Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “optimal start”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

An online replanning method using warm start optimization and aperture morphing for flattening-filter-free beams

Purpose: In a situation where a couch shift for patient positioning is not preferred or prohibited (e.g., MR-linac), segment aperture morphing (SAM) can address target dislocation and deformation. For IMRT/VMAT with flattening-filter-free (FFF) beams, however, SAM method would lead to an adverse translational dose effect due to the beam unflattening. Here the authors propose a new two-step process to address both the translational effect of FFF beams and the target deformation. Methods: The replanning method consists of an offline and an online step. The offline step is to create a series of preshifted-plans (PSPs) obtained by a so-called “warm start” optimization (starting optimization from the original plan, rather than from scratch) at a series of isocenter shifts. The PSPs all have the same number of segments with very similar shapes, since the warm start optimization only adjusts the MLC positions instead of regenerating them. In the online step, a new plan is obtained by picking the closest PSP or linearly interpolating the MLC positions and the monitor units of the closest PSPs for the shift determined from the image of the day. This two-step process is completely automated and almost instantaneous (no optimization or dose calculation needed). The previously developed SAM algorithm is then applied for daily deformation. The authors tested the method on sample prostate and pancreas cases. Results: The two-step interpolation method can account for the adverse dose effects from FFF beams, while SAM corrects for the target deformation. Plan interpolation method is effective in diminishing the unflat beam effect and may allow reducing the required number of PSPs. The whole process takes the same time as the previously reported SAM process (5–10 min). Conclusions: The new two-step method plus SAM can address both the translation effects of FFF beams and target deformation, and can be executed in full automation except the delineation of target contour required by the SAM process.

60 APPLIED LIFE SCIENCES↗

Implementation and validation of optimal start control strategy for air conditioners and heat pumps

Commercial buildings are responsible for approximately 20 % of the total energy consumption and greenhouse gas emissions in the United States. Over 85 % of these buildings lack building automation systems, and many are small (<50,000 square feet), underserved, and use rooftop units (RTUs) for heating, ventilation, and air-conditioning needs. Because these buildings lack proper energy management systems, several operational deficiencies lead to excess energy consumption. Studies have shown that managing the RTUs’ heating and cooling set points, schedules, setbacks, and optimal start can result in a 20 % to 25 % reduction in electricity consumption in small commercial buildings. These buildings typically use fixed schedules to start the RTUs 60 to 120 min before occupancy begins, which results in excess energy consumption. This paper presents research that demonstrates and evaluates the performance of four optimal start methods, which utilize data-based modeling as a key element in facilitating adaptive control in response to time-varying inputs while requiring minimal sensor inputs. The evaluation found energy savings in two commercial buildings equipped with RTUs by periodically alternating four different optimal start models during the cooling and heating season. The resulting energy savings are positive for all models and range from 2 to 5 kWh/day/unit. The units on the east side of the building showed higher savings, while interior units showed greater variability in savings due to the differences in capacities and room sizes. Savings were considerably greater during the heating season compared to the cooling season. The performance of all four models on Mondays was poor; models suggested a shorter optimal start time, which resulted in relatively larger errors. Finally, the future work will look at using a different model for the days after weekends and holidays.

42 ENGINEERING↗

Finding diverse ways to improve algebraic connectivity through multi-start optimization

The algebraic connectivity, also known as the Fiedler value, is a spectral measure of network connectivity that can be increased through edge addition. We present an algorithm for producing many diverse ways to add a fixed number of edges to a network to achieve a near optimal Fiedler value. Previous Fielder value optimization algorithms (i.e. the greedy algorithm) output only one solution. Obtaining a single solution is rarely good enough for real-world network redesign problems, as practical constraints (political, physical or financial) may prevent implementation. Our algorithm takes a multi-start optimization approach, adding a random initial edge and then applies a greedy heuristic to improve the Fiedler value. The random choice moves us to a new region of the search space, enabling discovery of diverse solutions. Additionally, we present a Determinantal Point Process framework for quantifying diversity. We then apply a Markov chain Monte Carlo technique to sift through the large number of output solutions and locate a smaller, more manageable collection of highly diverse solutions that can be presented to network redesign engineers. We demonstrate the effectiveness of our algorithm on real-world graphs with varied structures.

