Optimal Network Reconfiguration and Scheduling With Hardware-in-the-Loop Validation for Improved Microgrid Resilience

With the increased occurrence of various major extreme weather events, power outages and prompt power system restorations have recently drawn more attention to the resilience and recovery of power systems. From the perspective of a more resilient power delivery at the distribution grid, system restoration using network topology reconfiguration together with optimal scheduling of distributed energy resources are adopted in this paper. The proposed optimization model aims at minimizing the total load shedding cost and other operational costs, in which linearized topological constraints borrowed from graph theory and linearized DistFlow models are respectively used to maintain the radial network topology and power flow balance after system contingencies. To demonstrate the applicability of the proposed strategy, a real-world case study of a networked three-microgrid system in Adjuntas, Puerto Rico, is used with the consideration of different independent/interconnected microgrid scenarios, contingencies, and fairness settings. Furthermore, hardware-in-the-loop testing is conducted for the same three-microgrid network, where the closely matched results with the simulated ones have validated the effectiveness of the proposed restoration strategy, which is now ready to move one step forward towards field deployment. Finally, to test the proposed restoration strategy in a larger networked system, the modified IEEE-33 bus test distribution system is considered, and the results show a more resilient power delivery for critical loads under three and four line outages.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Optimization of Distribution Feeder Topology: A Differential Programming Learning Approach

This paper presents a gradient based method for optimizing distribution feeder network topology under load un- certainty. We recast the optimal network reconfiguration problem as a learning problem where edge weights of a graph are learned to produce an optimized spanning tree for a distribution network. Using recent methods published on differentiable programming, we provide a data driven method for learning these weights. We test our method on 100 variations of an IEEE 15-bus test system. Our results show that our method outperforms more traditional mathematical programming-based approaches.

differentiable programming↗

Machine Learning-Assisted Distribution System Network Reconfiguration Problem

High penetration from volatile renewable energy resources in the grid and the varying nature of loads raise the need for frequent line switching to ensure the efficient operation of electrical distribution networks. Operators must ensure maximum load delivery, reduced losses, and the operation between voltage limits. However, computations to decide the optimal feeder configuration are often computationally expensive and intractable, making it unfavorable for real-time operations. This is mainly due to the existence of binary variables in the network reconfiguration optimization problem. To tackle this issue, we have devised an approach that leverages machine learning techniques to reshape distribution networks featuring multiple substations. This involves predicting the substation responsible for serving each part of the network. Hence, it leaves simple and more tractable Optimal Power Flow problems to be solved. This method can produce accurate results in a significantly faster time, as demonstrated using the IEEE 37-bus distribution feeder. Compared to the traditional optimization-based approaches, a feasible solution is achieved approximately ten times faster for all the tested scenarios.

deep neural networks↗

A Machine Learning-Based Method to Estimate Transformer Primary-Side Voltages with Limited Customer-Side AMI Measurements

Distribution control applications such as volt/var optimization, network reconfiguration, and distribution automation require accurate knowledge of the distribution system state. The lack of sufficient sensors on the primary side of distribution networks often limits the accuracy of the control decisions by these applications. The deployment of advanced metering infrastructure (AMI) provides utilities an opportunity to translate the AMI data on the secondary onto the primary so that it can be used as pseudo-measurements to augment the limited existing measurements on the primary. This paper develops a machine learning based approach for estimating service transformer primary-side voltages by using limited secondary-side AMI measurement. The machine learning model is developed by using random forest algorithm. The estimated primary-side voltages can be used by utilities as pseudo-measurements for distribution control applications. The detailed secondary model topology, which is an essential input data for many existing algorithms, is not required for the proposed method. The performance of the proposed method is validated by using AMI measurements from the field and an actual distribution feeder model of San Diego Gas & Electric Company.

advanced metering infrastructure↗

A Machine Learning-Based Method to Estimate Transformer Primary-Side Voltages with Limited Customer-Side AMI Measurements

Distribution control applications such as volt/var optimization, network reconfiguration, and distribution automation require accurate knowledge of the distribution system state. The lack of sufficient sensors on the primary side of distribution networks often limits the accuracy of the control decisions by these applications. The deployment of advanced metering infrastructure (AMI) provides utilities an opportunity to translate the AMI data on the secondary onto the primary so that it can be used as pseudo-measurements to augment the limited existing measurements on the primary. This paper develops an approach for estimating service transformer primary-side voltages by using limited secondary-side AMI measurements. The estimated primary-side voltages can be used by utilities as pseudo-measurements for distribution control applications. The detailed secondary model topology, which is an essential input data for many existing algorithms, is not required for the proposed method. The performance of the proposed method is validated by using AMI measurements from the field and an actual distribution feeder model of San Diego Gas & Electric Company.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

