Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “office building”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Dynamics of airborne fungal populations in a large office building

The increasing concern with bioaerosols in large office buildings prompted this prospective study of airborne fungal concentrations in a newly constructed building on the Gulf coast. We collected volumetric culture plate air samples on 14 occasions over the 18-month period immediately following building occupancy. On each sampling occasion, we collected duplicate samples from three sites on three floors of this six-story building, and an outdoor sample. Fungal concentrations indoors were consistently below those outdoors, and no sample clearly indicated fungal contamination in the building, although visible growth appeared in the ventilation system during the course of the study. We conclude that modern mechanically ventilated buildings prevent the intrusion of most of the outdoor fungal aerosol, and that even relatively extensive air sampling protocols may not sufficiently document the microbial status of buildings.

NASA Program Biomedical Research and Countermeasur↗

Solar-Heated and Cooled Office Building--Columbus, Ohio

Final report documents solar-energy system installed in office building to provide space heating, space cooling and domestic hot water. Collectors mounted on roof track Sun and concentrate rays on fluid-circulating tubes. Collected energy is distributed to hot-water-fired absorption chiller and space-heating and domestic-hot-water preheating systems.

Source record↗

Solar-Heated Office Building -- Dallas, Texas

Solar heating system designed to supply 87 percent of space heating and 100 percent of potable hot-water needs of large office building in Dallas, Texas. Unique feature of array serves as roofing over office lobby and gives building attractive triangular appearance. Report includes basic system drawings, test data, operating procedures, and maintenance instructions.

Source record↗

Solar energy to heat and cool a new NASA Langley office building

A solar heating and cooling system will be installed at a new NASA office building. The objective of this project is to establish a full-scale working test-bed facility to investigate solar energy for heating and cooling buildings. The energy collected will provide between 80 and 100 percent of the heating and cooling requirements during the cool months and between one-half and two-thirds of the cooling requirements in the summer. Thermal energy storage will be provided to bridge the gap between cloudy and clear days.

Maag, W. L.↗

Solar heating and cooling system for an office building at Reedy Creek Utilities

The solar energy system installed in a two story office building at a utilities company, which provides utility service to Walt Disney World, is described. The solar energy system application is 100 percent heating, 80 percent cooling, and 100 percent hot water. The storage medium is water with a capacity of 10,000 gallons hot and 10,000 gallons chilled water. Performance to date has equaled or exceeded design criteria.

Source record↗

The design of a solar energy collection system to augment heating and cooling for a commercial office building

Analytical studies supported by experimental testing indicate that solar energy can be utilized to heat and cool commercial buildings. In a 50,000 square foot one-story office building at the Langley Research Center, 15,000 square feet of solar collectors are designed to provide the energy required to supply 79 percent of the building heating needs and 52 percent of its cooling needs. The experience gained from the space program is providing the technology base for this project. Included are some of the analytical studies made to make the building design changes necessary to utilize solar energy, the basic solar collector design, collector efficiencies, and the integrated system design.

Basford, R. C.↗

Fungal colonization of fiberglass insulation in the air distribution system of a multi-story office building: VOC production and possible relationship to a sick building syndrome

Complaints characteristic of those for sick building syndrome prompted mycological investigations of a modern multi-story office building on the Gulf coast in the Southeastern United States (Houston-Galveston area). The air handling units and fiberglass duct liner of the heating, ventilating and air conditioning system of the building, without a history of catastrophic or chronic water damage, demonstrated extensive colonization with Penicillium spp and Cladosporium herbarum. Although dense fungal growth was observed on surfaces within the heating-cooling system, most air samples yielded fewer than 200 CFU m-3. Several volatile compounds found in the building air were released also from colonized fiberglass. Removal of colonized insulation from the floor receiving the majority of complaints of mouldy air and continuous operation of the units supplying this floor resulted in a reduction in the number of complaints.

NASA Program Environmental Health↗

Fungal colonization of air filters and insulation in a multi-story office building: production of volatile organics

Secondary air filters in the air-handling units on four floors of a multi-story office building with a history of fungal colonization of insulation within the air distribution system were examined for the presence of growing fungi and production of volatile organic compounds. Fungal mycelium and conidia of Cladosporium and Penicillium spp. were observed on insulation from all floors and both sides of the air filters from one floor. Lower concentrations of volatile organics were released from air filter medium colonized with fungi as compared with noncolonized filter medium. However, the volatiles from the colonized filter medium included fungal metabolites such as acetone and a carbonyl sulfide-like compound that were not released from noncolonized filter medium. The growth of fungi in air distribution systems may affect the content of volatile organics in indoor air.

NASA Discipline Environmental Health↗

Solar heating and hot water system installed at office building, One Solar Place, Dallas, Texas

A solar heating on cooling system is described which is designed to provide 87 percent of the space heating needs, 100 percent of the potable hot water needs and is sized for future absorption cooling. The collection subsystem consists of 28 solargenics, series 76, flat plate collectors with a total area of 1,596 square feet. The solar loop circulates an ethylene glyco water solution through the collectors into a hot water system exchanger. The water storage subsystem consists of a heat exchanger, two 2,300 gallon concrete hot water storage tanks with built in heat exchangers and a back-up electric boiler. The domestic hot water subsystem sends hot water to the 10,200 square feet floor area office building hot water water fixtures. The building cold water system provides make up to the solar loop, the heating loop, and the hot water concrete storage tanks. The design, construction, cost analysis, operation and maintenance of the solar system are described.

