At least 19 records

Design of a Crossflow Attenuated Natural Laminar Flow Flight Test Article

This abstract includes preliminary information on the computational design and analysis of a flight test article. The flight test aims to experimentally validate the new Crossflow Attenuated Natural Laminar Flow (CATNLF) design method in a flight environment. The CATNLF design method uses geometry shaping to produce specific pressure distributions that enable laminar flow on vehicle components with high sweep and high Reynolds numbers by attenuating the crossflow growth that typically leads to premature transition on such components. The flight test article design is scheduled to be completed at the end of 2019, with model fabrication beginning in early 2020.Design results presented in this abstract are representative of the final test article. The final paper will be updated to include the finalized test article geometry and analysis.

Michelle N. Lynde↗

Design of a Crossflow Attenuated Natural Laminar Flow Flight Test Article

A natural laminar flow test article has been designed and analyzed for a flight test at the NASA Armstrong Flight Research Center using the F-15 aircraft with Centerline Instrument Pylon (CLIP) testbed. The flight test aims to experimentally validate the new Crossflow Attenuated Natural Laminar Flow (CATNLF) design method in a flight environment. The CATNLF design method uses geometry shaping to produce specific pressure distributions that enable laminar flow on vehicle components with high sweep and high Reynolds numbers by attenuating the crossflow growth that typically leads to premature transition on such components. The CATNLF test article, which will be mounted vertically below the F-15 for flight testing, is designed to be representative of a transonic transport wing and accounts for transition mechanisms due to crossflow, Tollmien-Schlichting, and attachment line transition instabilities. The test article is predicted to support 53% surface area of laminar flow on the suction-side at the design point and maintains significant laminar flow extents at near-cruise, off-design conditions. The design was performed, flight matrix selected, and instrumentation chosen with two primary test goals in mind: to confirm the effectiveness of the CATNLF method in attenuating crossflow growth on a representative transonic transport wing, and to investigate surface requirements needed for laminar flow applications.

Michelle N. Lynde↗

Components Cleaning Facility, SWMU 030 Eastern High-Concentration Plume Area Implementation Work Plan Kennedy Space Center, Florida

This Implementation Work Plan (IWP) presents detailed design elements and coordination specifics to implement an air sparging (AS) Interim Measure (IM) to remediate groundwater at the Components Cleaning Facility (CCF), Eastern High Concentration Plume (HCP) Area located at Kennedy Space Center (KSC), Florida. The objective of the CCF East IM is to remediate groundwater where trichloroethene, cis-1,2-dichloroethene, and vinyl chloride concentrations exceed Florida Department of Environmental Protection Natural Attenuation Default Criteria (NADC) (identified as the HCP) via AS and to transition to monitored natural attenuation. CCF has been designated Solid Waste Management Unit 030 under KSC’s Resource Conservation and Recovery Act Corrective Action Program.

James Lloyd↗

In Situ Chemical Reduction Interim Measures Work Plan Hot Spot 3 Mobile Launcher Platform Rehabilitation Sites / Vehicle Assembly Building Area (SWMU 056) Kennedy Space Center, Florida

