Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “packer”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

A Review on Geothermal Energy and HPHT Packers for Geothermal Applications

Energy is an essential component for prosperity, economic growth, and development and has become a basic necessity for humans, but at the same time, it has an impact on the environment. Therefore, it is believed that, in the coming future, renewable energy will play an important part in fulfilling the energy demand. In that respect, geothermal energy will be vital as it is a continuous source of energy that is not affected by metrological conditions and can be used in power generation or domestic heating. Many countries around the globe are actively producing energy from geothermal resources. However, the extraction of the heat from the subsurface comes with challenges such as subsurface environment, wellbore instability, corrosion, loss of circulation, and cementing operation. However, one of the most challenging and critical tasks is the zonal isolation of the geothermal well. A packer is a tool that is used for the zonal isolation of a well, and at high pressure and high temperature (HPHT) conditions, which is common for geothermal wells. Most of the components of packers fail, causing well integrity issues. This paper gives a review of the forces acting on packers, testing standards, problems encountered by a packer in the HPHT subsurface environment, and designs to overcome those problems.

15 GEOTHERMAL ENERGY↗

Origin of the patchy emission pattern at the ZERT CO2 Release Test

A numerical experiment was carried out to test whether the patchy CO{sub 2} emission patterns observed at the ZERT release facility are caused by the presence of packers that divide the horizontal injection well into six CO2-injection zones. A three-dimensional model of the horizontal well and cobble-soil system was developed and simulations using TOUGH2/EOS7CA were carried out. Simulation results show patchy emissions for the seven-packer (six-injection-zone) configuration of the field test. Numerical experiments were then conducted for the cases of 24 packers (23 injection zones) and an effectively infinite number of packers. The time to surface breakthrough and the number of patches increased as the number of packers increased suggesting that packers and associated along pipe flow are the origin of the patchy emissions. In addition, it was observed that early breakthrough occurs at locations where the horizontal well pipe is shallow and installed mostly in soil rather than the deeper cobble. In the cases where the pipe is installed at shallow depths and directly in the soil, higher pipe gas saturations occur than where the pipe is installed slightly deeper in the cobble. It is believed this is an effect mostly relevant to the model rather than the field system and arises through the influence of capillarity, permeability, and pipe elevation of the soil compared to the cobble adjacent to the pipe.

54 ENVIRONMENTAL SCIENCES↗

Developing a Prototype Methodology to Rank CO2-EOR Wells and Assess Their Reuse Potential for Geologic Carbon Storage

This paper presents a prototype methodology to assess the possible transition of Class II carbon dioxide-enhanced oil recovery (CO2-EOR) wells to Class VI wells. The focus is on wellbore construction materials—casing, cement, tubing, and the packer—and includes comprehensive workflows to evaluate these materials, with primary emphasis on compliance with Environmental Protection Agency (EPA) Class VI well construction and conversion guidelines. These workflows systematically assess material properties and performance criteria to ensure regulatory compliance and optimize long-term wellbore integrity and functionality. Utilizing Python scripts and JavaScript Object Notation (JSON) representations, the study automates checks on digitized Texas Railroad Commission (TRRC) data to rank wells based on workflow criteria. By emphasizing critical factors such as casing integrity, cementing techniques, tubing compatibility, and packer selection, the methodology helps well owners and operators prioritize wells for potential reuse as CO2 injection wells. Given limitations in digitized data, manual user verification is required in some sections. Future improvements include integrating non-digitized data through web scraping and machine learning techniques. This research serves as a practical guide for stakeholders, supporting environmental compliance and sustainable well operations.

