Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “nonconformance report”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Nonconformance Report Coordinators (NCRCs) Training Course #57109 [Slides]

This course applies to persons performing work under P-330-6, Nonconformance Control and Reporting(NCR), who will be assigned the NCR Coordinator role. Upon completion of the course, employees will have a clear understanding of the unique role and responsibilities of an NCR Coordinator during the Initiation, Investigation and Closure Processes.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

Nonconformance Control & Reporting Owning Managers (NCR OMS): Training Course #58013

This course applies to persons performing work under P330-6, Nonconformance Control and Reporting (NCR), who will be assigned the NCR Owning Manager role. Upon completion of the course, employees will have a clear understanding of the unique role and responsibilities of an NCR Manager during the Initiation, Investigation, Disposition and Closure Processes.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

Independent Verification and Validation Of SAPHIRE 8 Software Quality Assurance Plan Project Number: N6423 U.S. Nuclear Regulatory Commission

This report provides an evaluation of the Software Quality Assurance Plan. The Software Quality Assurance Plan is intended to ensure all actions necessary for the software life cycle; verification and validation activities; documentation and deliverables; project management; configuration management, nonconformance reporting and corrective action; and quality assessment and improvement have been planned and a systematic pattern of all actions necessary to provide adequate confidence that a software product conforms to established technical requirements; and to meet the contractual commitments prepared by the sponsor; the Nuclear Regulatory Commission.

99 GENERAL AND MISCELLANEOUS↗

Independent Verification and Validation Of SAPHIRE 8 Software Quality Assurance Plan Project Number: N6423 U.S. Nuclear Regulatory Commission

This report provides an evaluation of the Software Quality Assurance Plan. The Software Quality Assurance Plan is intended to ensure all actions necessary for the software life cycle; verification and validation activities; documentation and deliverables; project management; configuration management, nonconformance reporting and corrective action; and quality assessment and improvement have been planned and a systematic pattern of all actions necessary to provide adequate confidence that a software product conforms to established technical requirements; and to meet the contractual commitments prepared by the sponsor; the Nuclear Regulatory Commission.

99 GENERAL AND MISCELLANEOUS↗

Data Compilation for AGR-2 UCO Variant Compact Lot LEU09-OP2-Z

This document is a compilation of characterization data for the candidate AGR-2 UCO Variant fuel compact lot LEU09-OP2-Z. The compacts were produced by ORNL for the Advanced Gas Reactor Fuel Development and Qualification (AGR) program for the second AGR irradiation test (AGR-2). This compact lot was fabricated using particle composite LEU09. LEU09 came from Babcock and Wilcox (B&W) coated particle lot G73J-14-93073A, which was an upgraded batch of TRISO-coated 425 μm diameter, 14% low enriched uranium oxide/uranium carbide kernels (LEUCO). The AGR-2 TRISO-coated particles consist of a spherical kernel coated with an ~50% dense carbon buffer layer (100 μm nominal thickness), followed by a dense inner pyrocarbon layer (40 μm nominal thickness), followed by a SiC layer (35 μm nominal thickness), followed by another dense outer pyrocarbon layer (40 μm nominal thickness). The kernels were also manufactured by B&W and identified as kernel lot G73I-14-69307. Two data packages were submitted by B&W containing the acceptance testing results for the kernels and coated particles, these are identified by their lot numbers. A discussion on the coating of the B&W TRISO particles can also be found in INL report INL/EXT-09-16545. A data compilation of ORNL analysis of G73J-14-93073A can be found in ORNL/TM-2008/134. The AGR-2 Fuel Specification (INL SPC-923) provides the requirements necessary for acceptance of the fuel manufactured for the AGR-2 irradiation test. Section 3.3 of SPC-923 provides the property requirements for the heat treated compacts. The Statistical Sampling Plan for AGR-2 Fuel Materials (INL PLN-2691) provides additional guidance regarding statistical methods for product acceptance and recommended sample sizes. The procedures for characterizing and qualifying the compacts are outlined in ORNL product inspection plan AGRCHAR- PIP-12. The inspection report forms generated by this product inspection plan document the product acceptance for the property requirements listed in section 3.3 of SPC-923. Prior to compacting, the overcoated particles are characterized per ORNL product inspection plan AGRCHAR- PIP-11 to obtain data needed for calculation of compacting charge weight and matrix density. Riffling of compact charges is also covered by this procedure. Prior to overcoating, the TRISO particles are characterized per ORNL product inspection plan AGR-CHAR-PIP-10 to determine uranium content, obtain data needed for overcoating and compact fabrication, and obtain further data needed for calculation of matrix density. Riffling of overcoater charges is also covered by this procedure. This document contains all the inspection report forms and data report forms generated by these inspection plans. In addition to the characterization data, this report also contains other records relevant to the fuel product acceptance. A history of the material flow and sample naming is included. The overcoating and compacting process is summarized, and a record of the materials used to make the matrix is included. A Certificate of Conformance and any applicable Nonconformance Reports are attached as Appendices.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Data Compilation for AGR-2 UCO Baseline Compact Lot LEU07-OP1-Z

