Engineering PapersSearch

SEARCH · Engineering Papers

Results for “pra”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Practical Application of PRA as an Integrated Design Tool for Space Systems

This paper presents the application of the first comprehensive Probabilistic Risk Assessment (PRA) during the design phase of a joint NASA/NOAA weather satellite program, Geostationary Operational Environmental Satellite Series R (GOES-R). GOES-R is the next generation weather satellite primarily to help understand the weather and help save human lives. PRA has been used at NASA for Human Space Flight for many years. PRA was initially adopted and implemented in the operational phase of manned space flight programs and more recently for the next generation human space systems. Since its first use at NASA, PRA has become recognized throughout the Agency as a method of assessing complex mission risks as part of an overall approach to assuring safety and mission success throughout project lifecycles. PRA is now included as a requirement during the design phase of both NASA next generation manned space vehicles as well as for high priority robotic missions. The influence of PRA on GOES-R design and operation concepts are discussed in detail. The GOES-R PRA is unique at NASA for its early implementation. It also represents a pioneering effort to integrate risks from both Spacecraft (SC) and Ground Segment (GS) to fully assess the probability of achieving mission objectives. PRA analysts were actively involved in system engineering and design engineering to ensure that a comprehensive set of technical risks were correctly identified and properly understood from a design and operations perspective. The analysis included an assessment of SC hardware and software, SC fault management system, GS hardware and software, common cause failures, human error, natural hazards, solar weather and infrastructure (such as network and telecommunications failures, fire). PRA findings directly resulted in design changes to reduce SC risk from micro-meteoroids. PRA results also led to design changes in several SC subsystems, e.g. propulsion, guidance, navigation and control (GNC), communications, mechanisms, and command and data handling (C&DH). The fault tree approach assisted in the development of the fault management system design. Human error analysis, which examined human response to failure, indicated areas where automation could reduce the overall probability of gaps in operation by half. In addition, the PRA brought to light many potential root causes of system disruptions, including earthquakes, inclement weather, solar storms, blackouts and other extreme conditions not considered in the typical reliability and availability analyses. Ultimately the PRA served to identify potential failures that, when mitigated, resulted in a more robust design, as well as to influence the program's concept of operations. The early and active integration of PRA with system and design engineering provided a well-managed approach for risk assessment that increased reliability and availability, optimized lifecyc1e costs, and unified the SC and GS developments.

Kalia, Prince

Towards a Methodology and Tooling for Model-Based Probabilistic Risk Assessment (PRA)

A Probabilistic Risk Assessment (PRA) aims to identify and assess potential risks to system technical performance requirements for the purpose of furnishing risk insights into project decisions. PRAs have traditionally been conducted manually using software with an isolated data model. As system complexity rises it becomes difficult to ensure consistency between a PRA, the evolving system design, and other engineering analyses; the techniques for conducting PRAs must evolve to meet this challenge. This work presents progress towards a methodology and tooling for conducting a PRA by leveraging data in the system model, embedded for other purposes and analyses, to conduct a PRA. An approach for identifying the appropriate probabilistic equation for each risk scenario from a standard library is presented, which is a significant step towards the quantification of the likelihood of a risk scenario occurrence. The final calculation of the likelihood of occurrence is left as an item of future work. We also present the development of preliminary tooling to carry out the methodology on a well-formed system model. The information needed to conduct the PRA is embedded in a consistent manner in a system model, so the model-based PRA can be regularly executed as the system model changes. The ability to modify the PRA in concert with lifecycle evolution affords a project the opportunity to track the extent to which system modification impacts compliance with requirements. These aspects of this model-based PRA methodology make it capable of managing risk in increasingly complex technical systems.

Schreiner, Samuel S.

