Engineering PapersSearch

SEARCH · Engineering Papers

Results for “monitoring”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Launch Complex 34, SWMU CCO542022 DNAPL Source Zone Operations, Maintenance, and Monitoring, Site-Wide Long-Term Monitoring, and Hot Spot 6 Air Sparge System Annual Performance Monitoring Report Cape Canaveral Space Force Station, Florida

This Annual Performance Monitoring Report (PMR) for the Dense Non-Aqueous Phase Liquid (DNAPL) Source Zone (DSZ), Site-Wide Long-Term Monitoring (LTM), and Hot Spot (HS) 6 Air Sparge (AS) System presents the results of Year 13 operation of the hydraulic containment (HC) Interim Measure (IM), the results of performance monitoring direct-push technology (DPT) sampling and monitoring well sampling conducted in the DSZ, results of the biennial site-wide LTM event, and the results of operations and performance sampling of the HS 6 AS IM at Launch Complex 34 (LC34), located at Cape Canaveral Space Force Station (CCSFS), Florida. This site has been designated Solid Waste Management Unit (SWMU) CC054 under the Kennedy Space Center (KSC) Resource Conservation and Recovery Act (RCRA) Corrective Action Program. For the site-wide biennial LTM event, a total of 55 monitoring wells were sampled for volatile organic compounds (VOCs) in February 2023 and one well was sampled for polychlorinated biphenyls (PCBs) in December 2022. One well planned for VOC sampling was found to be destroyed and could not be sampled (CW0002). The LTM wells are screened in two lithologic zones: Layer 1 (0 to 25 feet below land surface [bls]) and Layer 2 (25 to 30 ft bls), and are located in the outlying areas of LC34 to monitor groundwater conditions within the Low-Concentration Plume (LCP), defined as concentrations exceeding Groundwater Cleanup Target Levels (GCTLs), and the High-Concentration Plume (HCP), defined as concentrations exceeding Natural Attenuation Default Concentrations (NADCs). Results from the biennial sampling event indicated overall plume stability and delineation for the plume, which extends over 300 acres. The operational period for Year 13 of the HCS was from April 1, 2022 to March 31, 2023. Operational runtime for the system was 90 percent during Year 13, with downtime events attributed to planned maintenance, system repairs, and power outages. As of March 31, 2023, a total of 313,673,241 cumulative gallons of groundwater containing 88,337 pounds of VOCs have been removed by the HCS. Influent concentrations of trichloroethene (TCE) have decreased since startup from approximately 280,000 μg/L (January 2010) to 12,000 μg/L (March 2023). During the reporting period, all effluent concentrations from the HCS (aqueous and vapor) were below regulatory reporting limits, indicating the system continues to operate as intended. Performance monitoring was conducted in December 2022 within the DSZ to evaluate TCE contamination. Groundwater samples were collected via DPT at nine locations, consistent with previous events between 2017 and 2021. Full vertical profile sampling was completed at each DPT from 8 to 98 feet bls, at 5-foot intervals. The DPT performance monitoring results are summarized in this PMR. The results revealed TCE remains at concentrations greater than 11,000 μg/L in the DSZ (1-percent solubility, indicative of DNAPL) at eight of the nine DPT locations and at depths ranging from 8 to 98 feet bls. In addition to DPT sampling, groundwater samples were collected from deep monitoring wells in the DSZ area (Layers 7 and 8) in December 2022 to verify vertical delineation. Layer 7/8 monitoring well results were non-detect in December 2022, with exception of three wells (IW0162, IW043D2, and IW044D2), where TCE, cis-1,2-dichloroethene (cDCE), and/or vinyl chloride (VC) were detected above GCTLs. These wells are screened 105 to 115 feet bls, which is below the existing recovery well capture zone. TCE was first detected in IW0162 in December 2021 and has since been sampled at least monthly to monitor TCE concentrations. The maximum TCE concentration during this operational period was 15,000 μg/L at IW0162 in March 2023. Because of the increased TCE concentrations in this well, a new recovery well (RW21D), screened 86 to 106 feet bls, was installed in January 2023 and incorporated into existing HCS operations. The HS 6 AS IM was initiated in 2018 with 160 AS wells, and expanded in 2019 with an additional 140 AS wells. Quarterly performance monitoring was reduced to semi-annual in 2020. The HS 6 AS system remained operational during the reporting period covered under this report. The results of the HS 6 system operation and semi-annual performance monitoring are summarized in this report. Semi-annual monitoring results collected in April and October 2022 show concentrations of contaminants of concern (cDCE, trans-1,2-dichloroethene, and vinyl chloride) are generally decreasing and not impacting the surface water drainage canal, indicating the HS 6 IM is meeting objectives. A Phase Two Expansion of the HS 6 AS IM was recently completed. As of the date of this report, the expansion became operational in August 2023 and the first quarter of monitoring was conducted in November 2023. Details of the construction, start-up, and performance monitoring will be included in a future Annual PMR. Overall, the tasks associated with Year 13 operation of the HC IM, operation of the HS 6 AS IM, and biennial site-wide sampling were performed in accordance with recommendations included in the previous 2021 LC34 (Year 12) annual report. Evaluation of results from the HC IM and HS 6 IM show that these systems are operating as designed and meeting performance objectives. Results from the site-wide biennial LTM program also show that the overall network of monitoring wells is adequate to continue monitoring plume-wide conditions.