This document is a compilation of characterization data for the candidate AGR-2 UCO Baseline fuel compact lot LEU07-OPI-Z. The compacts were produced by ORNL for the Advanced Gas Reactor Fuel Development and Qualification (AGR) program for the second AGR irradiation test (AGR-2). This compact lot was fabricated using particle composite LEU07. LEU07 came from Babcock and Wilcox (B&W) coated particle lot G73J-14-92072A, which was an upgraded batch of TRISO-coated 425 μm diameter, 14% low enrichment uranium oxide/uranium carbide kernels (LEUCO). The AGR-2 TRISO-coated particles consist of a spherical kernel coated with an ~50% dense carbon buffer layer (100 μm nominal thickness), followed by a SiC layer (35 μm nominal thickness), followed by another dense outer pyrocarbon layer (40 μm nominal thickness). The kernels were also manufactured by B&W and identified as kernel lot G73I-14-69307. Two data packages were submitted by B&W containing the acceptance testing results for the kernels and coated particles, these are identified by their lot numbers. A discussion on the coating of the B&W TRISO particles can also be found in INL report INL/EXT-09-16545. A data compilation of ORNL analysis of G73J-14-93072A can be found in ORNL/TM-2008/133. The AGR-2 Fuel Specification (INL SPC-923) provides the requirements necessary for acceptance of the fuel manufactured for the AGR-2 irradiation test. Section 3.3 of SPC-923 provides the property requirements for the heat treated compacts. The Statistical Sampling Plan for AGR-2 Fuel Materials (INL PLN-2691) provides additional guidance regarding statistical methods for product acceptance and recommended sample sizes. The procedures for characterizing and qualifying the compacts are outlined in ORNL product inspection plan AGR-CHAR-PIP-11 to obtain data needed for calculation of compacting charge weight and matrix density. Riffling of compact charges is also covered by this procedure. Prior to overcoating, the TRISO particles are characterized per ORNL product inspection plan AGR-CHAR-PIP-10 to determine uranium content, obtain data need for overcoating and compact fabrication, and obtain further data needed for calculation of matrix density. Riffling of overcoater charges is also covered by this procedure. This document contains all the inspection report forms and data report forms generated by these inspection plans. In addition to the characterization data, this report also contains other records relevant to the fuel product acceptance. A history of the material flow and sample naming is included. The overcoating and compacting process is summarized. A record of the materials use to make the matrix is also included. A Certificate of Conformance and any applicable Nonconformance Reports are attached as Appendices.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Data Compilation for AGR-2 UCO Variant Compact Lot LEU06-OP1-Z

