Engineering PapersSearch

SEARCH · Engineering Papers

Results for “operations maintenance”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Mechanisms Engineering Test Loop (METL) Operations, Maintenance, and Testing - FY2025

This report documents the operations, maintenance, and improvements that were performed at the Mechanisms Engineering Test Loop (METL) and its supporting infrastructure during FY2024. The METL facility had a very successful seventh year of operations while supporting the testing of multiple test article experiments in the facility. The METL facility continued supporting the Gear Test Assembly (GTA) testing and the Thermal Hydraulic Experimental Test Article (THETA) with the full testing with both the primary and secondary systems. Work to accommodate two additional experiments, a flow sensor test article (F-STAr) gripper test and a fuel handling gripper test article (GrTA) continued as they are expected to undergo testing in METL in FY2025. In addition, a new 18” test article, the Sample Testing Basket (STB) was used a few times to provide screening tests for sodium service materials. A fifth test vessel was installed in the location of Test Vessel 6, and a wet vapor nitrogen sodium processing system was developed and initially tested.

22 GENERAL STUDIES OF NUCLEAR REACTORS

National Solar Thermal Test Facility: Operations & Maintenance Report

The NSTTF O&M Project continues the operation and maintenance activities of the existing critical capabilities and infrastructure at the NSTTF. This project is to support and assure the success of Solar Heat for Industrial Process in the United States and the larger global community by ensuring the NSTTF is a safe and operational facility. The primary goal of this project will be to maintain the solar tower and heliostat field while also allowing NSTTF staff to improve processes for operations and maintenance. This includes expanding our preventative maintenance program, inventory systems, and our data sharing capabilities. Additionally, this will support an outreach program with regular seminars, sharing of data, and the release of open-source software to support heliostat metrology

14 SOLAR ENERGY

Pumped Storage Hydropower Operation & Maintenance Cost Estimation

The National Laboratory of the Rockies (NLR) develops and hosts a pumped storage hydropower (PSH) cost model that is the most detailed bottom-up PSH cost model available to the public. It is available both as a spreadsheet and an interactive web tool, enabling users with a variety of PSH interests to transparently characterize costs of alternative PSH sites and designs. The NLR PSH cost model was designed originally to consider only upfront capital costs only. This slide deck describes methodology to expand the cost model to include operations and maintenance (OM) costs. OM costs are characterized as five distinct components with unique sources and methods for cost estimation. By combining methods for each of these components into a cumulative OM cost estimate, these methods allow a more complete estimation of total OM costs that agrees with existing literature values. The methods are scalable and transparent, allowing them to be readily to applied to any prospective PSH facility for a representative preliminary OM cost estimate in advance of detailed site-specific engineering and other studies.

13 HYDRO ENERGY

Space Transportation System Technology Symposium: Operations, Maintenance, and Safety (Including Cryogenic Systems) - Volume 5

The prospect of undertaking a reusable launch vehicle development led the NASA Office of Manned Space Flight (OMSF) to request the Office of Advanced Research and Technology (OART) to organize and direct a program to develop the technology that would aid in selecting the best system alternatives and that would support the ultimate development of an earth-to-orbit shuttle. Such a Space Transportation System Technology Program has been initiated. OART, OMSF, and NASA Flight and Research Centers with the considerable inputs of Department of Defense personnel have generated the program through the efforts of several Technology Working Groups and a Technology Steering Group. Funding and management of the recommended efforts is being accomplished through the normal OART and OMSF line management channels. The work is being done in government laboratories and under contract with industry and universities. Foreign nations have been invited to participate in this work as well. Substantial funding, from both OART and OMSF, was applied during the second half of fiscal year 1970. The Space Transportation System Technology Symposium held at the NASA Lewis Research Center, Cleveland, Ohio, July 15-17, 1970, was the first public report on that program. The Symposium goals were to consider the technology problems, their status, and the prospective program outlook for the benefit of the industry, government, university, and foreign participants considered to be contributors to the program. In addition, it offered an opportunity to identify the responsible individuals already engaged in the program. The Symposium sessions were intended to confront each presenter with his technical peers as listeners, and this, I believe, was substantially accomplished. Because of the high interest in the material presented, and also because the people who could edit the output are already deeply involved in other important tasks, we have elected to publish the material essentially as it was presented, utilizing mainly the illustrations used by the presenters along with brief words of explanation. Those who heard the presentations, and those who are technically astute in specialty areas, can probably put this story together again. We hope that more will be gained by compiling the information in this form now than by spending the time and effort to publish a more finished compendium later.

