Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “pilot learning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

The CanBikeCO Mini Pilot: Preliminary Results and Lessons Learned

In fall 2020, the Colorado Energy Office, as part of the State of Colorado’s “Can Do Colorado” initiative, initiated a project aimed at encouraging energy-efficient transportation during the COVID-19 pandemic. The initial mini-pilot provided e-bikes to 13 low-income households under an individual ownership model. This report assesses the impact of providing this additional mobility option on the travel behavior of participants. It also outlines the lessons learned from deploying a continuous monitoring platform to track the travel behavior. These lessons will influence the evaluation component for the full pilot, which will cover multiple geographic regions, starting in summer 2021, and run for 2 years. The continuous data collection was enabled by a customized version of the open-source e-mission platform, called CanBikeCO, configured with a behavioral gamification feature. The Colorado Energy Office used this system to collect a unique data set consisting of 3 months of partially automated travel diaries, combining sensed and surveyed data and linked with demographic information, from 12 participants. The data collection process worked well overall: users generally liked the app, appreciated the game, and did not complain about battery life. The long tracking period introduced behavioral challenges in user engagement, which we plan to address using repeated patterns and automated status checks for the full pilot. The analysis results, based on the subset of trips with user-reported labels (68%), indicate that the e-bike was the dominant commute mode share (31%), in sharp contrast to the census bicycle commute mode share (<1%). E-bike trips primarily replaced single-occupancy vehicle (SOV) trips (28%), followed closely by walking (24%) and regular bike (20%). The nonmotorized mode replacement corresponds to lower travel time and increased productivity enabled by the program. The emissions impact analysis of the program, computed using trip-level energy intensity factors, indicates savings of 1,367 lbs. of CO 2 . Although the results are strongly positive, the narrow demographic profile of study participants, their limited mobility alternatives, and nonuniform labeling indicate caution in broader interpretation. These preliminary results do suggest that such programs, supported by real-time education and support from program managers, can simultaneously meet equity and sustainability goals. The planned full pilot, addressing the data collection challenges and broadening the geographic scope, will provide additional insights into the generality of this approach.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Wholesale Electricity Analysis via Simulation & Learning Experiments (WEASLE): Platform Development and Pilot Competition

This document reports the development of the Wholesale Electricity Analysis via Simulation and Learning Experiments (WEASLE) platform and the pilot competition that was conducted to test the platform. Due to the increasing reliance on variable renewable energy resources for bulk power, the pilot competition, called the Energy Storage Participation Algorithm Competition (ESPA-Comp), was used to test the effect of various market designs on storage utilization and market efficiency. Basic details of the platform are provided, including an overview of the market clearing engine, the battery dispatch and degradation models, electric grid topology and resource mix, and software architecture. Two market designs were tested: a two-settlement market analogous to typical ISO design today, and a multi-settlement market that allows additional forward-trading periods during the real-time market. Results from the pilot competition show that the storage bidding problem is nontrivial and is well suited for future challenges. We find that: 1) all four teams utilized different approaches to the bidding problem, 2) different methodological approaches led to substantially different offer behaviors, 3) resource profits are clustered by team and methodological approach, 4) simulated offers reduced market surplus by about 0.5%, 5) substantially different prices between two-settlement and multi-settlement markets albeit minimal difference in overall market surplus.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Delivering Effective Virtual Energy-Focused Trainings: Successful Strategies and Lessons Learned from the Virtual Cohort In-Plant Training Pilot

While there are always barriers to energy efficiency efforts, few challenges have been as severe as the global COVID-19 pandemic. Many manufacturers throughout the United States and the world have been trying to determine how to safely open and operate their plants. To minimize the number of people working within facilities and maximize the physical distance between workers, only essential facility engineers are allowed into plants to ensure proper operations. The Department of Energy’s Better Plants Program created In-Plant Trainings (INPLTs) to help partners develop in-house expertise in energy efficiency. Delivering INPLTs in the traditional in-person fashion is infeasible under these circumstances. To continue providing INPLTs during this difficult time, the Better Plants Program piloted Virtual Cohort In-Plant Trainings (VINPLTs) on wastewater treatment and ammonia industrial refrigeration systems from October 27 to November 19, 2020. This paper provides an overview of the pilot, then discusses successful strategies and lessons learned from this pilot for delivering effective virtual energy-focused trainings.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Quick Talk: Resilient Communities, Maryland