Complex 34

Launch Complex 34, SWMU CC054 2023 DNAPL Source Zone Operations, Maintenance, and Monitoring, Site-Wide Long-Term Monitoring, and Hot Spot 6 Air Sparge System Annual Performance Monitoring and Phase Two Expansion Construction Completion Report Cape Canaveral Space Force Station, Florida

This Annual Performance Monitoring Report (PMR) for the Dense Non-Aqueous Phase Liquid (DNAPL) Source Zone (DSZ), Site-Wide Long-Term Monitoring (LTM), and Hot Spot 6 (HS 6) Air Sparge (AS) System presents the results of Year 14 operations and performance monitoring of the hydraulic containment (HC) Interim Measure (IM), details associated with construction and implementation of the HS 6 AS system expansion (Phase Two), and the results of operations and performance sampling of the HS 6 AS IM at Launch Complex 34 (LC34), located at Cape Canaveral Space Force Station (CCSFS), Florida. The timeframe for activities documented in this PMR extends from April 1, 2023 to March 31, 2024. LC34 has been designated Solid Waste Management Unit CC054 under the Kennedy Space Center (KSC) Resource Conservation and Recovery Act Corrective Action Program. The objective of the HC IM at LC34 is to contain the shallow and deep DSZ and surrounding dissolved-phase trichloroethene (TCE) high concentration plume via operation of a hydraulic containment system (HCS). The pre-IM design 300 micrograms per liter (μg/L) TCE groundwater contour was used to establish the deep zone capture area for deep recovery wells, and the shallow zone capture area was defined by the DSZ. The system began operating in 2010, and in 2015, the system was expanded to provide HC for areas within the 300 μg/L TCE groundwater isocontours of HS 3 and 4. In 2018 and 2019, an investigation was conducted to recharacterize the DSZ, which included investigating TCE mass in Layer 7. This data was subsequently used to optimize the pumping rates of the HCS and install additional recovery wells in Layer 7 to more adequately capture residual contaminant mass. The operational period for Year 14 of the HCS was from April 1, 2023 to March 31, 2024. Operational runtime for the system was 94 percent during Year 14, with downtime events attributed to planned maintenance, system repairs, and power outages. As of March 31, 2024, a total of 344,849,634 cumulative gallons of groundwater containing 94,656 pounds of chlorinated volatile organic compounds (CVOCs) have been removed by the HCS. During the reporting period covered under this report, the HCS recovered 31,176,393 gallons and approximately 6,319 pounds of CVOC mass. Total combined influent concentrations of TCE have decreased since startup from approximately 280,000 µg/L (January 2010) to 25,000 µg/L (March 2024). During the reporting period, all effluent concentrations from the HCS (aqueous and vapor) were below regulatory reporting limits, indicating the system continues to operate as intended. Performance monitoring was conducted in January 2024 within the DSZ to evaluate TCE contamination. Groundwater samples were collected via DPT at nine locations, consistent with previous events between 2017 and 2022. Full vertical profile sampling was completed at each DPT from 8 to 98 feet below land surface (bls), at 5-foot intervals. The DPT performance monitoring results are summarized in this PMR. The results revealed TCE remains at concentrations greater than 11,000 µg/L in the DSZ (1-percent solubility, indicative of DNAPL) at eight of the nine DPT locations and at depths ranging from 28 to 98 feet bls. An overall decreasing trend of TCE concentrations was observed in DPT samples during this reporting period, which is a reduction from the previous event (December 2022) and the peak event in December 2021, where TCE percentages appeared to increase in all depth zones because several recovery wells were turned off during the AS pilot study in the DSZ. The maximum TCE concentration in January 2024 was 1,600,000 µg/L in the 53 feet bls depth interval at DPT594 (previous maximum result in 2022 was 1,800,000 µg/L in the 48 feet bls depth interval