Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “planning under uncertainty”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Grasp planning under uncertainty

The planning of dexterous grasps for multifingered robot hands operating in uncertain environments is covered. A sensor-based approach to the planning of a reach path prior to grasping is first described. An on-line, joint space finger path planning algorithm for the enclose phase of grasping was then developed. The algorithm minimizes the impact momentum of the hand. It uses a Preshape Jacobian matrix to map task-level hand preshape requirements into kinematic constraints. A master slave scheme avoids inter-finger collisions and reduces the dimensionality of the planning problem.

Erkmen, A. M.↗

Dynamic Control of Plans with Temporal Uncertainty

Certain planning systems that deal with quantitative time constraints have used an underlying Simple Temporal Problem solver to ensure temporal consistency of plans. However, many applications involve processes of uncertain duration whose timing cannot be controlled by the execution agent. These cases require more complex notions of temporal feasibility. In previous work, various "controllability" properties such as Weak, Strong, and Dynamic Controllability have been defined. The most interesting and useful Controllability property, the Dynamic one, has ironically proved to be the most difficult to analyze. In this paper, we resolve the complexity issue for Dynamic Controllability. Unexpectedly, the problem turns out to be tractable. We also show how to efficiently execute networks whose status has been verified.

Morris, Paul↗

Task planning with uncertainty for robotic systems

In a practical robotic system, it is important to represent and plan sequences of operations and to be able to choose an efficient sequence from them for a specific task. During the generation and execution of task plans, different kinds of uncertainty may occur and erroneous states need to be handled to ensure the efficiency and reliability of the system. An approach to task representation, planning, and error recovery for robotic systems is demonstrated. Our approach to task planning is based on an AND/OR net representation, which is then mapped to a Petri net representation of all feasible geometric states and associated feasibility criteria for net transitions. Task decomposition of robotic assembly plans based on this representation is performed on the Petri net for robotic assembly tasks, and the inheritance of properties of liveness, safeness, and reversibility at all levels of decomposition are explored. This approach provides a framework for robust execution of tasks through the properties of traceability and viability. Uncertainty in robotic systems are modeled by local fuzzy variables, fuzzy marking variables, and global fuzzy variables which are incorporated in fuzzy Petri nets. Analysis of properties and reasoning about uncertainty are investigated using fuzzy reasoning structures built into the net. Two applications of fuzzy Petri nets, robot task sequence planning and sensor-based error recovery, are explored. In the first application, the search space for feasible and complete task sequences with correct precedence relationships is reduced via the use of global fuzzy variables in reasoning about subgoals. In the second application, sensory verification operations are modeled by mutually exclusive transitions to reason about local and global fuzzy variables on-line and automatically select a retry or an alternative error recovery sequence when errors occur. Task sequencing and task execution with error recovery capability for one and multiple soft components in robotic systems are investigated.

Cao, Tiehua↗

Scheduling and Airport Taxiway Path Planning Under Uncertainty

Congestion and uncertainty on the airport surface are major constraints to the available capacity of the air transport system. This project is to study the problem of planning and scheduling airport surface movement at large airports. Specifically, we focus on the departure time scheduling and taxiway path planning of multiple aircraft under uncertainty. We also developed a simulation tool that is capable of simulating aircraft movement along the taxiway and possible uncertainty during the movement.

Li, Jiaoyang↗

Collaborative Seamless Manager for Airspace Resources and Traffic

In today's NAS, airlines conduct pre-departure flight planning with limited information about traffic congestion. Then, as events evolve (pre-departure, on the surface, or inflight) and are impacted by congestion, limited options for changing flight plans are offered to the airlines, and, in some cases, flight plans are changed by air traffic managers on behalf of the airlines. For the airlines, this produces flight plan uncertainty and possible disruption to their business plans. The Collaborative Seamless Manager of Airspace Resources and Traffic (CSMART) is a tool being developed for the 2045 Next Gen System that will enhance the airlines' ability to flight plan, both pre-departure and during flight. CSMART achieves this, using the UTM architecture approach, by connecting via the internet airlines with other airlines and airlines with FAA agents. Flight plans, including digital, discrete planned trajectories with tolerances, are passed through the connection. Planned trajectories are used to create probabilistic predictions of when and where congestion will occur. Pre-departure, airline agents will use the predictions to collaboratively and seamlessly create flight plans that avoid congestion or go through it, depending on business objectives. In cases, where demand exceeds capacity and priorities need to be set, airline agents will have the ability to negotiate with each other to set them. Moreover, if flights are impacted by congestion during flight, CSMART will allow airlines more real-time decision making options for changing flight plans. This seminar presents the general CSMART concept and tool and research needed to develop it.

