Bottleneck Detection in Modular Construction Factories Using Computer Vision

The construction industry is increasingly adopting off-site and modular construction methods due to the advantages offered in terms of safety, quality, and productivity for construction projects. Despite the advantages promised by this method of construction, modular construction factories still rely on manually-intensive work, which can lead to highly variable cycle times. As a result, these factories experience bottlenecks in production that can reduce productivity and cause delays to modular integrated construction projects. To remedy this effect, computer vision-based methods have been proposed to monitor the progress of work in modular construction factories. However, these methods fail to account for changes in the appearance of the modular units during production, they are difficult to adapt to other stations and factories, and they require a significant amount of annotation effort. Due to these drawbacks, this paper proposes a computer vision-based progress monitoring method that is easy to adapt to different stations and factories and relies only on two image annotations per station. In doing so, the Scale-invariant feature transform (SIFT) method is used to identify the presence of modular units at workstations, and the Mask R-CNN deep learning-based method is used to identify active workstations. This information was synthesized using a near real-time data-driven bottleneck identification method suited for assembly lines in modular construction factories. This framework was successfully validated using 420 h of surveillance videos of a production line in a modular construction factory in the U.S., providing 96% accuracy in identifying the occupancy of the workstations and an F-1 Score of 89% in identifying the state of each station on the production line. The extracted active and inactive durations were successfully used via a data-driven bottleneck detection method to detect bottleneck stations inside a modular construction factory. The implementation of this method in factories can lead to continuous and comprehensive monitoring of the production line and prevent delays by timely identification of bottlenecks.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Identifying Modular Construction Worker Tasks Using Computer Vision

Modular construction is increasingly being seen as an attractive method for delivering building projects due to advantages in safety, quality, and lead-time. Despite these benefits, this method still relies heavily on human labor, which causes variability in factory assembly-line performance that can erode performance benefits of modular construction. Continuous improvement methods can alleviate some of these issues, but they also require continuous monitoring of human workers' performance. Due to limitations of manual time study and automated sensor-based monitoring methods, recently computer vision-based methods have gained momentum in identifying the activities of construction workers from the videos of onsite construction. Therefore, this paper explores the use of computer vision-based human activity recognition techniques to identify and classify worker activities in modular construction videos. Computer vision-based tracking method has been used to track the human workers in each frame, and Resnet-50 network has been used to classify the activity of tracked workers. Evaluation of this framework has achieved higher than 90% accuracy and recall in testing.

computer vision↗

Automated Progress Monitoring in Modular Construction Factories Using Computer Vision and Building Information Modeling

Modular construction methods have recently gained interest due to the advantages offered in terms of safety, quality, and productivity for projects. In this method, a significant portion of the construction is performed off-site in factories where modular components are built in different workstations, assembled on the production line, and shipped to the site for installation. Due to the labor-intensive nature of tasks, cycle times in modular construction factories are highly variable, which commonly leads to major bottlenecks and delays in construction projects. To remedy this effect, recent methods rely on sensors such as RFID to monitor the production process, which is reportedly expensive, and intrusive to the work process. Recently, computer vision-based methods have been proposed to track the production process in modular construction factories. However, these methods overlook monitoring the assembly process on the production line. Therefore, this paper presents a method to monitor the assembly process by integrating computer vision-based methods with Building Information Modeling (BIM). The proposed method detects the modular units using object segmentation; superimposes the installation area with the corresponding 2D region using BIM, and identifies the installation of the components using image processing techniques. The proposed method has been validated using surveillance videos captured from a modular construction factory in the US. Successful implementation of the proposed method can lead to timely identification of delays during the assembly process and reduce delays in modular integrated construction projects.

building information modeling↗

Understanding the Challenges of Financing Modular Construction: A Case Study for Prospective Multifamily Units

Compared to traditional site build, modular construction can significantly shorten construction schedules and speed income generation. Modular construction may also reduce construction costs. Yet access to commercial financing remains one of the most significant barriers to modular construction. Materials must be purchased, and production lines reconfigured for each project months ahead of fabrication. Materials alone can be 60% or more of the total cost of production. As a result, manufacturers require large upfront deposits—often 30% or more of the off-site contract. In addition, the capital-intensive nature of modular construction requires frequent progress payments for manufacturers to maintain cash flow. For those lenders willing to fund modular projects, many require the developer to share more of the risk. This may include the developer paying for line reservation fees and material deposits 3–6 months prior to production. Because these are unsecured loans, interest rates may be higher and loan amounts lower. As suppliers, modular manufacturers discourage retainage. Together, these and other factors may contribute to higher equity requirements for the developer—particularly at the beginning of the project.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Automated Assembly Progress Monitoring in Modular Construction Factories Using Computer Vision-Based Instance Segmentation

