Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “power system planning and analysis”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Satellite power systems (SPS) concept definition study. Volume 7: SPS program plan and economic analysis, appendixes

Three appendixes in support of Volume 7 are contained in this document. The three appendixes are: (1) Satellite Power System Work Breakdown Structure Dictionary; (2) SPS cost Estimating Relationships; and (3) Financial and Operational Concept. Other volumes of the final report that provide additional detail are: Executive Summary; SPS Systems Requirements; SPS Concept Evolution; SPS Point Design Definition; Transportation and Operations Analysis; and SPS Technology Requirements and Verification.

Hanley, G.↗

Space-based solar power conversion and delivery systems study. Volume 2: Engineering analysis of orbital systems

Program plans, schedules, and costs are determined for a synchronous orbit-based power generation and relay system. Requirements for the satellite solar power station (SSPS) and the power relay satellite (PRS) are explored. Engineering analysis of large solar arrays, flight mechanics and control, transportation, assembly and maintenance, and microwave transmission are included.

Source record↗

Space station WP-04 power system preliminary analysis and design document, volume 3

Rocketdyne plans to generate a system level specification for the Space Station Electric Power System (EPS) in order to facilitate the usage, accountability, and tracking of overall system level requirements. The origins and status of the verification planning effort are traced and an overview of the Space Station program interactions are provided. The work package level interfaces between the EPS and the other Space Station work packages are outlined. A trade study was performed to determine the peaking split between PV and SD, and specifically to compare the inherent total peaking capability with proportionally shared peaking. In order to determine EPS cost drivers for the previous submittal of DRO2, the life cycle cost (LCC) model was run to identify the more significant costs and the factors contributing to them.

Source record↗

Modeling and analysis of power processing systems: Feasibility investigation and formulation of a methodology

A review is given of future power processing systems planned for the next 20 years, and the state-of-the-art of power processing design modeling and analysis techniques used to optimize power processing systems. A methodology of modeling and analysis of power processing equipment and systems has been formulated to fulfill future tradeoff studies and optimization requirements. Computer techniques were applied to simulate power processor performance and to optimize the design of power processing equipment. A program plan to systematically develop and apply the tools for power processing systems modeling and analysis is presented so that meaningful results can be obtained each year to aid the power processing system engineer and power processing equipment circuit designers in their conceptual and detail design and analysis tasks.

Biess, J. J.↗

EPS analysis of nominal STS-1 flight

The results of electrical power system (EPS) analysis of the planned Shuttle Transportation System Flight 1 mission are presented. The capability of the orbiter EPS to support the planned flight and to provide program tape information and supplementary data specifically requested by the flight operations directorate was assessed. The analysis was accomplished using the orbiter version of the spacecraft electrical power simulator program, operating from a modified version of orbiter electrical equipment utilization baseline revision four. The results indicate that the nominal flight, as analyzed, is within the capabilities of the orbiter power generation system, but that a brief, and minimal, current overload may exist between main distributor 1 and mid power controlled 1, and that inverter 9 may the overloaded for extended periods of time. A comparison of results with launch commit criteria also indicated that some of the presently existing launch redlines may be violated during the terminal countdown.

Wolfgram, D. F.↗

Satellite power system (SPS) concept definition study. Volume 3: Experimental verification definition

An evolutionary Satellite Power Systems development plan was prepared. Planning analysis was directed toward the evolution of a scenario that met the stated objectives, was technically possible and economically attractive, and took into account constraining considerations, such as requirements for very large scale end-to-end demonstration in a compressed time frame, the relative cost/technical merits of ground testing versus space testing, and the need for large mass flow capability to low Earth orbit and geosynchronous orbit at reasonable cost per pound.

Hanley, G. M.↗

Satellite Power Systems (SPS) concept definition study. Volume 7: SPS program plan and economic analysis

The economic and programmatic requirements for a recommended SPS solar photovoltaic baseline concept were analyzed. Costs are determined for the DDT&E; initial capital investment (covers initial procurement and emplacement of each SPS plant and equipment); replacement capital investment (capital asset replacement over the SPS operating life); operations and maintenance (expendables, minor maintenance, repair crews); and taxes/insurance.