This document presents the design details of an In Situ Chemical Reduction (ISCR) Interim Measures Work Plan for Hot Spot 3 within Mobile Launcher Platform Rehabilitation Sites/Vehicle Assembly Building Area, Solid Waste Management Unit (SWMU) 056 (SWMU 056), located at the John F. Kennedy Space Center, Florida. The interim measures (IM) treatment zone encompasses an area identified as the High Concentration Plume (HCP), which is defined as the area with chlorinated volatile organic compound (CVOC) groundwater concentrations greater than their respective Natural Attenuation Default Concentration (NADC). The objective of the IM is to remove CVOC mass within the treatment area to levels that facilitate a transition to natural attenuation monitoring. The IM design consists of the selected ISCR amendment, Provect-IR, which is a mixture of solid reagents in a single product that promotes enhanced reductive dechlorination and ISCR. ProvectIR includes natural antimethanogenic compounds; multiple hydrophilic, nutrient-rich organic carbon sources; zero valent iron; chemical oxygen scavengers; and vitamin and mineral sources. The proposed treatment area for this IM encompasses less than 1 acre and includes three vertical treatment intervals to reach the NADC plumes that vary per CVOC and depth: 4 to 10 feet below land surface (bls), 10 to 18 feet bls, and 42 to 52 feet bls. The amendment will be distributed through 16 injection points (IP01 through IP16) using dosing rates ranging from 0.4% to 0.6% of soil mass within the treatment interval and a 15% or 20% slurry strength. Dosage rates and slurry strength are based on groundwater geochemistry, soil characteristics, and contaminant concentrations. To aid in the evaluation of the ISCR IM performance, six performance monitoring wells will be installed following injections and sampled semiannually. CVOC parameters will be sampled until concentrations reduce to below their NADC. Underground Injection Control parameters will be sampled until concentrations decrease to background levels or to levels that meet respective groundwater standards. Sampling frequency will be evaluated annually and modified as needed. The path forward for the ISCR IM implementation includes preparing the IM Implementation Work Plan, ISCR injections, monitoring well installation, performance monitoring, and reporting.

Randall K. Sillan↗

Launch Complex 39B, SWMU 009 Air Sparging System Expansion Implementation Work Plan Kennedy Space Center, Florida

This Implementation Work Plan (IWP) for expansion of the Air Sparging (AS) system at Launch Complex 39B (LC39B), presents the design and coordination specifics to expand the existing AS Interim Measure (IM) at LC39B located at Kennedy Space Center (KSC), Florida. The existing AS system at LC39B was installed in 2017 and included 279 AS wells. LC39B has been designated as Solid Waste Management Unit (SWMU) 009 under the KSC Resource Conservation and Recovery Act (RCRA) Corrective Action Program. Expansion of the AS IM will include installation of an additional five AS wells to depths of approximately 13 and 17 feet below land surface (bls) to remediate contaminated groundwater identified northwest of the launch pad, near the liquid oxygen (LOX) tank. The expansion will target concentrations of cis-1,2-dichloroethene (cDCE) and vinyl chloride (VC) greater than Florida Department of Environmental Protection (FDEP) Natural Attenuation Default Concentrations (NADCs) that were identified during direct push technology (DPT) sampling events between 2019-2022 in shallow intervals between 8 and 16 feet bls. The objective for this expansion is to remediate contaminated groundwater within the treatment zone to below NADCs to support transition to monitored natural attenuation (MNA) through a long-term monitoring (LTM) program. This expansion will treat approximately 0.07-acres of residual groundwater contamination. The IWP design for this expansion will utilize the existing AS system trailer that is already onsite and operating. The five new AS expansion wells will be integrated into the existing Zone Z4 distribution manifold to deliver compressed air to the new AS wells. To deliver airflow, three existing lateral lines will be split in the field at a lateral split junction point (using 2-way or 3-way splits). Each split lateral will supply air to AS wells at the same depth interval to minimize preferential pathways. The trenching layout for the new AS wells was developed to minimize ground disturbance due to the amount of utilities in the area. One new monitoring well will also be installed and added to LC39B’s performance monitoring program to evaluate the effectiveness of the AS system expansion. This well will be sampled on a semi-annual basis for volatile organic compounds, with results evaluated to determine if system adjustments may be required. The main components of this IWP were presented to the KSC Remediation Team (KSCRT) at the October 2022 Meeting (Meeting 2210-M05). DPT delineation data from the LOX area were also presented, which included some inferred boundaries due to physical restrictions of the LOX tank and associated concrete pad and infrastructure. Planned monitoring well sampling in this area will help determine if back-diffusion may be occurring from beneath the pad. Additionally, based on potential petroleum odors and staining identified at two DPT locations during the January 2022 DPT event in the 10-16 feet bls range, a KSCRT action item was assigned during the October 2022 meeting to collect soil samples for petroleum compounds if similar odors or staining are identified during IM implementation. Construction completion and performance monitoring will be incorporated into LC39B’s groundwater monitoring reports, which are currently submitted on an annual basis to FDEP to document operation and maintenance activities and results from the AS IM.