A Machine Learning-Based Method to Estimate Transformer Primary-Side Voltages with Limited Customer-Side AMI Measurements: Preprint

Distribution control applications such as volt/var optimization, network reconfiguration, and distribution automation require accurate knowledge of the distribution system state. The lack of sufficient sensors on the primary side of distribution networks often limits the accuracy of the control decisions by these applications. The deployment of advanced metering infrastructure (AMI) provides utilities an opportunity to translate the AMI data on the secondary onto the primary so that it can be used as pseudo-measurements to augment the limited existing measurements on the primary. This paper develops an approach for estimating service transformer primary-side voltages by using limited secondary-side AMI measurements. The estimated primary-side voltages can be used by utilities as pseudo-measurements for distribution control applications. The detailed secondary model topology, which is an essential input data for many existing algorithms, is not required for the proposed method. The performance of the proposed method is validated by using AMI measurements from the field and an actual distribution feeder model of San Diego Gas & Electric Company.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Optimizing connectivity in reconfigurable networks

A method may include determining whether the topology of a network includes a direct path between a first endpoint and a second endpoint in the network. A direct path may be used to send a first type of traffic from the first endpoint to the second endpoint whereas any currently available path may be used to send a second type of traffic from the first endpoint to the second endpoint. If the topology of the network does not include a direct path, the first type of traffic may be buffered at the first endpoint until the topology of the network is reconfigured to include the direct path. The topology of the network may be reconfigured when at least one switch in the network reconfigures, for example, by switching from one interconnection to another interconnection pattern. Related systems and articles of manufacture are also provided.

Mellette, William↗

Distributed Energy Resource-Cognizant Upgrade Paths to the Traditional Restoration Strategy of Utilities for Improved Load Restoration: Preprint

Climate change has resulted in increasingly impactful and more frequent occurrences of extreme weather events. This trend poses a significant challenge for distribution utilities and system operators to ensure that there is uninterrupted power supply to critical loads in their networks under fault scenarios; however, currently, utilities deploying the automated fault location, isolation and restoration (FLISR) function in their advanced distribution management system (ADMS) do not take into account the available generation and load-modification capabilities of distributed energy resources present in the disconnected network due to an upstream isolated fault. This results in the network reconfiguration and restoration to result in sub-optimal load restoration. Therefore, this paper presents two approaches that can upgrade the existing FLISR capabilities of distribution utilities to significantly increase the restoration of critical loads. The performance of the proposed approaches is evaluated on a numerical model of a real distribution feeder in Georgia, USA.

DER↗

Distributionally Robust Decentralized Volt-Var Control With Network Reconfiguration

Here, this paper presents a decentralized volt-var optimization (VVO) and network reconfiguration strategy to address the challenges arising from the growing integration of distributed energy resources, particularly photovoltaic (PV) generation units, in active distribution networks. To reconcile control measures with different time resolutions and empower local control centers to handle intermittency locally, the proposed approach leverages a two-stage distributionally robust optimization; decisions on slow-responding control measures and set points that link neighboring subnetworks are made in advance while considering all plausible distributions of uncertain PV outputs. We present a decomposition algorithm with an acceleration scheme for solving the proposed model. Numerical experiments on the IEEE 123 bus distribution system are given to demonstrate its outstanding out-of-sample performance and computational efficiency, which suggests that the proposed method can effectively localize uncertainty via risk-informed proactive timely decisions.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Co-optimization of repairs and dynamic network reconfiguration for improved distribution system resilience

In this work, a post-disaster distribution system repair and restoration (DSRR) strategy is proposed to improve distribution system resilience. The DSRR strategy is formulated as a two-stage optimization. The first stage is a comprehensive co-optimization of repair crew scheduling, dynamic network reconfiguration, and distributed energy resource (DER) dispatch based on the forecast load profile. The goal is to minimize the accumulative operating cost caused by the load reduction payment as well as DER operating cost. In particular, since the number of available repair crews is usually smaller than the number of faulted lines after a disaster event, the DSRR strategy determines the optimal scheduling for repairing faulted lines. The second stage is a re-dispatch of the DER power output and load shedding based on the real-time load demand of each bus. The proposed algorithm is validated by case studies of the IEEE 33-bus and 123-bus test systems. We consider those scenarios in which faults occur in multiple heavy-loaded feeders. The simulation results demonstrate that the DSRR strategy effectively coordinate the repair scheduling, network reconfiguration and load shedding to minimize the operating cost.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Phase Identification in Real Distribution Networks with High PV Penetration Using Advanced Metering Infrastructure Data