geologic carbon sequestration↗

Completion Design Considerations for a Horizontal Enhanced Geothermal System

The petroleum industry has had considerable success in recent decades in developing unconventional shale plays using horizontal drilling and multi-zonal isolation and stimulation techniques to fracture tight formations to enable the commercial production of oil and gas. Similar well completions could be used in Enhanced Geothermal Systems (EGS) to create multiple fractures from horizontal wells. This study assesses whether well completion techniques used in the unconventional shale industry to create multi-stage fractures can be applied to an enhanced geothermal system, with a focus on the completion of the EGS injection well. This study assumes an Enhanced Geothermal System (EGS) consisting of a central horizontal injection well flanked on each side by horizontal production wells, connected to the injection well by multiple fractures. The focus is on the design and completion of the horizontal well. For the purpose of developing design criteria, a reservoir temperature of 200 degrees C (392 degrees F) and an injection well flow rate of 87,000 barrels per day (160 kg/s), corresponding to production well flow rates of 43,500 barrels per day (80 kg/s) is assumed. The analysis found that 9-5/8 inches 53.5 pounds per foot (ppf) P110 casing string with premium connections meets all design criteria for the horizontal section of injection well. A P110 grade is fairly common and is often used in horizontal sections of shale development wells in petroleum operations. Next, several zonal isolation systems commonly used in the shale gas industry were evaluated. Three techniques were evaluated -- a 'plug and perf' design, a 'sand and perf' design, and a 'packer and port' design. A plug and perf system utilizes a cemented casing throughout the length of the injector wellbore. The sand and perf system is identical to the plug and perf system, but replaces packers with sand placed in the casing after stimulation to screen out the stimulated perforated zones and provide zonal isolation. The packer and port completion approach utilizes an open horizontal hole that zonally isolates areas through the use of external packers and a liner. A review of technologies used in these systems was performed to determine if commercially available equipment from the petroleum industry could be used at the temperatures, pressures, and sizes encountered in geothermal settings. The study found no major technical barriers to employing shale gas multi-zonal completion techniques in a horizontal well in a geothermal setting for EGS development. For all techniques considered, temperature limitations of equipment are a concern. Commercially available equipment designed to operate at the high temperatures encountered in geothermal systems are available, but is generally unproven for geothermal applications. Based on the study, further evaluation of adapting oil and gas completion techniques to EGS is warranted.

15 GEOTHERMAL ENERGY↗

Evaluation of known-boundary and resistivity constraints for improving cross-borehole DC electrical resistivity imaging of discrete fractures

There is a need to better characterize discrete fractures in contaminated hard rock aquifers to determine the fate of remediation injections away from boreholes and also to evaluate hydraulic fracturing performance. A synthetic cross borehole electrical resistivity study was conducted assuming a discrete fracture model of an existing contaminated site with known fracture locations. Four boreholes and two discrete fracture zones, assumed to be the dominant electrical and hydraulically conductive pathways, were explicitly modeled within an unstructured tetrahedral mesh. We first evaluated different regularization constraints starting with an uninformed smoothness-constrained inversion, to which a priori information was incrementally added. We found major improvements when (1) smoothness regularization constraints were relaxed (or disconnected) along boreholes and fractures, (2) a homogeneous conductivity was assumed along boreholes, and (3) borehole conductivity constraints that could be determined from a specific conductance log were applied. We also evaluated the effect of including borehole packers on fracture zone model recovery. We found the fracture zone conductivities with the inclusion of packers were comparable to similar trials excluding the use of packers regardless of electrical potential changes. The misplacement of fracture regularization disconnects (FRDs) can easily be misinterpreted as actual fracture locations. Conductivities within these misplaced disconnects were near the starting model value and removing smoothing between boreholes and assumed fracture locations helped in identifying incorrectly located FRDs. Analysis confirmed improved model sensitivity when regularization disconnects were (1) applied along the boreholes and fracture zones, and (2) FRDs were placed where actual fractures existed. Our findings demonstrate that structural constraints used after careful evaluation of a priori information are critical to improve imaging of fracture electrical conductivities, locations and orientations.

geophysics, inversion, resistivity, fracture, cont↗

EGS Collab - Hydraulic Fracturing Test Measurements on the 4100L of SURF

This package includes data from two days of testing at the Sanford Underground Research Facility (SURF) on the 4100 level. The tests were performed in borehole TV4100 in the battery charging alcove south of the Yates shaft. TV4100 is a vertical borehole ~50 meters deep. A series of hydraulic fracture (mini-frac) and reopening tests were conducted at various depths to investigate the magnitude and direction of the minimum principal stress in that area of the mine. Apparent features of the pressure time/pressure injected volume curves are the onset of fracture, peak pressure, and the initial shut in pressure (ISIP). The raw data files include a Readme with the day, time, and location of each file. The files are organized into 9 columns: time (sec), flow meter (V), Pressure of Return (V), Pressure of Packer (V), Pressure of Injection (V), flow (gpm), Pressure of Return (psi), Pressure of Packer (psi), Pressure of Injection (psi). The shift reports are a short log of how the tests were run in the two-day period. An American Geophysical Union (AGU) 2019 presentation by Ingraham et al. is shown to provide visualization/interpretation of the data. The columns which report voltage (V) show the unscaled voltage value from the transducer, which was recorded in case pressure values needed to be rescaled due to incorrect calibration factors. This was not necessary. Results reported in the AGU poster were filtered with a moving average to remove pump noise before presentation. Note that the logging and impression packer results are included in separate datasets managed by Lawrence Berkeley Laboratory.