at DPT599). This maximum concentration in the 53 feet bls depth interval is in the deep capture zone. During the January 2024 DPT event, the largest portion of TCE mass was observed in the 48 feet bls interval above/within Layer 4. This trend remains consistent with previous years and appears to indicate continued mass discharge from Layer 4 (fine-grained unit). In addition to DPT sampling, annual groundwater samples were collected from 11 deep monitoring wells in the DSZ area (Layers 7 and 8) in December 2023 to verify vertical and horizontal delineation. Three of the wells were also sampled biweekly to evaluate operations of recovery well RW21D (screened 86 to 106 feet bls), which was installed in January 2023. Of the Layer 7/8 monitoring sampled only annually, results were non-detect or less than groundwater cleanup target levels GCTLs in December 2023, with the exception of one well, IW45D2, which had a cis-1,2-dichloroethene (cDCE), detection greater than the GCTL. Of the three wells sampled biweekly during the operational period, the well located closest to Layer 7 recovery well RW21D (IW44D2, screened 105 to 115 feet bls) had concentrations of TCE, cDCE and vinyl chloride (VC) greater than GCTLs throughout the operational period, but displayed a decreasing trend since the peak concentrations in September 2023. The maximum TCE concentration during this operational period was 190,000 µg/L at IW44D2 in September 2023, but reduced to 700 µg/L in March 2024, indicating the HCS is still effectively removing mass from the source area. Expansion of the HCS and addition of new recovery wells is ongoing and will continue to be evaluated as the groundwater recovery scheme is optimized. Details of the expansion and optimization will be provided in a future PMR. The HS 6 AS IM was initiated in 2018 with 160 AS wells and expanded in 2019 with another 140 AS wells. An additional expansion of the HS 6 AS IM was completed during the reporting period covered under this report and details of the construction implementation and startup of the expansion are detailed in Section III of this report. The new expansion, referred to as Phase Two, was implemented between August 17, 2022 and August 28, 2023, and included the installation of 190 air sparge wells to treat an additional 11.2 acres. The original configuration (referred to as Phase One) operated until Phase Two came online, then all but 52 AS wells were turned off so the components could be moved and utilized in the Phase Two area. The 52 AS wells that remain on are in a barrier configuration preventing contaminated groundwater from impacting the treated area. The HS 6 AS system (both Phase One and Two) operated normally during the reporting period covered under this report. Semi-annual performance monitoring of the Phase One configuration was conducted in April and November 2023, consistent with previous years. For the Phase Two configuration, 21 new monitoring wells were installed and sampled quarterly, with a baseline event in July 2023, and quarterly events in November 2023 and February 2024 summarized in this report. Semi-annual monitoring results collected in April and October 2023 show concentrations of contaminants of concern (cDCE, trans-1,2-dichloroethene, and VC) have decreased to less than GCTLs in nearly all wells and not impacting the surface water drainage canal, indicating the HS 6 IM continues to meet objectives. The baseline and quarterly sampling for the Phase Two configuration indicate generally decreasing concentrations in wells within and around the perimeter of the treatment area. At least two more quarters of monitoring will be conducted and once those results are evaluated a reduced the sampling frequency may be considered. Overall, the tasks associated with Year 14 operation of the HC IM and operation of the HS 6 AS IM were performed in accordance with recommendations included in the previous 2022 LC34 (Year 13) PMR. Evaluation of results from the HC IM and HS 6 IM show that these systems are operating as designed and meeting performance objectives.

