Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “power modeling and estimation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Stick-Fixed Stability and Control Characteristics of the Consolidated Vultee Model 240 Airplane as Estimated from Tests of a 0.092-Scale Powered Model

Estimates of the static stick-fixed stability and control characteristics of the Consolidated Vultee model 240 airplane are presented in this report. The estimates are based on tests of a 0.092-scale powered model in the 10-foot wind tunnel of the Guggenheim Aeronautical Laboratory of the California Institute of Technology. Results of the analysis are evaluated in terms of the Army specifications for stability and control characteristics which are more specific and, in general, equal to or more rigid than the Civil Aeronautics Administration requirements. The stick-fixed stability and control characteristics of the Consolidated Vultee model 240 were found to be satisfactory except for the following: 1) Marginal longitudinal stability in the landing approach (flaps 30 deg, 50% minimum continuous power) with aft center of gravity (31% M.A.C.); 2) Marginal rudder control to hold zero sideslip in a climb after take-off with asymmetric power (flaps 30 deg, left engine inoperative, right engine delivering take-off power) with maximum rudder throw limited to +/- 18 deg; 3) Marginal dihedral effect with flaps 40 deg and engines delivering maximum continuous power.

McCullough, George B.↗

A DATA EFFICIENT SPARSE MODELING FRAMEWORK FOR POWER ESTIMATION IN WATER TREATMENT SENSING OPERATIONS

With increasing freshwater scarcity, advanced process design mechanisms such as Closed-Circuit Reverse Osmosis (CCRO) and Digital/Physical Twin systems are gaining traction in water treatment and reuse operations. While digital and physical twin models enable improved system insight and control, their development is often expensive and computationally intensive, requiring large volumes of synthetic or experimental data to characterize underlying process dynamics. This work introduces a sparse surrogate modeling framework to estimate power consumption from measured flow and pressure variables, along with their nonlinear polynomial and interaction expansions. To ensure model reliability and reduce overfitting, a two-stage pipeline is proposed. First, a dynamic data filtering algorithm is employed to remove uninformative observations and transient operational states. Second, a sparse penalized regression technique is applied to select a minimal set of parsimonious features. The proposed model achieves high sparsity, retaining only 7 out of 34 candidate features (≈79.41% sparsity) while delivering a root mean square error (RMSE) of 0.072 on the test dataset.

Mukherjee, Subrata [ORNL] (ORCID:0000000309930338)↗

Systems and methods for enhanced sequential power system model parameter estimation

A system for enhanced sequential power system model calibration is provided. The system is programmed to store a model of a device. The model includes a plurality of parameters. The system is also programmed to receive a plurality of events associated with the device, receive a first set of calibration values for the plurality of parameters, generate a plurality of sets of calibration values for the plurality of parameters, for each of the plurality of sets of calibration values, analyze a first event of the plurality of events using a corresponding set of calibration values to generate a plurality of updated sets of calibration values, analyze the plurality of updated sets of calibration values to determine a current updated set of calibration values, and update the model to include the current updated set of calibration values.

Wang, Honggang↗

Roles of Dynamic State Estimation in Power System Modeling, Monitoring and Operation

—Power system dynamic state estimation (DSE) remains an active research area. This is driven by the absence of accurate models, the increasing availability of fast-sampled, time synchronized measurements, and the advances in the capability, scalability, and affordability of computing and communications. This paper discusses the advantages of DSE as compared to static state estimation, and the implementation differences between the two, including the measurement configuration, modeling framework and support software features. The important roles of DSE are discussed from modeling, monitoring and operation aspects for today’s synchronous machine dominated systems and the future power electronics-interfaced generation systems. Several examples are presented to demonstrate the benefits of DSE on enhancing the operational robustness and resilience of 21st century power system through time critical applications. Future research directions are identified and discussed, paving the way for developing the next generation of energy management systems.