15 GEOTHERMAL ENERGY↗

High Temperature, High Pressure Devices for Zonal Isolation in Geothermal Wells

The U.S. Department of Energy is leading the development of alternative energy sources that will ensure the long-term energy independence of our nation. One key renewable resource being advanced is geothermal energy which offers an environmentally benign, reliable source of energy for the nation. To utilize this resource, water will be introduced into wells 3 to 10 km deep to create a geothermal reservoir. This approach is known as an Enhanced Geothermal System (EGS). The high temperatures and pressures at these depths have become a limiting factor in the development of this energy source. For example, reliable zonal isolation for high-temperature applications at high differential pressures is needed to conduct mini-fracs and other stress state diagnostics. Zonal isolation is essential for many EGS reservoir development activities. To date, the capability has not been sufficiently demonstrated to isolate sections of the wellbore to: 1) enable stimulation; and 2) seal off unwanted flow regions in unknown EGS completion schemes and high-temperature (>200°C) environments. In addition, packers and other zonal isolation tools are required to eliminate fluid loss, to help identify and mitigate short circuiting of flow from injectors to producers, and to target individual fractures or fracture networks for testing and validating reservoir models. General-purpose open-hole packers do not exist for geothermal environments, with the primary barrier being the poor stability of elastomeric seals at high temperature above 175°C. Experimental packer systems have been developed for geothermal environments but they currently only operate at low pressure, they are not retrievable, and they are not commercially available. The development of the high-temperature, high-pressure (HTHP) zonal isolation device would provide the geothermal community with the capability to conduct mini-fracs, eliminate fluid loss, to help identify and mitigate short circuiting of flow from injectors to producers, and to target individual fractures or fracture networks for testing and validating reservoir models. The goal of this program, therefore, was to develop and demonstrate reliable high-temperature high-pressure zonal isolation devices that are compatible with the high-temperature downhole environment anticipated for Enhanced Geothermal Systems. Over the course of this 3 year program, CTD designed and demonstrated a high temperature high pressure zonal isolation device. CTD has utilized its expertise in high-temperature materials, shape memory composites and foams, and deployment mechanisms for spacecraft and oil tools to develop a new class of HTHP zonal isolation devices for use in EGS. Specifically, the objective was to demonstrate the ability to isolate sections of an EGS wellbore to: 1) enable stimulation; and 2) seal off unwanted flow regions in unknown EGS completion schemes and high-temperature (>200°C) environments at temperatures upwards of 300°C. A concept for a high-temperature, high-pressure zonal isolation device was designed for use in creating circulation paths in environments where temperatures are in excess of 300°C and differential pressures of up to 10,000 psi are required to stimulate solid granite. This new zonal isolation device distributes the high-pressure differential through a significant length of high temperature, shape memory polymer composite material. The development of differential pressure is initiated by a thermally triggered actuation of a ‘structural seal’ that fills the cross section of the bore with the shape memory material. After this preliminary seal is made, differential pressure begins to build through the material as the seal forces the flow to pass through pores in the shape memory material. The shape memory material is compressed into place to react the force of the internal

58 GEOSCIENCES↗

Basic Data Report for Well Plugging and Abandonment and Reconfiguration Activities for Fiscal Year 2005 (Rev. 1)