Modular construction has recently gained interest as a transformative construction method. In this method, a large portion of the construction is performed inside factories, where processes are fast-paced and interdependent; therefore, any deviation from the schedule can delay the production. Such deviations are frequent in modular factories due to the labor-intensive nature of the tasks. This propagation of delays can be mitigated by continuously monitoring each process; however, current manual monitoring methods are laborious, and recently proposed contact sensor-based methods are intrusive to the work. In addition, recent computer vision-based monitoring methods inside factories are limited to detection algorithms that fail to provide the pixel-level accuracy required for assembly progress monitoring in highly occluded factory scenes, and they require a large number of manual annotations. Therefore, this paper proposes a method to monitor the installation of subassemblies in modular construction factories using mask R-CNN instance segmentation and improves the data efficiency of the model using a copy-paste augmentation method. This method was validated on the CCTV videos captured from a modular construction factory in the US, resulting in a 9% mAP improvement in segmentation.

computer vision↗

Monitoring installation of partially occluded subassemblies in modular construction factories using BIM, ray tracing, and computer vision

Modular and offsite construction methods are being increasingly adopted due to the advantages they offer in terms of project completion time, quality, and energy-efficiency. Despite these advantages, the current state of monitoring systems in modular construction factories highly relies on labor-intensive, subjective, and error-prone observational methods. A large body of research has aimed to automate the monitoring process using an array of sensors, such as IMUs and RFIDs, during the past two decades. Recently, computer vision-based methods have gained increasing interest as a non-intrusive technology to monitor the process inside modular construction factories. However, partial occlusion challenges have impeded their practical application on a large scale. This challenge is specifically important for monitoring the installation of subassemblies since they can obstruct the view of the monitoring camera, especially those that enable long-term monitoring like closed-circuit television (CCTV) fixed-view surveillance cameras. Here, this paper aims to address this challenge by proposing a novel computer vision-based method to monitor the installation of new subassemblies inside modular factories in highly occluded scenes. The proposed methodology identifies the subassemblies in the CCTV video footage using computer vision, analyzes the occlusions using BIM and ray casting techniques, and estimates the progress of assembly by comparing the BIM model with the detected subassemblies in the video. The proposed methodology was successfully validated on surveillance videos captured from a volumetric modular construction factory in the U.S., achieving 93% accuracy in identifying the installation of subassemblies. The results from this research show that the integration of BIM and computer vision is a promising method for monitoring the installation processes inside modular factories under severe occlusion.

97 MATHEMATICS AND COMPUTING↗

How the Modular Construction Industry Is Changing the Construction Workforce [Slides]

564,000 - that's the number of construction workers the United States lacked in 2023. This is not a new or unfamiliar problem, but high interest rates, housing shortages, and an aging workforce are amplifying the pressure to build faster and recruit new talent. Panelized and modular construction are often touted as a solution to this workforce challenge and have seen year over year increases in market share. While research confirms industrialized construction can increase building efficiencies, researchers at the National Renewable Energy Laboratory (NREL), RMI, Washington State University, Dodge Construction Network and Guidehouse were curious how workers are being impacted both on construction sites, at factories, and all the stages in between.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Accelerating Optimal Integration of Energy Efficiency Strategies with Industrialized Modular Construction: Preprint