Zhao, Junbo↗

PowerMappeR: Power-Optimized Mapping of SNNs onto ReRAM Crossbars coupled via Packet-Switched NoCs

Many recent efforts in developing hardware-accelerated spiking neural networks (SNNs) are characterized by deep co-design between algorithms, architectures, and devices. Architectural advances overcome device constraints by coupling together many small resistive-RAM (ReRAM) crossbars via a network-on-chip (NoC) for neuromorphic component operation. Concurrently, improved SNN training methods increase accuracy and structural sparsity in networks despite growing problem sizes. Finally, compilers leverage these attributes to minimize area and inter-crossbar communication while mapping large SNNs to sophisticated architectures. However, for compiler-driven co-design to realize increasingly complex and profitable optimizations, a compile-time view of power consumption is critical. We present PowerMappeR to express and optimize over mapping-, architecture-, and device-specific power consumption information. By modeling the dynamic power of well-established components, we develop an integer linear programming (ILP)-based, encoding-agnostic, parametric power estimation model. Using this model, we demonstrate practical improvements in area and inter-crossbar communication by 0%–9.5% and 1.4%–5.1%, respectively. We also limit hotspot formation during optimization, achieving comparable or better results in targeted metrics with up to 96.4%–97.1% restriction of hotspot magnitude. Finally, we introduce profile-guided formulations to reduce worst-case and expected-case hotspot magnitude by 40.7%–69.5% and 40.6%–56.3%, respectively. Optimizing worst-case hotspot magnitude incidentally improves expected-case magnitude by 10.85%–33.45%. Reciprocally, optimizing expected-case magnitude incidentally improves worst-case magnitude by 4.33%–39.87%. Validation against hardware simulators confirms that PowerMappeR can decrease dynamic power consumption by 12.6%–27.3%.

Pohl, Devin [ORNL] (ORCID:0009000040149027)↗

Transient Efficiency Flexibility and Reliability Optimization of Coal-Fired Power Plants (Model-Based Estimation Library Report)

This document pertains to the reporting requirements of DOE contract FE-0031767. The document covers the development of a model-based estimation (MBE) library for generating digital twins of coal-fired power plants (CFPPs). The models used by the MBE are transient and physics-based. Model classes in the library that correspond to different components in CFPPs are presented with physical explanations and representative results. MBE library provides Extended Kalman Filter (EKF), and Unscented Kalman Filter (UKF) algorithms. The MBE library is generic and can be used to represent a variety of CFPPs. A digital twin of a CFPP will be created as the reduced-order model of that CFPP is embedded in the developed MBE architecture.

20 FOSSIL-FUELED POWER PLANTS↗

Hybrid NEP-Chemical Vehicle and Propulsion Technology Study for Crewed Mars Missions

Nuclear Electric Propulsion (NEP) is a suite of technologies with the potential to enable crewed opposition-class missions to Mars. Each subsystem comprising an NEP system has multiple technology options that present tradeoffs in vehicle sizing and technology development risk. Multiple vehicle concepts have been studied in the past and are currently being studied at NASA. Three models have been developed to illustrate the impact of key technology parameters on overall sizing for a crewed Mars transportation vehicle. Vehicle mass required to close the mission as a function of NEP system alpha (kWe/kg) and specific impulse (Isp) is estimated with a detailed trajectory model. A power system mass model estimates alpha as a function of power and radiator mass assumption. A power conversion system thermodynamic model predicts the radiator area required to close a Brayton cycle power conversion system. Combined with the architecture mass required for mission closure, the radiator area and alpha model provide insight into how technology development may impact the mission. Our focus is on parametric sweeps of the whole design space rather than any particular point design. Results from the mission model comparing electric propulsion technology (Hall, Ion, Magnetoplasmadynamic) and both 2039 and 2042 opposition-class mission launch windows are included. The results of the study illustrate the technology parameters that can result in mission closure and illustrate where the architecture is sensitive to variations in technology performance or requirements.

Matthew Duchek↗

Power System Frequency Dynamics Modeling, State Estimation, and Control using Neural Ordinary Differential Equations (NODEs) and Soft Actor-Critic (SAC) Machine Learning Approaches

With the global energy transition of the electric power system, grid control, supervision, and protection is becoming more challenging. With the increasing integration of renewable energy sources (RES), the system dynamics are changing, causing traditional power system dynamic modeling with swing equation-based modeling approaches to fail. Additionally, the converter-dominated power grid is decreasing the system inertia, making the power system more fragile to the frequency swings. This paper first investigates and compares the application of a model-based Kalman filter state estimation approach with (i) a model-free machine learning approach --- neural ordinary differential equations (NODEs) --- and (ii) a data-driven system identification (SysId) approach to model and infer critical state values of the power system frequency dynamics. Then a model predictive control (MPC) framework is compared to a model-free Soft Actor-Critic (SAC) reinforcement learning (RL) control algorithm in providing efficient fast frequency response (FFR) to the power system frequency dynamics. The approaches are compared in terms of their performance goals as well as their per-timestep computational efficiency. Furthermore, the comparative study for state estimation shows that for the model-free requirement, both NODEs and SysId can provide accurate state estimates; however, with increasing model complexity, NODEs can be a better choice for model identification. Similarly, the results from the FFR comparative study show that the SAC RL-based FFR, once trained, outperforms MPC with better control signals and faster computation time, making the SAC RL-based FFR better option for providing FFR to the power system.