97 MATHEMATICS AND COMPUTING↗

SU-E-J-126: An Online Replanning Method for FFF Beams Without Couch Shift

Purpose: In a situation that couch shift for patient positioning is not preferred or prohibited (e.g., MR-Linac), segment aperture morphing (SAM) can address target dislocation and deformation. For IMRT/VMAT with flattening filter free (FFF) beams, however, SAM method would lead to an adverse translational dose effect due to the beam unflattening. Here we propose a new 2-step process to address both the translational effect of FFF beams and the target deformation. Methods: The replanning method consists of an offline and an online steps. The offline step is to create a series of pre-shifted plans (PSP) obtained by a so called “warm start” optimization (starting optimization from the original plan, rather from scratch) at a series of isocenter shifts with fixed distance (e.g. 2 cm, at x,y,z = 2,0,0 ; 2,2,0 ; 0,2,0; …;− 2,0,0). The PSPs all have the same number of segments with very similar shapes, since the warm-start optimization only adjusts the MLC positions instead of regenerating them. In the online step, a new plan is obtained by linearly interpolating the MLC positions and the monitor units of the closest PSPs for the shift determined from the image of the day. This two-step process is completely automated, and instantaneously fast (no optimization or dose calculation needed). The previously-developed SAM algorithm is then applied for daily deformation. We tested the method on sample prostate and pancreas cases. Results: The two-step interpolation method can account for the adverse dose effects from FFF beams, while SAM corrects for the target deformation. The whole process takes the same time as the previously reported SAM process (5–10 min). Conclusion: The new two-step method plus SAM can address both the translation effects of FFF beams and target deformation, and can be executed in full automation requiring no additional time from the SAM process. This research was supported by Elekta inc. (Crawley, UK)

60 APPLIED LIFE SCIENCES↗

A Model Predictive Control Based Generator Start-Up Optimization Strategy for Restoration With Microgrids as Black-Start Resources

Microgrids (MGs) can operate in an islanded mode and serve as black-start resources for power system restoration (PSR). Here, a model predictive control (MPC) based generator start-up optimization strategy for PSR is proposed utilizing MGs as black-start resources. First, the generator start-up sequence (GSUS) optimization is formulated as a mixed integer linear programming. Then, the uncertainties of MG black-start resources (MBSRs) are modeled by discretizing the probability distribution of the forecast errors, and representative scenarios for MBSRs extracted by formulating the probability mass transportation problem. Third, the generator start-up optimization strategy considering MBSRs is proposed utilizing the MPC technique, in which the optimization objective is to maximize the energy capability of the power systems and minimize the load curtailment of the MGs in each looking-ahead interval. Simulations on the IEEE 118 bus system with MGs and Zhejiang provincial power system in China verify that the introduced strategy for PSR can successfully restore the power system and effectively determine the optimal GSUS.