Groundswell, Inc., in partnership with the Maryland Energy Administration (MEA), Ayika Solutions, the National Renewable Energy Lab (NREL), and the Baltimore Office of Sustainability, is advancing a vision for resilient, community-centered energy systems in Maryland. This effort aligns with Groundswell's commitment to a clean energy economy that equitably benefits all communities, closing gaps in representation, wages, and access to wealth generation, savings, and local jobs within a diverse energy supply chain. Project Vision and Objectives The project emphasizes "energy resilience," defined as a community’s capacity to anticipate, adapt to, and swiftly recover from power disruptions through inclusive planning and technical solutions. The approach centers on Resilience Hubs—designated community facilities equipped to support residents before, during, and after power-related disruptions. These hubs offer emergency resources, coordinate communications, and deliver essential services while reducing carbon emissions, ultimately enhancing residents' quality of life. Additionally, Resilience Hubs foster social connections, support disaster preparedness, and provide spaces for community programming and everyday use. The goals of Resilient Communities Maryland include: Developing a replicable framework for community energy resilience, applicable beyond Maryland. Defining community-led indicators of social impact and resilience. Establishing equitable decision-making processes in project design and implementation. Informing MEA of practical, community-based resilience strategies to shape future state initiatives. Approach Groundswell and its partners prioritize collaborative engagement with local stakeholders, ensuring that solutions are responsive to each community's unique needs. By integrating feedback from residents, local organizations, and government entities, the team has developed a holistic model for resilience that balances immediate benefits, such as improved emergency response, with long-term gains in social equity and environmental sustainability. Key Outcomes This initiative has produced valuable resources and insights, including: A Community Energy Resilience Framework: Designed to guide other communities in establishing energy resilience strategies tailored to their specific needs. Case Studies: Documenting best practices and lessons learned from pilot projects to serve as models for future resilience efforts. Community-Driven Impact Metrics: Highlighting the positive social impacts that resilience initiatives can bring, such as improved social connectedness and local decision-making power. Recommendations for MEA: Offering evidence-based insights to inform policies and funding opportunities that support resilient energy infrastructure in vulnerable communities. Next Steps Groundswell's final report will detail findings, including the potential for scaling resilience hubs across Maryland and other regions, with a focus on equitable access and community-driven outcomes. This project underscores the importance of aligning energy resilience with social equity, reinforcing community agency, and building systems that withstand and recover from future challenges effectively and sustainably.

14 SOLAR ENERGY↗

Heavy Oil Polymer EOR in the Challenging Alaskan Arctic - It Works!

Under co-sponsorship of the US Department of Energy and Hilcorp Alaska LLC the first ever polymer field pilot commenced on 8/28/2018 in the Schrader Bluff heavy oil reservoir at the Milne Point Field on Alaska North Slope (ANS). The primary objective of the pilot is to prove the efficacy of polymer Enhanced Oil Recovery (EOR) to unlock the vast heavy oil resources on ANS. More than two and half years after startup, the polymer injection, supporting laboratory experiments and simulation studies steadily continue. The pilot started injecting hydrolyzed polyacrylamide (HPAM), at a concentration of 1,750 ppm to achieve a target viscosity of 45 cP, into the two horizontal injectors in the flood pattern. Production is monitored in the two horizontal producers. Based on laboratory measurements of polymer viscosity at reservoir conditions, the team decided to reduce polymer concentration to 1,200 ppm since July 2020 in an effort to control injection pressure and optimize polymer utilization. Quality control (QC) on the field ensures uniform polymer solution properties. Representative rock and fluid systems and test conditions are utilized in the corefloods on polymer retention, effect of injection water salinity, polymer loading, and their combinations on oil recovery. A history matched reservoir simulation model for forecasting oil recovery was developed on the basis of all the available field data. Field concerns related to the post-polymer breakthrough impact on flow assurance is addressed via specialized laboratory tests. Notwithstanding early operational disruptions and hydration issues, continuous polymer injection in both injectors has been achieved. To date, 950,000 lbs of polymer or 2 million barrels of polymer solution, equating to 13% of total pore volume (PV), has been placed in the flood pattern, serving as an effective indicator of adequate polymer injectivity. So far, the success of polymer EOR is evident from drastically reduced water cut in the producers, an estimated incremental 1,000 bopd over waterflood, and a favorable polymer utilization of 1.7 lbs/barrel of incremental oil. Polymer breakthrough was observed 26 months after the start of polymer injection. Main observations from corefloods are unusually high polymer retention values in some cases and a positive response to low salinity water. Although the heterogeneity in the flood pattern and exceptionally low water cut pose some challenges, persistent novel and justifiable simulation approaches have resulted in a robust history matched model. Experimental results on produced fluids treatment provide operational guidance for improved oil-water separation and mitigation of heater tube fouling. The ongoing success of the pilot is a key indicator of bringing the team ever closer to meeting the project’s primary objective. The encouraging results of the pilot is one of the drivers that has provided the impetus to apply polymer EOR throughout the Milne Point Field, which would increase oil recovery and extend the economic life of the Trans Alaska Pipeline System. The scientific knowledge, including the many lessons learned from this pilot also has referential value for other potential heavy oil EOR projects throughout the world. The collected data, operational lessons learned, and the overall success of the pilot are summarized in the paper.