groundwater remediation

Launch Complex 34, SWMU Cc054 2021 DNAPL Source Zone Operations, Maintenance, and Monitoring, and Hot Spot 6 Air Sparge System Annual Performance Monitoring Report Cape Canaveral Space Force Station, Florida

This Annual Performance Monitoring Report (PMR) for the Dense Non-Aqueous Phase Liquid (DNAPL) Source Zone (DSZ) and Hot Spot 6 (HS 6) Air Sparge (AS) System presents the results of Year 12 operation of the hydraulic containment (HC) Interim Measure (IM), the results of performance monitoring direct-push technology (DPT) sampling and monitoring well sampling conducted in the DSZ, and the results of operations and performance sampling of the HS 6 AS IM at Launch Complex 34 (LC34), located at Cape Canaveral Space Force Station (CCSFS), Florida. Site-wide biennial LTM sampling was not conducted during this reporting period and is scheduled to be conducted in December 2022. The timeframe for activities documented in this PMR extends from April 1, 2021 to March 31, 2022. LC34 has been designated Solid Waste Management Unit CC054 under the Kennedy Space Center (KSC) Resource Conservation and Recovery Act Corrective Action Program. The objective of the HC IM at LC34 is to contain the DSZ and deep dissolved-phase trichloroethene (TCE) high concentration plume via operation of a hydraulic containment system (HCS). The pre-IM design 300 micrograms per liter (μg/L) TCE groundwater contour was used to establish the deep zone capture area for deep recovery wells, and the shallow zone capture area was defined by the DSZ. The system began operating in 2010, and in 2015, the system was expanded to provide HC for areas within the 300 μg/L TCE groundwater isocontours of HS 3 and 4. In 2018 and 2019, an investigation was conducted to re-characterize the DSZ, which included investigating TCE mass in Layer 7. This data was subsequently used to optimize the pumping rates of the HCS to more adequately capture residual contaminant mass. The operational period for Year 12 of the HCS was from April 1, 2021 to March 31, 2022. Operational runtime for the system was 94 percent during Year 12, with downtime events attributed to planned maintenance, system repairs, and power outages. As of March 31, 2022, a total of 285,712,801 gallons of groundwater containing 84,933 pounds of VOCs have been removed by the HCS. Influent concentrations of TCE have decreased since startup from approximately 280,000 µg/L (January 2010) to 12,000 µg/L (March 2022). During the reporting period, all effluent concentrations from the HCS (aqueous and vapor) were below regulatory reporting limits, indicating the system continues to operate as intended. Performance monitoring was conducted in December 2021 within the DSZ to evaluate TCE contamination. Groundwater samples were collected via DPT at nine locations, consistent with previous events in 2017, 2018, 2019, and 2020. Full vertical profile sampling was completed at each DPT from 8 to 98 ft bls, at 5 foot intervals. The DPT performance monitoring results are summarized in this PMR. The results revealed TCE remains at concentrations greater than 11,000 µg/L in the DSZ (1-percent solubility, indicative of DNAPL) at eight of the nine DPT locations at depths ranging from 8 to 98 ft bls. An overall increasing trend of TCE concentrations was observed in DPT samples during this reporting period, which may be due to several recovery wells that were turned off during the AS Pilot Study in the DSZ that operated from July 2021 to February 2022 (documented separately from this report). The maximum TCE concentration in 2021 was 15,400,000 µg/L in the 58 ft bls depth interval at DPT597 (previous maximum result in 2020 was 1,690,000 at 48 ft bls at DPT596). During the 2021 DPT event, the overall majority of TCE contamination was identified in the 58 ft bls interval (below Layer 4), where in the previous year the majority of mass was observed in Layer 4. This trend appears to indicate continued mass discharge from Layer 4 (fine-grained unit). In addition to DPT sampling, monitoring well samples were collected from deep wells in the DSZ area (Layers 7 and 8) to verify vertical delineation. All monitoring well results were non-detect or below cleanup levels, with exception of one well (IW0162, screened 105 to 115 ft bls, which is below the existing recovery well capture zone) where TCE was identified above cleanup target levels. The HS 6 AS system remained operational during the reporting period covered under this report. The HS 6 AS IM was initiated in 2018 with 160 AS wells, and expanded in 2019 with an additional 140 AS wells. Quarterly performance monitoring was reduced to semi-annual prior to this operational period. The results of the HS 6 system operation and semi-annual performance monitoring are summarized in this report. Semi-annual monitoring results collected in April and October 2021 show concentrations of contaminants of concern (cis-1,2-dichloroethene, trans-1,2- dichloroethene, and vinyl chloride) are generally decreasing and not impacting the surface water drainage canal, indicating the HS 6 IM is meeting objectives. Overall, the tasks associated with Year 12 operation of the HC IM and operation of the HS 6 AS IM were performed in accordance with the recommendations of the 2020 LC34 (Year 11) Operations, Maintenance, and Monitoring Report for DNAPL Source Zone, Site Wide LongTerm Monitoring, and Hot Spot 6 Air Sparging System PMR (NASA, 2021c). Evaluation of results from the HC IM and HS 6 IM show that these systems are operating as designed and meeting performance objectives.

trichloroethene

Paint and Oil Locker SWMU 067 Southern Treatment Area Air Sparge System Year 2 Performance Monitoring and Paint and Oil Locker Northern Area (SWMU 067) and Supply Warehouse #3, SWMU 088 Long-Term Monitoring Kennedy Space Center, Florida