24 POWER TRANSMISSION AND DISTRIBUTION↗

ORNL_AISD_NiNb

This dataset describes the nickel-niobium solid solution binary alloy, where the two constituent elements nickel (Ni) and niobium (Nb) are randomly placed on an underlying crystal lattice. This dataset for nickel-niobium (Ni-Nb) alloys available includes the formation energy and bulk modulus for each crystal structure. Each atomic sample has a disordered phase which is obtained starting from an initial regular crystal structure of type body-centered cubic (BCC), face-centered cubic (FCC), or hexagonal compact packed (HCP). The geometry optimization ensures that all the alloy samples reached the equilibrium with negative formation energy. We perform geometry optimizations using the LAMMPS simulation package [1], a flexible simulation tool for particle-based materials modeling at the atomic, meso, and continuum scales. We utilized the embedded atom model (EAM) potential for Ni and Nb developed in a previous study [2]. The potential could describe behaviors of the liquid and solid phases of Ni-Nb alloy. The structural factors and angular distributions of three atoms are well-matched with X-ray and ab initio-based molecular dynamics data. We prepared the three different crystals with different initial lattice parameters (3.52 Ã… for FCC, 3.32 Ã… for BCC, and 3.5 Ã… for HCP). We performed energy minimization in two steps. Firstly, we minimized the structures with an isotropic unit cell to minimize the side effects from our arbitrary lattice parameters for all other compositions. Then, we applied geometry optimization with a triclinic (non-orthogonal) unit cell to fully minimize the stress components to calculate the elastic constants. In this procedure, we chose 10,000 as the maximum number of allowable steps aimed at obtaining fully relaxed atomic geometries. The dataset consists of three sets of crystal structures. The first set contains 46,086 irregular crystal structures, each of them with 54 atoms, obtained through optimization starting from a regular BCC crystal structure. The second set contains 24,543 irregular crystal structures, each of them with 32 atoms, obtained through optimization starting from a regular FCC crystal structure. The third set contains 39,303 irregular crystal structures, each of them with 48 atoms, obtained through optimization starting from a regular HCP crystal structure. The atomic configurations within each set span the possible compositional range. The three sets have been unified in a global dataset, which is extremely heterogeneous in terms of crystal structures, lattice volumes, and atomic configurations. Organization of files inside the dataset: the dataset contains three subdirectories called • BCC_opt • FCC_opt • HCP_opt based on the type of initial regular structure used to start the geometry optimization. Inside each of these folders, every atomic structure is identified by a string “A_B_Câ€, where A denotes the number of Nb in the system, B denotes index of structure with a given Nb number, and C denotes the total number of structures generated with a given Nb number. For each optimized crystal structure identified by the unique string of characters “A_B_Câ€, three files are provided: • A_B_C_opt.xyz: The optimized geometries in xyz format • A_B_C_opt.cfg: The optimized geometries in cfg format. It includes cell information and atomic energy, and forces calculated from LAMMPS. • A_B_C.elastic: Raw data of 21 elastic constants from LAMMPS output. • A_B_C.bulk: Calculated upper and lower bounds of bulk modulus and averaged one based on Voigt-Reuss-Hill approach from *.elastic. References: [1] A. P. Thompson, H. M. Aktulga, R. Berger, D. S. Bolintineanu, W. M. Brown, P. S. Crozier, P. J. in 't Veld, A. Kohlmeyer, S. G. Moore, T. D. Nguyen, R. Shan, M. J. Stevens, J. Tranchida, C. Trott, and S. J. Plimpton. LAMMPS - a flexible simulation tool for particle-based materials modeling at the atomic, meso, and continuum scales. Comp. Phys. Comm., 271:108171, 2022. [2] Y Zhang, R Ashcraft, MI Mendelev, CZ Wang, and KF Kelton. Experimental and molecular dynamics simulation study of structure of liquid and amorphous ni62nb38 alloy. The Journal of chemical physics, 145(20):204505, 2016.

36 MATERIALS SCIENCE↗

Optimal Power System Black start using Inverter-Based Generation

Power system black start readiness is part of the system planning. Utility planners perform periodic studies to assess if their power system is capable of total restoration following a black out. Hydro and diesel generators are the most commonly used black start capable resources by power utilities. However, with increasing penetration of solar generation, inverter-based resources can be considered to provide black start capability. Since the solar inverters can be located at multiple locations throughout the power system, and in view of their unique characteristics, an optimal real-time capable plan is helpful for system operators for faster black start. Black start optimization is a multi stage mixed-integer non-linear optimization which is extremely hard to solve. In this paper, we propose an optimal black start methodology that is easier to solve and scalable in real-time. We demonstrate the proposed methodology on two test systems and illustrate how inverter-based resources can contribute and improve power system restoration.

power system restoration, blackstart, Inverter-bas↗

Formulations and Valid Inequalities for Optimal Black Start Allocation in Power Systems

The restoration of a power system after a blackout starts around units with enhanced technical capabilities, referred to as black start units (BSUs). We examine the planning problem of optimally allocating these units on the grid subject to a budget constraint. We present a mixed integer programming model based on current literature in power systems. Binary variables are associated with the allocation of BSUs and with the energization state of buses, branches, and generators of the power system over a time horizon. We extract a substructure of the feasible region which imposes the requirement that each island that appears during the restoration process must have at least one operational generator. We discuss three equivalent reformulations for this requirement. We introduce a family of exponentially many, polynomially separable, valid inequalities to strengthen the formulation. Under simplifying assumptions, we show that the convex hull of the feasible region is a full-dimensional polyhedron, and prove that some of the constraints we introduced are facet-defining. We perform experiments to examine the difference in strength between the formulations as well as the computational times to solve the problem to near optimality for synthetic instances of the IEEE-39, IEEE-118, Illinois-200, WECC-225, IEEE-300, South Carolina-500, and Texas-2000 power systems. We illustrate a use case of the model. We conclude by suggesting extensions of the current work for future research.

