At least 19 records

Effectively Considering the Distribution System in Integrated Resource Plans

While electricity planning practices vary by state and utility based on utility type and market structure, integrated resource planning (IRP) remains a prominent vehicle — even in states with centrally-organized wholesale electricity markets. IRP focuses on meeting forecasted long-term electricity needs. Typically, utilities have not considered impacts of design and operation of the low-voltage distribution network in IRP. With advanced capabilities of grid-edge technologies to generate and store electricity and provide load flexibility, and large utility investments in distribution systems, it's increasingly important to consider at least some distribution planning elements in IRP. This report considers the value proposition for doing so, such as reducing utility costs through resource co-optimization and strategic siting of grid-edge resources, and idenfities the most important touchpoints between planning for bulk power and distribution systems and provide a range of tactics for integrating these two processes.

Relf, Grace [Lawrence Berkeley National Laboratory

Generator Interconnection Costs to the Transmission System in non-ISO Balancing Authorities [Slides]

Electric transmission system operators—including Independent System Operators (ISOs), Regional Transmission Organizations (RTOs), and utilities—require proposed power plants to undergo a series of interconnection studies before connecting to the grid. These studies assess what transmission upgrades or new infrastructure may be necessary and assign the associated costs to the project. Lawrence Berkeley National Laboratory has compiled, aggregated, and cleaned interconnection cost data, originally for ISOs/RTOs, and now for five non-ISO Balancing Authorities: PacifiCorp, Bonneville Power Authority, Duke Energy Progress, Duke Energy Carolinas and Duke Energy Florida. Insufficient transparency in interconnection cost data may contribute to rapidly expanding interconnection queues, with active queue capacities tripling between 2020 and 2024 in the studied BAs. Most projects withdraw after receiving high interconnection cost estimates. Interconnection costs have increased since the early 2000s, with average costs for "complete" projects reaching $194/kW between 2018 and 2024. Active queue projects and withdrawn projects incur substantially higher costs, primarily due to rising network upgrade costs. Recent interconnection costs in non-ISO balancing authorities are higher than in ISO regions, potentially due to a greater willingness to pay among developers. Utility-scale solar, wind, and storage projects have interconnection costs that exceed those for natural gas. However, when focusing on projects that do not withdraw from the queue, the interconnection costs for these technologies are more similar to natural gas projects. Other key findings include: (1) Larger generation projects benefit from lower proportional interconnection costs, (2) capacity transmission service (NRIS) often requires additional network investments, and (3) projects with high network upgrade costs are often clustered geographically. The dataset includes results from 2,104 interconnection studies conducted between 2000 and 2024, covering projects that are operational, withdrawn, or still progressing through the study process. The Excel file contains (a) the complete project-level interconnection cost dataset, and (b) seven additional tabs summarizing cost metrics across dimensions such as time, market structure, cost category (point of interconnection vs. broader network upgrades), fuel type, service type (ERIS vs. NRIS), generator size, and geography.

24 POWER TRANSMISSION AND DISTRIBUTION

Power now, pay later: the evolution of U.S. residential solar financing

Most U.S. residential rooftop solar customers finance their solar purchases through loans or by buying power from third-party owned systems. Prior research demonstrates how third-party ownership (TPO) models such as leases emerged in the early 2010s and accelerated solar adoption by low- and moderate-income households while driving market concentration in the installation industry. Since 2015, loans have emerged as a prevalent financing alternative, but the potential effects of loans on the customer base and industry remain understudied. Here, we fill that research gap by developing a methodology to identify loan-financed and third-party owned systems in a household-level solar adopter data set. The data suggest that loans accounted for increasing solar market shares from 2017 until reaching as high as 70% in 2022, but that the market has since shifted back to TPO. The data show that TPO adopters in our sample earned about 16%–18% less and loan recipients earned 3%–7% less, at the median, than customers who self-financed systems. These results reaffirm prior research showing that TPO has accelerated low- and moderate-income adoption and that loans have likewise expanded the customer base to a lesser extent. The results suggest that loan-financed systems entail around a 16%–26% price premium that is only partly explained by loan fees. Finally, the data suggest that the emergence of loans has likely reduced market concentration in the rooftop solar industry.