97 MATHEMATICS AND COMPUTING↗

Transmission Interface Limits for High-Spatial Resolution Capacity Expansion Modeling

Large-scale capacity expansion models typically rely on estimates of the power transfer limits between modeled zones. Accurate estimation of these interface transfer limits (ITLs) requires modeling the underlying transmission network. Here we expand on a maximum flow optimization method that uses linearized power flow to estimate transfer limits. We apply this method to a data set of the U.S. transmission network to estimate ITLs between U.S. counties. By calculating ITLs using different subsets of the network, we evaluate how the size of the network used in the estimation affects the results. The results show diminishing returns to ITL accuracy after six hops, suggesting that a network subset can reasonably be used to approximate ITLs. The county-level estimates produced in this study will support more spatially resolved capacity expansion modeling and will help inform policy making at local and national levels.

capacity planning↗

Transmission Interface Limits for High-Spatial Resolution Capacity Expansion Modeling

Large-scale capacity expansion models typically rely on estimates of the power transfer limits between modeled zones. Accurate estimation of these interface transfer limits (ITLs) requires modeling the underlying transmission network. Here we expand on a maximum flow optimization method that uses linearized power flow to estimate transfer limits. We apply this method to a data set of the U.S. transmission network to estimate ITLs between U.S. counties. By calculating ITLs using different subsets of the network, we evaluate how the size of the network used in the estimation affects the results. The results show diminishing returns to ITL accuracy after six hops, suggesting that a network subset can reasonably be used to approximate ITLs. The county-level estimates produced in this study will support more spatially resolved capacity expansion modeling and will help inform policy making at local and national levels.

capacity planning↗

Mass and power modeling of communication satellites

Analytic estimating relationships for the mass and power requirements for major satellite subsystems are described. The model for each subsystem is keyed to the performance drivers and system requirements that influence their selection and use. Guidelines are also given for choosing among alternative technologies which accounts for other significant variables such as cost, risk, schedule, operations, heritage, and life requirements. These models are intended for application to first order systems analyses, where resources do not warrant detailed development of a communications system scenario. Given this ground rule, the models are simplified to 'smoothed' representation of reality. Therefore, the user is cautioned that cost, schedule, and risk may be significantly impacted where interpolations are sufficiently different from existing hardware as to warrant development of new devices.

Price, Kent M.↗

Empirically-calibrated H100 node power models for accurate AI training energy estimation

Accurately quantifying the energy use of artificial intelligence (AI) training is critical for infrastructure planning, carbon accounting, and sustainable data center operation, but few studies have directly measured the power consumption of production workloads on contemporary hardware. By combining empirical measurements from Brookhaven National Laboratory during AI training on 8-graphics-processing-unit H100 systems with open-source benchmarking data, we develop statistical models relating computational intensity to node-level power consumption. We measure the gap between manufacturer-rated thermal design power (TDP) and actual power demand during AI training. Our analysis reveals that even computationally intensive workloads operate at only 76% of the 10.2 kW TDP rating. Our architecture-specific model, calibrated to floating-point operations, predicts energy consumption with 11.4% mean absolute percentage error, significantly outperforming TDP-based approaches (27%–37% error). We identified distinct power signatures between transformer and convolutional neural network architectures, with transformers showing characteristic fluctuations that may impact grid stability. These results provide a measurement-grounded basis for improving AI training energy estimates, enabling more reliable infrastructure sizing, cost projections, and environmental impact assessments.