None, None↗

Safety-Related Instrumentation and Control Pilot Upgrade: Conceptual - Detailed Design Phase Report and Lessons Learned

Historically, regulatory barriers have precluded nuclear plant safety-related (SR) Instrumentation and Control (I&C) system modernizations. These barriers have been largely addressed by industry and United States Nuclear Regulatory Commission (NRC) efforts, including development of the License Amendment Request (LAR) Alternate Review (AR) process for digital I&C upgrades. The U.S. Department of Energy (DOE) and the Idaho National Laboratory (INL) are supporting a SR I&C pilot upgrade at the Limerick Generating Station (LGS) to demonstrate this process and capturing associated lessons learned for the benefit of industry. In 2021, a paper summarizing lessons learned as captured in INL/EXT-20-59809, Safety Related Instrumentation & Control Pilot Upgrade Initial Scoping Phase Implementation Report and Lessons Learned was presented at the 12th NPIC & HMIT conference. It is recommended that readers of this paper review reference 1 or the associated Nuclear Journal paper for context. This paper summarizes activities performed and lessons learned for the conceptual design phase and portions of the detailed design phase as captured in INL/RPT-23-XXXX, “Safety-Related Instrumentation and Control Pilot Upgrade: Conceptual - Detailed Design Phase Report and Lessons Learned.” The portions of the effort covered by reference 2 include conceptual design phase activities from December 2020, through completion in November 2021, and detailed design activities through September 2022. These efforts and associated detailed documentation in reference 3 are intended to support similar industry upgrades as a foundation stone for a Digital Transformation that will improve plant safety, reliability, and operational performance while lowering plant total cost of ownership.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Findings on Subtask 3.1 - Bakken Rich Gas Enhanced Oil Recovery Project