Deborah M. Wilson↗

A Design Exploration of Natural Laminar Flow Applications for the SUSAN Electrofan Concept

A trade study supported by the NASA Convergent Aeronautics Solutions (CAS) Project is presently underway to explore the desirability, feasibility, and viability of a new vehicle concept. The vehicle under development is the SUbsonic Single Aft eNgine (SUSAN) Electrofan configuration, which is a subsonic regional jet with the transformative concept of combining wing-mounted distributed electrified aircraft propulsion with a single engine design. The multidisciplinary team is investigating several potential technologies that would help the SUSAN Electrofan configuration achieve its performance goals, one of which is the application of Natural Laminar Flow (NLF) to the main wing. The present computational study utilizes the Crossflow Attenuated Natural Laminar Flow (CATNLF) design method to reshape the wing airfoils to obtain significant extents of NLF at the cruise condition. Fully-turbulent and laminar designs were performed to quantify the aerodynamic performance potential of NLF on the SUSAN Electrofan configuration. The laminar design supported laminar flow on53% of the area of the wing upper surface, resulting in a 19count (8.8%) drag reduction for the wing-fuselage configuration. The near-cruise off-design characteristics are also studied and illustrate that the robust laminar design sustains an NLF performance benefit through perturbations in Mach and angle of attack. A discussion is also included on multidisciplinary implications of utilizing NLF for the configuration, including design, manufacturing, and operational considerations required to support NLF on the main wing, as well as the interaction between the potential wing-mounted boundary layer ingestion technology that is also being explored for the SUSAN Electrofan configuration.

Natural Laminar Flow↗

Effects of Potassium Permanganate Oxidation on Subsurface Microbial Activity

In situ chemical oxidation has the potential for degrading large quantities of organic contaminants and can be more effective and timely than traditional ex situ treatment methods. However, there is a need to better characterize the potential effects of this treatment on natural processes. This study focuses on potential inhibition to anaerobic dechlorination of trichloroethene (TCE) in soils from a large manufacturing facility as a result of in situ oxidation using potassium permanganate (KMn04)Previous microcosm studies established that natural attenuation occurs on-site and that it is enhanced by the addition of ethanol to the system. A potential remediation scheme for the site involves the use of potassium permanganate to reduce levels of TCE in heavily contaminated areas, then to inject ethanol into the system to "neutralize" excess oxidant and enhance microbial degradation. However, it is currently unknown whether the exposure of indigenous microbial populations to potassium permanganate may adversely affect biological reductive dechlorination by these microorganisms. Consequently, additional microcosm studies were conducted to evaluate this remediation scheme and assess the effect of potassium permanganate addition on biological reductive dechlorination of TCE. Samples of subsurface soil and groundwater were collected from a TCE-impacted area of the site. A portion of the soil was pretreated with nutrients and ethanol to stimulate microbial activity, while the remainder of the soil was left unamended. Soil/groundwater microcosms were prepared in sealed vials using the nutrient-amended and unamended soils, and the effects of potassium permanganate addition were evaluated using two permanganate concentrations (0.8 and 2.4 percent) and two contact times (1 and 3 weeks). TCE was then re-added to each microcosm and TCE and dichloroethene (DCE) concentrations were monitored to determine the degree to which microbial dechlorination occurred following chemical oxidation. Evidence of microbial degradation was generally detected within four weeks after TCE addition. Increases in DCE concentrations were consistent with decreases in TCE. The concentration of TCE in the nutrient-amended samples exposed to 2.4% KMnO4 for one week degraded somewhat more slowly than the samples exposed to the 0.8% KMnO4. The rates of degradation did not correlate with the length of KMn04 exposure for the nutrient-amended microcosms. Microbial degradation of TCE in the unamended microcosms was generally similar to that observed in the nutrient-amended microcosms. One treatment condition (unamended, one week exposure, 2.4% KMnO4) was exposed to elevated levels of ethanol and showed little evidence of degradation. It is suspected that the high levels of ethanol were toxic to the microorganisms. The results of the study indicate that exposure of indigenous soil and groundwater microbial populations to KMnO4 at concentrations of 0.8 to 2.4% do not impair the ability of the microbial populations to dechlorinate TCE. Consequently, the combination of chemical oxidation followed by enhanced biological reductive dechlorination appears to be a viable remedial strategy for highly-impacted subsurface areas of the site.