Newkirk, Alex C↗

Field Validation of Thermoelectric Generation System at Holcim Cement Plant in Alpena, Michigan

Executive Summary Project Background The Industrial Technology Validation (ITV) program aims to identify and demonstrate the performance of new, emerging, and underutilized energy-saving technologies in the industrial sector to help inform decisions to help accelerate their commercialization and deployment, as well as to help make industries more competitive. This ITV demonstration evaluated a thermoelectric generation (TEG) technology at a cement plant, aiming to reduce energy demand in the cement industry. A median cement plant consumes 5.73 million British thermal units per ton of clinker production (resulting in 0.838 metric tons of carbon dioxide [CO₂] emissions per ton of clinker) (Boyd and Zhang 2011, EPA 2021), equivalent to approximately 6.9 trillion British thermal units (TBtu) per year in energy consumption at a cement plant producing 3,300 tons of clinker per day.¹ Collaborating with Holcim, Advanced Thermovoltaic Systems (ATS) developed and deployed a pilot-scale thermoelectric power system to efficiently capture and convert waste heat to electricity. The system leverages the Seebeck effect to convert temperature differences on two sides of semiconductor cartridges into electrical power (ScienceDirect, n.d.). This generation is realized with minimal moving parts compared to existing waste-heat-to-generation solutions and allows capture from heat sources with temperatures as low as 150°C. This project aimed to validate a scalable solution applicable for capturing medium-temperature waste heat, including ambient losses from other high-temperature processes, and high-temperature sources less suitable for other waste-heat-to-power solutions. By recovering this otherwise wasted heat, this project intends to validate improvements to overall process efficiency through reduction in purchased electricity, thereby reducing operational costs while enhancing resiliency and competitiveness. Description and Scope This study evaluated the performance of a TEG system from ATS as a solution to convert waste heat into useful power at a Holcim cement plant in Alpena, Michigan. This plant is a fully integrated cement plant that has been operating since 1907. The facility operates continuously (24/7/365) with approximately 250 employees and five long dry kilns, yielding a total production capacity of 7,852 tons of cement per day (EPA 2023). Currently, the Alpena plant uses waste heat boilers to convert waste heat from the exhaust of each kiln into steam, which drives steam turbine generators. The ATS TEG is being evaluated for its potential to supplement the steam turbines by capturing the remaining lower grade heat. This technology is also being considered for other Holcim plants where steam turbines are not a viable option. ATS installed a pilot-scale TEG unit with an array of 582 individual thermoelectric semiconductor cartridges, of which 573 were operational. The cartridges are sandwiched between 48 hot plates and 49 cold plates. Each cartridge is designed to generate 20 watts (W) of gross power at a hot-side temperature of 240°C and cold-side temperature of 20°C. As such, the total gross generation capacity of the installed system is 11.5 kilowatts (kW) at design conditions. The system configuration for the evaluation was designed to prioritize convenience of installation and minimize disruption to production at the site, while ensuring that the heat required can be obtained for evaluating the TEG system at various operational conditions. To accomplish this, a portion of the steam supplied to Alpena’s steam turbine generation system was diverted to be used as the heat source for the TEG system, while water was supplied to the cold side of the system from nearby Lake Huron. This configuration was designed for the evaluation of the pilot-scale system to assess the performance at different conditions. A commercial-scale system will likely vary from the pilot system depending on typical configurations, including both scale and application. Future commercial applications of the ATS system would involve integrating the system into the exhaust from kiln preheaters, clinker coolers, or radiant heat capture from kiln shells for the heat source. For the cold source, a range of cooling solutions can be considered, including a mechanical cooling system, depending on the location and the application. To increase the generation capacity for commercial applications, the technology provider is working toward developing a commercial-scale TEG system, which would combine multiple TEG units (each similar in design to the pilot system) together. The scope of this evaluation includes the pilot-scale TEG system and all impacted equipment including pumps, controllers, and power handling equipment. Study Objectives The evaluation's goal was to assess the potential of the ATS TEG system to generate useful electrical power by capturing waste heat from cement production kilns. The objectives of this study are to evaluate and verify the following claims made by ATS regarding the pilot-scale system installed at the Holcim Alpena plant. The following design parameters and claims are also outlined in Table ES- 1 and