Total in-place oil for the Bakken petroleum system (BPS) (which includes the Bakken and Three Forks Formations) has been estimated to be 600 billion barrels (bbl). However, BPS wells have decline rates as high as 85% over the first 3 years of their lives, and primary recovery factors typically range from 3% to 10% of original oil in place. Given the low initial recovery rates, even small incremental productivity improvements could dramatically increase technically recoverable oil in the BPS. One potential solution is enhanced oil recovery (EOR) using gas injection, such as carbon dioxide (CO2) or hydrocarbon (HC) gases. While commonly used in conventional reservoirs, CO2 EOR in unconventional tight oil reservoirs has been limited to pilot tests. EOR using rich gas (mixture of methane, ethane, and propane) has also been employed in numerous pilots in several unconventional plays and has recently been successfully applied in the Eagle Ford play. If successful, large-scale gas-based EOR in the BPS could dramatically increase oil productivity and recovery factors and extend the life of the play for decades. While CO2 may be a technically suitable working fluid for EOR in the BPS, supplies are limited and costs for using CO2 in EOR pilots are prohibitively high. Meanwhile, produced gas flaring has presented challenges for BPS operators in North Dakota. Analysis conducted by the North Dakota Pipeline Authority indicates that the current gas-gathering infrastructure in North Dakota is insufficient to accommodate all of the associated gas that is produced from the BPS. The geographically isolated location of North Dakota relative to large natural gas markets, combined with suppressed natural gas prices, has made it economically challenging for industry to invest capital in expanding gas-gathering infrastructure in the state. These circumstances led to a research program conducted by the Energy & Environmental Research Center (EERC) in partnership with Liberty Resources Management Company LLC (LR) to examine the potential to use rich gas injection for EOR and mitigate flaring. A rich gas EOR pilot test was designed and executed by LR at its Stomping Horse development area in Williams County, North Dakota. From July 2018 through May 2019, a total of 160 million standard cubic feet (MMscf) of rich produced gas was injected into the BPS using five different wells in a sequential injection strategy. LR’s Leon–Gohrick drill spacing unit (DSU) was used as the test site. Regulatory oversight was provided by the North Dakota Industrial Commission (NDIC). Technical support was provided by the EERC through a series of laboratory, modeling, and field-based activities, and additional post-pilot research activities incorporated learnings from the test, developed new laboratory data, improved fracture modeling methods, and developed machine learning and big data analytics. The results from the Stomping Horse rich gas EOR pilot activities indicate that developing an effective, economical EOR approach for the BPS will require more field tests. Another key lesson learned from the Stomping Horse tests is that detailed pre- and posttest data on reservoir conditions and fluids production are essential. Robust reservoir characterization provides information that is crucial to creating realistic geomodels and conducting valid dynamic simulations of potential EOR scenarios. A detailed understanding of the completions and production history of offset wells is also necessary for valid test result interpretations. This knowledge is essential to designing the operational parameters of injectivity tests and interpreting the results. A conformance control strategy is also essential to success. Laboratory-based examinations of rich gas interactions with reservoir fluids and rocks were conducted, with an emphasis on determining the ability to mobilize oil in the tight reservoir rocks and shales of the BPS. Injection fluid composition was shown to have a positive impact on reducing reservoir oil minimum miscibility pressure (MMP), reducing interfacial tension (IFT), and altering wettability. IFT and contact angle measurements demonstrated that wettability can be altered in the presence of rich gas, suggesting the potential to improve oil recovery. Iterative modeling of surface infrastructure and reservoir performance using data generated by the various project activities was conducted. A geologic model of the Stomping Horse area was built; history-matched oil, gas, and water production was used in simulations of various EOR scenarios. Early programmatic modeling results were used to support LR’s design and operation of the EOR pilot and to provide insight regarding optimization of future commercial-scale BPS EOR design and operations. Post-pilot modeling focused on alternative methods of understanding complex fracture networks and accelerating simulation time. These led to improved simulation run times and provide excellent history-matching results. Several of these iterative models were used as the bases for developing algorithms into machine learning and big data analytics. History matching in reservoir simulation is time-consuming and computer processing-intensive. Machine learning algorithms were created, and an automated history-matching tool was developed. A large set of synthetic reservoir simulations were created to generate well responses (oil, gas, and water production, well bottomhole pressure [BHP], and tracer or propane breakthrough) for a set of EOR operating parameters that included offset well status (open or closed), injectate (rich gas or propane), injection rate, and injection well BHP. A user interface was developed to provide real-time visualization. Machine learning-based models were developed to provide rapid forecasting of well performance given a set of user-defined EOR operating parameters. These predictive models allow the user to modify the offset well status, injection rate, and injection well BHP and rapidly forecast future production performance. The combination of real-time visualization tools with real-time forecasting tools provides a framework for real-time control—operational changes that the EOR site operator can enact (e.g., changing gas injection rates) to affect the observed performance and potentially improve the EOR outcome. There is great reason to be optimistic about the future of EOR in the Bakken. The results of the laboratory studies suggest significant potential for high rates of oil mobilization using produced field gas injection under the right conditions. The results of the lab studies, combined with rigorous statistical analysis of well production data and associated modeling efforts, confirm the notion that fluid mobility within the reservoir is controlled by fractures. As more knowledge is gained about the nature and distribution of fracture networks in the Bakken, the industry will be in a better position to predict and, ultimately, influence fluid mobility. New field tests are necessary to develop a more complete understanding of those conditions. Thoughtful and creatively engineered field tests within a well-characterized geologic setting will yield the fundamental knowledge needed to take Bakken oil production to the next level. This subtask was cofunded through the EERC–U.S. Department of Energy Joint Program on Research and Development for Fossil Energy-Related Resources Cooperative Agreement No. DE-FE0024233. Nonfederal funding was provided by the North Dakota Industrial Commission’s Oil and Gas Research Program and Computer Modelling Group.