The Waste Isolation Pilot Plant (WIPP) is a U.S. Department of Energy (DOE) facility disposing of transuranic and mixed waste under a permit issued by the New Mexico Environment Department (NMED). WIPP is located 26 miles east of Carlsbad, New Mexico, in eastern Eddy County (Figure 1). Disposal panels are mined in the Permian Salado Formation at a depth of about 2,150 feet below ground surface (bgs). Over the years a number of groundwater monitor wells have been installed for site characterization and to monitor temporal and spatial changes in groundwater elevation and chemistry at WIPP. Many of the wells in the fiscal year (FY) 2005 program were selected for plugging and abandonment (P&A) due to redundancy. In other words, the well pads have multiple wells that monitor the Culebra ("Culebra") Member of the Rustler Formation when only one is necessary. These multi-well locations are a relic of various aquifer testing programs associated with the site characterization of WIPP. Additionally, the multi-well locations had wells that were completed in both the Culebra and the Magenta ("Magenta") Members of the Rustler Formation for dual monitoring of these intervals. The intervals were separated by inflatable packers used as bridge plugs, and over the years these packers have aged and their integrity compromised. For these wells, the packers were removed and the wells were converted to Magenta-only monitor wells. The FY 2005 program was initiated on March 31, 2005, and concluded on July 16, 2005. The FY 2005 program initially included 25 wells requiring workover (P&A, Magenta reconfiguration, cleaning and keeping). During the process, the U.S. Bureau of Land Management (BLM) requested transfer of two wells (H-7c and H-8c) to their ownership for future livestock watering. These wells were transferred to the BLM through execution of Form wr-03, Declaration of Owner of Underground Water Rights, between the New Mexico Office of the State Engineer (NMOSE), the BLM, and the DOE Carlsbad Field Office (CBFO). One well (H-2b2) was cleaned and retained as a Culebra monitor well for continued use. One well (H-3d) was converted to a shallow well to monitor the formational contact between the Dewey Lake Redbeds Formation and the Santa Rosa Formation in support of the DP-831 discharge permit monitoring program. Nine dual-completion wells were reconfigured as Magenta-only monitor wells, and 12 wells were plugged and abandoned permanently. This report presents the summary in the same order that the wells were worked in the field.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Establishing a silica gel zone in well annulus and evaluating its performance in blocking vertical water flow

Wells are often constructed for monitoring purposes with relatively long screen lengths (e.g., >10 m). Vertical water flows can occur within the artificial or natural filterpack annulus that surrounds the screened interval, bypassing packer assemblies installed inside the wellbore. Attempts to isolate discrete vertical zones during groundwater sampling are unsuccessful when annular flow occurs and lead to remedy decisions based on biased or incorrect interpretations. Blocking vertical annular water flow and contaminant transport will help obtain more accurate concentrations of contaminants from sampling in targeted depth intervals. The application of silica gels formed from the injected colloidal silica CS suspensions is a novel approach to minimize or prevent movement of vertical movement of groundwater in the surrounding filterpack annulus. In this work, we tested the feasibility of injecting CS suspensions to target locations and developed a modified CS formulation that is injectable and prevents gravity sinking. We studied the distribution and penetration of silica gel at laboratory scale in mock well annulus with surrounding formations. We evaluated the performance of the silica gel in blocking vertical water flow in the annulus and in minimizing chemical transport through the gel zone. CS suspension formulations have been defined that are ready for injection, stay in target locations, and form gel within desired time frames. Injection of CS suspensions achieved uniform distribution in a well annulus filter pack, fully occupied the annulus pore space, and penetrated the formation surrounding the filter packer with a sufficient distance to create a hydraulic annular seal when the injection was applied at a sufficient rate. The depth of penetration into the formation was dependent on the permeability contrast between the filter pack and the surrounding formation. Silica gel that formed in the annulus blocked vertical water flow and stopped the chemical transport through the gel zone. In conclusion, this research reveals that using CS suspension injection and sequential gelation (CS-GEL) is a promising technology for blocking vertical water flow and chemical transport through the filter pack in targeted zones within the annulus of long-screened well systems.

Colloidal silica suspension↗

Permeability scaling relationships of volcanic tuff from core to field scale measurements

A recent chemical explosive test in P-Tunnel at the Nevada National Security Site, Nevada, USA, was conducted to better understand how signals propagate from explosions in the subsurface. A primary signal of interest is the migration of gases that can be used to differentiate chemical from nuclear explosions. Gas migration is highly dependent on the rock permeability which is notoriously difficult to determine experimentally in the field due to a potentially large dependence on the scale over which measurements are made. Here, we present pre-explosion permeability estimates to characterize the geologic units surrounding the recent test. Permeability measurements were made at three scales of increasing size: core samples (≈2 cm), borehole packer system tests (≈1 m), and a pre-shot cavity pressurization test (> 10 m) across ten tuff units. Permeability estimates based on core measurements showed little difference from borehole packer tests. However, permeability in most rock units calibrated from cavity pressurization tests resulted in higher permeability estimates by up to two orders of magnitude. Here, we demonstrate that the scale of the measurement significantly impacts the characterization efforts of hydraulic properties in volcanic tuff, and that local-scale measurements (< 10 m scale) do not incorporate enough heterogeneity to accurately predict field-scale flow and mass transport.

