Engineering PapersSearch

SEARCH · Engineering Papers

Results for “power system relaying”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Evaluation of a Reduced-Order Model for IBR Fault Response Representation via OEM Blackbox Models: Preprint

Driven by the need to capture the electromagnetic transients of transmission lines, inverter switching behavior, and detailed control systems, electromagnetic transient (EMT) studies have become increasingly important in industry, such as IBR interconnection study and fault study. However, original equipment manufacturer (OEM) inverter models typically include extensive parameters and proprietary settings that are unavailable to protection engineers. This paper introduces a data-driven, reduced-order model (ROM) developed as a PSCAD library component for use in EMT-based fault studies. The ROM replicates key OEM model behaviors without requiring detailed knowledge of control design or parameterization. The accompanying Python automation scripts streamline data generation, parameter fitting, and validation. The ROM's performance is demonstrated through comparison with both IEEE 2800-compliant and non-compliant OEM models in a real-world power system. Relay responses show nearly identical results, while simulation runtime is reduced by an average of 32.8\%, highlighting the ROM's practicality for protection engineers.

14 SOLAR ENERGY

Voltage Service Limits Smart Contract Using Distributed Ledger Technology for Electrical Utility Grid with Customer-Owned Generator

Modern electrical grids face growing stability risks from customer-owned generators, especially at points of common couplings (PCCs). Disruptive behavior from power-electronic sources can cause protective relays to isolate problematic generators, making measurement integrity critical. This article presents a distributed ledger technology (DLT) approach that uses smart contracts to evaluate PCC voltage measurements and trigger backup breaker operations. The approach is framed as a verifiable, multi-organization attestation and audit layer, not as a real-time control security mechanism. In the proposed architecture, voltage measurements from a hardware protective relay are anchored on a DLT through the Cyber Grid Guard (CGG) system for attestation by both the grid utility and customer-owned generator. A Voltage Service Limits (VSLs) smart contract evaluates the on-chain measurements against allowable phase-voltage limits derived from the ANSI C84.1 standard. The framework is validated in a hardware-relay-in-the-loop test bed under sustained-undervoltage, sustained-overvoltage, and transient line-to-line fault scenarios. The results show that the VSL smart contract can process these measurements and issue backup breaker actions consistent with the defined service-limit criteria, demonstrating the DLT potential as a verifiable audit layer at the PCC that complements primary protection.

cyber security

Studying the Impact of Momentary Cessation of IBRs Compliant With IEEE Std. 2800-2022 on Transmission Line Protection Elements

This paper examines the impact of inverter-based resource (IBR) momentary cessation timing on transmission system protection relays. IEEE Std. 2800 mandates voltage ride-through, requiring IBRs to remain online during voltage disturbances. However, for severe voltage dips (|V| = 0.1 p.u.), the standard permits current blocking. In practice, vendors implement momentary cessation with varying delays, potentially affecting relay operation if IBRs cease too early. This article studies the impact of the time IBRs enter momentary cessation on transmission line protective relays. Using an electromagnetic transient (EMT) simulation, this study models IBR momentary cessation with tunable delays in a realistic transmission network. COMTRADE files generated from EMT simulations are analyzed in MATLAB using detailed protective relay models. Results indicate that IBRs must sustain operation for at least one cycle to ensure proper relay response; otherwise, relays may fail to oper- ate. These findings guide IBR vendors in optimizing momentary cessation settings to enhance transmission line protection.

24 POWER TRANSMISSION AND DISTRIBUTION

Digital Grid Twin–Direct Communication Scheme Test Bed for Assessing Relay-to-Relay Radio Antenna and Optical Fiber Performance and Misoperations