A Cabonaceous Chondrite Dominated Lithology from the HED Parent; PRA 04401

The paired howardite breccias Mt. Pratt (PRA) 04401 and PRA 04402 are notable for their high proportion of carbonaceous chondrite clasts [1]. They consist predominantly of coarse (0.1-7 mm) diogenite (orthopyroxene), eucrite (plagioclase + pyroxene), and carbonaceous chondrite clasts set in a finer grained matrix of these same materials. Coarse C-chondrite clasts up to 7 mm are composed mainly of fine-grained phyllosilicates with lesser sulfides and high-mg# anhydrous magnesian silicates. Most of these clasts appear to be texturally consistent with CM2 classification [1] and some contain relict chondrules. The clasts are angular and reaction or alteration textures are not apparent in the surrounding matrix. PRA 04401 contains about 70 modal% C-chondrite clasts while PRA 04402 contains about 7%. Although many howardites are known to contain abundant C-chondrite clasts [2,3,4], PRA 04401 is, to our knowledge, the most chondrite-rich howardite lithology identified to date. Low EPMA totals from CM2-type clasts in other howardites suggest that they frequently contain 10 wt% or more water [2], a figure consistent with their mineralogy. PRA 04401, therefore, demonstrates the potential for hydrous lithologies with greater than 5 wt% water to occur locally within the nominally anhydrous HED parent body. Since the origin of this water is xenogenic, it might therefore be concentrated in portions of the asteroid surface where it would be more readily observable by remote sensing techniques. We plan to further examine C-chondrite clasts in PRA 04401/2 with the intent of establishing firm chemical classification, estimating water content, and evaluating their relationship with the host breccia. To help place them in context of the HED parent, we will also compare these breccias with other howardites to evaluate which lithologies are likely to be more prevalent on the asteroid surface.

Herrin, Jason S.

Probabilistic Risk Assessment (PRA): A Practical and Cost Effective Approach

The Lunar Reconnaissance Orbiter (LRO) is the first mission of the Robotic Lunar Exploration Program (RLEP), a space exploration venture to the Moon, Mars and beyond. The LRO mission includes spacecraft developed by NASA Goddard Space Flight Center (GSFC) and seven instruments built by GSFC, Russia, and contractors across the nation. LRO is defined as a measurement mission, not a science mission. It emphasizes the overall objectives of obtaining data to facilitate returning mankind safely to the Moon in preparation for an eventual manned mission to Mars. As the first mission in response to the President's commitment of the journey of exploring the solar system and beyond: returning to the Moon in the next decade, then venturing further into the solar system, ultimately sending humans to Mars and beyond, LRO has high-visibility to the public but limited resources and a tight schedule. This paper demonstrates how NASA's Lunar Reconnaissance Orbiter Mission project office incorporated reliability analyses in assessing risks and performing design tradeoffs to ensure mission success. Risk assessment is performed using NASA Procedural Requirements (NPR) 8705.5 - Probabilistic Risk Assessment (PRA) Procedures for NASA Programs and Projects to formulate probabilistic risk assessment (PRA). As required, a limited scope PRA is being performed for the LRO project. The PRA is used to optimize the mission design within mandated budget, manpower, and schedule constraints. The technique that LRO project office uses to perform PRA relies on the application of a component failure database to quantify the potential mission success risks. To ensure mission success in an efficient manner, low cost and tight schedule, the traditional reliability analyses, such as reliability predictions, Failure Modes and Effects Analysis (FMEA), and Fault Tree Analysis (FTA), are used to perform PRA for the large system of LRO with more than 14,000 piece parts and over 120 purchased or contractor built components.

Lee, Lydia L.

Medical Updates Number 5 to the International Space Station Probability Risk Assessment (PRA) Model Using the Integrated Medical Model

The Integrated Medical Model (IMM) Project has been developing a probabilistic risk assessment tool, the IMM, to help evaluate in-flight crew health needs and impacts to the mission due to medical events. This package is a follow-up to a data package provided in June 2009. The IMM currently represents 83 medical conditions and associated ISS resources required to mitigate medical events. IMM end state forecasts relevant to the ISS PRA model include evacuation (EVAC) and loss of crew life (LOCL). The current version of the IMM provides the basis for the operational version of IMM expected in the January 2011 timeframe. The objectives of this data package are: 1. To provide a preliminary understanding of medical risk data used to update the ISS PRA Model. The IMM has had limited validation and an initial characterization of maturity has been completed using NASA STD 7009 Standard for Models and Simulation. The IMM has been internally validated by IMM personnel but has not been validated by an independent body external to the IMM Project. 2. To support a continued dialogue between the ISS PRA and IMM teams. To ensure accurate data interpretation, and that IMM output format and content meets the needs of the ISS Risk Management Office and ISS PRA Model, periodic discussions are anticipated between the risk teams. 3. To help assess the differences between the current ISS PRA and IMM medical risk forecasts of EVAC and LOCL. Follow-on activities are anticipated based on the differences between the current ISS PRA medical risk data and the latest medical risk data produced by IMM.