Windhorst, Robert D.↗

Intelligent Systems for Aerospace Engineering: An Overview

Intelligent systems are nature-inspired, mathematically sound, computationally intensive problem solving tools and methodologies that have become extremely important for advancing the current trends in information technology. Artificially intelligent systems currently utilize computers to emulate various faculties of human intelligence and biological metaphors. They use a combination of symbolic and sub-symbolic systems capable of evolving human cognitive skills and intelligence, not just systems capable of doing things humans do not do well. Intelligent systems are ideally suited for tasks such as search and optimization, pattern recognition and matching, planning, uncertainty management, control, and adaptation. In this paper, the intelligent system technologies and their application potential are highlighted via several examples.

Krishnakumar, Kalmanje↗

Hybridized Agile Software Development of Flight Control Team Tools for International Space Station's Payload Operations Integration Center

Ground systems operations at the National Aeronautics and Space Administration's (NASA) Payload Operations and Integration Center (POIC) at Marshall Space Flight Center (MSFC) recently increased via a High Operations Tempo (HOT) initiative, in order to support more science activities with a fourth crew member on the International Space Station (ISS). The Flight Control Team's (FCT) need to support this increasing pace of payload science operations was the impetus for creating a series of new tools. While their need was clear, the full scope and user experience for each tool was not as well-understood, thus establishing a fixed set of initial requirements was not feasible. A hybridized Agile Software Development (ASD) paradigm was created to take advantage of this uncertainty, plan for it, permit the exploration of novel concepts, and also facilitate a rapid and flexible response to inevitably changing requirements. The POIC's hybridized ASD approach places preeminent focus on providing customer value through the delivery of high quality, customer-focused solutions in short timeframes. This has been successfully achieved through creating unprecedented modes of cooperation and collaboration between operations and software development teams, frequent user evaluations of the software with well-defined feedback mechanisms, increased human factors involvement, and a dedication to successful outcomes by the whole of the POIC. Since space science operations and software development are not typically so closely linked, this paper discusses an approach that offers an optimal way to provide an increased return on investment and a faster time-to-completion than traditional software development paradigms, while aiming at delivering high quality products and customer-driven value.

Albers, Cerese M.↗

Scaling Up Decision Theoretic Planning to Planetary Rover Problems

Because of communication limits, planetary rovers must operate autonomously during consequent durations. The ability to plan under uncertainty is one of the main components of autonomy. Previous approaches to planning under uncertainty in NASA applications are not able to address the challenges of future missions, because of several apparent limits. On another side, decision theory provides a solid principle framework for reasoning about uncertainty and rewards. Unfortunately, there are several obstacles to a direct application of decision-theoretic techniques to the rover domain. This paper focuses on the issues of structure and concurrency, and continuous state variables. We describes two techniques currently under development that address specifically these issues and allow scaling-up decision theoretic solution techniques to planetary rover planning problems involving a small number of goals.

Meuleau, Nicolas↗

Robust Path Planning and Feedback Design Under Stochastic Uncertainty

Autonomous vehicles require optimal path planning algorithms to achieve mission goals while avoiding obstacles and being robust to uncertainties. The uncertainties arise from exogenous disturbances, modeling errors, and sensor noise, which can be characterized via stochastic models. Previous work defined a notion of robustness in a stochastic setting by using the concept of chance constraints. This requires that mission constraint violation can occur with a probability less than a prescribed value.In this paper we describe a novel method for optimal chance constrained path planning with feedback design. The approach optimizes both the reference trajectory to be followed and the feedback controller used to reject uncertainty. Our method extends recent results in constrained control synthesis based on convex optimization to solve control problems with nonconvex constraints. This extension is essential for path planning problems, which inherently have nonconvex obstacle avoidance constraints. Unlike previous approaches to chance constrained path planning, the new approach optimizes the feedback gain as wellas the reference trajectory.The key idea is to couple a fast, nonconvex solver that does not take into account uncertainty, with existing robust approaches that apply only to convex feasible regions. By alternating between robust and nonrobust solutions, the new algorithm guarantees convergence to a global optimum. We apply the new method to an unmanned aircraft and show simulation results that demonstrate the efficacy of the approach.