This study introduces a novel “Digital Grid Twin–Direct Communication Scheme” test bed. This advanced platform evaluates point-to-point communication between transmitter and receiver relays with optical fiber and radio omnidirectional antenna systems, implemented at the Advanced Protection lab in the Grid Research Innovation and Development Center at Oak Ridge National Laboratory. The increased diversity of energy sources has led to more protective relay misoperations. In North America, microgrid protection schemes now use point-to-point communication along distribution lines between relays to implement advanced logic in nonradial grids that include both high- and low-inertia generators. This trend challenges utilities to minimize misoperations while ensuring rapid fault clearance and accurate selectivity coordination between primary and backup relays. This study assesses relay-to-relay communication schemes by introducing an advanced testing platform based on a digital grid twin protection test bed using a synchronized time source system. The platform evaluates the communication system using radio antennas or optical fiber links by integrating protective relays that operate breakers within the digital twin and record relay events and communication signals. In the experiments, transmitter and receiver relays were configured with inverse time overcurrent and breaker trip detection logic to assess the total time of the communication protection schemes based on the sum of the relay protection element operating time, radio latency, propagation delay, baud rate delay, and relay processing time. These delays were derived from recorded relay events and communication signals from the interface of a real-time simulator set as a digital grid twin. The test bed successfully simulated various electrical faults along a distribution line while ensuring effective and reliable point-to-point communication between transmitter and receiver relays. The radio antenna communication system exhibited latency because of the radio. This latency depends on the baud rate setting and type of radio application; in general, the higher the baud rate, the lower the radio latency. The measured radio latency (for Mirrored Bits with an encryption card at 9,600 bps) was about 9–10 ms. Additionally, calculated propagation delay per mile for radio antennas and optical fiber was 5.36 µs/mi and 8.04 µs/mi, respectively. Optical fiber communication did not demonstrate radio latency. Instead, the protection element operating time depends mainly on the protection logic function set in the relay, and the relay processing time depends on the processing rate of the relay in samples per power system cycle.

24 POWER TRANSMISSION AND DISTRIBUTION

Smart Contracts for Power Grid Applications Using the Advanced DLT Cyber Grid Guard Testbed

In this study is presented two power system applications with distributed ledger technology (DLT) and smart contracts (SC) that were assessed in a Cyber-Grid-Guard System (CGGS) advanced testbed, with protective relays, power meters, communication devices, DLT devices, synchronized time source, clock displays and real time simulator. This CGGS testbed was set in the Advanced Protection Lab, 252 lab space of the Grid Research Integration and Deployment Center (GRID- C), at Oak Ridge National Laboratory. In power grids, customer-owned distributed energy resources (DERs) are more frequent than in the past, and the numbers of points of interconnection (POI) with customer-owned DERs have increased. Disruptive operation from DERs presents a risk to grid operations, and protective relays located at the POI are used to isolate out-of-tolerance or poorly behaving of DERs. Ensuring the integrity of data from the relays at the POI, and DLT could enhance the security of the power grids. The first application is a SC to define and control the allowable total power factor (TPF) of the DER (wind farm) output, and the terms of the SC are implemented using DLT with a CGGS for a customer-owned DER. The TPF SC was implemented by the CGGS using DLT. The experimental model was performed with a real-time simulator using a CGGS and relay in-the-loop. The data collected from the CGGS were used to execute the TPF SC. The TPF limits were between +0.9 and +1.0, and the breakers’ operation in the POI was controlled by the relay using the SC. The events were collected from the real-time simulator, CGGS, and SEL 700GT relay to validate a successful application of the TPF SC using DLT. The second application is a SC to measure and control the allowable voltage service limits (VSL) by the CGGS using DLT. The tests were performed by using a real-time simulator, CGGS and relay in-the-loop. The data was collected from the CGGS that executed the SC. The main constraints were defined based on ANSI C84.1 service voltage limits, and the operation of the breakers in the POI. The events were collected from the CGGS, and SEL 700GT relay to assess a successful operation of the VSL SC using DLT.

24 POWER TRANSMISSION AND DISTRIBUTION

Impact assessment of geomagnetic induced current neutral blocking devices with power electronics sources on distance relay for 230 kV transmission lines

Electrical grids increased the integration of power electronics sources onto transmission lines. In addition, recent reports show a significant rise in geomagnetic storms occurring in 2024. These geomagnetic storms can affect transmission lines by inducing electrical currents within them, potentially causing power outages due to overloaded power transformers. Geomagnetic induced current neutral blocking devices (GIC-NBDs) are capacitors on the ground of wye power transformers, to avoid damage caused by geomagnetic storms. The integration of distance relays and transmission lines with power electronics sources and GIC-NBDs needs to be studied to observe if GIC-NBDs and power electronics sources could adversely affect operation of the electrical grid. In this analysis, the effect of 2 MW power electronics sources and GIC-NBDs on distance relays is assessed for different 230 kV transmission line lengths in radial and nonradial power systems. The simulations measured the apparent impedances, with different electrical faults. Results for a typical 2,650 μF GIC-NBD application were presented on impedance plots, and the distance relay model operations were assessed. In conclusion, the tests for radial and nonradial power systems showed the behavior of the distance elements and source impedance ratios, assessing the effect of power electronics sources and GIC-NBDs on 230 kV transmission lines.