04 OIL SHALES AND TAR SANDS↗

Safety-Related Instrumentation and Control Pilot Upgrade: Initial Scoping Phase Implementation and Lessons Learned

In May 2016, the U.S. Nuclear Regulatory Commission (NRC) staff provided a digital instrumentation and control (I&C) regulatory infrastructure integrated action plan to the NRC for approval. One of the objectives of that plan was to establish a clear regulatory structure with reduced regulatory uncertainty to enable the expanded safe use of digital I&C in commercial nuclear reactors while continuing to ensure safety and security. To achieve this end, the NRC, with collaboration from industry, developed a streamlined License Amendment Request Alternate Review (AR) process for safety-related (SR) digital I&C upgrades. In spite of this effort, the industry has remained reluctant to perform such I&C upgrades because of perceived regulatory and financial risks associated with being the first or an early adopter of the AR process for SR I&C upgrades. The U.S. Department of Energy Light Water Reactor Sustainability Program at the Idaho National Laboratory performed Initial Scoping Phase research to help break this impasse by supporting a SR I&C Pilot Upgrade, working with MPR Associates, ScottMadden Inc., and Exelon Generation. Exelon’s Limerick Generating Station (LGS) was selected as the target for this research. This paper summarizes the Initial Scoping Phase engineering and operations, licensing, and project management activities necessary to bound the scope, schedule, and estimated cost of the project sufficiently to enable utility management authorization of Conceptual Design Phase activities. These efforts and associated products are intended to provide a template to support larger industry efforts to perform similar upgrades as a foundation stone for a digital transformation that will improve plant safety, reliability, and operational performance while lowering plant total cost of ownership. As a result of the combined effort of Exelon Generation and research participants, Conceptual Design Phase activities for the subject upgrade at LGS were approved by Exelon. Further, the U.S. Department of Energy also awarded a $50 million cost share award to Exelon in order to pave the way for SR I&C modernization and associated control room upgrades across the U.S. nuclear fleet. Additional research reports are planned for the Conceptual Design Phase, Detailed Design Phase, and the Implementation Phase of the LGS project to document the process followed and promulgate lessons learned to industry.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Safety-Related Instrumentation and Control Upgrade Pilot Project: NUREG- 0711 Process Development, Planning and Analysis Activities, and Lessons Learned

Constellation Energy and the United States Department of Energy (DOE) have established a public/private partnership to implement a pilot digital upgrade to replace legacy analog, safety-related reactor protection and emergency safety feature actuation systems (RPS/ESFAS) with modern digital systems. This effort is occurring at Constellation’s Limerick Generating Station. This project is being performed in accordance with industry processes that have been adapted to better support digital upgrades. These processes include IP-ENG-001, Standard Design Process, NISP-EN-04, Standard Digital Engineering Process and Electric Power Research Institute Report 3002011816, Digital Engineering Guide. The Light Water Reactor Sustainability (LWRS) Program at the Idaho National Laboratory (INL) has been supporting this effort. Latest INL HFE efforts in support of this project have focused on definition and implementation of the Human Factors Engineering (HFE) Program in support of Constellation design and related licensing efforts. This paper presents the development execution of the HFE Program through completion of the Planning and Analysis Phase as defined by NUREG-0711 as well as HFE lessons learned.