autonomuys vehicles↗

Planning Under Continuous Time and Resource Uncertainty: A Challenge for AI

There has been considerable work in Al on decision-theoretic planning and planning under uncertainty. Unfortunately, all of this work suffers from one or more of the following limitations: 1) it relies on very simple models of actions and time, 2) it assumes that uncertainty is manifested in discrete action outcomes, and 3) it is only practical for very small problems. For many real world problems, these assumptions fail to hold. A case in point is planning the activities for a Mars rover. For this domain none of the above assumptions are valid: 1) actions can be concurrent and have differing durations, 2) there is uncertainty concerning action durations and consumption of continuous resources like power, and 3) typical daily plans involve on the order of a hundred actions. We describe the rover problem, discuss previous work on planning under uncertainty, and present a detailed. but very small, example illustrating some of the difficulties of finding good plans.

Bresina, John↗

Contingency Planning for Planetary Rovers

There has been considerable work in AI on planning under uncertainty. But this work generally assumes an extremely simple model of action that does not consider continuous time and resources. These assumptions are not reasonable for a Mars rover, which must cope with uncertainty about the duration of tasks, the power required, the data storage necessary, along with its position and orientation. In this paper, we outline an approach to generating contingency plans when the sources of uncertainty involve continuous quantities such as time and resources. The approach involves first constructing a "seed" plan, and then incrementally adding contingent branches to this plan in order to improve utility. The challenge is to figure out the best places to insert contingency branches. This requires an estimate of how much utility could be gained by building a contingent branch at any given place in the seed plan. Computing this utility exactly is intractable, but we outline an approximation method that back propagates utility distributions through a graph structure similar to that of a plan graph.

Dearden, Richard↗

Incremental Contingency Planning

There has been considerable work in AI on planning under uncertainty. However, this work generally assumes an extremely simple model of action that does not consider continuous time and resources. These assumptions are not reasonable for a Mars rover, which must cope with uncertainty about the duration of tasks, the energy required, the data storage necessary, and its current position and orientation. In this paper, we outline an approach to generating contingency plans when the sources of uncertainty involve continuous quantities such as time and resources. The approach involves first constructing a "seed" plan, and then incrementally adding contingent branches to this plan in order to improve utility. The challenge is to figure out the best places to insert contingency branches. This requires an estimate of how much utility could be gained by building a contingent branch at any given place in the seed plan. Computing this utility exactly is intractable, but we outline an approximation method that back propagates utility distributions through a graph structure similar to that of a plan graph.

Dearden, Richard↗

From conditional oughts to qualitative decision theory

The primary theme of this investigation is a decision theoretic account of conditional ought statements (e.g., 'You ought to do A, if C') that rectifies glaring deficiencies in classical deontic logic. The resulting account forms a sound basis for qualitative decision theory, thus providing a framework for qualitative planning under uncertainty. In particular, we show that adding causal relationships (in the form of a single graph) as part of an epistemic state is sufficient to facilitate the analysis of action sequences, their consequences, their interaction with observations, their expected utilities, and the synthesis of plans and strategies under uncertainty.

Pearl, Judea↗

Planning: Management of predictability and uncertainty and keeping abreast of developments

The purpose of this study is to propose method to set up and control of a space mission plan such as that of the HERMES spaceplane. The interest of this subject, other than its complexity, is due to the need to manage imprecision and uncertainty during a mission, as well as changes in between missions. Under these conditions, the set up and control of a flight plan require certain special attention and this has led us to define a certain number of qualities: mastery of complexity in order to resolve conflicts between activities: configuration, resource and time management; consideration of various criteria such as risk minimization or the attainment of mission objectives; robustness and flexibility to allow for hazards and deviations from the norm during operation without having to draw up new plans; aptness for replanning by making changes to the plan without having to set up the whole plan again; and memorization and explanation facility in order to manage developments between missions.

Bastien-Thiry, Christophe↗