAR) system for terrain mapping, currently under development by a consortium including NASA's Jet Propulsion Laboratory (JPL), Calgis, Inc., and the California Department of Conservation (CalDOC) with funding provided by the Topographic Engineering Center (TEC) of the U.S. Army Corps of Engineers and the Defense Advanced Research Projects Agency (DARPA). The radar simultaneously maps swaths on both sides of the aircraft at two frequencies, X-Band and P-Band. For the P-Band system, data is collected for two across track interferometric baselines and at the crossed polarization. The aircraft position and attitude are measured using two Honeywell Embedded GPS Inertial Navigation Units (EGI) and an Ashtech Z12 GPS receiver. The mechanical orientation and position of the antennas are actively measured using a Laser Baseline Metrology System (LBMS). In the GeoSAR motion measurement software, these data are optimally combined with data from a nearby ground station using Ashtech PNAV software to produce the position, orientation, and baseline information are used to process the dual frequency radar data. Proper calibration of the GeoSAR system is essential to obtaining digital elevation models (DEMS) with the required sub-meter level planimetric and vertical accuracies. Calibration begins with the determination of the yaw and pitch biases for the two EGI units. Common range delays are determined for each mode, along with differential time and phase delays between channels. Because the antennas are measured by the LBMS, baseline calibration consists primarily of measuring a constant offset between mechanical center and the electrical phase center of the antennas. A phase screen, an offset to the interferometric phase difference which is a function of absolute phase, is applied to the interferometric data to compensate for multipath and leakage. Calibration parameters are calculated for each of the ten processing modes, each of the operational bandwidths (80 and 160 MHZ), and each aircraft altitude. In this talk we will discuss the layout calibration sites, the synthesis of data from multiple flights to improve the calibration, methods for determining time and phase delays, and techniques for determining radiometric and polarimetric quantities. We will describe how calibration quantities are incorporated into the processor and pre-processor. We will demonstrate our techniques applied to GeoSar data and assess the stability and accuracy of the calibration. This will be compared to the modeled performance determined from calibrating the output of a point target simulator. The details of baseline determination and phase screen calculation are covered in related talks.

Chapine, Elaine

Atic Experiment: Flight Data Processing

The Advanced Thin Ionization Calorimeter (ATIC) is a balloon borne experiment to measure the composition and energy spectra of Z = 1 to 28 cosmic rays over the energy range approx. 30 GeV - 100 TeV. The instrument consists of a fully active 320-crystal Bismuth Germanate (BGO) calorimeter, 202 scintillator strips in 3 hodoscopes interleaved with a graphite target, and a 4480-pixel silicon matrix charge detector. ATIC has had two successful Long Duration Balloon flights from McMurdo, Antarctica: from 12/28/00 to 01/13/01 and from 12/29/02 to 01/18/03. We have developed the ATIC Data Processing System (ADPs), which is an Object Oriented data processing program based on ROOT. In this paper, we describe the processing scheme used in handling the flight data, especially the calibration method and the event reconstruction algorithm.

Ahn, H. S.