This Year 2 Air Sparge (AS) System Performance Monitoring (PM) Report for Paint and Oil Locker (POL) Solid Waste Management Unit (SWMU) 067 Southern Treatment Area and Long- Term Monitoring (LTM) Report for POL Northern Area (SWMU 067) and Supply Warehouse #3 (SW3) SWMU 088 documents ongoing remedial efforts at the POL and SW3 sites at Kennedy Space Center (KSC), Florida. The overall goal for these sites is to reduce concentrations of groundwater contaminants of concern (COCs), specifically trichloroethene (TCE), cis-1,2-dichloroethene (cDCE), trans-1,2-dichloroethene (tDCE) and vinyl chloride (VC), to below the State of Florida Groundwater Cleanup Target Levels (GCTLs). Remediation and reporting of POL and SW3 have been streamlined over the years due to the proximity of the two sites. The scope for these sites currently includes two main components: (1) LTM at SW3 and the POL Northern Area, where an AS system began operation in May 2009 (with expansion in December 2012) and June 2013, respectively, and subsequently turned off for both sites in March 2018 (NASA, 2019a); and (2) Active AS operations and PM in the POL Southern Treatment Area where an AS system was installed and began operation in 2021. The timeframe for activities covered under this report is from September 2022 to July 2023. Based on Year 2 system operation and PM results, the AS system at POL operated as designed and successfully met the performance objective of reducing VOCs to concentrations that support transition of the site from active remediation to long-term monitoring. The results from the samples collected from performance monitoring wells within the AS system ROI showed a significant decrease in COC concentrations since the baseline sampling event conducted in April 2020. Based on the Year 2 OM&M and monitoring results obtained from the POL Southern Treatment Area, the IM objective to reduce concentrations to below the LTM transition target concentrations for TCE, cDCE, tDCE, and VC has been achieved. LTM sampling events at SW3 were conducted in October 2022 and July 2023. LTM sampling was conducted at the POL Northern Area in October 2022, December 2022, March 2023, and July 2023. Analytical results from October 2022 and July 2023 generally indicate that concentrations of COCs have been stable or decreasing compared to the previous year. TCE remains greater than the NADC in one monitoring well (POL-MW0034S) and greater than the GCTL in one monitoring well (POL-MW0009S). Concentrations of cDCE were greater than the GCTL in one monitoring well (POL-MW0026S), and tDCE was non-detect or less than the GCTL in all monitoring wells sampled. VC was greater than the GCTL in four monitoring wells (MW0024, MW0025, MW0027, and MW0028) at SW3 and one monitoring well (MW0026S) at the POL Northern Area.

remediation

Pre-commissioning of the wide-dynamic range halo monitor to be installed in the Fermilab MI-8 line

The beam halo can contribute to beam losses in accelerators and is very difficult to measure. With an increase in beam intensity following the PIP-II upgrade at Fermilab, the beam losses are expected to be higher with some coming from beam halo. Therefore, it is important to measure the sources of beam halo to minimize the beam losses. A modified Halo Monitor developed by J-PARC will be installed in Fermilab MI-8 transfer line to measure the beam halo. In this paper, an update on the beam profile monitor fabrication is covered. The updates include the location selection for the Halo Monitor in the MI-8 transfer line, shielding options for instrumentation, initial testing of equipment, and ray tracing simulations for the Offner optics and the targets used in the monitor.

Babacan, Betiay [IIT, Chicago; Fermilab]

Paint and Oil Locker, SWMU 067 Southern Treatment Area Air Sparge System Construction Completion and Performance Monitoring and Paint and Oil Locker, Northern Area (SWMU 067) and Supply Warehouse #3, SWMU 088 Long-Term Monitoring Report Kennedy Space Center, Florida

This Air Sparge (AS) System Construction Completion, Performance Monitoring, and Long-Term Monitoring (LTM) Report presents activities conducted at the Paint and Oil Locker (POL) (Solid Waste Management Unit [SWMU] 067) and Supply Warehouse #3 (SW3) (SWMU 088) sites located at the Kennedy Space Center (KSC), Florida. Activities include implementation and Year 1 (Quarters [Q] 1 through 4) and Q5 operation, maintenance, and monitoring (OM&M) activities and performance monitoring results for the AS Interim Measure (IM) in the POL Southern Treatment Area, LTM results for the POL Northern Area and SW3, and supplemental direct push technology (DPT) sampling at both sites to support the LTM and performance monitoring programs. The timeframe for activities included in this report extends from August 2019 to August 2022. The scope for these sites currently includes two main components, which are documented within this report: (1) LTM at SW3 and POL Northern Area where an AS system began operation at these sites in May 2009 and June 2013, respectively, and subsequently turned off for both sites in March 2018 (during the previous reporting period); and (2) Active AS operations and performance monitoring in the POL Southern Treatment Area where an AS system was installed and began operation in 2021. The AS IM in the POL Southern Treatment Area was implemented between 2019 and 2021 to treat a chlorinated solvent groundwater plume that resulted from historic operations supporting the National Aeronautics and Space Administration’s (NASA) Space Program. The objective of the AS IM is to remediate groundwater within the treatment zone to support transition to monitored natural attenuation (MNA). The overall Corrective Action objective is to reduce concentrations of trichloroethene (TCE), cis-1,2-dichloroethene (cDCE), trans-1,2- dichloroethene (tDCE), and vinyl chloride (VC) present in groundwater to levels below their respective State of Florida Groundwater Cleanup Target Levels (GCTLs). The AS IM was installed in the POL Southern Treatment Area to target the high concentration plume (HCP), which includes a source zone (SZ) area where TCE was found to exceed 11,000 micrograms per liter (µg/L), and extend to a depth of 30 feet below land surface (bls).