Environmental sciences↗

Project Plan: Salt in Situ Heater Test.

This project plan gives a high-level description of the US Department of Energy Office of Nuclear Energy (DOE-NE) Spent Fuel and Waste Disposition (SFWD) campaign in situ borehole heater test project being planned for the Waste Isolation Pilot Plant (WIPP) site This plan provides an overview of the schedule and responsibilities of the parties involved. This project is a collaborative effort by Sandia, Los Alamos, and Lawrence Berkeley National Laboratories to execute a series of small-diameter borehole heater tests in salt for the DOE-NE SFWD campaign. Design of a heater test in salt at WIPP has evolved over several years. The current design was completed in fiscal year 2017 (FY17), an equipment shakedown experiment is underway in April FY18, and the test implementation will begin in summer of FY18. The project comprises a suite of modular tests, which consist of a group of nearby boreholes in the wall of drifts at WIPP. Each test is centered around a packer-isolated heated borehole (5" diameter) containing equipment for water-vapor collection and brine sampling, surrounded by smaller-diameter (2" diameter) satellite observation boreholes. Observation boreholes will contain temperature sensors, tracer release points, electrical resistivity tomography (ERT) sensors, fiber optic sensing, and acoustic emission (AE) measurements, and sonic velocity sources and sensors. These satellite boreholes will also be used for plugging/sealing tests. The first two tests to be implemented will have the packer-isolated borehole heated to 120°C, with one observation borehole used to monitor changes. Follow-on tests will be designed using information gathered from the first two tests, will be conducted at other temperatures, will use multiple observation boreholes, and may include other measurement types and test designs.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Hydraulic Testing of the Lost Lake Aquifer Near Recovery Well RWM 8

Groundwater beneath the M-Area HWMF is contaminated with chlorinated ethenes including trichloroethylene (TCE) and tetrachloroethylene (PCE). SRS operates a network of recovery wells designed to hydraulically contain and capture the high concentration VOC plume in the Lost Lake Aquifer Zone (LLAZ) (Figure 1). The recovery wells are connected to the M-1 Air Stripper and the system is permitted by the South Carolina Department of Environmental Control (SCDHEC) to operate at a total flow of 610 gpm. RWM 8, which is one of ten operational recovery wells, has historically operated at a flow rate of approximately 40 gpm. RWM 8 was installed with four separate 10-ft screens that spanned the LLAZ with a continuous gravel pack spaced as shown in Figure 2. The three uppermost screens are located within the LLAZ whereas the deepest screen is located within the middle sand of the Crouch Branch Confining Unit (CBCU). Area Closure Projects (ACP) installed a permanent packer in May 2019 to isolate the lowest screen from the pump with the goal being to target the zone of highest concentration in the LLAZ. ACP expressed concern that a substantial portion of the flow from RWM 8 comes from the lower screen. With this screen isolated from service, flow from the well may be below the desired operational envelope for the well. The reconfiguration of RWM 8 presented an opportunity to re-evaluate the performance characteristics of the well. Following placement of the packer and relocation of the pump, the well was redeveloped. To assess the effects of eliminating the lower screen, a step-drawdown test was planned. The purpose of this test was to establish new baseline well performance properties including specific capacity, well efficiency, and well loss coefficients. Data from the step-drawdown testing was also used to estimate a maximum pumping rate for RWM 8 under the new configuration. The setup for the step-drawdown test facilitated a subsequent constant rate aquifer pumping test aimed at determining aquifer hydraulic properties. Properties estimated for the LLAZ included transmissivity and storativity. Following shutdown of RWM 8, recovery data were also collected and analyzed to estimate aquifer properties. This report discusses the hydrologic tests conducted following the reconfiguration of RWM 8. The information provided in this report may serve as input to subsequent updates to the groundwater flow and contaminant transport model for A/M Area.