Towards Automating Spacecraft Attitude Sensor Calibration

With a view towards reducing cost and complexity for spacecraft early mission support at the NASA Goddard Space Flight Center (GSFC), efforts are being made to automate the attitude sensor calibration process. This paper addresses one of the major components needed by such a system. The beneficiaries of an improved calibration process are missions that demand moderate to high precision attitude knowledge or that need to perform accurate attitude slews. Improved slew accuracy reduces the time needed for re-acquisition of fine-pointing after each attitude maneuver, Rapid target acquisition can be very important for astronomical targeting or for off-nadir surface feature targeting by Earth-oriented spacecraft. The normal sequence of on-orbit calibration starts with alignment calibration of the star trackers and possibly the Sun sensor. Their relative alignment needs to be determined using a sufficiently large data set so their fields of view are adequately sampled. Next, the inertial reference unit (IRU) is calibrated for corrections to its alignment and scale factors. The IRU biases are estimated continuously by the onboard attitude control system, but the IRU alignment and scale factors are usually determined on the ground using a batch-processing method on a data set that includes several slews sufficient to give full observability of all the IRU calibration parameters. Finally, magnetometer biases, alignment, and its coupling to the magnetic torquers are determined in order io improve momentum management and occasionally for use in the attitude determination system. The detailed approach used for automating calibrations will depend on whether the automated system resides on the ground or on the spacecraft with an ultimate goal of autonomous calibration. Current efforts focus on a ground-based system driving subsystems that could run either on the ground or onboard. The distinction is that onboard calibration should process the data sequentially rather than in a single large batch since onboard computer data storage is limited. Very good batch- processing calibration utilities have been developed and used extensively at NASA/GSFC for mission support but no sequential calibration utilities are available. To meet this need, this paper presents the mathematical description of a sequential IRU calibration system. The system has been tested using flight data from the Rossi X-ray Timing Explorer (RXTE) during a series of attitude slews. The paper also discusses the current state of the overall automated system and describes plans for adding sequential alignment calibration and other additions that will reduce the amount of analyst time and input.

Sedlak, Joseph

Demonstration of precise estimation of polar motion parameters with the global positioning system: Initial results

Data from the Global Positioning System (GPS) were used to determine precise polar motion estimates. Conservatively calculated formal errors of the GPS least squares solution are approx. 10 cm. The GPS estimates agree with independently determined polar motion values from very long baseline interferometry (VLBI) at the 5 cm level. The data were obtained from a partial constellation of GPS satellites and from a sparse worldwide distribution of ground stations. The accuracy of the GPS estimates should continue to improve as more satellites and ground receivers become operational, and eventually a near real time GPS capability should be available. Because the GPS data are obtained and processed independently from the large radio antennas at the Deep Space Network (DSN), GPS estimation could provide very precise measurements of Earth orientation for calibration of deep space tracking data and could significantly relieve the ever growing burden on the DSN radio telescopes to provide Earth platform calibrations.

Lichten, S. M.

ATIC Flight Data Processing

The first flight of the Advanced Thin Ionization Calorimeter (ATIC) experiment from McMurdo, Antarctica lasted for 16 days, starting on December 28, 2000. The ATIC instrument consists of a fully active 320-crystal, 960-channel Bismuth Germanate (BGO) calorimeter, 202 scintillator strips (808 channels) in 3 hodoscopes, interleaved with graphite target layers, and a 4480-pixel silicon matrix charge detector. We have developed an object-oriented data processing package based on ROOT. In this paper, we describe the data processing scheme used in handling the accumulated 45 GB of flight data. We discuss calibration issues, particularly the time-dependence of housekeeping information.

Ahn, H. S.

Ground-Support Algorithms for Simulation, Processing, and Calibration of Barnes Static Earth Sensor Measurements: Applications to Tropical Rainfall Measuring Mission Observatory

New algorithms are described covering the simulation, processing, and calibration of penetration angles of the Barnes static Earth sensor assembly (SESA) as implemented in the Goddard Space Flight Center Flight Dynamics Division ground support system for the Tropical Rainfall Measuring Mission (TRMM) Observatory. The new treatment involves a detailed analysis of the measurements by individual quadrants. It is shown that, to a good approximation, individual quadrant misalignments can be treated simply as penetration angle biases. Simple formulas suitable for real-time applications are introduced for computing quadrant-dependent effects. The simulator generates penetration angles by solving a quadratic equation with coefficients uniquely determined by the spacecraft's position and the quadrant's orientation in GeoCentric Inertial (GCI) coordinates. Measurement processing for attitude determination is based on linearized equations obtained by expanding the coefficients of the aforementioned quadratic equation as a Taylor series in both the Earth oblateness coefficient (alpha approx. 1/150) and the angle between the pointing axis and the geodetic nadir vector. A simple formula relating a measured value of the penetration angle to the deviation of the Earth-pointed axis from the geodetic nadir vector is derived. It is shown that even near the very edge of the quadrant's Field Of View (FOV), attitude errors resulting from quadratic effects are a few hundredths of a degree, which is small compared to the attitude determination accuracy requirement (0.18 degree, 3 sigma) of TRMM. Calibration of SESA measurements is complicated by a first-order filtering used in the TRMM onboard algorithm to compute penetration angles from raw voltages. A simple calibration scheme is introduced where these complications are avoided by treating penetration angles as the primary raw measurements, which are adjusted using biases and scale factors. In addition to three misalignment parameters, the calibration state vector contains only two average penetration angle biases (one per each pair of opposite quadrants) since, because of the very narrow sensor FOV (+/- 2.6 degrees), differences between biases of the penetration angles measured by opposite quadrants cannot be distinguished from roll and pitch sensor misalignments. After calibration, the estimated misalignments and average penetration angle biases are converted to the four penetration angle biases and to the yaw misalignment angle. The resultant biases and the estimated scale factors are finally used to update the coefficients necessary for onboard computations of penetration angles from measured voltages.