Butler, Doug

Dynamic Positioning System (DPS) Risk Analysis Using Probabilistic Risk Assessment (PRA)

The National Aeronautics and Space Administration (NASA) Safety & Mission Assurance (S&MA) directorate at the Johnson Space Center (JSC) has applied its knowledge and experience with Probabilistic Risk Assessment (PRA) to projects in industries ranging from spacecraft to nuclear power plants. PRA is a comprehensive and structured process for analyzing risk in complex engineered systems and/or processes. The PRA process enables the user to identify potential risk contributors such as, hardware and software failure, human error, and external events. Recent developments in the oil and gas industry have presented opportunities for NASA to lend their PRA expertise to both ongoing and developmental projects within the industry. This paper provides an overview of the PRA process and demonstrates how this process was applied in estimating the probability that a Mobile Offshore Drilling Unit (MODU) operating in the Gulf of Mexico and equipped with a generically configured Dynamic Positioning System (DPS) loses location and needs to initiate an emergency disconnect. The PRA described in this paper is intended to be generic such that the vessel meets the general requirements of an International Maritime Organization (IMO) Maritime Safety Committee (MSC)/Circ. 645 Class 3 dynamically positioned vessel. The results of this analysis are not intended to be applied to any specific drilling vessel, although provisions were made to allow the analysis to be configured to a specific vessel if required.

Thigpen, Eric B.

Dynamic Positioning System (DPS) Risk Analysis Using Probabilistic Risk Assessment (PRA)

The National Aeronautics and Space Administration (NASA) Safety & Mission Assurance (S&MA) directorate at the Johnson Space Center (JSC) has applied its knowledge and experience with Probabilistic Risk Assessment (PRA) to projects in industries ranging from spacecraft to nuclear power plants. PRA is a comprehensive and structured process for analyzing risk in complex engineered systems and/or processes. The PRA process enables the user to identify potential risk contributors such as, hardware and software failure, human error, and external events. Recent developments in the oil and gas industry have presented opportunities for NASA to lend their PRA expertise to both ongoing and developmental projects within the industry. This paper provides an overview of the PRA process and demonstrates how this process was applied in estimating the probability that a Mobile Offshore Drilling Unit (MODU) operating in the Gulf of Mexico and equipped with a generically configured Dynamic Positioning System (DPS) loses location and needs to initiate an emergency disconnect. The PRA described in this paper is intended to be generic such that the vessel meets the general requirements of an International Maritime Organization (IMO) Maritime Safety Committee (MSC)/Circ. 645 Class 3 dynamically positioned vessel. The results of this analysis are not intended to be applied to any specific drilling vessel, although provisions were made to allow the analysis to be configured to a specific vessel if required.

Thigpen, Eric B.

Estimating Software Reliability for Space Launch Vehicles in Probabilistic Risk Assessment (PRA)

It is acutely recognized in the Probabilistic Risk assessment (PRA) field that software plays a defining role in overall system reliability for all modern systems across a wide variety of industries. Regardless if the software is embedded firmware for working components or elements, part of a Human-Machine-Interface, or automated command and control logic, the success of the software to fulfill its function under nominal and off-nominal environments will be a dominant contributor to system reliability. It is also recognized that software reliability prediction and estimation is one of the more challenging and questionable aspects of any PRA or system analyses due to the nature of software and its integration with physics based systems. Irrespective of this dichotomy, any incorporation of software reliability methods requires that the contributions are accountable, quantitative, and tractable. This paper provides a brief overview of software reliability methods, establishes some minimum requirements that the methods should incorporate for completeness, and provides a logic structure for applying software reliability. Model resolution will be discussed that supports current testing plans and trade studies. We will provide initial recommendations for use in the NASA PRA and present a future dynamic option for software and PRA. Space Launch Vehicle Software is recognized to be reliable in static conditions, yet relatively vulnerable to a set of failure modes in changing environments/flight phases. Two quantitative methods were chosen to incorporate software reliability into a Space Launch Vehicle PRA accounting for phase adjustments. One method predicts latent software failure using statistical methods, and the second provides estimates of coding errors and software operating system failures based on test and historical data, respectively. Software uncertainty will also be discussed. We determined that recommendations for PRA software reliability should be modeled at the software module level where multiple software components compose a module and combinations of the software architecture can lead to a functional failure.