Distance relays

How Inverter-Based Resources (IBRs) Affect Protection Relay Elements

Inverter-based resources (IBRs) exhibit fault responses that differ significantly from those of synchronous generators, which can challenge the reliable operation of many commonly used power system protection elements. The fault response of IBRs is primarily influenced by their control algorithms and configurations, but the impact of these controls on protection relays is not yet fully understood. This presentation provides a comprehensive study of how IBR modeling and controls affect transmission line protection. Key modeling and control aspects include the DC source, inverter model, power level control, current control, and current limiting. The study reveals that certain aspects - such as the type of DC source (battery, PV, or hybrid), inverter model (average vs. switching), and power level control methods (PQ dispatch vs. Vdc-Vac control for grid-following IBRs, and droop vs. VSM for grid-forming IBRs) - do not significantly affect relay response. However, faster control loops, such as current control and current limiting, do influence the relay behavior. Additionally, the study explores the effects of other factors, including momentary cessation, operating points, fast/slow current responses, and grid strength on relay performance. Finally, the study offers recommendations for both IBR and protection engineers to improve IBR fault response and enhance the reliability of protection systems.

14 SOLAR ENERGY

A Comprehensive Study of the Impact of Inverter-Based Resource (IBR) Modeling and Control on Protection Relay Elements

Inverter-based resources (IBRs) exhibit fault responses that differ significantly from those of synchronous generators, which can challenge the reliable operation of many commonly used power system protection elements. The fault response of IBRs is primarily influenced by their control algorithms and configurations, but the impact of these controls on protection relays is not yet fully understood. This presentation provides a comprehensive study of how IBR modeling and controls affect transmission line protection. Key modeling and control aspects include the DC source, inverter model, power level control, current control, and current limiting. The study reveals that certain aspects - such as the type of DC source (battery, PV, or hybrid), inverter model (average vs. switching), and power level control methods (PQ dispatch vs. Vdc-Vac control for grid-following IBRs, and droop vs. VSM for grid-forming IBRs) - do not significantly affect relay response. However, faster control loops, such as current control and current limiting, do influence the relay behavior. Additionally, the study explores the effects of other factors, including momentary cessation, operating points, fast/slow current responses, and grid strength on relay performance. Finally, the study offers recommendations for both IBR and protection engineers to improve IBR fault response and enhance the reliability of protection systems.

14 SOLAR ENERGY

Study the Protection Improvements for a Weak Grid Area With High IBRs

NLR is collaborating with Florida Power & Light (FPL) and GE to investigate power system stability and protection reliability challenges in a weak-grid region with high penetration of inverter-based resources (IBRs). This presentation will primarily focus on the protection aspects of the study. We will share key insights from this real-world project, including best practices for developing high-fidelity fault study models, establishing a controller-hardware-in-the-loop (CHIL) platform for testing physical relays, identifying system-level protection challenges, and designing enhanced protection schemes to address those issues. Through this discussion, the audience will gain practical understanding of protection studies in IBR-dominated systems, the emerging challenges associated with reduced fault current and altered transient behavior, and effective mitigation strategies. In particular, we will highlight the critical importance of IBR compliance with IEEE 2800-2022 to ensure dependable and secure protection relay operation in modern transmission systems.

24 POWER TRANSMISSION AND DISTRIBUTION

Convolutional Variational Autoencoder-based Unsupervised Learning for Power Systems Faults

Classification of power system event data is a growing need, particularly where non-protective relaying-based sensors are used to monitor grid performance. Given the high burden of obtaining event data with appropriate labeling, an unsupervised approach is highly valuable. This approach enables using event data without labeling, which is far easier to obtain. This paper presents an unsupervised learning method to classify and label transients observed in the distribution grid. A Convolutional Variational Autoencoder (CVAE) was developed for this purpose. We demonstrate the efficacy of our approach using the transient data generated from the simulations. The simulation data is used to train the CVAE that identifies different faults as different clusters in the latent space. The clusters are then used as the foundation model to categorize the real-world data.