This document is a compilation of characterization data for the candidate AGR-2 UCO Baseline fuel compact lot LEU07-OPI-Z. The compacts were produced by ORNL for the Advanced Gas Reactor Fuel Development and Qualification (AGR) program for the second AGR irradiation test (AGR-2). This compact lot was fabricated using particle composite LEU07. LEU07 came from Babcock and Wilcox (B&W) coated particle lot G73J-14-92072A, which was an upgraded batch of TRISO-coated 425 μm diameter, 14% low enrichment uranium oxide/uranium carbide kernels (LEUCO). The AGR-2 TRISO-coated particles consist of a spherical kernel coated with an ~50% dense carbon buffer layer (100 μm nominal thickness), followed by a SiC layer (35 μm nominal thickness), followed by another dense outer pyrocarbon layer (40 μm nominal thickness). The kernels were also manufactured by B&W and identified as kernel lot G73I-14-69307. Two data packages were submitted by B&W containing the acceptance testing results for the kernels and coated particles, these are identified by their lot numbers. A discussion on the coating of the B&W TRISO particles can also be found in INL report INL/EXT-09-16545. A data compilation of ORNL analysis of G73J-14-93072A can be found in ORNL/TM-2008/133. The AGR-2 Fuel Specification (INL SPC-923) provides the requirements necessary for acceptance of the fuel manufactured for the AGR-2 irradiation test. Section 3.3 of SPC-923 provides the property requirements for the heat treated compacts. The Statistical Sampling Plan for AGR-2 Fuel Materials (INL PLN-2691) provides additional guidance regarding statistical methods for product acceptance and recommended sample sizes. The procedures for characterizing and qualifying the compacts are outlined in ORNL product inspection plan AGR-CHAR-PIP-11 to obtain data needed for calculation of compacting charge weight and matrix density. Riffling of compact charges is also covered by this procedure. Prior to overcoating, the TRISO particles are characterized per ORNL product inspection plan AGR-CHAR-PIP-10 to determine uranium content, obtain data need for overcoating and compact fabrication, and obtain further data needed for calculation of matrix density. Riffling of overcoater charges is also covered by this procedure. This document contains all the inspection report forms and data report forms generated by these inspection plans. In addition to the characterization data, this report also contains other records relevant to the fuel product acceptance. A history of the material flow and sample naming is included. The overcoating and compacting process is summarized. A record of the materials use to make the matrix is also included. A Certificate of Conformance and any applicable Nonconformance Reports are attached as Appendices.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Data Compilation for AGR-2 B&W UO₂ Compact Lot LEU11-OP2-Z (Revision 1)

This document is a compilation of characterization data for the candidate AGR-2 B&W UO 2 fuel compact lot LEU11-OP2-Z. The compacts were produced by ORNL for the Advanced Gas Reactor Fuel Development and Qualification (AGR) program for the second AGR irradiation test (AGR-2). This compact lot was fabricated using particle composite LEU11. LEU11 came from Babcock and Wilcox (B&W) coated particle lot G73H-10-93085B, which was an upgraded batch of TRISO-coated 500 μm nominal diameter, 9.6% low enriched uranium oxide kernels (LEU). The AGR-2 TRISO-coated particles consist of a spherical kernel coated with an ~50% dense carbon buffer layer (100 μm nominal thickness), followed by a dense inner pyrocarbon layer (40 μm nominal thickness), followed by a SiC layer (35 μm nominal thickness), followed by another dense outer pyrocarbon layer (40 μm nominal thickness). The kernels were also manufactured by B&W and identified as kernel lot G73AA-10-69308. Two data packages were submitted by B&W containing the acceptance testing results for the kernels and coated particles, these are identified by their lot numbers. A discussion on the coating of the B&W TRISO particles can also be found in INL report INL/EXT-09-16545. A data compilation of ORNL analysis of G73H-10-93085B can be found in ORNL/TM-2009/255. The AGR-2 Fuel Specification (INL SPC-923) provides the requirements necessary for acceptance of the fuel manufactured for the AGR-2 irradiation test. Section 4.3 of SPC-923 provides the property requirements for the heat treated UO 2 compacts. The Statistical Sampling Plan for AGR-2 Fuel Materials (INL PLN-2691) provides additional guidance regarding statistical methods for product acceptance and recommended sample sizes. The procedures for characterizing and qualifying the compacts are outlined in ORNL product inspection plan AGRCHAR- PIP-14. The inspection report forms generated by this product inspection plan document the product acceptance for the property requirements listed in section 4.3 of SPC-923. Prior to compacting, the overcoated particles are characterized per ORNL product inspection plan AGRCHAR- PIP-11 to obtain data needed for calculation of compacting charge weight and matrix density. Riffling of compact charges is also covered by this procedure. Prior to overcoating, the TRISO particles are characterized per ORNL product inspection plan AGR-CHAR-PIP-10 to determine uranium content, obtain data needed for overcoating and compact fabrication, and obtain further data needed for calculation of matrix density. Riffling of overcoater charges is also covered by this procedure. This document contains all the inspection report forms and data report forms generated by these inspection plans. In addition to the characterization data, this report also contains other records relevant to the fuel product acceptance. A history of the material flow and sample naming is included. The overcoating and compacting process is summarized, and a record of the materials used to make the matrix is included. A Certificate of Conformance and any applicable Nonconformance Reports are attached as Appendices.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

