Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “planning under uncertainty”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Grasp planning under uncertainty

The planning of dexterous grasps for multifingered robot hands operating in uncertain environments is covered. A sensor-based approach to the planning of a reach path prior to grasping is first described. An on-line, joint space finger path planning algorithm for the enclose phase of grasping was then developed. The algorithm minimizes the impact momentum of the hand. It uses a Preshape Jacobian matrix to map task-level hand preshape requirements into kinematic constraints. A master slave scheme avoids inter-finger collisions and reduces the dimensionality of the planning problem.

Erkmen, A. M.↗

Planning Amidst Uncertainty: Identifying Core CCS Infrastructure Robust to Storage Uncertainty

Carbon Capture and Storage (CCS) is a critical technology for reducing anthropogenic CO2 emissions, but its large-scale deployment is complicated by uncertainties in geological storage performance. These uncertainties pose significant financial and operational risks, as underperforming storage sites can lead to costly infrastructure modifications, inefficient pipeline routing, and economic shortfalls. To address this challenge, we propose a novel optimization workflow that is based on mixed-integer linear programming and explicitly integrates probabilistic modeling of storage uncertainty into CCS infrastructure design. This workflow generates multiple infrastructure scenarios by sampling storage capacity distributions, optimally solving each scenario using a mixed-integer linear programming model, and aggregating results into a heatmap to identify core infrastructure components that have a low likelihood of underperforming. A risk index parameter is introduced to balance trade-offs between cost, CO2 processing capacity, and risk of underperformance, allowing stakeholders to quantify and mitigate uncertainty in CCS planning. Applying this workflow to a CCS dataset from the US Department of Energy’s Carbon Utilization and Storage Partnership project reveals key insights into infrastructure resilience. Reducing the risk index from 15% to 0% is observed to lead to an 83.7% reduction in CO2 processing capacity and a 77.1% decrease in project profit, quantifying the trade-off between risk tolerance and project performance. Furthermore, our results highlight critical breakpoints, where small adjustments in the risk index produce disproportionate shifts in infrastructure performance, providing actionable guidance for decision-makers. Unlike prior approaches that aimed to cheaply repair underperforming infrastructure, our workflow constructs robust CCS networks from the ground up, ensuring cost-effective infrastructure under storage uncertainty. These findings demonstrate the practical relevance of incorporating uncertainty-aware optimization into CCS planning, equipping decision-makers with a tool to make informed project planning decisions.

Olson, Daniel↗

Dynamic Control of Plans with Temporal Uncertainty

Certain planning systems that deal with quantitative time constraints have used an underlying Simple Temporal Problem solver to ensure temporal consistency of plans. However, many applications involve processes of uncertain duration whose timing cannot be controlled by the execution agent. These cases require more complex notions of temporal feasibility. In previous work, various "controllability" properties such as Weak, Strong, and Dynamic Controllability have been defined. The most interesting and useful Controllability property, the Dynamic one, has ironically proved to be the most difficult to analyze. In this paper, we resolve the complexity issue for Dynamic Controllability. Unexpectedly, the problem turns out to be tractable. We also show how to efficiently execute networks whose status has been verified.

Morris, Paul↗

Task planning with uncertainty for robotic systems

In a practical robotic system, it is important to represent and plan sequences of operations and to be able to choose an efficient sequence from them for a specific task. During the generation and execution of task plans, different kinds of uncertainty may occur and erroneous states need to be handled to ensure the efficiency and reliability of the system. An approach to task representation, planning, and error recovery for robotic systems is demonstrated. Our approach to task planning is based on an AND/OR net representation, which is then mapped to a Petri net representation of all feasible geometric states and associated feasibility criteria for net transitions. Task decomposition of robotic assembly plans based on this representation is performed on the Petri net for robotic assembly tasks, and the inheritance of properties of liveness, safeness, and reversibility at all levels of decomposition are explored. This approach provides a framework for robust execution of tasks through the properties of traceability and viability. Uncertainty in robotic systems are modeled by local fuzzy variables, fuzzy marking variables, and global fuzzy variables which are incorporated in fuzzy Petri nets. Analysis of properties and reasoning about uncertainty are investigated using fuzzy reasoning structures built into the net. Two applications of fuzzy Petri nets, robot task sequence planning and sensor-based error recovery, are explored. In the first application, the search space for feasible and complete task sequences with correct precedence relationships is reduced via the use of global fuzzy variables in reasoning about subgoals. In the second application, sensory verification operations are modeled by mutually exclusive transitions to reason about local and global fuzzy variables on-line and automatically select a retry or an alternative error recovery sequence when errors occur. Task sequencing and task execution with error recovery capability for one and multiple soft components in robotic systems are investigated.