TCE

Reservoir Sediment Management and Monitoring Database

Overview This dataset compiles dam sediment management and monitoring information from surveys, case studies, and journal articles. Additionally, features described by the National Inventory of Dams (i.e., presence of sluice gates) are included to indicate known infrastructure features that may address sediment releases. The location and description of records from downstream monitoring gages are catalogued in order to help with tracking conditions over time (e.g., before and after management actions, as operations change, etc.). The data help address national scale understanding of challenges and solutions related to the accumulation of sediment behind a dam as well as downstream passage. Sediment trapping causes problems as it reduces storage capacity, disrupts dam and reservoir function, impedes access for recreation, alters water quality/habitat conditions, and contributes to riverbank and coastal erosion within the reservoir. Data compilation from a variety of sources is a first step towards assessing system-wide efficacy of management solutions. This dataset was developed under the Water Power Technologies Office funded effort which began as a Seedling on Reservoir Sedimentation Data, and was supported by the Reservoir Sedimentation Modeling Framework and Data Analysis project. These projects have addressed challenges in describing sediment transport, trapping, and management at dams throughout the US. Methodology An outer join on dams/reservoirs with surveys and survey reports (documented in the RESSED database, USBR or USACE databases, project websites, etc.) with the National Inventory of Dams, based on the NIDID to determine dams with documented management and/or sluice gates. Additional dams with documented management activity were identified through review of technical articles from the past 25 years in Journal of Hydrology, Journal of Water Resources Planning and Management, Geomorphology, Journal of Hydraulic Engineering, Water, Journal of Cleaner Production, International Journal of Sediment Research, Nature Scientific Reports, Earth Surface Processes and Landforms, and Environmental Science and Pollution Research. Individual records were created for each survey or management activity documented. To evaluate downstream sediment monitoring records, the nhdPlusTools and dataRetrieval packages in R were used to find gages within 10km of each dam in the management database. Length of record and location of matched gages were retrieved for those parameters relevant to sediment concentration or total sediment discharge.

Hansen, Carly [ORNL] (ORCID:0000000193280838)

Atmospheric analyzer, carbon monoxide monitor and toluene diisocyanate monitor

The purpose of the atmospheric analyzer and the carbon monoxide and toluene diisocyanate monitors is to analyze the atmospheric volatiles and to monitor carbon monoxide and toluene diisocyanate levels in the cabin atmosphere of Skylab. The carbon monoxide monitor was used on Skylab 2, 3, and 4 to detect any carbon monoxide levels above 25 ppm. Air samples were taken once each week. The toluene diisocyanate monitor was used only on Skylab 2. The loss of a micrometeoroid shield following the launch of Skylab 1 resulted in overheating of the interior walls of the Orbital Workshop. A potential hazard existed from outgassing of an isocyanate derivative resulting from heat-decomposition of the rigid polyurethane wall insulation. The toluene diisocyanate monitor was used to detect any polymer decomposition. The atmospheric analyzer was used on Skylab 4 because of a suspected leak in the Skylab cabin. An air sample was taken at the beginning, middle, and the end of the mission.

Shannon, A. V.

Space shuttle main engine monitoring experience and advanced monitoring systems development

Advanced space transportation systems must provide improved availability, reliability, safety, and reduced cost in order to make a new, more vigorous level of space activity economically feasible. Earth-to-Orbit (ETO) propulsion monitoring systems are a major factor in progress toward these improvements, and in the success of current systems. Operational experience with the Space Shuttle Main Engine (SSME), the first reusable ETO rocket engine, is valuable for examining current rocket engine monitoring capability and technology developments. Here, Space Shuttle Main Engine (SSME) monitoring practice and experience are surveyed. Unique aspects of rocket engine mission requirements are highlighted to provide improved understanding of engine monitoring practices and technology needs. Current ETO engine transportation systems mission needs are outlined. With this foundation, the techniques and components addressed within current technology programs are discussed to complete a picture of ETO propulsion monitoring status and development.