42 ENGINEERING↗

Project Plan: Salt in Situ Heater Test

This project plan gives a high-level description of the US Department of Energy Office of Nuclear Energy (DOE-NE) Spent Fuel and Waste Disposition (SFWD) campaign in situ borehole heater test project planned for the Waste Isolation Pilot Plant (WIPP) site, titled the Brine Availability Test in Salt (BATS). BATS is the first stage in a planned sequence of tests to bolster the technical basis for disposal of heat generating waste in salt. This plan provides an overview of the schedule and responsibilities of the parties involved. This project is a collaborative effort by Sandia, Los Alamos, and Lawrence Berkeley National Laboratories to execute a series of small-diameter borehole heater tests in salt for the DOE-NE SFWD campaign. Design of a heater test in salt at WIPP has evolved over several years. The experiment has begun in January 2020 and the first phase will continue for several months with the possibility for follow on testing. BATS comprises a suite of modular tests, which consist of a group of adjacent horizontal boreholes in the wall of drifts at WIPP. Each test is centered around a packer-isolated heated borehole (12.2 cm [4.81 diameter) containing equipment for water-vapor collection and borehole closure monitoring, surrounded by smaller-diameter (up to 5.3 cm [2.11 diameter) satellite observation boreholes. Observation boreholes contain grouted-in temperature sensors, electrical resistivity tomography (ERT) sensors, and fiber optics; packer-isolated tracer release and sampling intervals; and acoustic emission (AE) piezoelectric sensors. A larger-diameter (12.2 cm [4.81) satellite borehole includes sorel and salt cement plugs, as part of an engineered barrier sealing test. The first two tests, to be implemented in parallel, are heated (target borehole wall temperature of 120 °C) and unheated, with similar arrays of observation borehole monitoring changes. Follow-on tests will be designed using information gathered from the first two tests, and may be conducted at other borehole wall temperatures, use multiple observation boreholes, and may include different measurement types and test designs. This 2020 update of the original 2018 project plan satisfies DOE-NE Spent Fuel and Waste Science and Technology (SFWST) milestone M3SF-205N010303034, as part of the SNL "Salt Disposal R&D" work package.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

June 2022 Permeability Measurements in P-Tunnel, Nevada National Security Site

This document describes gas permeability measurements made in June 2022 in P-Tunnel at the Nevada National Security Site (NNSS). Four boreholes (AC-1, GI-5, GI-6, and HF-1) were tested with a dual packer system. The pressure versus flow rate data that were collected are analyzed using a numerical simulation method that captures compressible gas flow in partially saturated porous media using a close approximation to the geometry of the test setup. The first part of this document begins with data collection and a description of the packer assembly followed by details on data acquisition, measurement instrumentation, and equipment followed by a description of pre-test system verification. Next, the implementation of testing in the field is described, including how specific locations were chosen for testing. The second part of this document describes the numerical simulations used to back-out permeability from the pressure versus flow rate data. First, the numerical model is described, including assumptions. Next the details of the mesh that represents the experiment are described. A method for generating type curves in pressure versus flow rate space is presented and finally the data are mapped to permeability. We conclude with a discussion of the results.

54 ENVIRONMENTAL SCIENCES↗

Developing a Prototype Methodology to Rank CO2-EOR Wells and Assess Their Reuse Potential for Geologic Carbon Sequestration

This study presents a prototype methodology for evaluating the reuse potential of Class II CO₂-enhanced oil recovery (CO₂-EOR) wells as Class VI wells for geologic carbon sequestration. The approach focuses on assessing wellbore construction materials—casing, cement, tubing, and packers—based on U.S. Environmental Protection Agency (EPA) Class VI well conversion guidelines. Utilizing Python scripts and JSON representations, the methodology automates checks on digitized Texas Railroad Commission (TRRC) data to rank wells based on regulatory and integrity criteria. Key factors include casing integrity, cementing techniques, tubing compatibility, and packer selection. Due to limitations in digitized data, manual verification is required for certain sections. Future enhancements include incorporating non-digitized data via web scraping and machine learning. This research provides a practical framework for well owners and regulators, supporting informed decision-making for sustainable CO₂ storage.

carbon sequestration↗