Source record

DOE’s National Solar Thermal Test Facility Operations and Maintenance

This report details operations and maintenance (O&M) activities performed across Fiscal Years 2022 through 2024 in support of the continued capabilities of the National Solar Thermal Testing Facility (NSTTF) at Sandia National Laboratories. The NSTTF O&M project is funded by the U.S. Department of Energy Solar Energy Technologies Office (SETO) to support research activities and testing on behalf of external customers at the facility under award number CPS 38491. During the project period, the NSTTF made progress in the areas of site metrics, site maintenance and utilization tracking, and customer engagement. The O&M project also supported special initiatives including procurement of a heat exchanger for particle concentrating solar thermal processes and a scoping and cost study for refurbishment and repair of component in the NSTTF heliostat field.

14 SOLAR ENERGY

Co-optimization of nuclear reactor flexible power operation and maintenance scheduling

As flexible power operation of nuclear power plants becomes more attractive due to the reduction in fossil-fueled dispatchable generation on energy grids, finding optimal power production strategies that balance revenue generation with operational concerns becomes more complex. This article presents a general framework to aid operators in designing economically optimal long term dispatch strategies for nuclear power plants. The principal novelty is the linking of estimated system remaining useable life (RUL) to strategic operational decisions. It is shown that, depending on the relationship between the fixed costs from maintenance and the associated lost revenue from an outage, it can be economically optimal in the long term to delay a maintenance outage and not perform this alongside refueling. For a given relationship between power ramping and degradation, optimal strategies were found that discouraged load following in some situations while minimizing unnecessary maintenance. It is shown that heavy load following can cause maintenance and refueling outages to diverge due to their inverse relationships with respect to load following, potentially leading to a significant loss in capacity factor. As a result, this general framework can be applied to specific reactor dispatch allowing operators to adapt operational strategies as future grid conditions change.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS

Build-to-Replace Strategy to Reduce Operations and Maintenance Costs for Advanced Reactors

This paper targets the reduction of fixed operations and maintenance (O&M) costs for advanced reactor (AR) designs. This goal will be severely constrained if the underlying assumptions of O&M approaches and practices are not questioned and reexamined, especially today when changes can be implemented effectively and efficiently. Achieving a reduction in AR O&M costs requires a completely new way of thinking -a paradigm shift- not through incremental, technology-focused approaches alone. Here, we address this challenge by evaluating the impact of moving to a shorter design life for major structures, systems, and components and shorter, more predictable refurbishment cycles as modeled by the commercial airline industry: the build-to-replace approach. This paper provides a brief overview of this different mindset to O&M applied to ARs and it provided a set of analytical tools based on multi-objective optimization to identify the benefits of such an approach. In conclusion, we provide a direct example analysis of a build-to-replace scenario by identifying and evaluating scenarios for reduced system and component lifetimes and associated replacement and refurbishment schedules to evaluate impacts on O&M costs and other lifecycle elements, such as structure, system, and component reliability.

97 - MATHEMATICS AND COMPUTING

Operations and Maintenance for Electric Vehicle Charging Infrastructure in Indian Country

This fact sheet provides an overview of operations and maintenance (O&M) costs, responsibilities, and contracts to help ensure EV charging infrastructure remains functional and reliable in Indian Country. O&M planning is important for Tribes to consider at the beginning of EV charging infrastructure projects to help ensure charger uptime and longevity.

33 ADVANCED PROPULSION SYSTEMS

Reinforcement Learning for Anomaly Detection in Nuclear Power Plant Operation and Maintenance

In nuclear power plants (NPPs), timely identification of sensor and human errors is critical to ensure safe and efficient plant operations. Anomaly detection models can be employed for this task. However, traditional anomaly detection approaches may have high dependency on labeled datasets and struggle with adaptability in complex, dynamic environments. Reinforcement learning (RL) has demonstrated significant potential in fault diagnosis and anomaly detection; however, its application to anomaly detection in NPPs remains a relatively underexplored research direction. Hence, to address this gap, in this study, we present a novel physics-informed reinforcement learning model, PIRL-AD: Physics-Informed Reinforcement Learning for Anomaly Detection, that integrates domain knowledge from calorimetric equations into the RL framework for enhanced sensor and human error anomaly detection. We evaluate the performance of PIRL-AD against a non-physics informed RL benchmark and a support vector machine (SVM) on data collected from a forced flow loop testbed. Experimental results suggest that PIRL-AD outperforms other baselines on a range of anomalous datasets that include both sensor and human-induced anomalies across key performance metrics, statistically outperforming the RL and SVM benchmarks with respect to geometric mean (respectively, 92.96% vs. 91.06% vs. 83.01%) and F1-score (respectively, 89.23% vs. 86.98% vs. 77.01%). Furthermore, the findings suggest the potential of physics-integrated reinforcement learning models for enhanced anomaly detection performance in NPPs.

Reinforcement learning