financing

Nine Canyon Long-Duration Energy Storage: A Feasibility Study

The Nine Canyon Long Duration Energy Storage (LDES) Feasibility Study explores the technical and economic viability of deploying advanced energy storage technologies at Energy Northwest's (EN) Nine Canyon (9C) Wind Project site in Benton County, Washington. Supported by the Washington State Department of Commerce and the U.S. Department of Energy’s Office of Electricity under its LDES Voucher Program, the study represents a collaborative effort between EN, Pacific Northwest National Laboratory (PNNL), and ARES North America. At the core of this effort is the development of a generalized techno-economic modeling framework and evaluation tool designed to assess the value proposition of LDES projects across a variety of contexts. The modeling tool is technology-agnostic and accommodates user-defined parameters such as rated power, energy duration, round-trip efficiency, capital and operational costs, and dispatch constraints. It also integrates economic inputs, including market prices, energy revenue structures, and financing parameters to evaluate performance through key metrics. The tool provides utilities with a transparent, adaptable platform to support decision-making, investment prioritization, and portfolio planning for various storage technologies. To guide scenario design and interpretation, the study first surveyed the LDES technology landscape, including lithium-ion batteries, flow batteries, non-hydro gravity storage, and thermo-mechanical systems, comparing cost trajectories, technical performance, safety and hazards, materials sourcing and recyclability, and spatial/siting considerations. This literature-grounded review highlights technology trade-offs and reinforces the need to align technology choice with site characteristics, use cases, and project objectives. A companion chapter examines ownership structures (EN ownership, third-party ownership, shared models) and offtake options (energy marketing, capacity/energy PPAs, time-of-use PPAs, block-delivery PPAs, and tolling), where PPAs (power purchase agreements) represent contractual arrangements for buying and selling electricity. The chapter also highlights implications for risk allocation, capital access, operational control, and revenue certainty. The study also evaluates supervisory control and data acquisition (SCADA) and transmission interconnection pathways, options include upgrading the existing SCADA or deploying a dedicated LDES controller, with attention to protection schemes, data telemetry, cybersecurity, and regulatory coordination with BPA. In addition, an ARES-specific geotechnical and hydrology assessment presented in the appendix screens multiple corridors for slope stability, bearing capacity, cut-and-fill magnitude, and stormwater behavior.

25 ENERGY STORAGE

Electricity Markets and Long-Duration Energy Storage: A Survey of Grid Services and Revenue Streams

Purpose of Review Long Duration Energy Storage (LDES) is increasingly viewed as a potential resource for providing grid services that enhance the stability and flexibility of electricity systems. While some LDES services are integrated into existing market frameworks, traditional mechanisms may not fully account for their operational characteristics, potentially leading to undervaluation. Within this context, this paper reviews the literature and industry practices to assess potential grid services for LDES, evaluates existing compensation mechanisms, and identifies challenges to full market integration. Recent Findings We first review existing literature and identify key grid services unique to LDES, including enhancing grid resilience during extreme weather events, enabling long-term energy shifting, and providing flexible and firm energy in systems with limited dispatchable resources. Here, we also review how LDES services are compensated in current market frameworks and the challenges associated with the full realization of LDES values. Additionally, we summarize market mechanisms for storage technologies across U.S. wholesale markets. We find that some markets are adjusting incentive structures, such as incorporating storage duration in capacity accreditation, to better align with system needs and LDES contributions to the grid. However, further refinements in capacity remuneration and dispatch timeframes may be needed for more effective realization of LDES value. Summary This review evaluates potential grid services for LDES, examines existing compensation mechanisms for LDES technologies, and identifies gaps between these mechanisms and LDES operational characteristics. The review concludes by outlining potential market enhancements for more effective LDES integration and articulating additional research needs to support its efficient participation in future power systems.

Flexible resources

U.S. ESCO Industry Report: Industry Size and Recent Market Trends, 2022- 2024

The latest edition of the U.S. Energy Service Company (ESCO) Industry Report by Lawrence Berkeley National Laboratory (LBNL) finds that the U.S. ESCO industry continues to show strong growth. The report draws from ESCO industry reported revenue data for the 2022-2024 period, detailing the current size and characteristics of the U.S. ESCO industry. Following 20 years of ESCO industry reports, the 2024 report explores significant revenue trends across market segments, geographic regions, ESCO size, financing structures, and business activities. New analysis in this report outlines customer priorities and non-energy benefit drivers of Energy Savings Performance Contract projects, adjusted revenue analysis detailing the impacts of inflation on industry growth, and project challenges by market segment.