CMM Interim Check (U)

Coordinate Measuring Machines (CMM) are widely used in industry, throughout the Nuclear Weapons Complex and at Los Alamos National Laboratory (LANL) to verify part conformance to design definition. Calibration cycles for CMMs at LANL are predominantly one year in length. Unfortunately, several nonconformance reports have been generated to document the discovery of a certified machine found out of tolerance during a calibration closeout. In an effort to reduce risk to product quality two solutions were proposed – shorten the calibration cycle which could be costly, or perform an interim check to monitor the machine’s performance between cycles. The CMM interim check discussed makes use of Renishaw’s Machine Checking Gauge. This off-the-shelf product simulates a large sphere within a CMM’s measurement volume and allows for error estimation. Data was gathered, analyzed, and simulated from seven machines in seventeen different configurations to create statistical process control run charts for on-the-floor monitoring.

42 ENGINEERING↗

Responses to Nonconformances, AIHA Onsite Assessment August 29-31, 2022

A nonconformance report (NCR) was not generated to document the original Beryllium (Be) positive result being changed to negative due to an oversight by the lab. The sample was re-analyzed on the Agilent ICP-OES which includes software to deal with interferences and resulted in a negative for Be. In order to determine the cause of the false positive, which was originally thought to be due to the Titanium interference in the sample, the laboratory analyzed a blank and a reporting limit standard with 5 ppm and 10 ppm of Titanium added in. These were analyzed on the Perkin Elmer ICP 5 instrument to see if the positive Be was reproducible.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

HB-Line Plutonium Oxide Data Collection Strategy

HB-Line and H-Canyon will handle and process plutonium material to produce plutonium oxide for feed to the Mixed Oxide Fuel Fabrication Facility (MFFF). However, the plutonium oxide product will not be transferred to the MFFF directly from HB-Line until it is packaged into a qualified DOE-STD-3013-2012 container. In the interim, HB-Line will load plutonium oxide into an inner, filtered can. The inner can will be placed in a filtered bag, which will be loaded into a filtered outer can. The outer can will be loaded into a certified 9975 with getter assembly in compliance with onsite transportation requirement, for subsequent storage and transfer to the K-Area Complex (KAC). After DOE-STD-3013-2012 container packaging capabilities are established, the product will be returned to HB-Line to be packaged into a qualified DOE-STD-3013-2012 container. To support the transfer of plutonium oxide to KAC and then eventually to MFFF, various material and packaging data will have to be collected and retained. In addition, data from initial HB-Line processing operations will be needed to support future DOE-STD-3013-2012 qualification as amended by the HB-Line DOE Standard equivalency. As production increases, the volume of data to collect will increase. The HB-Line data collected will be in the form of paper copies and electronic media. Paper copy data will, at a minimum, consist of facility procedures, nonconformance reports (NCRs), and DCS print outs. Electronic data will be in the form of Adobe portable document formats (PDFs). Collecting all the required data for each plutonium oxide can will be no small effort for HB-Line, and will become more challenging once the maximum annual oxide production throughput is achieved due to the sheer volume of data to be collected. The majority of the data collected will be in the form of facility procedures, DCS print outs, and laboratory results. To facilitate complete collection of this data, a traveler form will be developed which identifies the required facility procedures, DCS print outs, and laboratory results needed to assemble a final data package for each HB-Line plutonium oxide interim oxide can. The data traveler may identify the specific values (data) required to be extracted from the collected facility procedures and DCS print outs. The data traveler may also identify associated criteria to be checked. Inevitably there will be procedure anomalies during the course of the HB-Line plutonium oxide campaign that will have to be addressed in a timely manner.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