99 GENERAL AND MISCELLANEOUS↗

CyTRICS Impact-Based Prioritization Process

Cyber Testing for Resilient Industrial Control Systems™ (CyTRICS™) is the Department of Energy’s (DOE’s) program for cybersecurity vulnerability testing, digital subcomponent enumeration, and forensic assessment. CyTRICS leverages best-in-class test facilities and analytic capabilities at six DOE National Laboratories and strategic partnerships with key stakeholders including technology developers, manufacturers, asset owners and operators, and interagency partners. During the program’s development, CyTRICS established a unique methodology for prioritizing digital components within operational technology (OT) and industrial control systems (ICS) in the Energy Sector Industrial Base (ESIB) for cyber vulnerability testing. The CyTRICS prioritization process leverages multiple characteristics of systems, components, and their contextual deployment to calculate a quantification of individual digital components for CyTRICS testing. The initial version of the CyTRICS prioritization process was premised largely upon the impact which could result to an energy sector industrial control system if the digital component under testing was compromised, either through malicious means, faulty engineering, or other modes. CyTRICS has termed this process the “CyTRICS Impact-based Prioritization Process.” This paper describes the factors identified for use in the Impact-based Prioritization process and identifies the rationale for inclusion. During development, three National Laboratories piloted this prioritization process and generated prioritization scores for seven systems. Following the piloting of the process, laboratory subject matter experts (SME) validated that the numerical scores generated by the prioritization process were consistent with their knowledge of the impact that may occur should any of these systems be disrupted. The following document explains how to perform the prioritization process to generate prioritization scores for energy sector systems. After outlining assumptions required to conduct the process, it describes how to identify and elicit data which can be leveraged to evaluate a system and assign numerical values for each factor. The prioritization process uses different weights on different factors; rationale for each weight is included within the paper. Additionally, the paper includes some recommendations for future enhancements to prioritization, including lessons learned from developing and piloting the process. Finally, a comprehensive appendix includes example documents to be leveraged by those looking to execute the prioritization process.

99 GENERAL AND MISCELLANEOUS↗

Adaptively Learned Modeling for a Digital Twin of Hydropower Turbines with Application to a Pilot Testing System

In the development of a digital twin (DT) for hydropower turbines, dynamic modeling of the system (e.g., penstock, turbine, speed control) is crucial, along with all the necessary data interface, virtualization, and dashboard designs. Since the DT must mimic the actual dynamics of the hydropower turbine accurately, adaptive learning is required to train these dynamic models online so that the models in the DT can effectively follow the representation of the actual hydropower turbine dynamics accurately and reliably. This study presents an adaptive learning method for obtaining the hydropower turbine models for DT development of hydropower systems using the recursive least squares algorithm. To simplify the formulation, the hydropower turbine under consideration was assumed to operate near a fixed operating point, where the system dynamics can be well represented by a set of linear differential equations with constant parameters. In this context, the well-known six-coefficient model for the Francis turbine was formulated as the starting point to obtain input and output models for the turbine. Then, an adaptive learning mechanism was developed to learn model parameters using real-time data from a hydropower turbine testing system. This led to semi-physical modeling, in which first principles and data-driven modeling are integrated to produce dynamic models for DT development. Applications to a pilot system at the Norwegian University of Science and Technology (NTNU) were made, and the models learned adaptively using the data collected from the university’s pilot system. Desired modeling and validation results were obtained.

13 HYDRO ENERGY↗

Demonstration of and future perspective on scaling ultrafast-laser-ablation microstructuring of Li-ion battery electrodes to roll-to-roll production and large-format cells

This work demonstrates integration of an ultrafast laser onto a roll-to-roll machine, the laser structuring of a double-sided, 700 m long roll of graphite battery anode and its subsequent manufacture into 27 Ah prismatic cells. The electrode was ablated with a novel hybrid-microstructure composed of both hexagonally arranged pores for enhanced rate performance and channels for fast electrolyte wetting. Subsequently, this anode and a non-ablated baseline anode are paired with an NMC111 cathode for cell building and electrochemical characterization. Compared to the baseline, laser ablated cells demonstrated a reduction in soaking time of at least 60%, an improvement in fast charge capability with >30% more capacity accepted during 6C charging, and an extension of cycle life of >40% during 0.5C cycling. Further, a perspective is provided on scaling ultrafast laser ablation of battery electrodes to industrial throughputs. Additionally, lessons learned from this pilot-scale demonstration are provided in regards to optical architecture, debris removal, and system control. A techno-economic analysis is used to demonstrate that laser ablation can be integrated into existing electrode manufacturing facilities with only ≈$\$$1.3 per kWh increase (≈2%) in manufacturing cost. Preemptive electrode design for laser ablation is discussed as a further method for enhancing performance. Finally, an analysis of available laser systems and beam-scanning architectures is used to determine design requirements to scale process throughput to a state-of-the-art speed of 50 m min −1 . This analysis demonstrates that laser ablating Li-ion battery electrodes has multiple benefits to manufacturing and battery performance, that the technology already exists to achieve high laser-ablation throughputs, and that integrating ultrafast laser ablation to electrode manufacturing will not create a cost or processing bottleneck.