Alam, Maksudul

Behavior of Single-Line-Ground Faults in Inverter-Based Resource Dominated Grids Explained

It has been observed by protection engineers that it is difficult for a protective relay to identify the faulted phase during a single-line-ground (SLG) fault in a power system with a high ingression of inverter-based resources (IBR) using currents (phase or sequence). Further studies using electromagnetic transient (EMT) simulation show that the initial operating conditions of the IBRs influence the response of phase currents during an SLG fault. In this letter, we conduct a quantitative analysis using sequence components. We find that the pre-fault condition determines the relative position of the current contributed by the grid versus that from the IBR, and further dictates which phase has the largest magnitude during an SLG condition. Finally, this finding is further verified by the EMT simulation results.

electromagnetic transient simulation

Post-Event Fault Identification with Machine Learning for Protection System Validation

Power system protection devices have transitioned over the past few decades from mechanical to analog devices, then to solid state and finally digital. Relays and their associated critical network of equipment have significantly increased in complexity. Even internally, relays have gained significant intricacy, with relatively simple overcurrent or differential functions now being assisted by a myriad of other functions. This is necessary as the grid becomes more complex, but it brings increased difficulty in monitoring and upkeep. Misoperation caused by accidental improper relay settings or deliberate malicious actions is a constant challenge faced by all utilities. These improper settings can be difficult to identify and may require exhaustive post-mortem analysis, typically after a major outage event has already occurred. A mechanism is needed for monitoring the behavior of protection systems to validate that their performance falls within expectations. Relays that fail to isolate a fault or trip when there is no system disturbance can be flagged for settings review in situations where this behavior may not have been noticed due to manual restoration or backup protection operations. This work presents a concept for a machine learning (ML) system capable of validating the performance of protection systems by identifying fault events and characterizing protection system responses based solely on available current and voltage measurements. As a first step in its development, an experimental dataset is generated, and a random forest model is implemented with high accuracy in distinguishing four power system scenarios.

24 - POWER TRANSMISSION AND DISTRIBUTION

Protection System Validation Using Post-Event Anomaly Classification with Machine Learning

Power system protection devices have transitioned over the past few decades from mechanical to analog devices, then to solid state and finally digital. Relays and their associated critical network of equipment have significantly increased in complexity. Even internally, relays have gained significant intricacy, with relatively simple overcurrent or differential functions now being assisted by a myriad of other functions. This is necessary as the grid becomes more complex, but it brings increased difficulty in monitoring and upkeep. Misoperation caused by improper relay settings or malicious actions is a constant challenge faced by all utilities. These improper settings can be difficult to identify and may require exhaustive post-mortem analysis, typically after a major outage event has already occurred. A mechanism is needed for monitoring the behavior of protection systems to validate that they act and perform as expected. This work presents a concept for a machine learning (ML) system capable of validating the performance of protection systems by classifying anomalous events and characterizing protection system responses based solely on available current and voltage measurements. As a first step in its development, an experimental dataset is generated, and a random forest model is implemented with high accuracy in distinguishing four power system scenarios.

24 - POWER TRANSMISSION AND DISTRIBUTION

Protection System Validation with Machine Learning Anomaly Classification

A poster for the Early Career Poster Session. Power system protection devices have transitioned over the past few decades from mechanical to analog devices, then to solid state and finally digital. Relays and their associated critical network of equipment have significantly increased in complexity. Even internally, relays have gained significant intricacy, with relatively simple overcurrent or differential functions now being assisted by a myriad of other functions. This is necessary as the grid becomes more complex, but it brings increased difficulty in monitoring and upkeep. Misoperation caused by improper relay settings or malicious actions is a constant challenge faced by all utilities. These improper settings can be difficult to identify and may require exhaustive post-mortem analysis, typically after a major outage event has already occurred. A mechanism is needed for monitoring the behavior of protection systems to validate that they act and perform as expected. This work presents a concept for a machine learning (ML) system capable of validating the performance of protection systems by classifying anomalous events and characterizing protection system responses based solely on available current and voltage measurements. As a first step in its development, an experimental dataset is generated, and a random forest model is implemented with high accuracy in distinguishing four power system scenarios.

24 - POWER TRANSMISSION AND DISTRIBUTION

Theoretical foundations of waste factor and waste figure with applications to fixed wireless access and relay systems

The growing energy demands of next-generation wireless systems call for unified, system-level metrics to evaluate and optimize energy efficiency. This paper advances the concept of the Waste Factor (W), or Waste Figure (WF) in decibel scale, as a general framework for modeling power loss across cascaded communication components. By integrating W into the Consumption Factor (CF)–the ratio of data rate to consumed power–we reveal how component inefficiencies influence the minimum achievable energy per bit. Closed-form expressions are derived for energy-per-bit consumption in both direct and relay-assisted links, along with a decision rule for selecting the more energy-efficient path. While not explicitly modeled, Reflective Intelligent Surfaces (RIS) are shown to fit naturally within this framework. The analysis is further applied to a Fixed Wireless Access (FWA) scenario, where asymmetries in traffic direction and hardware inefficiencies are jointly considered, demonstrating the utility of the Waste Factor in guiding energy-aware system design.