RH Packaging Program Guidance (Rev. 3)

The purpose of this program guidance document is to provide the technical requirements for use, operation, inspection, and maintenance of the Remote Handled-Transuranic (RH-TRU) 72-B Waste Shipping Package (also known as the "RH-TRU 72-B") and directly related components. This document complies with the requirements as specified in the RH-TRU 72-B Safety Analysis Report for Packaging (SARP), and Nuclear Regulatory Commission (NRC) Certificate of Compliance (C of C) 9212. If there is a conflict between this document and the SARP and/or C of C, the C of C shall govern. The C of C states: "...each package must be prepared for shipment and operated in accordance with the procedures described in Chapter 7.0, Operating Procedures, of the application." It further states: "...each package must be tested and maintained in accordance with the procedures described in Chapter 8.0, Acceptance Tests and Maintenance Program of the Application." Chapter 9.0 of the SARP tasks the Waste Isolation Pilot Plant (WIPP) Management and Operating (M&O) Contractor with assuring the packaging is used in accordance with the requirements of the C of C. Because the packaging is NRC-approved, users need to be familiar with Title 10 Code of Federal Regulations (CFR) §71.8, "Deliberate Misconduct." Any time a user suspects or has indications that the conditions of approval in the C of C were not met, the U.S. Department of Energy (DOE) Carlsbad Field Office (CBFO) shall be notified immediately. The CBFO will evaluate the issue and notify the NRC if required. In accordance with 10 CFR Part 71, "Packaging and Transportation of Radioactive Material," certificate holders, packaging users, and contractors or subcontractors who use, design, fabricate, test, maintain, or modify the packaging shall post copies of (1) 10 CFR Part 21, "Reporting of Defects and Noncompliance," regulations, (2) Section 206 of the Energy Reorganization Act of 1974, and (3) NRC Form 3, Notice to Employees. These documents must be posted in a conspicuous location where the activities subject to these regulations are conducted. This document details the instructions to be followed to operate, maintain, and test the RH-TRU 72-B packaging. This Program Guidance standardizes instructions for all users. Users shall follow these instructions or equivalent approved instructions. Following these instructions assures that operations meet the requirements of the SARP.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

RH Packaging Program Guidance (Rev. 3.1)

The purpose of this program guidance document is to provide the technical requirements for use, operation, inspection, and maintenance of the Remote-Handled Transuranic (RH-TRU) 72-B Waste Shipping Package (also known as the "RH-TRU 72-B") and directly related components. This document complies with the requirements as specified in the RH-TRU 72-B Safety Analysis Report for Packaging (SARP), and Nuclear Regulatory Commission (NRC) Certificate of Compliance (C of C) 9212. If there is a conflict between this document and the SARP and/or C of C, the C of C shall govern. The C of C states, "each package must be prepared for shipment and operated in accordance with the procedures described in Chapter 7.0, Operating Procedures, of the application." It further states: "…each package must be tested and maintained in accordance with the procedures described in Chapter 8.0, Acceptance Tests and Maintenance Program of the Application." Chapter 9.0 of the SARP tasks the Department of Energy Carlsbad Field Office or the Waste Isolation Pilot Plant (WIPP) Management and Operating (M&O) Contractor with assuring the packaging is used in accordance with the requirements of the C of C. Because the packaging is NRC approved, users need to be familiar with Title 10 Code of Federal Regulations (CFR) §71.8, "Deliberate Misconduct." Any time a user suspects or has indications that the conditions of approval in the C of C were not met, the U.S. Department of Energy (DOE) Carlsbad Field Office (CBFO) shall be notified immediately. The CBFO will evaluate the issue and notify the NRC if required. In accordance with 10 CFR Part 71, "Packaging and Transportation of Radioactive Material," certificate holders, packaging users, and contractors or subcontractors who use, design, fabricate, test, maintain, or modify the packaging shall post copies of (1) 10 CFR Part 21, "Reporting of Defects and Noncompliances," regulations, (2) Section 206 of the Energy Reorganization Act of 1974, and (3) NRC Form 3, Notice to Employees. These documents must be posted in a conspicuous location where the activities subject to these regulations are conducted. This document details the instructions to be followed to operate, maintain, and test the RH-TRU 72-B packaging. This Program Guidance standardizes instructions for all users. Users shall follow these instructions or equivalent approved instructions. Following these instructions assures that operations meet the requirements of the SARP.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

