Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “portfolio management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Optimal Portfolio Management in a Modified Constant Elasticity of Variance Model

We investigate the optimal management of a portfolio consisting of a risk asset and a risk-free bond. The asset dynamics is specified by the M-CEV model. Assuming that the investor has a power utility function, we derive an explicit analytical portfolio-management formula that contains confluent hypergeometric functions. The asymptotic form of the proposed portfolio management strategy is obtained, as well as approximate formulas consisting only of elementary functions. We additionally present an application of our results in the context of algorithmic statistical-arbitrage strategies.

97 MATHEMATICS AND COMPUTING↗

Creating Portfolio Management Concepts for Highly Agile and Innovative Government Research Programs Using Design Thinking and Lean Startup Methodologies

Managing a research and development (R&D) portfolio presents numerous challenges, such as prioritizing research areas, remaining agile, strategic workforce planning, and measuring return on investment, impact, and innovation. One government R&D program is charged with producing a high degree of innovative, transformational breakthroughs in aviation technology. A practical, structured methodology for strategically prioritizing emerging aviation R&D in such an environment is lacking. The existing multi-criteria decision aid tools are primarily utilized at an enterprise level, take months to set up and collect data, require large teams of experts, are used on an infrequent basis, and are not conducive to a highly innovative, high-risk portfolio. Prior to audaciously creating a new portfolio prioritization process, the exact challenges with portfolio management for R&D projects were identified using the design thinking and lean start-up methods. A key part of this discovery process was interviewing stakeholders, as well as other managers of organizations charged with producing innovative portfolios. These interviews, as well as additional techniques, were used to develop a deeper understanding of the challenges and, subsequently, lay the foundation for development of an effective portfolio prioritization process. Four potential concepts that represent key findings emerged: carefully selected criteria for portfolio assessment and selection, targeted portfolio turnover rate, dynamic portfolio prioritization framework, and streamlined transition or commercialization of R&D. Acting on any one of the resulting portfolio management concepts will increase the transparency and confidence in portfolio decisions and, ideally, result in a greater degree of transformational breakthroughs in aviation technology.

project portfolio management↗

Development of a Portfolio Management Approach with Case Study of the NASA Airspace Systems Program

A portfolio management approach was developed for the National Aeronautics and Space Administration s (NASA s) Airspace Systems Program (ASP). The purpose was to help inform ASP leadership regarding future investment decisions related to its existing portfolio of advanced technology concepts and capabilities (C/Cs) currently under development and to potentially identify new opportunities. The portfolio management approach is general in form and is extensible to other advanced technology development programs. It focuses on individual C/Cs and consists of three parts: 1) concept of operations (con-ops) development, 2) safety impact assessment, and 3) benefit-cost-risk (B-C-R) assessment. The first two parts are recommendations to ASP leaders and will be discussed only briefly, while the B-C-R part relates to the development of an assessment capability and will be discussed in greater detail. The B-C-R assessment capability enables estimation of the relative value of each C/C as compared with all other C/Cs in the ASP portfolio. Value is expressed in terms of a composite weighted utility function (WUF) rating, based on estimated benefits, costs, and risks. Benefit utility is estimated relative to achieving key NAS performance objectives, which are outlined in the ASP Strategic Plan.1 Risk utility focuses on C/C development and implementation risk, while cost utility focuses on the development and implementation portions of overall C/C life-cycle costs. Initial composite ratings of the ASP C/Cs were successfully generated; however, the limited availability of B-C-R information, which is used as inputs to the WUF model, reduced the meaningfulness of these initial investment ratings. Development of this approach, however, defined specific information-generation requirements for ASP C/C developers that will increase the meaningfulness of future B-C-R ratings.

Neitzke, Kurt W.↗

System Architecture Modeling for Technology Portfolio Management using ATLAS

Strategic planners and technology portfolio managers have traditionally relied on consensus-based tools, such as Analytical Hierarchy Process (AHP) and Quality Function Deployment (QFD) in planning the funding of technology development. While useful to a certain extent, these tools are limited in the ability to fully quantify the impact of a technology choice on system mass, system reliability, project schedule, and lifecycle cost. The Advanced Technology Lifecycle Analysis System (ATLAS) aims to provide strategic planners a decision support tool for analyzing technology selections within a Space Exploration Architecture (SEA). Using ATLAS, strategic planners can select physics-based system models from a library, configure the systems with technologies and performance parameters, and plan the deployment of a SEA. Key parameters for current and future technologies have been collected from subject-matter experts and other documented sources in the Technology Tool Box (TTB). ATLAS can be used to compare the technical feasibility and economic viability of a set of technology choices for one SEA, and compare it against another set of technology choices or another SEA. System architecture modeling in ATLAS is a multi-step process. First, the modeler defines the system level requirements. Second, the modeler identifies technologies of interest whose impact on an SEA. Third, the system modeling team creates models of architecture elements (e.g. launch vehicles, in-space transfer vehicles, crew vehicles) if they are not already in the model library. Finally, the architecture modeler develops a script for the ATLAS tool to run, and the results for comparison are generated.

Thompson, Robert W.↗

Machine Learning for Solar Technology Portfolio Management

Technology readiness level (TRL) labeling and forecasting today is done entirely manually. A computationally-assisted model of a TRL-like classification for estimation and tracking could enable a research and development (R&D) portfolio manager to more accurately estimate the relative level of development for technologies in that portfolio. This report describes the work to understand readiness level systems, train a machine learning algorithm to recognize textual indicators of particular readiness levels within written material from carefully chosen case studies in renewable technology development, and apply that algorithm to predict the readiness levels of other technology development cases. We account for the results of each step of the work conducted, including the predictive accuracy of the trained model: 54% correct, within a +/-1 readiness level error threshold and a root mean squared error of 1.88. Great potential remains to improve and apply this model for management of individual projects and across portfolios.