Novack, Steven

Estimating Software Reliability for Space Launch Vehicles in Probabilistic Risk Assessment (PRA)

It is acutely recognized in the Probabilistic Risk Assessment (PRA) field that software plays a defining role in overall system reliability for all modern systems across a wide variety of industries. Regardless of whether the software is embedded firmware for working components or elements, part of a Human-Machine-Interface, or automated command and control logic, the success of the software to fulfill its function under nominal and off-nominal environments will be a dominant contributor to system reliability. It is also recognized that software reliability prediction and estimation is one of the more challenging and questionable aspects of any PRA or system analyses due to the nature of software and its integration with physics based systems. Irrespective of this dichotomy, any incorporation of software reliability methods requires that the contributions are accountable, quantitative, and tractable. This paper provides a brief overview of software reliability methods, establishes some minimum requirements that the methods should incorporate for completeness, and provides a logic structure for applying software reliability. Model resolution will be discussed that supports current testing plans and trade studies. We will provide initial recommendations for use in the National Aeronautics and Space Administration (NASA) PRA and present a future dynamic option for software and PRA. Space Launch Vehicle software is recognized to be reliable in static conditions, yet relatively vulnerable to a set of failure modes in changing environments/flight phases. Two quantitative methods were chosen to incorporate software reliability into a Space Launch Vehicle PRA accounting for phase adjustments. One method predicts latent software failure using statistical methods, and the second provides estimates of coding errors and software operating system failures based on test and historical data. Software uncertainty will also be discussed. It is determined that recommendations for PRA software reliability should be modeled at the software module level where multiple software components compose a module and combinations of the software architecture can lead to a functional failure.

Steven D. Novack

Use of PRA in Shuttle Decision Making Process

How do you use PRA to support an operating program? This presentation will explore how the Shuttle Program Management has used the Shuttle PRA in its decision making process. It will reveal how the PRA has evolved from a tool used to evaluate Shuttle upgrades like Electric Auxiliary Power Unit (EAPU) to a tool that supports Flight Readiness Reviews (FRR) and real-time flight decisions. Specific examples of Shuttle Program decisions that have used the Shuttle PRA as input will be provided including how it was used in the Hubble Space Telescope (HST) manifest decision. It will discuss the importance of providing management with a clear presentation of the analysis, applicable assumptions and limitations, along with estimates of the uncertainty. This presentation will show how the use of PRA by the Shuttle Program has evolved overtime and how it has been used in the decision making process providing specific examples.

Boyer, Roger L.

PRA (Probabilistic Risk Assessments) Participation versus Validation

Probabilistic Risk Assessments (PRAs) are performed for projects or programs where the consequences of failure are highly undesirable. PRAs primarily address the level of risk those projects or programs posed during operations. PRAs are often developed after the design has been completed. Design and operational details used to develop models include approved and accepted design information regarding equipment, components, systems and failure data. This methodology basically validates the risk parameters of the project or system design. For high risk or high dollar projects, using PRA methodologies during the design process provides new opportunities to influence the design early in the project life cycle to identify, eliminate or mitigate potential risks. Identifying risk drivers before the design has been set allows the design engineers to understand the inherent risk of their current design and consider potential risk mitigation changes. This can become an iterative process where the PRA model can be used to determine if the mitigation technique is effective in reducing risk. This can result in more efficient and cost effective design changes. PRA methodology can be used to assess the risk of design alternatives and can demonstrate how major design changes or program modifications impact the overall program or project risk. PRA has been used for the last two decades to validate risk predictions and acceptability. Providing risk information which can positively influence final system and equipment design the PRA tool can also participate in design development, providing a safe and cost effective product.