Chelminski, Kathryn

Swing Contract-Based Valuation for Distributed Energy Resources in Transactive Energy Systems: A Reinforcement Learning Approach

With the proliferation of distributed energy resources (DERs) and power grids with high fractions of renewable energy, market constructs are evolving to allow DERs to participate in multiple possible markets, at different levels of grid hierarchy. The effective participation of DERs in market environments is aided by swing contract-based pricing mechanisms, whereby DERs have a two-part compensation structure – one for their reservation/commitment and another for performancedriven ex-post payment for their actual mobilization during dispatch. In this paper, we propose a reinforcement learningbased (Q-learning) approach that allows a rational DER agent to select the market it wants to participate in within a composite market environment where individual markets are coordinated by possibly different actors. The proposed Q-learning framework aids DERs in their self-valuation by implicitly maximizing their own payoff through market participation, assuming a swing contract-based compensation structure. We complement our work through simulation-based investigations where factors affecting the DER decision making process, such as parametric uncertainties in market (and grid) environments, are studied.

Naqvi, Syed Ahsan Raza

Challenges and Opportunities for Electric Utility Modeling and Asset Valuation Frameworks: Case Study on Valuing New Pumped Storage Hydropower

Asset valuation by electric utilities is becoming increasingly difficult in the rapidly changing electric sector. Rapid deployment of variable generation and inverter-based storage systems along with uncertain demand growth, climate, policies, and other factors create a challenging environment for understanding the value proposition of a new potential asset. This report describes an effort between the Tennessee Valley Authority (TVA) and three U.S. Department of Energy laboratories to perform a detailed review of utility modeling and analysis practices for asset valuation and identify challenges and opportunities for advancing its methods into the future. It focuses on a case study of new potential pumped storage hydropower (PSH) because of growing interest in new PSH capacity to provide energy balancing, firm capacity, and a range of ancillary services. Staff from the DOE labs conducted systematic interviews about current practices in capacity expansion modeling, production-cost modeling, hydrological modeling, and transmission stability modeling while also discussing how scenario analysis is conducted and how models and data are integrated. The effort resulted in a set of model, integration, and scenario recommendations that could be valuable to TVA, other utilities, system operators, and other stakeholders conducting integrated grid analysis. Individual model recommendations suggest exploring computational tradeoffs with detail and resolution across spatiotemporal structure, supply- and demand-side details, transmission overlays, market interactions, and ancillary services. Automated processes to pass data between models and conduct larger scenario suites could also enhance valuation practices by enabling a more consistent study of asset value across a broader range of uncertain future grid conditions where PSH could be particularly valuable. TVA and other industry stakeholders can learn from and adapt applied research-grade methods developed by DOE laboratories and other research institutions to improve decision making and accelerate progress towards a reliable, economic, sustainable energy system.

13 HYDRO ENERGY

Financial Exposure After a Sealed-Source Release: Insurance Limits, Federal Cost Pathways, and Implications for Gamma Irradiator Substitution

This report assesses whether private insurance and existing federal authorities would likely provide meaningful financial protection to private operators of self-shielded gamma irradiators after a major sealed-source release. It does not answer this question quantitatively because publicly observable data on premiums, limits, uptake, and claims outcomes for this risk class appear sparse. Instead, it uses a qualitative structural analysis based on prior literature, review of relevant federal authorities, limited observable insurance-market evidence, expert outreach, and historical analogs. The analysis finds that available public and private mechanisms do not combine into a clear, dependable, or readily verifiable compensation structure for ordinary private sealed-source operators. Institutions therefore should not assume that either insurance or government response will make them financially whole after a severe incident. Source reduction and replacement remain more dependable than post-event financial mechanisms for reducing institutional exposure and broader radiological risk.

99 GENERAL AND MISCELLANEOUS

Long-Duration Energy Storage Grid Integration-Valuation Framework and Incentive Gaps

Given these challenges and current modeling gaps on Long Duration Energy Storage (LDES), enhancing the structure and design of existing planning, operations, and organized wholesale markets can better characterize the value of LDES to the power system. To more thoroughly assess the gaps and barriers to LDES investment and readiness for integration into a future grid, we conducted stakeholder outreach through an online survey, interviews with individual independent system operators/regional transmission organizations, and a literature review. Based on this assessment, we identified a set of opportunities for LDES focused development, including a framework to quantify the contributions of LDES on resource adequacy, reliability, and resiliency. Specifically, we identify the potential demand for and benefits of an open-source, LDES-centric evaluation framework that can guide future planning, operations, market design, and policy reforms.