Hanley, G.↗

Satellite power system concept development and evaluation program. Volume 2: System definition

The system level results of the system definition studies performed by NASA as a part of the Department of Energy/NASA satellite power system concept development and evaluation program are summarized. System requirements and guidelines are discussed as well as the major elements that comprise the reference system and its design options. Alternative system approaches including different system sizes, solid state amplifier (microwave) concepts, and laser power transmission system cost summaries are reviewed. An overview of the system analysis and planning efforts is included. The overall study led to the conclusion that the reference satellite power system concept is a feasible baseload source of electrical power and, within the assumed guidelines, the minimum cost per kilowatt is achieved at the maximum output of 5 gigawatts to the utility grid. Major unresolved technical issues include maximum allowable microwave power density in the ionosphere and performance/mass characteristics of laser power transmission systems.

Source record↗

Radioisotope Power Systems Reference Book for Mission Designers and Planners

The RPS Program's Program Planning and Assessment (PPA) Office commissioned the Mission Analysis team to develop the Radioisotope Power Systems (RPS) Reference Book for Mission Planners and Designers to define a baseline of RPS technology capabilities with specific emphasis on performance parameters and technology readiness. The main objective of this book is to provide RPS technology information that could be utilized by future mission concept studies and concurrent engineering practices. A progress summary from the major branches of RPS technology research provides mission analysis teams with a vital tool for assessing the RPS trade space, and provides concurrent engineering centers with a consistent set of guidelines for RPS performance characteristics. This book will be iterated when substantial new information becomes available to ensure continued relevance, serving as one of the cornerstone products of the RPS PPA Office. This book updates the original 2011 internal document, using data from the relevant publicly released RPS technology references and consultations with RPS technologists. Each performance parameter and RPS product subsection has been reviewed and cleared by at least one subject matter representative. A virtual workshop was held to reach consensus on the scope and contents of the book, and the definitions and assumptions that should be used. The subject matter experts then reviewed and updated the appropriate sections of the book. The RPS Mission Analysis Team then performed further updates and crosschecked the book for consistency. Finally, a second virtual workshop was held to ensure all subject matter experts and stakeholders concurred on the contents.

Lee, Young↗

Autonomous In-space Construction, Maintenance, and Reconfiguration Using Programmable Meta-Material

NASA ARC's Coded Structures Laboratory (CSL) is developing autonomous construction, maintenance, and reconfiguration technologies to meet long-duration and deep space infrastructure needs, in accordance with long-term NASA goals of "in-space reliance" and "mass-less exploration." We seek to achieve these capabilities by utilizing a "programmable meta-material" approach that integrates emerging advances in materials (mechanical meta-materials), manufacturing (cooperative mobile robotics), and autonomy (multi-agent planning algorithms). Through the ARMADAS project, we have shown assembly of high-performance engineered cellular materials using multiple cooperating mobile robotic assemblers. In this paper, we describe how such a programmable meta-material architecture may shift the paradigm of how we design, build, manufacture, and operate future space infrastructure and assets. The core of a programmable meta-material architecture consists of 3 main technology sub-areas: the structure, the assembly agents, and the assembly algorithms. We co-design these systems to ensure an adaptable system that can create and reconfigure structures from a base set of building block components. From this core technology, we can branch out and expand the capability of the system through additional secondary component types and robotic agents to perform activities such as inspections, maintenance, repair, payload installation, or perform power and communications interconnect. As these technologies mature, future designers will be able to utilize the system to rapidly integrate and operate assets in space or on planetary surfaces from a set of well-tested part library, or create their own modules to integrate into the system. A core trait to the development of this system is the automation approach. Because of the modular and functional discrete (pixel-like) nature of the structural system, a diverse set of powerful algorithms for analysis, planning, and simulation can be adapted and leveraged to optimize construction, maintenance, and dynamic reorganization (as hardware with programmable form and function). With an ability to free the design space from launch vehicle constraints and fundamentally shift how a mission is designed and conducted, we discuss the influence of a programmable meta-material architecture on mission design, build, and operations. For the "design phase", we discuss project lifecycle effects, costs, time, and performance. For the "build phase", we discuss reusability, ISRU, manufacturing, material logistics, and scalability. And for "operations", we discuss autonomy, maintenance and upgrades, reliability, and reconfiguration. Autonomy and modularity are the primary enabling traits of this system. Engineering systems that utilize a modular and reconfiguration building block approach such as digital communication and computation systems, currently lead all other areas of technology in size and complexity scalability. NASA is extending the benefits and flexibility of digital systems to hardware systems, to optimize materials lifecycle management and expand our space exploration mission capabilities.

in space assembly↗

Power Extension Package (PEP) system definition extension, orbital service module systems analysis study. Volume 7: PEP logistics and training plan requirements

Recommendations for logistics activities and logistics planning are presented based on the assumption that a system prime contractor will perform logistics functions to support all program hardware and will implement a logistics system to include the planning and provision of products and services to assure cost effective coverage of the following: maintainability; maintenance; spares and supply support; fuels; pressurants and fluids; operations and maintenance documentation training; preservation, packaging and packing; transportation and handling; storage; and logistics management information reporting. The training courses, manpower, materials, and training aids required will be identified and implemented in a training program.