Black Start Allocation↗

Contingency Contractor Optimization Phase 3 Quick Start Guide Contingency Contractor Optimization Tool Prototype - Release 2.2

This Quick Start Guide is an abbreviated version of the Contingency Contractor Optimization Phase 3, User Manual for the Contingency Contractor Optimization Tool engineering prototype. It focuses on providing quick access instructions to the core activities of the two main user roles: Planning Manager and Analyst. Based on an electronic storyboard prototype developed in Phase 2, the Contingency Contractor Optimization Tool engineering prototype was refined in Phase 3 of the OSD ATL Contingency Contractor Optimization to support strategic planning for contingency contractors. The tool uses a model to optimize the total workforce mix by minimizing the combined total costs for the selected mission scenarios. The model will optimize the match of personnel types (military, DoD civilian, and contractors) and capabilities to meet the mission requirements as effectively as possible, based on risk, cost, and other requirements.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Smart Building Start (SBS) (CRADA 480)

The idea of Smart Building Start (SBS) is to manage the on/off scheduling of HVAC equipment in buildings in an optimal way in order to achieve comfort conditions at the designated times with the minimal use of energy. This concept is also known as Optimal Start and it has typically been used in buildings to start up equipment based on predictions made for a representative (or average) zone in a building. This means that zones that could have waited longer to receive conditioned air are activated too early leading to unnecessary energy loss. The approach proposed in this project is to develop and implement a distributed version of optimal start that will consider the individual requirements of all treated zones. The developed control strategy will enable smart start of the central plant as well as further localized control over each individual zone by means of setpoint adjustment so that zones are not conditioned too early thereby reducing energy use compared to the current state of the art. This project is a collaboration between PNNL and Verdicity with the goal being to bring the research concept of SBS to commercialization. The SBS algorithm(s) will be implemented and hosted on the PNNL-developed open-platform VOLTTRON which will accelerate bringing the research to practice. It is anticipated that this project will lead to new IP surrounding the algorithm and its decentralized deployment. The project will also further demonstrate the success of VOLTRON as a flexible platform for implementation of innovative algorithms for improving energy efficiency in buildings. Previous studies on smart building start carried out by PNNL have indicated potential energy savings on the order of 10-15% for multi-zone buildings compared to conventional strategies. Verdicity currently has a number of customers who can benefit from the use of this technology. PNNL will work with Verdicity to identify any key gaps in the integrated software and jointly work to enhance and customize it for Verdicity and to integrate it with their existing products for use at their customers’ sites. The proposed work will help previously funded Federal research and development technology investments find their way into a viable commercial market.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

A Real-Time Optimization with Warm-Start of Multiperiod AC Optimal Power Flows

We present a real-time optimization strategy based on warm-start for solving a moving horizon of multi period AC optimal power flow (ACOPF) problems. In each horizon, ACOPFs are temporally interlinked via generator ramp constraints, and we assume that each horizon needs to be solved every few seconds or minutes. We introduce two approximate tracking schemes that closely follow a solution path consisting of strongly regular points. We present theoretical results bounding the tracking error by the square of the parameter changes between time periods. Experimental results for networks of sizes up to 9K buses show a fast computation time while maintaining a good solution quality, thus making our approach well suited for real-time circumstances.

moving horizon↗

Optimal Black Start Allocation for Power System Restoration

Equipment failures, operator errors, natural disasters and cyber-attacks can and have caused extended blackouts of the electric grid. Even though such events are rare, preparedness for them is critical because extended power outages endanger human lives, compromise national security, or result in economic losses of billions of dollars. Since most of the generating units cannot restart without connecting to an energized grid, the system operator relies on a few units with the ability to start autonomously, called Black Start (BS) units, to restore the power system. Allocating and maintaining these units is costly and can severely impact the restoration security and time. We formulate an optimization problem to optimally allocate BS units in the grid, while simultaneously optimizing over the restoration sequence. We extend existing optimal allocation models by including grid considerations such as active power nodal balance, transmission switching, nodal reactive power support and voltage limits. In order to aid the branch and bound tree that solves the resulting large scale mixed integer program, we propose a randomized heuristic that is executed multiple times in parallel on a high-performance computing environment to find feasible solutions. Here, we proceed to solve the IEEE-39, the IEEE-118, and a simplified WECC system with 225 nodes and 136 generators to near optimality.

97 MATHEMATICS AND COMPUTING↗

Optimally tuned starting point for single-shot GW calculations of solids

The dependence of ab initio many-body perturbation theory within the $\textit{GW}$ approximation on the eigensystem used in calculating quasiparticle corrections limits this method's predictive power. Here, we investigate the accuracy of the recently developed Wannier-localized optimally tuned screened range-separated hybrid (WOT-SRSH) functional as a generalized Kohn-Sham starting point for single-shot $\textit{GW}$ ($G_0W_0$) calculations for a range of semiconductors and insulators. Comparison to calculations based on well-established functionals, namely, PBE, PBE0, and HSE, as well as to self-consistent GW schemes and to experiment, shows that band gaps computed via $G_0W_0$@WOT-SRSH have a level of precision and accuracy that is comparable to that of more advanced methods such as quasiparticle self-consistent $\textit{GW}$ and eigenvalue self-consistent $\textit{GW}$. In this work, we also find that $G_0W_0$@WOT-SRSH improves the description of states deeper in the valence band manifold. Finally, we show that $G_0W_0$@WOT-SRSH significantly reduces the sensitivity of computed band gaps to ambiguities in the underlying WOT-SRSH tuning procedure.