Table ES- 2: • Gross Power: The thermoelectric system converts heat into power to create gross power, the total measured power generated by the system. The 573 active cartridge pilot-scale system is expected to generate 11.5 kW of gross power at the designed hot-side temperature of 240°C and cold-side temperature of 20°C. Power production is dependent on the temperature difference between the heat source (ultimately from the waste heat) and cold temperature supply source. • Net Power: The net power is the total usable power provided to the site by the TEG system after deducting parasitic power loads from the gross generated power. Supplementary equipment is required to operate the TEG system including pumps, controllers, and, in certain anticipated applications, mechanical cooling, which introduce parasitic loads to system operation. After deducting the parasitic loads from the gross power generation, ATS anticipates achieving a net power generation of 7.5 kW from the pilot-scale system. • Thermal Efficiency: The thermal efficiency is the percent of the total heat transferred to the TEG system that is converted to gross power. Historically, TEGs have a thermal efficiency of 2%–5% (DOE 2008). Prior industrial-scale TEG systems, such as the E1 TEG offered by Alphabet Energy, operated at an efficiency of 2.5% (Lamonica, 2014). ATS anticipates achieving an average efficiency of 4.8% or higher in converting heat energy to usable electricity. • Cartridge Performance: The TEG system comprises 573 active individual semiconductor cartridges, each of which generates a portion of the total power. Cartridge optimization and selection is an important design consideration for potential future TEG system design performance. Therefore, understanding the distribution of gross power and efficiency within the pilot system is vital to understanding what is achievable. At a design hot-side temperature of 240°C and cold-side temperature of 20°C, ATS anticipates a cartridge performance of 20 W of gross power per cartridge at an efficiency of 4.8% per cartridge. In addition to evaluating the claimed performance of the TEG pilot-scale unit, the study estimated the potential annual impacts of a scaled-up commercial system used to capture kiln waste heat over annual operations. The evaluation estimated the gross and net annual electric generation achievable by capturing heat from the two proposed tap-in points: the kiln exhaust and the clinker cooler exhaust; see Section 2.1 for details. Two use cases were examined: • Holcim Alpena: The Holcim Alpena site consists of long dry kilns with superheater boilers, which differs from the rest of Holcim’s cement plant portfolio and results in lower waste heat temperatures. The study estimates gross and net annual generation using the superheater boiler exhaust and clinker cooler exhaust, based on 2023 operational data. • Typical Installation: Common cement plants have preheater kilns with higher exhaust temperatures than Holcim Alpena across a range of production rates. The study estimates gross and net annual generation using the preheater exhaust and clinker cooler exhaust, with a sensitivity analysis to account for the typical range of preheater exhaust temperatures, clinker cooler exhaust temperatures, and clinker production rates. Methodology The evaluation methodology followed a measurement and verification (M&V) strategy based on the International Performance Measurement and Verification Protocol Option B through comprehensive measurements and analyses of the affected systems. Evaluation data was collected from March 9 to March 11, 2024, the test period of the pilot TEG system. During the test period, in coordination with the ITV team, the ATS team adjusted system operations to capture the range of variability expected for each of the variables pertinent to performance of the system. The methodology consisted of two parts: evaluating the performance of the pilot unit's TEG system and estimating the annual TEG impact in terms of gross and net power based on a given waste heat profile. First, the evaluation of the thermoelectric generation performance of the pilot unit relative to the claims was performed by analyzing the collected test data. Gross power of the pilot TEG system was directly measured. Net power was determined by deducting the measured parasitic power from the gross power. The gross power generation was compared to heat transferred to the system by the working fluid (which was heated by steam generated from the kiln waste heat) to calculate the thermal efficiency achieved by the system. Performance of individual semiconductor cartridges within the pilot array was also assessed in terms of measured gross cartridge power and calculated cartridge thermal efficiency. The second part of the evaluation estimated the annual TEG impacts in terms of gross power and net power (calculated from the difference between gross power and parasitic power). This analysis comprised development of mathematical regression models for gross power and parasitic power, with assessment of each model’s goodness-of-fit characteristics to ensure satisfaction of statistical requirements. The models predicted the gross power generation, the parasitic load based on the temperature difference