24 POWER TRANSMISSION AND DISTRIBUTION

Bridging Control and Deployment: A Cross-Layer Analysis of Scalable Building Cluster Control

Building cluster control has emerged as a promising approach for enabling flexible and coordinated operation of distributed building systems, yet its transition from pilot demonstrations to routine grid-interactive operation remains limited. This paper argues that this gap cannot be explained by control algorithms alone. Instead, it arises from interacting barriers in communication infrastructure, data and semantic interoperability, uncertainty management, stakeholder participation, market design, and policy support. Accordingly, the paper reviews both technical and non-technical barriers to building cluster control. Technical challenges include heterogeneous devices and protocols, communication latency and reliability, distributed decision-making, and uncertainty propagation across aggregated loads. Non-technical barriers include user participation, stakeholder coordination, incentive allocation, and data governance. Existing solution approaches are synthesized, including semantic interoperability frameworks, edge and hierarchical communication architectures, distributed and transactive control strategies, uncertainty-aware optimization, policy mechanisms, and market reforms. Based on this analysis, two research directions are identified: testing infrastructures that can evaluate control performance under realistic multi-building conditions, and abstraction methods that allow building clusters to interact with other energy sectors through standardized flexibility representations. Overall, the paper provides a structured review of how building cluster control can move from isolated demonstrations toward reproducible, market-compatible, and grid-relevant implementation.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI

Solar cities: A case study analysis of city-level enablers of expanded solar energy access

Rooftop solar photovoltaic (PV) adoption can benefit households by reducing electricity bills and enhancing energy resiliency. Low and moderate-income (LMI) households have been less likely to adopt PV and experience these benefits in the United States than higher-income households. Adopter income trends are often explored through quantitative analysis with limited explanatory power. Our quantitative analysis only explains around one-third of city-level variation in LMI adoption trends through socioeconomic factors such as median home values and income inequality and PV market factors such as cumulative adoption and incentives. We implement semi-structured interviews in three case studies of cities with relatively high rates of LMI PV adoption to better understand the factors that explain PV adopter income trends. The case studies partly reiterate findings from quantitative analysis, such as the role of PV incentives. The case studies reveal a broader set of LMI adoption drivers that are missed in quantitative analyses. The case studies show how city contexts can affect LMI adoption, such as the role of supportive city governments. The case studies also reveal the importance of partnerships, such as partnerships between city governments and state LMI PV program implementers. Finally, interviewees emphasized the importance of building trust among prospective LMI PV adopters. Interviewees suggested that partnerships, outreach, and consumer protection measures were crucial to building trust in PV installers among LMI households.

Adoption

Comparative life cycle assessment of a modular cross-laminated timber residential building designed for disassembly and reuse versus traditional wood frame construction

There is a need for affordable housing across the U.S., with high-performance modular and prefabricated buildings providing a logical avenue for meeting some of this demand. However, there is a need to balance high performance construction – including low emissions – with affordability. To provide a proof-of-concept in meeting these goals, the Circular Home is a cross-laminated timber (CLT)-based deconstructible and reconfigurable single-family residence that meets high performance targets in moisture, energy, design, economics, and life cycle assessment (LCA). This study focuses on the LCA, presenting a cradle-to-cradle whole-building life cycle assessment (WBLCA) for the Circular Home and a functionally equivalent Baseline Home constructed with traditional materials and methods. The functional unit is 1 m 2 of gross floor area across 60 years. Revit building information models (BIM) provided material quantities and Tally LCA was utilized for impact data (inclusive of biogenic carbon sequestration), supplemented with manufacturer environmental product declarations (EPDs). The Circular Home outperforms the baseline residence in most measured impact categories, including global warming potential (GWP), producing −2.73 kgCO 2 eq/m 2 in embodied emissions, whereas the modeled baseline has an embodied GWP of 428 kgCO 2 eq/m 2 . The careful material selection and advanced building design optimizes performance, with the Circular Home containing only −0.006 times the embodied emissions and −0.02 times the operational emissions of its traditional counterpart. Finally, the unique contribution of this work is in the environmental impact comparison of a high-performance modular CLT structure that can be affordably scaled and mass produced in a U.S. market, compared to typical single family home construction.