Many distribution network monitoring and control applications - including state estimation, volt/VAR optimization, and network reconfiguration - rely on accurate network models; however, the network models maintained by utilities can become outdated because of restoration activities, network reconfiguration, and missing data. With the widespread deployment of advanced metering infrastructure (AMI), abundant measurement data from low-voltage secondary networks are available. The AMI measurement data can be used for phase identification to improve the network models. Although the existing phase identification techniques work well in passive distribution feeders that do not have photovoltaic (PV) generation, they can fail to accurately identify the phases in the presence of PV. This paper proposes a robust phase identification algorithm based on supervised machine learning that accurately identifies the AMI meter phase connectivity in the presence of significant PV generation. The proposed algorithm does not require network topology information or feeder head measurement data. The algorithm is validated using the AMI measurement data collected in the field and the field-validated phase connectivity database on two real distribution feeders from San Diego Gas & Electric Company that have significant PV generation.

advanced metering infrastructure↗

Phase Identification in Real Distribution Networks with High PV Penetration Using Advanced Metering Infrastructure Data: Preprint

Many distribution network monitoring and control applications - including state estimation, volt/VAR optimization, and network reconfiguration - rely on accurate network models; however, the network models maintained by utilities can become outdated because of restoration activities, network reconfiguration, and missing data. With the widespread deployment of advanced metering infrastructure (AMI), abundant measurement data from low-voltage secondary networks are available. The AMI measurement data can be used for phase identification to improve the network models. Although the existing phase identification techniques work well in passive distribution feeders that do not have photovoltaic (PV) generation, they can fail to accurately identify the phases in the presence of PV. This paper proposes a robust phase identification algorithm based on supervised machine learning that accurately identifies the AMI meter phase connectivity in the presence of significant PV generation. The proposed algorithm does not require network topology information or feeder head measurement data. The algorithm is validated using the AMI measurement data collected in the field and the field-validated phase connectivity database on two real distribution feeders from San Diego Gas & Electric Company that have significant PV generation.

advanced metering infrastructure↗

Phase Identification in Real Distribution Networks with High PV Penetration Using Advanced Metering Infrastructure Data

Many distribution network monitoring and control applications - including state estimation, Volt/VAr optimization, and network reconfiguration - rely on accurate network models; however, the network models maintained by utilities can become outdated because of restoration activities, network reconfiguration, and missing data. With the widespread deployment of advanced metering infrastructure (AMI), abundant measurement data from low-voltage secondary networks are available. The AMI measurement data can be used for phase identification to improve the network models. Although the existing phase identification techniques work well in passive distribution feeders that do not have photovoltaic (PV) generation, they can fail to accurately identify the phases in the presence of PV. This paper proposes a robust phase identification algorithm based on supervised machine learning that accurately identifies the AMI meter phase connectivity in the presence of significant PV generation. The proposed algorithm does not require network topology information or feeder-head measurement data. The algorithm is validated using the AMI measurement data collected in the field and the field-validated phase connectivity database on two real distribution feeders from San Diego Gas & Electric Company that have significant PV generation.

advanced metering infrastructure (AMI)↗

Switch Opening and Exchange Method for Stochastic Distribution Network Reconfiguration

The purpose of distribution network reconfiguration (DNR) is to determine the optimal topology of an electricity distribution network, which is an efficient measure to reduce network power losses. Electricity load demand and photovoltaic (PV) output are uncertain and vary with time of day, and will affect the optimal network topology. Single-hour deterministic DNR is incapable of handling this uncertainty and variability. Therefore, this paper proposes to solve a multi-hour stochastic DNR (SDNR). Existing solution methods for DNR are either inaccurate or excessively time-consuming, and are therefore incapable of solving multi-hour SDNRs for large distribution networks. In this regard, a switch opening and exchange (SOE) method is proposed. Starting from a looped network with all switches closed, the SOE consists of three steps. The first step is to sequentially open the switches until all of the loops are opened. The second and third steps modify the status of branches obtained in the first step to obtain better radial topologies. Five test systems are used to validate the accuracy and fast solution speed of the SOE and the superiority of multi-hour SDNR over single-hour deterministic DNR.

distribution network reconfiguration↗

Advanced Transmission Technologies – GETs and HPCs Session 2: Advanced Power Flow Control and Transmission Topology Optimization