CH Packaging Program Guidance

The purpose of this document is to provide the technical requirements for preparation for use, operation, inspection, and maintenance of a Transuranic Package Transporter Model II (TRUPACT-II), a HalfPACT shipping package, and directly related components. This document complies with the minimum requirements as specified in the TRUPACT-II Safety Analysis Report for Packaging (SARP), HalfPACT SARP, and U.S. Nuclear Regulatory Commission (NRC) Certificates of Compliance (C of C) 9218 and 9279, respectively. In the event of a conflict between this document and the SARP or C of C, the C of C shall govern. The C of Cs state: "each package must be prepared for shipment and operated in accordance with the procedures described in Chapter 7.0, Operating Procedures, of the application." They further state: "each package must be tested and maintained in accordance with the procedures described in Chapter 8.0, Acceptance Tests and Maintenance Program of the Application." Chapter 9.0 of the SARP charges the U.S. Department of Energy (DOE) or the Waste Isolation Pilot Plant (WIPP) management and operating (M&O) contractor with assuring packaging is used in accordance with the requirements of the C of C. Because the packaging is NRC-approved, users need to be familiar with Title 10 Code of Federal Regulations (CFR) §71.8. Any time a user suspects or has indications that the conditions of approval in the C of C were not met, the Carlsbad Field Office (CBFO) shall be notified immediately. The CBFO will evaluate the issue and notify the NRC if required. In accordance with 10 CFR Part 71, certificate holders, packaging users, and contractors or subcontractors who use, design, fabricate, test, maintain, or modify the packaging shall post copies of (1) 10 CFR Part 21 regulations, (2) Section 206 of the Energy Reorganization Act of 1974, and (3) NRC Form 3, Notice to Employees. These documents must be posted in a conspicuous location where the activities subject to these regulations are conducted. This document provides the instructions to be followed to operate, maintain, and test the TRUPACT-II and HalfPACT packaging. The intent of these instructions is to standardize operations. All users will follow these instructions or equivalent instructions that assure operations are safe and meet the requirements of the SARPs.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

RH Packaging Operations Manual (Rev. 5)

This procedure provides operating instructions for the remote-handled transuranic (RH-TRU) 72-B Waste Shipping Package (hereinafter referred to as "RH-TRU 72-B"). In this document, "Packaging" refers to the assembly of components necessary to ensure compliance with the packaging requirements (not loaded with a payload). "Package" refers to a Type B packaging that, with its radioactive contents, is designed to retain the integrity of its containment and shielding when subject to the normal conditions of transport and hypothetical accident test conditions set forth in 10 CFR Part 71. Before RH-TRU 72-B loading operations begin, loading procedures and revisions must be sent to the DOE Carlsbad Field Office (CBFO) at site.documents@wipp.ws for approval. Loading of the RH-TRU 72-B can be done one of two ways: on the cask trailer in the vertical position or by removing the cask from the trailer and loading it in an area designated for remote-handling. Two types of trailers were specially designed to transport the RH-TRU 72-B: a spread-axle trailer requiring a crane to rotate the cask and a cask uprighting trailer designed with built-in hydraulics to rotate the RH-TRU 72-B into the vertical position while on the trailer. The hydraulic power unit is a separate piece of equipment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