between the hot working fluid and the cold-side fluid (cold water from Lake Huron) entering the system, the volumetric flow rate of the cold-side fluid at the inlet, and the volumetric flow rate of the hot working fluid at the inlet. The annual impact analysis considered a theoretical commercial-scale system sized to capture the available waste heat at a cement plant, consisting of linked pilot-scale units that receive heat from a theoretical gas-to-working-fluid heat exchanger. To estimate annual impacts at the Alpena plant, the gross power and parasitic power regression models were applied to the arrays in the theoretical commercial-scale system. The heat supplied to the unit was calculated based on the kiln run time, annual production, kiln exhaust waste heat, and clinker cooler waste heat derived from 2023 Holcim Alpena kiln operational data. Net power impacts were calculated by deducting the resulting parasitic power from the estimated gross power. Inputs for the model were generated from a combination of hourly data, assumed design considerations for TEG system scale-up from the pilot-scale unit, and assumptions regarding TEG system operations. This analysis was then used as the basis for estimating annual impacts of typical TEG installation at cement plants, by applying sensitivity analyses to key kiln operational characteristics including kiln preheater exhaust temperatures, cooler clinker exhaust temperatures, and plant daily production rates across a range of expected values. Project Results/Findings Table ES- 2 and Table ES- 2 provide a summary of the operating conditions and evaluation results compared to the stated claims from the technology provider. Key takeaways include: • Gross Power: The peak gross power achieved during the testing period was 10.0 kW, compared to the 11.5 kW expected for 573 active cartridges. The claimed gross power was associated with a target hot side of 240°C; however, the system only received a maximum hot-side mean plate temperature of 212°C during the testing period. • Net Power: The pilot-scale unit exceeded the claims for net power, achieving a peak of 7.7 kW net compared to a claim of 7.5 kW. One factor contributing to the higher achieved net power is the relatively high water pressure available through Lake Huron. The pilot TEG system did not require cold-side pumps during the test, whereas most installations would. This reduced the parasitic loads on the system, ultimately contributing to higher net power relative to the gross power. • Thermal Efficiency: The pilot-scale unit outperformed the claimed efficiency, achieving a peak system efficiency of 5.0% thermal efficiency compared to the stated 4.8%. • Cartridge Performance: To compare cartridge performance against claims, the study focused on the third day of testing, which aimed for conditions closest to the design specifications, with a hot side of 240°C and cold-side exit temperature of 6.4°–30°C. On this day, the mean gross power observed in the cartridges within the TEG array was 18.1 W/cartridge, and the peak performance was 34.7 W/cartridge. The estimated mean cartridge efficiency was 5.2%, and the estimated efficiency at peak gross cartridge power was 10%. The regression models developed for gross power generation and parasitic loads were used to estimate the generation impact for given heat input to the TEG from the working fluid (captured from the waste heat) and from the cold loop (Lake Huron) on an hourly basis for a year of operation. Based on this analysis, installation of a commercial-scale TEG system at the Holcim cement plant in Alpena, Michigan, with a waste heat exchanger of 0.85 effectiveness, would generate up to 391 kW of net power, translating to between 920,000 and 1,800,000 kilowatt-hours (kWh) in net electricity per year. Based on typical grid emissions for Alpena, this would avoid estimated net emissions by 752 metric tons of CO₂ annually.² The sensitivity analysis estimated that typical TEG system installations at cement plants could generate an average of 56–1,040 kW of net power, or between 488,000 and 9,110,000 kWh of net energy. This generation potential is most significantly affected by plant production rates and also influenced by preheater and clinker cooler exhaust temperatures. Applying the national average emission rate, typical commercial-scale installations at Holcim plants are projected to avoid between 182 and 3,401 metric tons of CO₂ annually per site. Table ES- 3 shows a summary of the estimated annual impacts.³ While parasitic loads are significant and vary by application, this analysis assumed the use of heating loop pumps and access to Lake Huron as a cold sink. This setup assumed no need for cooling loop pumps due to the available water pressure at the test site. Applications that require cooling towers or additional equipment are likely to experience higher parasitic loads. Therefore, the study’s estimates are most applicable to scenarios with similar parasitic load configurations—namely, access to a high-pressure cold sink. Applicability to other locations may be limited, as differing conditions could necessitate additional pumps and cooling systems, potentially impacting performance significantly.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