The INL TADA GETs Cohort Session 2, held on November 7, 2025, conducted in collaboration with ScottMadden, focused on two core Advanced Transmission Technologies (ATTs): Advanced Power Flow Control (APFC) and Transmission Topology Optimization (TTO). These technologies are pivotal in enhancing grid flexibility, reliability, and cybersecurity resilience. APFC, particularly through modular FACTS devices like Modular Static Synchronous Series Compensators (M-SSSCs), enables dynamic voltage injection to reroute power flows. The session highlighted the deployment benefits of APFC, such as rapid installation, minimal civil works, and re-deployability. Regulatory drivers like FERC Order 2023 mandate the inclusion of Grid-Enhancing Technologies (GETs) in interconnection studies. Case studies from Central Hudson, CAISO, and National Grid (UK) demonstrated APFC’s effectiveness in congestion relief and cost savings. The session also addressed cybersecurity concerns, including firmware vulnerabilities, SCADA integration risks, and supply chain dependencies. Participants engaged in interactive exercises to rank cybersecurity and supply chain risks, emphasizing the need for robust digital assurance strategies. TTO involves software-based reconfiguration of transmission networks to optimize power flow without new infrastructure. The session showcased its operational value, with examples from SPP, PJM, and MISO showing significant congestion cost reductions. Cybersecurity vulnerabilities were discussed, particularly in API security and software supply chains, referencing incidents like SolarWinds and attacks on Danish utilities. Digital assurance exercises explored worst-case scenarios, attack paths, and mitigation responsibilities between vendors and utilities. Reliability challenges such as algorithm stability, vendor dependency, and operator trust were also examined. Cross-cutting themes emphasized the importance of digital assurance tools, including Software Bills of Materials (SBOMs) and hardware-in-loop testing. Human performance, training, and operational confidence were identified as critical enablers of technology adoption. The session concluded with a preview of Session 3, which will focus on High Performance Conductors (HPCs) and risk-based cybersecurity tools. Session 2 of 3.

24 - POWER TRANSMISSION AND DISTRIBUTION↗

Power system restoration incorporating diverse distributed energy resources

An example system includes an aggregator configured to receive a service collaboration request and iteratively determine, based on minimum and maximum power values for DERs under its management, an optimized operation schedule. The aggregator may also be configured to iteratively determine, based on the optimized operation schedule, an estimated flexibility range for devices under its management and output an indication thereof. The system may also include a power management unit (PMU) configured to iteratively receive the indication and determine, based on a network model that includes the estimated flexibility range, a reconfiguration plan and an overall optimized operation schedule for the network. The PMU may also be configured to iteratively cause reconfiguration of the network based on the plan. The PMU and aggregator may also be configured to iteratively, at a fast timescale, cause energy resources under their management to modify operation based on the overall optimized operation schedule.

Ding, Fei↗

Distributed Energy Resource-Cognizant Upgrade Paths to the Traditional Restoration Strategy of Utilities for Improved Load Restoration

Climate change has resulted in increasingly impactful and more frequent occurrences of extreme weather events. This trend poses a significant challenge for distribution utilities and system operators to ensure that there is uninterrupted power supply to critical loads in their networks under fault scenarios; however, currently, utilities deploying the automated fault location, isolation and restoration (FLISR) function in their advanced distribution management system (ADMS) do not take into account the available generation and load-modification capabilities of distributed energy resources present in the disconnected network due to an upstream isolated fault. This results in the network reconfiguration and restoration to result in sub-optimal load restoration. Therefore, this paper presents two approaches that can upgrade the existing FLISR capabilities of distribution utilities to significantly increase the restoration of critical loads. The performance of the proposed approaches is evaluated on a numerical model of a real distribution feeder in Georgia, USA.

DER↗

Multiperiod Distribution System Restoration With Routing Repair Crews, Mobile Electric Vehicles, and Soft-Open-Point Networked Microgrids

This paper proposes a distribution system restoration model which is in response to multiple outages caused by natural disasters. The proposed restoration model includes the coordination of routing repair crews (RRCs), mobile batterycarried vehicles (MBCVs), and networked microgrids (NMGs) formed by soft open points (SOPs). The travel and repair time constraints are modeled for each RRC; travel path and charging strategy are modeled for each MBCV; and the network reconfiguration is developed considering the optimal operation of SOP-based NMGs. Furthermore, the proposed model is presented as a mixedinteger linear program which is solved by an auxiliary induce function based algorithm to reduce the computational complexity. The modified IEEE 33-bus and 69-bus distribution systems are tested with multiple outages. The presented results demonstrate the effectiveness of the proposed model