25 ENERGY STORAGE↗

Ensemble Simulations on Leadership Computing Systems

Scientific productivity can be enhanced through workflow management tools, relieving large High Performance Computing (HPC) system users from the tedious tasks of scheduling and designing the complex computational execution of scientific applications. This paper presents a study on the usage of ensemble workflow tools to accelerate science using the Summit and Frontier supercomputing systems. The research aims to connect science domain simulations using Oak Ridge Leadership Computing Facility (OLCF) supercomputing platforms with ensemble workflow methods in order to accelerate HPC-enabled discovery and boost scientific impact. We present the coupling, porting and optimization of Radical-Cybertools on three applications: Chroma, NAMD and LAMMPS. The tools augment traditional HPC monolithic runs with a pilot scheduler. Lessons-learned are discussed for physics, biology and materials science applications. We discuss intrinsic limitations of coupling and porting ensemble workflow tools to applications that run on large HPC systems. The origins of technical challenges and their solutions developed during the implementation process are discussed. Data management strategies, OLCF’s policies for ensembles, and natively supported workflow tools are also summarized.

Georgiadou, Antigoni [ORNL] (ORCID:000000020977631↗

2022 Bull E-Bike Pilot Program Study

In 2022, the City of Durham conducted an e-bike pilot program study to learn more about how electric bikes (e-bikes) could improve the transportation experience in the "Bull City" (a.k.a., Durham, North Carolina). The study used pedal-assist e-bikes, which feature an electric motor and battery to help power the bike. The motor amplifies the power behind each pedal stroke, augmenting the energy you put into the bike. #### Data Collection Agency The City of Durham's Transportation Department conducted the study. #### Survey Methodology Program participants used electric-assist e-bikes for at least 4 weeks between August and November 2022 in exchange for sharing information about their experiences, including tracking their travel via a smartphone app. In addition to the e-bike, participants received maintenance support along with a helmet, bike lock, and other accessories. Data collection was enabled by the [NLR OpenPATH platform](https://www.nlr.gov/transportation/openpath.html). #### Survey Records and Data Survey records include a total of 76 participants. The dataset contains 3 months of partially automated travel diaries, combining sensed and surveyed travel behavior data—patterns of multimodal, end-to-end, individual human mobility—as well as demographic and socioeconomic information from participants. The number of total trips was 6,488, the number of e-bike trips was 2,183, and the number of e-bike miles traveled was 5,450.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

AI-Driven Smart Community Control for Accelerating PV Adoption and Enhancing Grid Resilience

The U.S. Department of Energy (DOE) has launched a Connected Communities program that supports projects that expand DOE's network of grid-interactive, efficient building communities nationwide. As an early pilot of Connected Communities, the National Renewable Energy Laboratory (NREL) and its partners have developed and demonstrated a community-scale, hierarchical control solution to address the potential grid issues arising from high penetration of solar photovoltaics (PV) as well as to improve grid reliability and resilience in this residential community. A field pilot study has been performed at an affordable housing development called the Basalt Vista Community, which was built for school teachers and other professionals in the local workforce and represents an autonomous energy grid with all-electric, energy-efficient homes. With no natural gas line in the community, this is the first all-electric net-zero community in rural Colorado. In the field pilot study, NREL has validated the performance of the hierarchical control solution, which consists of NREL's foresee home energy management systems (HEMS) and community aggregators, in increasing demand flexibility and self-consuming PV, reducing potential over-voltages, and supporting critical loads during emergency events. In this presentation, we will present the methodology, simulation and field pilot results, and lessons learned from the project.