The DESI DR1 peculiar velocity survey: Growth rate measurements from the galaxy power spectrum

The large-scale structure of the Universe and its evolution encapsulate a wealth of cosmological information. A powerful means of unlocking this knowledge lies in measuring the auto-power spectrum and/or the cross-power spectrum of the galaxy density and momentum fields, followed by the estimation of cosmological parameters based on these spectrum measurements. In this study, we generalize the cross-power spectrum model to accommodate scenarios in which the density and momentum fields are derived from distinct galaxy surveys. The growth rate of the large-scale structures of the Universe, commonly represented as fσ 8 , was extracted by jointly fitting the monopole and quadrupole moments of the auto-density power spectrum, the monopole of the auto-momentum power spectrum, and the dipole of the cross-power spectrum. Our estimators, theoretical models, and parameter-fitting framework were tested using mocks, confirming their robustness and accuracy in retrieving the fiducial growth rate from simulation. These techniques were then applied to analyse the power spectrum of the DESI Bright Galaxy Survey and Peculiar Velocity Survey. The fit result of the growth rate is fσ8 = 0.440$^{+0.080}_{−0.096}$ at effective redshift zeff = 0.07. By synthesizing the fitting outcomes from correlation functions, maximum likelihood estimation, and the power spectrum, a consensus value is yielded of fσ 8 (z eff = 0.07) = 0.450$^{+0.055}_{−0.055}$, and correspondingly we obtain γ = 0.580$^{+0.110}_{−0.110}$, Ω m = 0.301$^{+0.011}_{−0.011}$, and σ 8 = 0.834$^{+0.032}_{−0.032}$. The measured fσ8 and γ are consistent with the prediction of the Λ cold dark matter model and general relativity.

79 ASTRONOMY AND ASTROPHYSICS↗

The DESI DR1 Peculiar Velocity Survey: Growth Rate Measurements from the Galaxy Power Spectrum

The large-scale structure of the Universe and its evolution encapsulate a wealth of cosmological information. A powerful means of unlocking this knowledge lies in measuring the auto-power spectrum and/or the cross-power spectrum of the galaxy density and momentum fields, followed by the estimation of cosmological parameters based on these spectrum measurements. In this study, we generalize the cross-power spectrum model to accommodate scenarios where the density and momentum fields are derived from distinct galaxy surveys. The growth rate of the large-scale structures of the Universe, commonly represented as $fσ_8$, is extracted by jointly fitting the monopole and quadrupole moments of the auto-density power spectrum, the monopole of the auto-momentum power spectrum, and the dipole of the cross-power spectrum. Our estimators, theoretical models and parameter-fitting framework have been tested using mocks, confirming their robustness and accuracy in retrieving the fiducial growth rate from simulation. These techniques are then applied to analyze the power spectrum of the DESI Bright Galaxy Survey and Peculiar Velocity Survey, and the fit result of the growth rate is $fσ_8=0.440^{+0.080}_{-0.096}$ at effective redshift $z_{\rm eff}=0.07$. By synthesizing the fitting outcomes from correlation functions, maximum likelihood estimation and power spectrum, yields a consensus value of $fσ_8(z_{\rm eff}=0.07) = 0.450 ^{+0.055}_{-0.055}$, and correspondingly we obtain $γ=0.580^{+0.110}_{-0.110}$, $Ω_\mathrm{m}=0.301^{+0.011}_{-0.011}$ and $σ_8=0.834^{+0.032}_{-0.032}$. The measured $fσ_8$ and $γ$ are consistent with the prediction of the $Λ$ Cold Dark Matter Model and General Relativity.

Qin, F. [Marseille, CPPM] (ORCID:0000000179507864)↗

Social vulnerability and power loss mitigation: A case study of Puerto Rico

The increasing occurrence of extreme weather events urges us to reevaluate the resiliency and vulnerability aspects of our most critical infrastructures — such as power grids — as their failures result in both economic loss and severe human hardship. Seen through the lens of alleviating human suffering, it is crucial to be able to identify critical system components of the infrastructure for targeted hardening given resource constraints. This effort is of particular importance in islanded areas such as Puerto Rico where hurricanes are frequent and resources are limited, and where the spatially diverse effects of power loss on human suffering are all the more severe. Recent studies on evaluating infrastructure networks during extreme weather events have taken a simulation based approach that incorporates a variety of component models, such as weather realizations, topological network models, fragility models, and power flow models to estimate expected loss of service. Here, in this work, we expand such a Component Based Event Simulation (CBES) methodology proposed in the literature and integrate it with a social vulnerability modeling component. This paradigm-advancing approach of synthesizing the cutting edge capability of power network modeling and the social impacts of the power transmission network failure is demonstrated for the island of Puerto Rico. Our work exemplifies the efficacy of this integrated modeling framework in developing a decision metric for targeted transmission line hardening.

24 POWER TRANSMISSION AND DISTRIBUTION↗