Cao, Tiehua↗

Measurement Plan for Uncertainty Contributions to 252 Cf Waste Measurements

This measurement plan establishes the methodology for performing and analyzing mock-up measurements of Building 7930 Cell G Cf waste generated from 252 Cf product preparation to better determine the measurement uncertainty contributors. Understanding the uncertainty contributors will establish the total measurement uncertainty. This is critical because it will impact the administrative threshold at which personnel can discriminate between low-level waste (LLW) and transuranic (TRU) waste.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Design and execution of a verification, validation, and uncertainty quantification plan for a numerical model of left ventricular flow after LVAD implantation

Left ventricular assist devices (LVADs) are implantable pumps that act as a life support therapy for patients with severe heart failure. Despite improving the survival rate, LVAD therapy can carry major complications. Particularly, the flow distortion introduced by the LVAD in the left ventricle (LV) may induce thrombus formation. While previous works have used numerical models to study the impact of multiple variables in the intra-LV stagnation regions, a comprehensive validation analysis has never been executed. The main goal of this work is to present a model of the LV-LVAD system and to design and follow a verification, validation and uncertainty quantification (VVUQ) plan based on the ASME V&V40 and V&V20 standards to ensure credible predictions. The experiment used to validate the simulation is the SDSU cardiac simulator, a bench mock-up of the cardiovascular system that allows mimicking multiple operation conditions for the heart-LVAD system. The numerical model is based on Alya, the BSC’s in-house platform for numerical modelling. Alya solves the Navier-Stokes equation with an Arbitrary Lagrangian-Eulerian (ALE) formulation in a deformable ventricle and includes pressure-driven valves, a 0D Windkessel model for the arterial output and a LVAD boundary condition modeled through a dynamic pressure-flow performance curve. The designed VVUQ plan involves: (a) a risk analysis and the associated credibility goals; (b) a verification stage to ensure correctness in the numerical solution procedure; (c) a sensitivity analysis to quantify the impact of the inputs on the four quantities of interest (QoIs) (average aortic root flow $Q^{avg}_{Ao}$, maximum aortic root flow $Q^{max}_{Ao}$, average LVAD flow $Q^{avg}_{VAD}$, and maximum LVAD flow $Q^{max}_{VAD}$; (d) an uncertainty quantification using six validation experiments that include extreme operating conditions. Numerical code verification tests ensured correctness of the solution procedure and numerical calculation verification showed a grid convergence index (GCI)95% <3.3%. The total Sobol indices obtained during the sensitivity analysis demonstrated that the ejection fraction, the heart rate, and the pump performance curve coefficients are the most impactful inputs for the analysed QoIs. The Minkowski norm is used as validation metric for the uncertainty quantification. It shows that the midpoint cases have more accurate results when compared to the extreme cases. The total computational cost of the simulations was above 100 [core-years] executed in around three weeks time span in Marenostrum IV supercomputer. This work details a novel numerical model for the LV-LVAD system, that is supported by the design and execution of a VVUQ plan created following recognised international standards. We present a methodology demonstrating that stringent VVUQ according to ASME standards is feasible but computationally expensive.

59 BASIC BIOLOGICAL SCIENCES↗

Scheduling and Airport Taxiway Path Planning Under Uncertainty

Congestion and uncertainty on the airport surface are major constraints to the available capacity of the air transport system. This project is to study the problem of planning and scheduling airport surface movement at large airports. Specifically, we focus on the departure time scheduling and taxiway path planning of multiple aircraft under uncertainty. We also developed a simulation tool that is capable of simulating aircraft movement along the taxiway and possible uncertainty during the movement.