Natanson, G. A.

Overview of SIM external calibration

Like all astrometric instruments, the Space Interferometry Mission (SIM) suffers from field-dependent errors requiring calibration. Diffraction effects in the delay line, polarization rotations on comer cubes, and beam walk across imperfect optics, all contribute to field-distortion that is significantly larger than is acceptable. The bulk of the systematic error is linear across the field - that is, it results in a magnification error. We show that the linear terms are inconsequential to the performance of SIM because they are inseparable from baseline length and orientation errors. One approach to calibrating the higher-order terms is to perform external' calibration; that is, SIM periodically makes differential measurements of a field of bright stars whose positions are not precisely known. We describe the requirements and constraints on the external calibration process and lay the groundwork for a specific procedure detailed in accompanying papers.

Space

ATIC Flight Data Processing

The first flight of the Advanced Thin Ionization Calorimeter (ATIC) experiment from McMurdo, Antarctica lasted for 16 days, starting in December, 2000. The ATIC instrument consists of a fully active 320-crystal, 960-channel Bismuth Germanate (BGO) calorimeter, 202 scintillator strips in 3 hodoscopes interleaved with a graphite target, and a 4480-pixel silicon matrix charge detector. We have developed an Object Oriented data processing package based on ROOT. In this paper, we will describe the data processing scheme used in handling the accumulated 45 GB of flight data. We will also discuss trigger issues by comparing the measured energy-dependent trigger efficiency with its simulation and calibration issues by considering the time-dependence of housekeeping information, etc.

Ahn, H. S.

Automated propellant leak detection

An automated hydrogen leak detection system is being developed for earth-to-orbit rocket engine applications. The system consists of three elements, a sensor array, a signal processing unit, and a diagnostic processor. The sensor array consists of discrete solid state sensors which are located at specific potential leak sites and in potential leak zones. The signal processing unit provides excitations power for the sensors and provides analog to digital data conversion of the sensor signals. The diagnostic computer analyzes the sensor outputs to determine leak sources and magnitude. Leak data from the sensor network is interpreted using knowledge based software and displayed on-line through a graphical user interface including 3-D leak visualization. The system requirements have been developed assuming eventual application to the Space Shuttle Main Engine which requires approximately 72 measurement locations. A prototype system has been constructed to demonstrate the operational features of the system. This system includes both prototype electronics and data processing software algorithms. Experiments are in progress to evaluate system operation at conditions which simulate prelaunch and flight. The prototype system consists of a network using 16 sensors within a testbed which simulates engine components. Sensor response, orientation, and data analysis algorithms are being evaluated using calibrated leaks produced within the testbed. A prototype flight system is also under development consisting of 8 sensors and flight capable electronics with autonomous control and data recording.

Makel, D. B.