DeMott, Diana

Use of Preliminary PRA to Inform Decisions During Initial NASA Gateway Development

How do you use Probabilistic Risk Assessment (PRA) to support a program in development before designs are even known? Traditional PRAs require detailed design information and early in a program life cycle such information is not available. National Aeronautics and Space Administration (NASA) Safety and Mission Assurance (SMA) developed a preliminary PRA for the Gateway Program based upon NASA reference designs utilizing data and models from pervious PRA studies as surrogates for the Gateway systems. Gateway will be a lunar outpost that supports missions to the moon and includes several elements/modules developed by NASA and International Partners. NASA SMA began supporting Gateway in fall 2017 during initial formulation and continues to support the Gateway Program today. This paper will explore how the NASA SMA developed preliminary PRA was used to inform Gateway Program decisions with specific examples provided.

PRA

Use of Preliminary PRA to Inform Decisions During Initial NASA Gateway Development

How do you use Probabilistic Risk Assessment (PRA) to support a program in development before designs are even known? Traditional PRAs require detailed design information and early in a program life cycle such information is not available. National Aeronautics and Space Administration (NASA) Safety and Mission Assurance (SMA) developed a preliminary PRA for the Gateway Program based upon NASA reference designs utilizing data and models from previous PRA studies as surrogates for the Gateway systems. Gateway will be a lunar outpost that supports missions to the moon and includes several elements/modules developed by NASA and International Partners. NASA SMA began supporting Gateway in fall 2017 during initial formulation and continues to support the Gateway Program today. This paper will explore how the NASA SMA developed preliminary PRA was used to inform Gateway Program decisions with specific examples provided.

PRA

A Probabilistic Risk Analysis (PRA) of Human Space Missions for the Advanced Integration Matrix (AIM)

The Advanced Integration Matrix (AIM) Project u7ill study and solve systems-level integration issues for exploration missions beyond Low Earth Orbit (LEO), through the design and development of a ground-based facility for developing revolutionary integrated systems for joint human-robotic missions. This paper describes a Probabilistic Risk Analysis (PRA) of human space missions that was developed to help define the direction and priorities for AIM. Risk analysis is required for all major NASA programs and has been used for shuttle, station, and Mars lander programs. It is a prescribed part of early planning and is necessary during concept definition, even before mission scenarios and system designs exist. PRA cm begin when little failure data are available, and be continually updated and refined as detail becomes available. PRA provides a basis for examining tradeoffs among safety, reliability, performance, and cost. The objective of AIM's PRA is to indicate how risk can be managed and future human space missions enabled by the AIM Project. Many critical events can cause injuries and fatalities to the crew without causing loss of vehicle or mission. Some critical systems are beyond AIM's scope, such as propulsion and guidance. Many failure-causing events can be mitigated by conducting operational tests in AIM, such as testing equipment and evaluating operational procedures, especially in the areas of communications and computers, autonomous operations, life support, thermal design, EVA and rover activities, physiological factors including habitation, medical equipment, and food, and multifunctional tools and repairable systems. AIM is well suited to test and demonstrate the habitat, life support, crew operations, and human interface. Because these account for significant crew, systems performance, and science risks, AIM will help reduce mission risk, and missions beyond LEO are far enough in the future that AIM can have significant impact.

Jones, Harry W.

Constellation Probabilistic Risk Assessment (PRA): Design Consideration for the Crew Exploration Vehicle

Managed by NASA's Office of Safety and Mission Assurance, a pilot probabilistic risk analysis (PRA) of the NASA Crew Exploration Vehicle (CEV) was performed in early 2006. The PRA methods used follow the general guidance provided in the NASA PRA Procedures Guide for NASA Managers and Practitioners'. Phased-mission based event trees and fault trees are used to model a lunar sortie mission of the CEV - involving the following phases: launch of a cargo vessel and a crew vessel; rendezvous of these two vessels in low Earth orbit; transit to th$: moon; lunar surface activities; ascension &om the lunar surface; and return to Earth. The analysis is based upon assumptions, preliminary system diagrams, and failure data that may involve large uncertainties or may lack formal validation. Furthermore, some of the data used were based upon expert judgment or extrapolated from similar components~systemsT. his paper includes a discussion of the system-level models and provides an overview of the analysis results used to identify insights into CEV risk drivers, and trade and sensitivity studies. Lastly, the PRA model was used to determine changes in risk as the system configurations or key parameters are modified.