The National Renewable Energy Laboratory's (NREL's) Industrialized Construction Innovation team first introduced the Industrialized Construction Assessment Framework to achieve affordable, net-zero energy (NZE) modular multifamily buildings in the 2020 ACEEE paper "Integrating Energy Efficiency Strategies with Industrialized Construction for our Clean Energy Future." Since then, NREL has continued to drive the ambitious plan to accelerate optimal integration of energy efficiency strategies during industrialized construction with little or no additional cost, labor, and production time. This follow-on paper introduces the Energy in Modular (EMOD) buildings method and presents NREL's research efforts over the last two years in collaboration with industry, including affordable housing partners. NREL has developed an idealized NZE modular multifamily building design that incorporates five energy efficiency strategies well suited for industrialized construction in factories: (1) envelope thermal control, (2) envelope infiltration control, (3) mechanical, electrical, and plumbing systems, (4) smart controls, and (5) solar plus storage. This paper highlights results from leveraging design for manufacturing and assembly principles, testing, and validation pilots with factory partners; demonstrating pod prototypes in test stand at NREL; and performing simulations. Overall, these research efforts address barriers to whole-building system integration, such as poor installation quality of thermal and air barriers; lack of unitized systems for space conditioning, energy recovery and ventilation, and water heating; problematic on-site installation, commissioning, and configuration of controls; and lack of cost-effective integration for grid-friendly design and emerging technologies. Conclusively, the paper delineates next steps for future work with NREL's partners toward developing a transformational pathway for our clean energy future.

affordable housing↗

Metal-Tipped and Electrochemically Wired Semiconductor Nanocrystals: Modular Constructs for Directed Charge Transfer

In our 2017 proposal to the Solar Photochemistry division of DOE/BES/Office of Science we targeted the creation, characterization and integratation of new II-IV semiconductor heterostructured nanomaterials into ultra-thin film (tethered) nanocrystalline arrays on transparent metal oxide (TCO) supports. Materials were to include CdSe quantum dots (QDs), asymmetric CdSe@CdS tetrapods (TPs) and CdSe@CdS nanorods (NRs), into unique photoelectrochemical platforms. The ultimate goal was to tether these new nanomaterials to either electron- or hole-selective oxide interlayers that would afford vectoral photo-induced charge transfer and ultimately formation of molecular products such as H 2 . This was an ambitious set of goals but integrated well with our previous work in this general area.

14 SOLAR ENERGY↗

Attitude control of the space construction base: A modular approach

A planar model of a space base and one module is considered. For this simplified system, a feedback controller which is compatible with the modular construction method is described. The systems dynamics are decomposed into two parts corresponding to base and module. The information structure of the problem is non-classical in that not all system information is supplied to each controller. The base controller is designed to accommodate structural changes that occur as the module is added and the module controller is designed to regulate its own states and follow commands from the base. Overall stability of the system is checked by Liapunov analysis and controller effectiveness is verified by computer simulation.

Oconnor, D. A.↗

Automated compatibility checking of prefabricated components using 3D as-built models and BIM

There have been recent efforts to use reality capture technologies to perform remote quality control in construction. However, there is a lack of research efforts in detecting construction incompatibilities in modular construction using reality capture technologies. The construction incompatibilities in modular construction often cause reworks and delays in the project schedule. To address this issue, this paper presents a general compatibility analysis method that propose scanning the modules in manufacturing plant and construction site, and check module-to-module compatibility remotely, prior to the shipment and installation. This study provides three sample module-to-module compatibility scenarios to validate the proposed compatibility analysis. The case study results show that the compatibility analysis method was able to identify the compatibility issues with high accuracy. Lastly, the compatibility analysis method was validated in terms of accuracy and time performance in six scenarios that was defined on the modules.

42 ENGINEERING↗

A New State of the Art: Zero Energy Modular Multifamily Construction

In 2020, the U.S. Department of Energy's Building Technologies Office (BTO) launched the Advanced Building Construction (ABC) Initiative. This initiative aimed to integrate energy efficiency into high-production construction practices. One focus area of the initiative is off-site construction, an approach that may achieve scalable, efficient, and high-performing construction buildings through process standardization. This report presents the findings and recommendations from our ABC Initiative project: A New State of the Art: Zero-Energy Modular Multifamily Construction System. The objectives of the BTO-funded project are to: 1) Achieve energy performance 50% better than the 2018 International Energy Conservation Code (IECC). 2) Achieve this level of energy performance at no additional cost VEIC worked with Louisiana State University (LSU), National Renewal Energy Lab (NREL), [the project team], and industry partners at the Mod Coach, KBS, and Solar Home Factory to identify and analyze multifamily business designs and modular construction practices. These designs and processes hold the promise of achieving the goals set out by the DOE.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