Phase Calibration for the Block 1 VLBI System

Very Long Baseline Interferometry (VLBI) in the DSN provides support for spacecraft navigation, Earth orientation measurements, and synchronization of network time and frequency standards. An improved method for calibrating instrumental phase shifts has recently been implemented as a computer program in the Block 1 system. The new calibration program, called PRECAL, performs calibrations over intervals as small as 0.4 seconds and greatly reduces the amount of computer processing required to perform phase calibration.

Roth, M. G.

The EUVE proposal database and scheduling system

The proposal database and scheduling system for the Extreme Ultraviolet Explorer will be described. The proposal database has been implemented to take input for approved observations selected by the EUVE Peer Review Panel and output target information suitable for the scheduling system to digest. The scheduling system is a hybrid of the SPIKE program and EUVE software which checks spacecraft constraints, produces a proposed schedule and selects spacecraft orientations with optimal configurations for acquiring star trackers, etc. This system has been used to schedule the In Orbit Calibration activities that took place this summer, following the EUVE launch in early June 1992. The implemented strategy has implications for the selection of approved targets, which have impacted the Peer Review process. In addition, it will be discussed how the proposal database, founded on Sybase, controls the processing of EUVE Guest Observer data.

Christian, C.

ICIASF '85 - International Congress on Instrumentation in Aerospace Simulation Facilities, 11th, Stanford University, CA, August 26-28, 1985, Record

Developments related to laser Doppler velocimetry are discussed, taking into account a three-component dual beam laser-Doppler-anemometer to be operated in large wind tunnels, a new optical system for three-dimensional laser-Doppler-anemometry using an argon-ion and a dye laser, and a two-component laser Doppler velocimeter by switching fringe orientation. Other topics studied are concerned with facilities, instrumentation, control, hot wire/thin film measurements, optical diagnostic techniques, signal and data processing, facilities and adaptive wall test sections, data acquisition and processing, ballistic instrument systems, dynamic testing and material deformation measurements, optical flow measurements, test techniques, force measurement systems, and holography. Attention is given to nonlinear calibration of integral wind tunnel balances, a microcomputer system for real time digitized image compression, and two phase flow diagnostics in propulsion systems.

Source record

Fluorescence Visualization of Hypersonic Flow over Rapid Prototype Wind-Tunnel Models

Reentry models for use in hypersonic wind tunnel tests were fabricated using a stereolithography apparatus. These models were produced in one day or less, which is a significant time savings compared to the manufacture of ceramic or metal models. The models were tested in the NASA Langley Research Center 31-Inch Mach 10 Air Tunnel. Most of the models did not survive repeated tests in the tunnel, and several failure modes of the models were identified. Planar laser-induced fluorescence (PLIF) of nitric oxide (NO) was used to visualize the flowfields in the wakes of these models. Pure NO was either seeded through tubes plumbed into the model or via a tube attached to the strut holding the model, which provided localized addition of NO into the model s wake through a porous metal cylinder attached to the end of the tube. Models included several 2-inch diameter Inflatable Reentry Vehicle Experiment (IRVE) models and 5-inch diameter Crew Exploration Vehicle (CEV) models. Various configurations were studied including different sting placements relative to the models, different model orientations and attachment angles, and different NO seeding methods. The angle of attack of the models was also varied and the location of the laser sheet was scanned to provide three-dimensional flowfield information. Virtual Diagnostics Interface technology, developed at NASA Langley, was used to visualize the data sets in post processing. The use of calibration "dotcards" was investigated to correct for camera perspective and lens distortions in the PLIF images. Lessons learned and recommendations for future experiments are discussed.

Alderfer, D. W.