14 SOLAR ENERGY↗

Machine Learning for Solar Technology Portfolio Management

Technology readiness level (TRL) labeling and forecasting today is done entirely manually. A computationally-assisted model of a TRL-like classification for estimation and tracking could enable a research and development (R&D) portfolio manager to more accurately estimate the relative level of development for technologies in that portfolio. This report describes the work to understand readiness level systems, train a machine learning algorithm to recognize textual indicators of particular readiness levels within written material from carefully chosen case studies in renewable technology development, and apply that algorithm to predict the readiness levels of other technology development cases. We account for the results of each step of the work conducted, including the predictive accuracy of the trained model: 54% correct, within a +/-1 readiness level error threshold and a root mean squared error of 1.88. Great potential remains to improve and apply this model for management of individual projects and across portfolios.

14 SOLAR ENERGY↗

Simulating energy performance of buildings: a study using eQUEST and Energy Star ® portfolio manager

Commercial buildings consume significant energy in the United States and exhibit high potential for energy use reduction through retrofits. Benchmarking and energy simulation are well established tools in the industry to identify potential improvements and measure performance. Analysis to identify most sensitive retrofit parameters to energy performance can optimize investment and available energy savings. Presented study demonstrates methodology using a static model to determine sensitivity of building design and retrofit parameters with respect to energy performance. Calibrated simulation energy models (eQUEST) of two distribution centers (A, B) are presented. A fractional factorial analysis is conducted on retrofit parameters of efficiency measures targeting the highest energy consumers, and the results are benchmarked using Energy Star® Portfolio Manager. A custom Microsoft Excel® based simulation model is created to simulate occupancy levels, lighting, plug loads, and other equipment used in various spaces throughout the day. For Building A, efficient lighting was the most influential parameter for energy savings, carbon savings and benchmarking score; whereas, for Building B, HVAC efficiency was most influential for energy and demand controlled ventilation and economizers was most influential for benchmarking score. While retrofit projects can save energy and carbon emissions, variation in source-site ratios and state grid emissions, benchmarking scores may not always reflect equivalent improvement. State grid emissions factors, natural gas composition are difficult to model and hence not considered in this study. In conclusion, the synergistic analysis presented, emphasizes the importance of benchmarking and efficiency retrofits in promoting sustainable building practices to reduce energy consumption.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Energy Star Portfolio Manager (ESPM) Training [Slides]

This is a presentation developed by the NREL-Alaska team for the Nonprofit Retrofits for Health and Housing (NORTHH) Program. This presentation will be shared with nonprofits and community members in and around the Interior Alaska region to share information about Energy Star Portfolio Manager (ESPM). ESPM is used to track the energy performance of buildings in the United States and was used on the NORTHH Project to understand the performance of nonprofit owned buildings in the program. This presentation will allow users to learn how to leverage the benefits of this tool.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Portfolio Management

Enterprise Business Information Services Division (EBIS) supports the Laboratory and its functions through the implementation and support of business information systems on behalf of its business community. EBIS Five Strategic Focus Areas: (1) Improve project estimating, planning and delivery capability (2) Improve maintainability and sustainability of EBIS Application Portfolio (3) Leap forward in IT Leadership (4) Comprehensive Talent Management (5) Continuous IT Security Program. Portfolio Management is a strategy in which software applications are managed as assets

Information Technology Applications↗

Probabilistic R&D Portfolio Management Applied to Energy Storage

Here this paper proposes a methodology to analyze the potential of several alternative technologies in advancing a research and development portfolio. The methodology considers technology maturation, use case requirements, performance goals, cost projections, and existing research and development (R&D) efforts to predict the impact of various R&D investment tracks across several energy storage technologies. Technology maturation and cost projections are derived from a probabilistic Monte Carlo simulation, yielding results that incorporate uncertainty in modeling the impact of future R&D. This framework allows the researcher to perform a robust sensitivity analysis to uncover critical pathways and areas where investment will have a high impact.

25 ENERGY STORAGE↗

Safety Risk Knowledge Elicitation in Support of Aeronautical R and D Portfolio Management: A Case Study

Aviation is a problem domain characterized by a high level of system complexity and uncertainty. Safety risk analysis in such a domain is especially challenging given the multitude of operations and diverse stakeholders. The Federal Aviation Administration (FAA) projects that by 2025 air traffic will increase by more than 50 percent with 1.1 billion passengers a year and more than 85,000 flights every 24 hours contributing to further delays and congestion in the sky (Circelli, 2011). This increased system complexity necessitates the application of structured safety risk analysis methods to understand and eliminate where possible, reduce, and/or mitigate risk factors. The use of expert judgments for probabilistic safety analysis in such a complex domain is necessary especially when evaluating the projected impact of future technologies, capabilities, and procedures for which current operational data may be scarce. Management of an R&D product portfolio in such a dynamic domain needs a systematic process to elicit these expert judgments, process modeling results, perform sensitivity analyses, and efficiently communicate the modeling results to decision makers. In this paper a case study focusing on the application of an R&D portfolio of aeronautical products intended to mitigate aircraft Loss of Control (LOC) accidents is presented. In particular, the knowledge elicitation process with three subject matter experts who contributed to the safety risk model is emphasized. The application and refinement of a verbal-numerical scale for conditional probability elicitation in a Bayesian Belief Network (BBN) is discussed. The preliminary findings from this initial step of a three-part elicitation are important to project management practitioners as they illustrate the vital contribution of systematic knowledge elicitation in complex domains.

Shih, Ann T.↗