Rowland, Martin A.↗

Converter Compressor Building, SWMU 089, Hot Spot Areas 1, 2, and 5 Operations, Maintenance, and Monitoring Report, Kennedy Space Center, Florida

This Operations, Maintenance, and Monitoring Report (OMMR) presents the findings, observations, and results from operation of the air sparging (AS) interim measure (IM) for Hot Spot (HS) Areas 1, 2, and 5 at the Converter Compressor Building (CCB) located at Kennedy Space Center (KSC), Florida. The objective of the IM at CCB HS Areas 1, 2, and 5 is to decrease concentrations of volatile organic compounds (VOCs) in groundwater in the treatment zones via AS to levels that will enable a transition to a monitored natural attenuation (MNA) phase. This OMMR presents system operations and maintenance (O&M) information and performance monitoring results since full-scale O&M began in June 2014 (2 months after initial system startup in April 2014), including quarterly performance monitoring events in July and October 2014 and January and May 2015. Based on the results to date, the AS system is operating as designed and is meeting the performance criteria and IM objective. The performance monitoring network is adequately constructed for assessment of IM performance at CCB HS Areas 1, 2, and 5. At the March 2014 KSC Remediation Team (KSCRT) Meeting, team consensus was reached for the design prepared for expansion of the system to treat the HS 4 area, and at the November 2014 KSCRT Meeting, team consensus was reached that HS 3 was adequately delineated horizontally and vertically and for selection of AS for the remedial approach for HS 3. At the July 2015 KSCRT meeting, team consensus was reached to continue IM operations in all zones until HSs 3 and 4 is operational, once HS 3 and 4 zones are operational discontinue operations in HS 1, 2, and 5 zones where concentrations are less than GCTLs to observe whether rebounding conditions occur. Team consensus was also reached to continue quarterly performance monitoring to determine whether operational zones achieve GCTLs and to continue annual IGWM of CCB-MW0012, CCBMW0013, and CCB-MW0056, located south of the treatment area. The next performance monitoring event is scheduled for July 2015.

Converter Compressor Building↗

Building M7-0505 Treatment Tank (SWMU 039) Annual Performance Monitoring Report

This Annual Performance Monitoring Report presents a summary of Interim Measure (IM) activities and an evaluation of data collected during the third year (June 2014 to September 2015) of operation, maintenance, and monitoring (OM&M) conducted at the Building M7-505 (M505) Treatment Tank area, Kennedy Space Center (KSC), Florida ("the Site"). Under KSC's Resource Conservation and Recovery Act Corrective Action Program, the M505 Treatment Tank area was designated Solid Waste Management Unit 039. Arcadis U.S., Inc. (Arcadis) began IM activities on January 10, 2012, after completion of construction of an in situ air sparge (IAS) system to remediate volatile organic compounds (VOCs) in groundwater at concentrations exceeding applicable Florida Department of Environmental Protection (FDEP) Chapter 62-777, Florida Administrative Code, Natural Attenuation Default Concentrations (NADCs). This report presents a summary of the third year of OM&M activities conducted between June 2014 and September 2015.