Landsat Data Continuity Mission

The Landsat Data Continuity Mission (LDCM) is currently under development and is on schedule to launch the 8th satellite in the Landsat series in December of 2012. LDCM is a joint project between the National Aeronautics and Space Administration (NASA) and the United States Geological Survey (USGS). NASA is responsible for developing and launching the flight hardware and on-orbit commissioning and USGS is responsible for developing the ground system and operating the system onorbit after commissioning. Key components of the flight hardware are the Operational Land Imager (OLI), nearing completion by Ball Aerospace & Technologies Corp in Boulder, CO, the Thermal Infrared Sensor (TIRS), being built by NASA's Goddard Space Flight Center and the spacecraft, undergoing integration at Orbital Sciences Corp in Gilbert, Arizona. The launch vehicle will be an Atlas-5 with launch services provided by NASA's Kennedy Space Center. Key ground systems elements are the Mission Operations Element, being developed by the Hammers Corporation, and the Collection Activity Planning Element, Ground Network Element, and Data Processing and Archive System, being developed internally by the USGS Earth Resources Observations and Science (EROS) Center. The primary measurement goal of LDCM is to continue the global coverage of moderate spatial resolution imagery providing continuity with the existing Landsat record. The science goal for this imagery is to monitor land use and land cover, particularly as it relates to global climate change. Together the OLI and TIRS instruments on LDCM replace the ETM+ instrument on Landsat-7 with significant enhancements. The OLI is a pushbroom design instrument where the scanning mechanism of the ETM+ is effectively replaced by a long line of detectors. The OLI has 9 spectral bands with similar spatial resolution to ETM+: 7 of them similar to the reflective spectral bands on ETM+ and two new bands. The two new bands cover (1) the shorter wavelength blue part of the spectrum to help with coastal studies and aerosol analyses/atmospheric correction and (2) an atmospheric water absorption band, where the Earth surface is generally not visible, but Cirrus clouds are, to aid in cloud detection and screening. The radiometry of OLI benefits from improved SNR, dynamic range and quantization. OLI is undergoing system testing with a delivery scheduled for Spring 2011. The TIRS is also a pushbroom design and used QWIPS detectors that require cooling to 43K using a cryocooler. It.has two spectral bands, effectively splitting the ETM+ band 6 in half, that can be used as a split window to aid in atmospheric correction. It has nominally 100 m spatial resolution as opposed to the 60 m of Landsat-7 ETM+: TIRS has commenced integration and test, with a delivery to the spacecraft vendor scheduled for Winter 2011-2012. The Orbital spacecraft currently being integrated for LDCM will have improved capabilities for pointing over previous missions. These capabilities will allow the OLI and TIRS instruments to point off-nadir the equivalent of one WRS-2 path to increase the chances of coverage for high priority targets, particularly in the event of natural disasters. Also, the pointing capability will allow the calibration of the OLI using the sun (roughly weekly), the moon (monthly), stars (during commissioning) and the Earth (at 90 deg from normal orientation, a.k.a., side slither) quarterly. The solar calibration will be used for OLI absolute and relative calibration, the moon for trending the stability of the OLI response, the stars will be used for Line of Sight determination and the side slither will be an alternate OLI and relative gain determination methodology. The spacecraft is scheduled to begin integration with the OLI instrument in Summer 2011. The LDCM data processing and archive system (DPAS), located at USGS EROS, generates the products for distribution to users. Like Landsat-7 this includes an image assessment system for characrizing instrument performance and updating calibration parameters. Products will be generated that include the spectral bands from both instruments, terrain corrected and registered to the geoid. Also, like Landsat-7, data products will be distributed at no charge to the user. The current status and plans of the space and ground segments of the LDCM project will be presented along with performance predictions as available. More detailed information on the two instruments is intended to be presented in separate papers.

Markham, Brian

Calibration experiments with DC-8 SAR data

This paper is a summary of some research activities in calibrating DC-8 SAR data conducted in 1989/90 by the author and others. Firstly, by examining the process of 'symmetrization' in the production of DC-8 Stokes' matrix data, it is shown that an exact solution to the problem of calibrating this data exists, given certain assumptions. Secondly a new, more general, system model for radar polarimeters is proposed, together with a simple approach for verifying the model's validity. The importance of the orientation angle about the radar line of sight for some types of calibration devices is discussed and some results of an experiment to cross-calibrate the C-Band VV data from the DC-8 and DLR E-SAR sensors are presented.

Freeman, Anthony