Source record↗

Report on studies of space to earth microwave power transmission systems

The studies reported include a preliminary analysis, conceptual design, technical and economic evaluation, and planning for a technology development, a ground demonstration, and an orbital test program. The concept investigated involves a transmitting antenna in geosynchronous orbit which beams microwave power to a ground antenna where it is rectified to DC power. The amplitron and the klystron are considered as devices for converting DC power to RF power at microwave frequencies.

Edwards, A., Jr.↗

Stability of large DC power systems using switching converters, with application to the international space station

As space direct current (dc) power systems continue to grow in size, switching power converters are playing an ever larger role in power conditioning and control. When designing a large dc system using power converters of this type, special attention must be placed on the electrical stability of the system and of the individual loads on the system. In the design of the electric power system (EPS) of the International Space Station (ISS), the National Aeronautics and Space Administration (NASA) and its contractor team led by Boeing Defense & Space Group has placed a great deal of emphasis on designing for system and load stability. To achieve this goal, the team has expended considerable effort deriving a dear concept on defining system stability in both a general sense and specifically with respect to the space station. The ISS power system presents numerous challenges with respect to system stability, such as high power, complex sources and undefined loads. To complicate these issues, source and load components have been designed in parallel by three major subcontractors (Boeing, Rocketdyne, and McDonnell Douglas) with interfaces to both sources and loads being designed in different countries (Russia, Japan, Canada, Europe, etc.). These issues, coupled with the program goal of limiting costs, have proven a significant challenge to the program. As a result, the program has derived an impedance specification approach for system stability. This approach is based on the significant relationship between source and load impedances and the effect of this relationship on system stability. This approach is limited in its applicability by the theoretical and practical limits on component designs as presented by each system segment. As a result, the overall approach to system stability implemented by the ISS program consists of specific hardware requirements coupled with extensive system analysis and hardware testing. Following this approach, the ISS program plans to begin construction of the world's largest orbiting power system in 1997.

Manners, B.↗

An Overview of ANN Application in the Power Industry

The paper presents a survey on the development and experience with artificial neural net (ANN) applications for electric power systems, with emphasis on operational systems. The organization and constraints of electric utilities are reviewed, motivations for investigating ANN are identified, and a current assessment is given from the experience of 2400 projects using ANN for load forecasting, alarm processing, fault detection, component fault diagnosis, static and dynamic security analysis, system planning, and operation planning.

artificial neural networks ANN electric power syst↗

Development Status: Automation Advanced Development Space Station Freedom Electric Power System

Electric power system automation for Space Station Freedom is intended to operate in a loop. Data from the power system is used for diagnosis and security analysis to generate Operations Management System (OMS) requests, which are sent to an arbiter, which sends a plan to a commander generator connected to the electric power system. This viewgraph presentation profiles automation software for diagnosis, scheduling, and constraint interfaces, and simulation to support automation development. The automation development process is diagrammed, and the process of creating Ada and ART versions of the automation software is described.

Dolce, James L.↗

Space station electrical power distribution analysis using a load flow approach

The space station's electrical power system will evolve and grow in a manner much similar to the present terrestrial electrical power system utilities. The initial baseline reference configuration will contain more than 50 nodes or busses, inverters, transformers, overcurrent protection devices, distribution lines, solar arrays, and/or solar dynamic power generating sources. The system is designed to manage and distribute 75 KW of power single phase or three phase at 20 KHz, and grow to a level of 300 KW steady state, and must be capable of operating at a peak of 450 KW for 5 to 10 min. In order to plan far into the future and keep pace with load growth, a load flow power system analysis approach must be developed and utilized. This method is a well known energy assessment and management tool that is widely used throughout the Electrical Power Utility Industry. The results of a comprehensive evaluation and assessment of an Electrical Distribution System Analysis Program (EDSA) is discussed. Its potential use as an analysis and design tool for the 20 KHz space station electrical power system is addressed.

Emanuel, Ervin M.↗