Li, Jiaoyang↗

Renewable electricity capacity planning with uncertainty at multiple scales

Abstract We formulate and compare optimization models of investment in renewable generation using a suite of social planning models that compute optimal generation capacity investments for a hydro-dominated electricity system where inflow uncertainty results in a risk of energy shortage. The models optimize the expected cost of capacity expansion and operation allowing for investments in hydro, geothermal, solar, wind, and thermal plant, as well as battery storage for smoothing load profiles. A novel feature is the integration of uncertain seasonal hydroelectric energy supply and short-term variability in renewable supply in a two-stage stochastic programming framework. The models are applied to data from the New Zealand electricity system and used to estimate the costs of moving to a 100% renewable electricity system by 2035. We also explore the outcomes obtained when applying different forms of CO 2 constraint that limit respectively non-renewable capacity, non-renewable generation, and CO 2 emissions on average, almost surely, or in a chance-constrained setting, and show how our models can be used to investigate the merits of a proposed pumped-hydro scheme in New Zealand’s South Island.

Ferris, Michael C.↗

A Multistage Stochastic Transmission Expansion Algorithm for Wide-Area Planning under Uncertainty

The overall objective for this project was to develop and demonstrate a set of methods for solving the transmission investment problem for a large network considering many possible scenarios of future conditions and multiple decision points when investments can be made. Project sub-objectives achieved this goal through a succession of extending the methods to apply to problems with increasing complexity or additional features, including the number of decision points, whether generation and transmission are co-optimized, and whether AC or DC power flow is used. A transmission model was developed for the Western Electric Coordinating Council (WECC) region, the high-voltage transmission system that serves the western third of the continental U.S. Using a dataset provided by WECC and by researchers from John Hopkins University, we have validated and demonstrated the model and used it to compare the new method for solving multi-stage stochastic transmission planning to several state-of-the-art techniques. The project has resulted in several key outcomes and achievements: The covariance-based method for choosing a small set of hours to represent short-term variability has superior performance in terms of accuracy to existing methods, including K-means clustering and Importance Sampling; The combined partitioning method for long-term uncertainty with the nested clustering approach for choosing representative hours for each long-term group has superior accuracy for equivalent computational effort compared with existing methods; Using the partitioning/clustering method combined with Sample Average Approximation provides both statistical bounds on the quality of the solution and at the same time, a complete investment plan for all contingencies in the full uncertainty set; no existing methods can provide both at the same time; The method is demonstrated to work well for choosing both transmission and generation investments; A variant on the method allows for both scenario selection and simultaneous correction for the error from the DC power flow approximation to provide a tractable method for AC power flow-based transmission planning under uncertainty; The method applied to the WECC case study demonstrates the additional value to the system operator and the consumer of identifying flexible investment options in the near-term decisions. In particular, the case study exhibits significant option value in postponing some transmission additions that appear useful but in some long-term system states create new congestion problems.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A control-inspired approach for energy transition planning under uncertainty

As the global carbon footprint continues to grow, many countries are implementing carbon emission reduction policies which have incentivized the expansion of low-carbon and renewable technologies. However, the speed and scale of deployment falls short of that needed to meet climate goals. Energy system models serve as key tools for guiding investment decisions and helping policymakers evaluate the effects of various policies on the development of an energy system. This study focuses on the energy system of the United States and builds upon prior work by incorporating more geographic granularity to account for the trade of commodities and addresses transmission congestion through electricity price adjustments. Furthermore, real-world characteristics, such as delays in constructing new liquid fuel production and electricity generation facilities, are integrated using a sequential decision-making approach that better reflects how decisions can be updated as uncertainties unfold. Results demonstrate that stochastic programming combined with sequential decision-making produces energy transition pathways that are robust to multiple uncertain futures. Additionally, considering real-world characteristics significantly impacts the deployment of renewable technologies and the ability to meet carbon emission reduction goals while also reliably meeting demand. These findings highlight the importance of accounting for uncertainty and real-world characteristics to avoid overly optimistic projections in energy system planning.

energy systems↗

Robotic Planning under Uncertainty in Spatiotemporal Environments in Expeditionary Science