Prassinos, Peter G.

Probabilistic Risk Analysis (PRA) of a Mobile Offshore Drilling Unit (MODU) Dynamic Positioning System (DPS)

Probabilistic Risk Assessment (PRA) has been utilized by NASA in a variety of space oriented projects. It has served as one of the primary risk identification and ranking tools. Recent developments in the oil and gas industry have presented opportunities for NASA to lend their PRA expertise to both ongoing and developmental projects within the industry. As a result, NASA has entered into an agreement with Anadarko Petroleum Company (APC) to collaboratively develop PRAs for different aspects of the subsea drilling and completion process of well development. This paper documents how PRA was applied to estimate the probability that a Mobile Offshore Drilling Unit (MODU) equipped with a generically configured Dynamic Positioning System (DPS) loses location and needs to initiate an emergency disconnect. Since this project was in essence a pilot project, the PRA described in this paper is intended to be generic such that the vessel meets the general requirements of an International Maritime Organization (IMO) Maritime Safety Committee (MSC)/Circ. 645 Class 3 dynamically positioned vessel. The results of this analysis are not intended to be applied to any specific drilling vessel, although provisions were made to allow the analysis to be configured to a specific vessel if required.

Thigpen, Eric B.

CHP-PRA Proof-of-Concept [Simulation] Sensitivity Assessment

An effort is underway to establish a Crew Health and Performance system (CHP) tradespace tool using a Probabilistic Risk Assessment (PRA) modeling and simulation system. The goal of the CHP-PRA effort is to provide a means of quantifying the integrated influence of CHP functions and capabilities on risk outcome metrics associated with health, performance, and long-term health. These metrics can then be used to establish potential risk-based trades on CHP system designed functionality and capabilities. Previously, our team demonstrated a proof-of-concept PRA approach that estimated the integrated influence of exercise countermeasures on 8 human system risks (Figure 1a) with outcomes associated with health and medical risk metrics. We reported that the change in the integrated relative health risk was small (Figure 1b) and that the small change in overall risk resulted from compounding and competing contribution levels of the individual risks. This interesting observation illustrates the emergent complexity of even straightforward representations of the human health and performance risk space and the ability of PRA models to capture this balance of global risk concerns. A key question that is not addressed in the initial analysis is “even though the global risk is relatively nominal, do any of the local risks become unacceptable?” In essence, we seek to determine what relative change in the human system risks are contributing to the relatively muted sensitivity of the proof-of-concept model combined risk assessments. Evaluations at the component risk level should elucidate if any individual risk reaches a high level that is subsequentially balanced by reductions in other areas. To further understand the relative changes in the component risks in the proof-of-concept model, and to elucidate how future refinements can be targeted, a means of establishing the contributions of the robustness of the proof-of-concept approach will be demonstrated.

astronaut health

PRA in Design: Increasing Confidence in Pre-Operational Assessments of Risks (Results of a Joint NASA/NRC Workshop)

In late 2009, the National Aeronautics and Space Administration (NASA) and the U.S. Nuclear Regulatory Commission (NRC) jointly organized a workshop to discuss technical issues associated with application of risk assessments to early phases of system design. The workshop, which was coordinated by the Idaho National Laboratory, involved invited presentations from a number of PRA experts in the aerospace and nuclear fields and subsequent discussion to address the following questions: (a) What technical issues limit decision-makers' confidence in PRA results, especially at a pre-operational phase of the system life cycle? (b) What is being done to address these issues'? (c) What more can be done ? The workshop resulted in participant observations and suggestions on several technical issues, including the pursuit of non-traditional approaches to risk assessment and the verification and validation of risk models. The workshop participants also identified several important non-technical issues, including risk communication with decision makers, and the integration of PRA into the overall design process.

Youngblood, Robert