RH Packaging Operations Manual (Rev. 6)

This procedure provides operating instructions for the remote-handled transuranic (RH-TRU) 72-B Waste Shipping Package (hereinafter referred to as "RH-TRU 72-B"). In this document, "Packaging" refers to the assembly of components necessary to ensure compliance with the packaging requirements (not loaded with a payload). "Package" refers to a Type B packaging that, with its radioactive contents, is designed to retain the integrity of its containment and shielding when subject to the normal conditions of transport and hypothetical accident test conditions set forth in 10 CFR Part 71. Before RH-TRU 72-B loading operations begin, loading procedures and revisions must be sent to the DOE Carlsbad Field Office (CBFO) at site.documents@wipp.ws for approval. Loading of the RH-TRU 72-B can be done one of two ways: on the cask trailer in the vertical position or by removing the cask from the trailer and loading it in an area designated for remote-handling. Two types of trailers were specially designed to transport the RH-TRU 72-B: a spread-axle trailer requiring a crane to rotate the cask and a cask uprighting trailer designed with built-in hydraulics to rotate the RH-TRU 72-B into the vertical position while on the trailer. The hydraulic power unit is a separate piece of equipment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

RH Packaging Maintenance Manual (Rev. 0)

This document provides instructions for performing (1) Inner containment vessel (IV) and outer containment vessel (OC) maintenance leakage rate test on packaging seals and corresponding seal surfaces using a nondestructive helium (He) leak test; (2) IV and OC periodic leakage rate test using nondestructive He leak test; and (3) IV and OC structural pressure tests.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Fiberboard Properties and Degradation Rates for Storage of 9975 Shipping Packages in KAC (2021 Status Report)

Thermal, mechanical, and physical properties have been measured on fiberboard samples following accelerated aging for up to 16 years. The aging environments include elevated temperature up to 250 ºF (the maximum allowed service temperature for fiberboard in 9975 packages) and elevated humidity. Accelerated aging results have been analyzed and used to build aging models. Correlations relating several properties (thermal conductivity, energy absorption, weight, dimensions, and density) to their rate of change in potential storage environments have been developed. Combined with an estimate of the actual conditions the fiberboard experiences in K-Area Complex (KAC), these models allow development of service life predictions. KAC completed calculations that supported extending the service life of 9975 packages with 3013 and non3013 containers in storage from 15 years to 20 years. These calculations addressed the potential for degraded fiberboard properties following 20 years in storage using degradation models developed previously. The updated degradation models developed in this report have been compared to the assumptions in these calculations, and the current results for fiberboard dimensions, density, radial thermal conductivity, and energy absorption remain consistent with those calculations. The axial thermal conductivity degradation rate slightly exceeds calculations estimate of 0.5% per year between 130 and 160 °F. Additional data will continue to be collected to permit future refinements to the models and assumptions. Some of the predicted degradation rates presented in this report are extreme. However, these relate to environments that do not exist within KAC or would be postulated only as upset conditions that would not likely persist for an extended period. For a typical package stored in KAC with approximately 10-12 watts internal heat load or less, and ambient temperatures below 90 ºF, the fiberboard assemblies experience storage conditions less severe than any of the aging environments. Fiberboard in conforming packages with lower internal heat loads should experience little or no degradation and is expected to provide a service life beyond the currently approved 20 year storage period. Packages with higher internal heat loads may not continue to perform their required safety functions beyond 20 years. Ultimately, service life will be determined by the cumulative effect of degradation from all the conditions these packages might encounter. The results and model predictions presented in this report are applicable to 9975 packages with cane or softwood fiberboard overpack assemblies. These degradation models do not address the effects of nonconforming conditions such as the presence of excess moisture and mold or beetle infestations.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