Cikanek, Harry A.

Monitoring for Flight Path Management: Inputs to Pilot Monitoring Training

The commercial aviation industry world-wide has identified a need for improved pilot monitoring (e.g., ICAO, 2016). More specifically, aviation safety data indicate that failures in pilots' monitoring for flight path management (FPM) have contributed to a range of undesired outcomes: accidents, major upsets, and non-compliance with ATC guidance. The FAA has further stated that these types of FPM failures are likely to worsen with the increasingly complex air traffic control systems and FPM concepts proposed for NextGen (https://www.faa.gov/nextgen/what_is_nextgen/) operations (e.g., see Hah et al., 2017). An important element of this additional complexity will be the introduction of new automation or artificial intelligence that is intended to work with the flight crew but can add additional monitoring burdens. One potential mitigation for this situation is to enhance pilot training for effective monitoring. NASA Ames Research Center was asked to identify and evaluate training approaches that have the potential to enhance pilots' ability to effectively monitor for FPM (with the result of improved awareness). The focus of this work is to identify, develop or validate training guidance to improve pilot monitoring/awareness regarding FPM and mitigate the recent trend of accidents and incidents, especially Loss of Control (LOC) events. The result of this work should be guidance for FAA training and standards organizations—such as the Air Carrier Training Aviation Rulemaking Committee (ACT ARC)—to aid in reducing the risk of incidents and accidents due to inadequate pilot monitoring/awareness.

Feary, Mike

Feasibility Study of a Rotorcraft Health and Usage Monitoring System ( HUMS): Usage and Structural Life Monitoring Evaluation

The objective of this study was to evaluate two techniques, Flight Condition Recognition (FCR) and Flight Load Synthesis (FLS), for usage monitoring and assess the potential benefits of extending the retirement intervals of life-limited components, thus reducing the operator's maintenance and replacement costs. Both techniques involve indirect determination of loads using measured flight parameters and subsequent fatigue analysis to calculate the life expended on the life-limited components. To assess the potential benefit of usage monitoring, the two usage techniques were compared to current methods of component retirement. In addition, comparisons were made with direct load measurements to assess the accuracy of the two techniques. The data that was used for the evaluation of the usage monitoring techniques was collected under an independent HUMS Flight trial program, using a commercially available HUMS and data recording system. The usage data collect from the HUMS trial aircraft was analyzed off-line using PC-based software that included the FCR and FLS techniques. In the future, if the technique prove feasible, usage monitoring would be incorporated into the onboard HUMS.

Dickson, B.

Autonomous Performance Monitoring System: Monitoring and Self-Tuning (MAST)

Maintaining the long-term performance of software onboard a spacecraft can be a major factor in the cost of operations. In particular, the task of controlling and maintaining a future mission of distributed spacecraft will undoubtedly pose a great challenge, since the complexity of multiple spacecraft flying in formation grows rapidly as the number of spacecraft in the formation increases. Eventually, new approaches will be required in developing viable control systems that can handle the complexity of the data and that are flexible, reliable and efficient. In this paper we propose a methodology that aims to maintain the accuracy of flight software, while reducing the computational complexity of software tuning tasks. The proposed Monitoring and Self-Tuning (MAST) method consists of two parts: a flight software monitoring algorithm and a tuning algorithm. The dependency on the software being monitored is mostly contained in the monitoring process, while the tuning process is a generic algorithm independent of the detailed knowledge on the software. This architecture will enable MAST to be applicable to different onboard software controlling various dynamics of the spacecraft, such as attitude self-calibration, and formation control. An advantage of MAST over conventional techniques such as filter or batch least square is that the tuning algorithm uses machine learning approach to handle uncertainty in the problem domain, resulting in reducing over all computational complexity. The underlying concept of this technique is a reinforcement learning scheme based on cumulative probability generated by the historical performance of the system. The success of MAST will depend heavily on the reinforcement scheme used in the tuning algorithm, which guarantees the tuning solutions exist.

Peterson, Chariya

Design for Vibration Monitoring: A Methodology for Reliable and Cost-Effective Vibration Monitoring

The purpose of health monitoring systems is to detect failures or defects for increased safety and performance and to provide on-condition maintenance with reduced costs. The problems associated with health monitoring systems include high rates of false alarms and missed failures, which make monitoring an unreliable and costly task. The reason for this is that unaccounted variations invalidate signal modeling assumptions. Our approach was to focus on vibration monitoring of rotating components. We analyzed baseline signals to determine statistical variations, identify and model factors that influence vibrations (pre-production vs. post-production variations), determine hit and false alarm rates with baseline flight data, model and predict effects of defects and variations on vibrations, and develop algorithms and metrics for failure and anomaly detection in the presence of variations.