The Energy in Modular (EMOD) Buildings Method: A Guide to Energy-Efficient Design for Industrialized Construction of Modular Buildings

Industrialized construction has immense potential to address the growing need globally to build and upgrade the building stock to be affordable, energy-efficient, and resilient. It can also help achieve the United States' goal of a 50% reduction in U.S. greenhouse gas (GHG) emissions by 2030. Despite this potential, and the ever-increasing push for electrification and decarbonization of households in the United States, industrialized construction has not yet been leveraged specifically to help address these challenges and accelerate the pathway to meet these goals. The National Renewable Energy Laboratory (NREL) aims to claim this missed opportunity by focusing on delivering affordable, grid-efficient net-zero energy (NZE) modular buildings for underserved communities to ensure an equitable transition to the future of clean energy, accelerate decarbonization of the built environment, and support the development of a high-productivity construction and energy efficiency workforce. The Energy in Modular (EMOD) method is our approach to designing, producing, and delivering affordable, net-zero energy, low-carbon, and healthier buildings at scale. The following energy efficiency strategies are part of the scope of this guide: envelope thermal control, envelope infiltration control, mechanical, electrical, and plumbing systems, smart controls, and solar plus storage. We draw synergies between design for manufacturing and assembly, process optimization, retrofit technologies, and digitization. Our goal is to influence the improvement and production of buildings to increase performance, enhance energy efficiency, and reduce GHG emissions. This guide documents the research and development efforts initiated by a set of design objectives to "modularize" a set of energy efficiency and low-carbon strategies into a housing unit while preserving and enhancing energy efficiency benefits and decarbonization pathways. This guide is intended to serve as a framework for housing developers, housing agencies, architects, energy experts, and process engineers or factory operator personnel who are critical to today's modular builder teams. This guide focuses on specific energy efficiency strategies, decarbonization pathways, and associated processes as part of NREL's research efforts. Stakeholders may substitute other means, methods, and technologies for the ones evaluated in this study.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Transformative Efficiency and Automation in Modular Homes (TEAMH)

This report documents the Transformative Efficiency and Automation in Modular Homes (TEAMH) project, which evaluates the integration of advanced building envelope technologies and automation-assisted modular construction to improve residential energy performance and construction efficiency. The study investigates high-performance insulation systems, including vacuum insulation panels (VIPs), combined with light gauge steel (LGS) modular construction and factory automation. Laboratory testing, whole-building energy modeling across multiple climate zones, and factory demonstrations were conducted to assess thermal performance, energy savings, and production efficiency. Results indicate that upgraded envelope assemblies can achieve up to ~50% heating and ~34% cooling energy savings relative to IECC 2018 code-compliant homes, while automation-assisted construction can reduce wall assembly time by 24%–46% compared to conventional wood framing. The findings demonstrate the potential for scalable, high-performance modular homes that deliver significant energy savings with competitive projected costs.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Long life, low cost ball valve, with lifted seals and cartridge type construction

Ball valve design incorporates modular construction in easy-to-install, easy-to-replace cartridge housing, and a system of cams to lift upstream and downstream seals away from the ball during rotation. Tests conducted on nitrogen tetroxide prove new valve to be more efficient than previous models in preventing leakage.

Carriker, J. W.↗

DRIRU II - The NASA standard high performance Inertial Reference Unit

This paper discusses the design configuration, performance and environmental capability of NASA's Dry Rotor Inertial Reference Unit (DRIRU II) for use in spacecraft precision attitude stabilization systems. The system is a self-contained, strapdown, dual rate sensing unit for spacecraft requiring high accuracy, reliability and low power consumption. Modular construction of the basic unit, arrangement of gyros, electronic modules and power supplies, signal flow, and mounting are described. DRIRU II is designed to meet specified performance requirements for a minimum of two years of operating time in orbit and a reliability prediction analysis is presented. The characteristics of test equipment are given together with the results of the environmental, radiation, and magnetic field sensitivity tests. DRIRU II may be modified for unique requirements and the rate range and resolution options are tabulated. The flexibility of the unit afforded by the use of dry tuned gimbal gyros and its modular construction results in a system capable of satisfying the demanding requirements of a broad spectrum of future applications. The units are planned for the Solar Max, Landsat-D and ASPS missions in the 1980's.

Irvine, R. B.↗