Sevim, Nurullah [Texas A&M University, College Sta

A Novel Protection Scheme for Unbalanced Faults in Inverter Dominated Networks: A Computationally Efficient Algorithm for Entry-Level Relays

Microgrids are now a common practice in distribution systems to increase resilience and reliability. However, microgrid protection remains a critical challenge, considering its requirement to operate in both grid connected and islanded, and the variability in fault characteristics under each mode of operation. This paper presents unbalanced power (S unb ) based fault detection algorithm, which considers local voltage and current unbalances to determine faults in the system. S unb is a computationally efficient fault detection algorithm that is suitable for implementation in the programmable logic of entry level protective relays. In addition, the difference in current and voltage unbalance (D n ) is used to determine the fault type. The proposed method demonstrates high sensitivity and selectivity for line-to-ground (LG), line-to-line (LL), and double line-to-ground (LLG) faults, representing the most common faults in distribution systems. It also allows relay coordination with upstream and downstream protection devices in both island and grid connected operation, while preserving grading margins. The same pickup and time multiplier settings of a particular relay for both modes of operation eliminates the need for adaptive settings, which rely on communication networks. Validation was performed with a hardware-in-the-loop (HIL) setup using Typhoon HIL real time simulator interfaced with three entry-level, SEL 751 relays. Results confirmed the algorithm’s ability to discriminate fault conditions, and determine the fault type under both operating modes, maintain fast detection times, and ensure proper protection coordination.

fault classification

Hydropower Black Start: A Guidebook for Retrofitting Grid Dependent Hydropower

Not all United States (US) hydropower plants were designed to provide black start, but they are increasingly needed to uphold resilience in the evolving electric grid. This guidance is designed to help understand the minimal retrofits required for grid dependent hydropower (GDH) plants behind the point of interconnection (POI). For distribution connected hydropower plants or those with dedicated cranking paths, such upgrades can be sufficient for the plant to provide black start. For others, more coordination with the transmission system operator will be needed. This guidebook answers a number of questions relevant to retrofitting hydropower plants with black start capabilities. For example, the guidebook answers: • How flexible do the wicket gate controls need to be? • Who needs to do hydro governor model validation, why, and how? • How robust and flexible do the excitation and AVR controls need to be? • What protection settings need to be adjusted? • What relay(s) will need to be bypassed or overridden and at what risk? • What is the electrical energy demand of the station load or auxiliary power systems? • What should the strategy to energize transformer(s) along cranking path to address inrush currents be? • How should the critical load restoration be sequenced? In addition to outlining the specifications that hydropower plants need to meet for each component to be able to perform black start, this guidebook provides a set of case studies for specific upgrades needed at actual plants. Between the case studies of plants that have already performed black start retrofits and the examples of how this guidebook can be applied to scope future retrofits, five key themes have been identified for retrofit needs. 1. Protection needs “black start” mode: hydropower plants that are not designed with black start capabilities will have protections that prevent them from interconnecting to a “dead bus.” These protections will need to be overridden in every retrofit case and a separate black start mode should be established so that operators can safely switch between black start and grid connected modes, minimizing the risk to the plant. 2. Wicket gates need modern controls: digital governors accelerate the parameter tuning process and gate position sensors improve controllability, so plants with mechanical governors should be upgraded. Furthermore, a black start and islanding mode should be established for controls to maximize plant performance. 3. Robust excitation support: the DC system or excitation generator needs to be reliable enough to form and sustain the rotor electromagnetic field. These systems are typically undersized in plants that were not designed for black start, so they will need to be upgraded. 4. Turbine-governor model validation and operator training: validation of a standard hydro governor model is needed to characterize the dynamic response (i.e., inertial and primary frequency response) of the GDH. This is required for control development and old hydropower plants often have outdated or incorrect models. Operator training is also typically required to ensure the hardware retrofits are utilized correctly during the black start process. 5. Transformer and cranking path energization: any upgradation and control adjustment in front of the POI will depend upon the existing interconnection. Coordination with the transmission or distribution operator may be required.

13 HYDRO ENERGY