Source record↗

Launch Complex 39A, SWMU 008, Operations, Maintenance, and Monitoring Report, Kennedy Space Center, FL

This Operations, Maintenance, and Monitoring Report (OMMR) presents the findings, observations, and results from Year 1 operation of the air sparging (AS) groundwater interim measure (IM) for High-Concentration Plumes (HCPs) and Low-Concentration Plumes (LCPs) within the perimeter fence line at Launch Complex 39A (LC39A) located at Kennedy Space Center (KSC), Florida. The objective of the LC39A groundwater IM is to actively decrease concentrations of trichloroethene (TCE), cis-1,2-dichloroethene (cDCE), and vinyl chloride (VC) in groundwater in the HCP and LCP within the pad perimeter fence line via AS to levels less than Florida Department of Environmental Protection (FDEP) Groundwater Cleanup Target Levels (GCTLs). The objective was developed because LC39A is currently being leased to Space Exploration Technologies (SpaceX), and the original IM for monitored natural attenuation (MNA) over an extended period of time was not suitable for future planned site use.

Operations↗

Mobile Launch Platform Vehicle Assembly Building Area (SWMU 056) Hot Spot 3 Bioremediation Interim Measures Work Plan, Kennedy Space Center, Florida

This Interim Measures Work Plan (IMWP) presents an approach and design for the remediation of chlorinated volatile organic compound (CVOC) groundwater impacts using bioremediation (biostimulation and bioaugmentation) in Hot Spot 3, which is defined by the area where CVOC (trichloroethene [TCE], cis-1,2-dichloroethene [cDCE], and vinyl chloride [VC]) concentrations are greater than 10 times their respective Florida Department of Environmental Protection (FDEP) Natural Attenuation Default Concentration (NADC) [10xNADC] near the western Mobile Launch Platform (MLP) structure. The IM treatment area is the Hot Spot 3 area, which is approximately 0.07 acres and extends from approximately 6 to 22 and 41 to 55 feet below land surface (ft BLS). Within Hot Spot 3, a source zone (SZ; area with TCE concentrations greater than 1% solubility [11,000 micrograms per liter (micrograms/L)]) was delineated and is approximately 0.02 acres and extends from approximately 6 to 16 and 41 to 50 ft BLS.

MLPV↗

Wilson Corners SWMU 001 2015 Annual Long Term Monitoring Report Kennedy Space Center, Florida

This document presents the findings of the 2015 Long Term Monitoring (LTM) that was completed at the Wilson Corners site, located at the National Aeronautics and Space Administration John F. Kennedy Space Center, Florida. The objectives of the 2015 LTM event were to evaluate the groundwater flow direction and gradient, to monitor the vertical and horizontal extent of the volatile organic compounds (VOCs; including the upgradient and sidegradient extents, which are monitored every five years), and to monitor select locations internal to the dissolved groundwater plume. The 2015 LTM event included several upgradient and sidegradient monitoring wells that are not sampled annually to verify the extent of VOCs in this portion of the site. The December 2015 LTM groundwater sampling event included, depth to groundwater measurements, 40 VOC samples collected using passive diffusion bags, and one VOC sample collected using low-flow techniques. Additionally, monitoring well MW0052DD was overdrilled and abandoned using rotasonic drilling techniques. The following conclusions can be made based on the 2015 LTM results: groundwater flow is generally to the west with northwest and southwest flow components from the water table to approximately 55 feet below land surface (ft BLS); peripheral monitoring wells generally delineate VOCs to groundwater cleanup target levels (GCTLs) except for monitoring wells MW0088, MW0090, MW0095, and NPSHMW0039, which had vinyl chloride (VC) concentrations near the GCTL and MW0062, which had trichloroethene (TCE), cis-1,2-dichloroethenen (cDCE), and VC concentrations above natural attenuation default concentrations (NADCs); VOCs in interior downgradient wells generally fluctuate within historic ranges except for monitoring wells in the north-northwest portion of the site, which have increasing VC concentrations indicating potential plume migration and expansion; Historically, the vertical extents of the VOCs were delineated by monitoring wells screened greater than 60 ft BLS (MW0083 through MW0086, and MW0078). The 2015 LTM results indicate that concentrations of daughter product cDCE is greater than the NADC in MW0078 and that cDCE and VC are greater than NADCs in MW0130. TCE was greater than the GCTL in monitoring well MW130 and not detected above method detection limits (9 micrograms per Liter) in monitoring well MW0078. No GCTL exceedances were identified in monitoring wells MW0083 or MW0086; the dissolved plume footprint appears generally stable, though not fully delineated by monitoring well data in the northeast portion of the site; and 2015 LTM results generally support the existing Conceptual Site Model. Geosyntec recommends modifying the LTM program, collecting a verification sample from monitoring well MW0062, and performing a direct push technology instigation in the northnortheastern portion of the site. A cluster of monitoring wells (MW0132 [2 to 12 ft BLS], MW0133 [15 to 25 ft BLS], and MW0134 [29 to 34 ft BLS]) is proposed to delineate impacts in the northnortheast portion of the site. Geosyntec recommends installation of a vertical extent well in the center of the site (Hot Spot 2 area) post-remediation implementation.