Source record↗

The Ares Projects Office: Building an Exploration Culture from the Inside Up

NASA is building its first new human-rated space exploration vehicles in nearly 40 years. This marks an important operational and cultural change from the Space Shuttle. In the wake of the Columbia disaster, the agency and the nation realized that NASA's goals and culture needed to change. The Ares Projects Office (APO), which is building the launch vehicles that will power human beings to the Moon, Mars, and beyond, is taking a page from the Saturn playbook by having NASA lead both the overall integration and the development of the Ares I upper stage. APO is also creating a new culture of cooperation, openness, and informed risk taking as we set our sights on other worlds. APO has established a team environment where issues can be discussed, information is shared, fun and teamwork are encouraged, and constructive conflict and accountability are expected. Following a "One NASA" philosophy, APO is taking steps to strengthen cooperation among space centers, contractor partners, engineering and scientific communities, and headquarters personnel. As we learn lessons from things that Went wrong with the Space Shuttle, we are also borrowing best practices from what has gone right with that program and others. All of these cultural elements will be necessary as we take the next steps beyond Earth orbit.

Leahy, Bartholomew↗

Solar heated and cooled office building

Installation at NASA Langley Research Center, Hampton, Virginia, serves as full-scale working test-bed facility to test flat-plate solar-energy collector systems.

Maag, W. L.↗

Solar--heated and cooled office building--Dalton, Georgia

Modern energy efficient building is heated and cooled by five rows of flat plate solar collectors; its domestic hot water needs are also met. Final report includes detailed drawings and photographs, manufacturer's literature, performance specifications, acceptance test data, and performance verification statements. Operation and maintenance manual is also attached.

Source record↗

Solar energy system installed at the North Georgia APDC office building

A hydronic, automatic drain-down solar heating and cooling system is described. The system provides solar heat exchange from a 2,001 square foot effective collector area and supplies 65-70 percent of the building's cooling demand, 90-95 percent of the heating demand, and domestic hot water. The acceptance test plan and results, system operation and maintenance, and predicted system performance are presented.

Source record↗

The Effects of Primary Light Sources on Worker Performance and Alertness

Traditional office buildings use a variety of primary light sources (e.g., LED/fluorescent lights). As interest in LEED certified office buildings increase and research has shown that enhanced lighting design improves human performance and alertness (Viola et al., 2008; Juslén & Tenner, 2005; Edwards & Torcellini, 2002), more office buildings are incorporating a daylighting design. We investigated the differences between employee performance and alertness in two different building types (daylight vs. artificial light). We hypothesized that employee performance and sleep duration would be improved in a building designed to increase exposure to natural daylight compared to traditional office settings.

cognitive performance↗

Solar heating system installed at Stamford, Connecticut

The solar heating system installed at the Lutz-Sotire Partnership Executive East Office Building, Stamford, Connecticut is described. The Executive East Office Building is of moderate size with 25,000 sq ft of heated space in 2 1/2 stories. The solar system was designed to provide approximately 50 percent of the heating requirements. The system components are described. Appended data includes: the system design acceptance test, the operation and maintenance manual, and as-built drawings and photographs.

Source record↗

Results of Outdoor to Indoor Propagation Measurements from 5-32GHz

The demand for wireless services has increased exponentially in the last few years and shows no signs of slowing in the near future. In order for the next generation wireless to provide seamless access, whether the user is indoors or out, a thorough understanding and validation of models describing the impact of building entry loss (BEL) is required. This information is currently lacking and presents a challenge for most system designers. For this reason empirical data is needed to assess the impact of BEL at frequencies that are being explored for future mobile broadband applications This paper present the results of measurements of outdoor-to-indoor propagation from 5-32 GHz in three different buildings. The first is a newer building that is similar in construction to modern residential home. The second is an older commercial office building. The last building is a very new commercial office building built using modern green building techniques. These three buildings allow for the measurement of propagation losses through both modern and older materials; such as glass windows and exterior block and siding. Initial results found that at particular spatial locations the BEL could be less than 1dB or more than 70dB with free space losses discounted (this is likely influenced by multipath). Additionally, it was observed that the PDF distributions of a majority of the measurements trended toward log-normal with means and standard deviations ranging from 8-38dB and 6-14dB, respectively.

building entry loss↗

Initial operation of a solar heating and cooling system in a full-scale solar building test facility

The Solar Building Test Facility (SBTF) was constructed to advance the technology for heating and cooling of office buildings with solar energy. Its purposes are to (1) test system components which include high-performing collectors, (2) test the performance of a complete solar heating and cooling system, (3) investigate component interactions, and (4) investigate durability, maintenance and reliability of components. The SBTF consists of a 50,000 square foot office building modified to accept solar heated water for operation of an absorption air conditioner and for the baseboard heating system. A 12,666 square foot solar collector field with a 30,000 gallon storage tank provides the solar heated water. A description of the system and the collectors selected is printed along with the objectives, test approach, expected system performance, and some preliminary results.

Knoll, R. H.↗