In the expeditionary sciences, spatiotemporally varying environments -- hydrothermal plumes, algal blooms, lava flows, or animal migrations -- are ubiquitous. Mobile robots are uniquely well-suited to study these dynamic, mesoscale natural environments. We formalize expeditionary science as a sequential decision-making problem, modeled using the language of partially-observable Markov decision processes (POMDPs). Solving the expeditionary science POMDP under real-world constraints requires efficient probabilistic modeling and decision-making in problems with complex dynamics and observational models. Previous work in informative path planning, adaptive sampling, and experimental design have shown compelling results, largely in static environments, using data-driven models and information-based rewards. However, these methodologies do not trivially extend to expeditionary science in spatiotemporal environments: they generally do not make use of scientific knowledge such as equations of state dynamics, they focus on information gathering as opposed to scientific task execution, and they make use of decision-making approaches that scale poorly to large, continuous problems with long planning horizons and real-time operational constraints. In this work, we discuss these and other challenges related to probabilistic modeling and decision-making in expeditionary science, and present some of our preliminary work that addresses these gaps. We ground our results in a real expeditionary science deployment of an autonomous underwater vehicle (AUV) in the deep ocean for hydrothermal vent discovery and characterization. Our concluding thoughts highlight remaining work to be done, and the challenges that merit consideration by the reinforcement learning and decision-making community.

Preston, Victoria↗

Collaborative Seamless Manager for Airspace Resources and Traffic

In today's NAS, airlines conduct pre-departure flight planning with limited information about traffic congestion. Then, as events evolve (pre-departure, on the surface, or inflight) and are impacted by congestion, limited options for changing flight plans are offered to the airlines, and, in some cases, flight plans are changed by air traffic managers on behalf of the airlines. For the airlines, this produces flight plan uncertainty and possible disruption to their business plans. The Collaborative Seamless Manager of Airspace Resources and Traffic (CSMART) is a tool being developed for the 2045 Next Gen System that will enhance the airlines' ability to flight plan, both pre-departure and during flight. CSMART achieves this, using the UTM architecture approach, by connecting via the internet airlines with other airlines and airlines with FAA agents. Flight plans, including digital, discrete planned trajectories with tolerances, are passed through the connection. Planned trajectories are used to create probabilistic predictions of when and where congestion will occur. Pre-departure, airline agents will use the predictions to collaboratively and seamlessly create flight plans that avoid congestion or go through it, depending on business objectives. In cases, where demand exceeds capacity and priorities need to be set, airline agents will have the ability to negotiate with each other to set them. Moreover, if flights are impacted by congestion during flight, CSMART will allow airlines more real-time decision making options for changing flight plans. This seminar presents the general CSMART concept and tool and research needed to develop it.

Windhorst, Robert D.↗

Intelligent Systems for Aerospace Engineering: An Overview

Intelligent systems are nature-inspired, mathematically sound, computationally intensive problem solving tools and methodologies that have become extremely important for advancing the current trends in information technology. Artificially intelligent systems currently utilize computers to emulate various faculties of human intelligence and biological metaphors. They use a combination of symbolic and sub-symbolic systems capable of evolving human cognitive skills and intelligence, not just systems capable of doing things humans do not do well. Intelligent systems are ideally suited for tasks such as search and optimization, pattern recognition and matching, planning, uncertainty management, control, and adaptation. In this paper, the intelligent system technologies and their application potential are highlighted via several examples.

Krishnakumar, Kalmanje↗

Hybridized Agile Software Development of Flight Control Team Tools for International Space Station's Payload Operations Integration Center

Ground systems operations at the National Aeronautics and Space Administration's (NASA) Payload Operations and Integration Center (POIC) at Marshall Space Flight Center (MSFC) recently increased via a High Operations Tempo (HOT) initiative, in order to support more science activities with a fourth crew member on the International Space Station (ISS). The Flight Control Team's (FCT) need to support this increasing pace of payload science operations was the impetus for creating a series of new tools. While their need was clear, the full scope and user experience for each tool was not as well-understood, thus establishing a fixed set of initial requirements was not feasible. A hybridized Agile Software Development (ASD) paradigm was created to take advantage of this uncertainty, plan for it, permit the exploration of novel concepts, and also facilitate a rapid and flexible response to inevitably changing requirements. The POIC's hybridized ASD approach places preeminent focus on providing customer value through the delivery of high quality, customer-focused solutions in short timeframes. This has been successfully achieved through creating unprecedented modes of cooperation and collaboration between operations and software development teams, frequent user evaluations of the software with well-defined feedback mechanisms, increased human factors involvement, and a dedication to successful outcomes by the whole of the POIC. Since space science operations and software development are not typically so closely linked, this paper discusses an approach that offers an optimal way to provide an increased return on investment and a faster time-to-completion than traditional software development paradigms, while aiming at delivering high quality products and customer-driven value.

Albers, Cerese M.↗