all-electric community↗

Full-Scale Development and Piloting of a Hybrid Digital Twin for Wastewater Operations Optimization

This full-scale pilot of a machine learning based nutrient controller/digital twin is being done as part of The Water Research Foundation (WRF) project 5121: Development of Innovative Predictive Control Strategies for Nutrient Removal. The overall goal of this project is to develop and full-scale test a hybrid (machine learning + mechanistic model) nutrient management controller at four different water resource recovery facilities (WRRFs). The controller demonstrates both short-term optimization functions and predictive capabilities. This project includes the design of the controller, its performance at the WRRFs, and a description of the future improvements.

Johnson, Bruce↗

First Ever Polymer Flood Field Pilot to Enhance the Recovery of Heavy Oils on Alaska North Slope – Producer Responses and Operational Lessons Learned

The US Department of Energy and Hilcorp Alaska, LLC are jointly cosponsoring a field pilot project entitled “First Ever Field Pilot on Alaska’s North Slope to Validate the Use of Polymer Floods for Heavy Oil Enhanced Oil Recovery (EOR).” The objective of this pilot is to perform a field experiment to validate the use of an advanced polymer flooding technology to unlock the vast heavy oil resources on Alaska North Slope (ANS). Two pairs of horizontal injection and production wells have been deployed in an isolated fault block of the Schrader Bluff heavy oil reservoir at the Milne Point Field to conduct a polymer flood pilot which was designed to acquire field performance data to optimize polymer flood design in the Schrader Bluff heavy oil reservoirs on ANS. Hydrolyzed polyacrylamide (HPAM) polymer injection started on August 28, 2018 using a custom made polymer mixing and pumping unit. Polymer solution properties such as concentration, viscosity, and filter ratio, have been closely monitored and adjusted as necessary. Operational procedures have been improved to ensure adequate injectivity and polymer propagation through the formation. Oil and water production is tested frequently to monitor water cut performance, and produced water is sampled and analyzed for polymer content. Tracers were pumped pre and post polymer injection startup to compare polymer flood breakthrough timing and sweep efficiency. Polymer injectivity of the horizontal wells drilled in the Schrader Bluff NB sand is found to be sufficient to replace the reservoir production voidage although there were some declines as high viscosity polymer swept the near wellbore region. Production data show significant reduction in water cut and the oil production rate has stabilized. No polymer production has been confirmed from the two horizontal producers after 22 months of polymer injection into the two supporting horizontal injectors. Tracer data show very low sweep efficiencies with waterflood alone, whereas significant improvement has been achieved with polymer flood. Many operational lessons have been learned and improvements have been made regarding polymer mixing, pumping, and onsite quality control, particularly in a challenging Arctic environment. Adequate polymer injection rate can be achieved with diligent monitoring and quality assurance of the properties of the injected polymer solution.

Ning, Samson↗

Design of Experiments for Dynamic Test Runs in Solvent-Based CO 2 Capture Pilot Plants

Test runs in the pilot plants consume significant resources, and therefore, the learning from test runs should be maximized. Test runs conducted in the pilot plants are often steady state. It takes several hours for reaching steady-state in the pilot plants, and thus, the duration of the test runs needs to be long even for collecting few steady-state data points. On the other hand, a large number of measurements can be collected through dynamic test runs in a short span of time. This paper presents a systematic design of dynamic experiments (DoDEs) for identifiability of model parameters, which is achieved by persistently exciting the inputs signals. A pseudorandom binary sequence (PRBS) is designed as the input signal for DoDE due to its efficiency in obtaining sufficient spectral content. However, due to the long sequence size of the PRBS signal, a Schroeder-phase input signal, which is a multisine signal, is also designed. Tests for both types of signals are run in the Pilot Solvent Test Unit (PSTU) at the National Carbon Capture Center in Wilsonville, Alabama. The transient data are used to solve dynamic data reconciliation and parameter estimation problem. The estimated parameters are found to be not only superior to those estimated from using data collected from hundreds of steady-state test runs in a nonreactive (air–water) system, but the parameters could be estimated by using the dynamic data collected for about 24 h from the pilot plant for the MEA-H 2 O–CO 2 system.

CO2 capture↗