groundwater↗

Supply Warehouse#3, SWMU 088 Operations, Maintenance, and Monitoring Report Kennedy Space Center, Florida

This document presents the findings, observations, and results associated with Operations, Maintenance, and Monitoring (OM&M) activities of Corrective Measures Implementation (CMI) activities conducted at Supply Warehouse #3 (SW3) located at John F. Kennedy Space Center (KSC), Florida from October 8, 2015, to September 12, 2016, and performance monitoring results for semi-annual sampling events conducted in March and September 2016. The primary objective of SW3 CMI is to actively decrease concentrations of trichloroethene (TCE) and vinyl chloride (VC) to less than Florida Department of Environmental Protection (FDEP) Natural Attenuation Default Concentrations (NADCs), and the secondary objective is to reduce TCE, cis-1,2-dichloroethene (cDCE), trans-1,2-dichloroethene (tDCE), 1,1-dichloroethene (11DCE), and VC concentrations to less than FDEP Groundwater Cleanup Target Levels (GCTLs). The SW3 facility has been designated Solid Waste Management Unit (SWMU) 088 under KSC's Resource Conservation and Recovery Act (RCRA) Corrective Action Program. Based on the results to date, the SW3 air sparging (AS) system is operating at or below the performance criteria as presented in the 2008 SW3 Corrective Measures Implementation (CMI) Work Plan and 2009 and 2012 CMI Work Plan Addenda. Since the start of AS system operations on December 19, 2012, through the September 2016 groundwater sampling event, TCE concentrations have decreased to less than the GCTL in all wells within the Active Remediation Zone (ARZ), and VC results remain less than NADC but greater than GCTL. Based on these results, team consensus was reached at the October 2016 KSC Remediation Team (KSCRT) meeting to continue AS system operations and semi-annual performance monitoring of volatile organic compounds in March 2017 at ten monitoring wells at select locations, and in September 2017 at four monitoring wells at select locations to reduce VC concentrations to below GCTL. Additionally, surface water samples will be collected at locations SW0001, SW0002, and SW0003 during both the March and September 2017 events. Team consensus was also reached at the October 2017 KSCRT meeting to continue with operation and maintenance (O&M) of the AS system at SW3.

REPORT↗

Hydrocarbon Burn Facility SWMU 007 Interim Groundwater Monitoring Report Kennedy Space Center, Florida

This Interim Groundwater Monitoring (IGWM) Report presents the findings of IGWM completed in September 2019 for the Northern Volatile Organic Compound (VOC) Area of the Hydrocarbon Burn Facility (HBF) at Kennedy Space Center (KSC), Florida. The IGWM was implemented for the Northern VOC Area to provide additional data, to be evaluated along with previous long-term monitoring data, to determine future IGWM options and to evaluate the efficacy of monitored natural attenuation (MNA) as a passive remedial measure in comparison to active remedies for the Northern VOC Area. The primary contaminants of concern in the Northern VOC Area are trichloroethene (TCE), cis-1,2-dichloroethene (cDCE), vinyl chloride (VC), and benzene.

groundwater↗