36 MATERIALS SCIENCE↗

Optimal Black Start Resource Allocation

The restoration of the bulk power system after a partial or complete blackout relies on black-start (BS) resources. To prepare for system restoration, it is important to procure the right amount of BS resources at the right locations in the grid so that the total restoration time can be minimized. Achieving this goal requires that resource procurement planning takes the restoration process into account. In this study, we integrate the BS resource procurement decision with a restoration planning model and develop an optimization model that produces a minimal cost procurement plan that satisfies the restoration time requirement.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Start-up Optimization Considering Integrated Power Electronic Systems

The startup of systems composed of power electronic systems is becoming more complex. As the systems grow, standard pre-configuration sequencing methods will struggle. This work proposes a linear programming optimization method to couple power electronic systems in a series of startup commands. This formulation is demonstrated in a real-time implementation on hardware.

Starke, Michael↗

Contingency Contractor Optimization Phase 3 Extension Quick Start Guide: Contingency Contractor Optimization Tool - Engineering Prototype (Release 2.3)

This Quick Start Guide is an abbreviated version of the Contingency Contractor Optimization Phase 3, User Manual for the Contingency Contractor Optimization Tool engineering prototype. It focuses on providing quick access instructions to the core activities of the two main user roles: Planning Manager and Analyst. Based on an electronic storyboard prototype developed in Phase 2, the Contingency Contractor Optimization Tool engineering prototype was refined in Phase 3 of the OSD ATL Contingency Contractor Optimization to support strategic planning for contingency contractors. The tool uses a model to optimize the total workforce mix by minimizing the combined total costs for the selected mission scenarios. The model will optimize the match of personnel types (military, DoD civilian, and contractors) and capabilities to meet the mission requirements as effectively as possible, based on risk, cost, and other requirements.

42 ENGINEERING↗

Data-Driven Approach to Generating Achievable Dose-Volume Histogram Objectives in Intensity-Modulated Radiotherapy Planning

Purpose: To propose a method of intensity-modulated radiotherapy (IMRT) planning that generates achievable dose-volume histogram (DVH) objectives using a database containing geometric and dosimetric information of previous patients. Methods and Materials: The overlap volume histogram (OVH) is used to compare the spatial relationships between the organs at risk and targets of a new patient with those of previous patients in a database. From the OVH analysis, the DVH objectives of the new patient were generated from the database and used as the initial planning goals. In a retrospective OVH-assisted planning demonstration, 15 patients were randomly selected from a database containing clinical plans (CPs) of 91 previous head-and-neck patients treated by a three-level IMRT-simultaneous integrated boost technique. OVH-assisted plans (OPs) were planned in a leave-one-out manner by a planner who had no knowledge of CPs. Thus, DVH objectives of an OP were generated from a subdatabase containing the information of the other 90 patients. Those DVH objectives were then used as the initial planning goals in IMRT optimization. Planning efficiency was evaluated by the number of clicks of the 'Start Optimization' button in the course of planning. Although the Pinnacle{sup 3} treatment planning system allows planners to interactively adjust the DVH parameters during optimization, planners in our institution have never used this function in planning. Results: The average clicks required for completing the CP and OP was 27.6 and 1.9, respectively (p <.00001); three OPs were finished within a single click. Ten more patient's cord + 4 mm reached the sparing goal D{sub 0.1cc} <44 Gy (p <.0001), where D{sub 0.1cc} represents the dose corresponding to 0.1 cc. For planning target volume uniformity, conformity, and other organ at risk sparing, the OPs were at least comparable with the CPs. Additionally, the averages of D{sub 0.1cc} to the cord + 4 mm decreased by 6.9 Gy (p <.0001); averages of D{sub 0.1cc} to the brainstem decreased by 7.7 Gy (p <.005). The averages of V(30 Gy) to the contralateral parotid decreased by 8.7% (p <.0001), where V(30 Gy) represents the percentage volume corresponding to 30 Gy. Conclusion: The method heralds the possibility of automated IMRT planning.

62 RADIOLOGY AND NUCLEAR MEDICINE↗