Tumer, Irem Y.

Inductive monitoring system constructed from nominal system data and its use in real-time system monitoring

The present invention relates to an Inductive Monitoring System (IMS), its software implementations, hardware embodiments and applications. Training data is received, typically nominal system data acquired from sensors in normally operating systems or from detailed system simulations. The training data is formed into vectors that are used to generate a knowledge database having clusters of nominal operating regions therein. IMS monitors a system's performance or health by comparing cluster parameters in the knowledge database with incoming sensor data from a monitored-system formed into vectors. Nominal performance is concluded when a monitored-system vector is determined to lie within a nominal operating region cluster or lies sufficiently close to a such a cluster as determined by a threshold value and a distance metric. Some embodiments of IMS include cluster indexing and retrieval methods that increase the execution speed of IMS.

Iverson, David L.

All-Sky Monitoring with the Fermi Gamma Ray Burst Monitor

We are currently monitoring the transient hard X-ray/soft gamma ray sky using the Gamma Ray Burst Monitor (GBM) on-board Fermi. The twelve GBM NaI detectors span 8 keV to 1MeV, while the two GBM BGO detectors span about 150 keV to 40 MeV. With GBM, we detect transient events on multiple timescales. Brief events, such as Gamma Ray Bursts, Solar flares, and magnetar bursts are detected with on-board triggers. On longer timescales, we use the Earth occultation technique to monitor a number of sources, including X-ray binaries, AGN, and solar flaring activity. To date we have detected 7 sources above 100 keV. Transient activity from accretion-powered pulsars is monitored using epoch-folding techniques. With GBM we track the pulsed flux and frequency for a number of pulsars. We will present highlights of GBM observations on various timescales.

Wilson-Hodge, Colleen A.

Earth Occultation Monitoring with the Fermi Gamma Ray Burst Monitor

Using the Gamma Ray Burst Monitor (GBM) on-board Fermi, we are monitoring the hard X-ray/soft gamma ray sky using the Earth occultation technique (EOT). Each time a source in our catalog is occulted by (or exits occultation by) the Earth, we measure its flux using the change in count rates due to the occultation. Currently we are using CTIME data with 8 energy channels spanning 8 keV to 1 MeV for the GBM NaI detectors for daily monitoring. Light curves, updated daily, are available on our website http://heastro.phys.lsu.edu/gbm. Our software is also capable of performing the Earth occultation monitoring using up to 128 energy bands, or any combination of those bands, using our 128-channel, 4-s CSPEC data. The GBM BGO detectors, sensitive from about 200 keV to 40 keV, can also be used with this technique. In our standard application of the EOT, we use a catalog of sources to drive the measurements. To ensure that our catalog is complete, our team has developed an Earth occultation imaging method. In this talk, I will describe both techniques and the current data products available. I will highlight recent and important results from the GBM EOT, including the current status of our observations of hard X-ray variations in the Crab Nebula.

Wilson-Hodge, Colleen A.

Monitoring of the Atmosphere on the International Space Station with the Air Quality Monitor

During the early years of human spaceflight, short duration missions allowed for monitoring of the spacecraft environment to be performed via archival sampling, in which samples were returned to Earth for analysis. With the construction of the International Space Station (ISS) and the accompanying extended mission durations, the need for enhanced, real-time monitors became apparent. The Volatile Organic Analyzer (VOA) operated on ISS for 7 years, where it assessed trace volatile organic compounds in the cabin air. The large and fixed-position VOA was eventually replaced with the smaller Air Quality Monitor (AQM). Since March 2013, the atmosphere of the U.S. Operating Segment (USOS) has been monitored in near real-time by a pair of AQMs. These devices consist of a gas chromatograph (GC) coupled with a differential mobility spectrometer (DMS) and currently target detection list of 22 compounds. These targets are of importance to both crew health and the Environmental Control and Life Support Systems (ECLSS) on ISS. Data is collected autonomously every 73 hours, though the units can be controlled remotely from mission control to collect data more frequently during contingency or troubleshooting operations. Due to a nominal three-year lifetime on-orbit, the initial units were replaced in February 2016. This paper will focus on the preparation and use of the AQMs over the past several years. A description of the technical aspects of the AQM will be followed by lessons learned from the deployment and operation of the first set of AQMs. These lessons were used to improve the already-excellent performance of the instruments prior to deployment of the replacement units. Data trending over the past several years of operation on ISS will also be discussed, including data obtained during a survey of the USOS modules. Finally, a description of AQM use for contingency and investigative studies will be presented.

Wallace William T.