Circularity

Environmentally Friendly Use of Carbon Ore for Advanced Building Materials for Homes and Commercial Buildings

Through this effort, X-MAT CCC sought to confirm the utility and commercialization potential of carbon-derived building materials (CDBM) technology licensed from our partner, Semplastics. These CDBM products contain at least 52% coal-derived carbon by mass. Including the binders within the resin, the products contain at least 71% carbon by mass overall, meeting a key criterion for DE-FOA-0002185 – Area of Interest (AOI) 5 – Design Research and Development, Validation, and Fabrication of a Prototype Carbon-Based Building. The Phase II project has resulted in a technology demonstrator prototype structure, a detailed design for a carbon-based building, and updated techno-economic analysis (TEA) including detailed market surveys to show the commercial viability of CDBM products. We pursued the following objectives in Phase II: (1) construction of a partial building shell as a technology demonstrator, (2) testing of CDBM products, individually and in assemblies, (3) demonstration of bonding of CDBM and traditional building materials (TBM) in structural applications, (4) production of a detailed design for a carbon-based building, and (5) an update of the TEA that was performed in Phase I. In Phase II, X-MAT CCC and our industry team performed the development and testing needed to improve the maturity of the technology from a Technology Readiness Level (TRL) of 5 to TRL 6. CDBM have been shown by our partner Semplastics to exhibit a number of high-performance characteristics, including high strength (five times the flexure strength of the best commercial brick, and more than twice the compressive strength of construction-grade concrete block), lower density, improved mechanical durability and abrasion resistance, very high temperature stability, and resistance to chemicals, acids, salts, and water. These properties offer significant improvements over conventional building materials. Phase II built upon the work accomplished in Phase I by performing technical and economic research and development to confirm the viability of CDBM as commercial products in various markets. Acknowledgment: This material is based upon work supported by the Department of Energy under Award Number DE-FE0031985.

01 COAL, LIGNITE, AND PEAT

Temporal Galactose‐Manganese Feeding in Fed‐Batch and Perfusion Bioreactors Modulates UDP‐Galactose Pools for Enhanced mAb Glycosylation Homogeneity

ABSTRACT Monoclonal antibodies (mAbs) represent a majority of biotherapeutics in the market today. These glycoproteins undergo posttranslational modifications, such as N‐linked glycosylation, that influence the structural & functional characteristics of the antibody. Glycosylation is a heterogenous posttranslational modification that may influence therapeutic glycoprotein stability and clinical efficacy, which is why it is often considered a critical quality attribute (CQA) of the mAb product. While much is known about the glycosylation pathways of Chinese Hamster Ovary (CHO) cells and how cell culture chemical modifiers may influence the N‐glycosylation profile of the final product, this knowledge is often based on the final cumulative glycan profile at the end of the batch process. Building a temporal understanding of N‐glycosylation and how mAb glycoform composition responds to real‐time changes in the biomanufacturing process will help build integrated process models that may allow for glycosylation control to produce a more homogenous product. Here, we look at the effect of specific nutrient feed media additives (e.g., galactose, manganese) and feeding times on the N‐glycosylation pathway to modulate N‐glycosylation of a Herceptin biosimilar mAb (i.e., Trastuzumab). We deploy the N‐GLYcanyzer process analytical technology (PAT) to monitor glycoforms in near real‐time for bench‐scale bioprocesses operated in both fed‐batch and perfusion modes to build an understanding of how temporal changes in mAb N‐glycosylation are dependent on specific media additives. We find that Trastuzumab terminal galactosylation is sensitive to media feeding times and intracellular nucleotide sugar pools. Temporal analysis reveals an increased desirable production of single and double galactose‐occupied glycoforms over time under glucose‐starved fed‐batch cultures. Comparable galactosylation profiles were also observed between fed‐batch (nutrient‐limited) and perfusion (non‐nutrient‐limited) bioprocess conditions. In summary, our results demonstrate the utility of real‐time monitoring of mAb glycoforms and feeding critical cell culture nutrients under fed‐batch and perfusion bioprocessing conditions to produce higher‐quality biologics.

Biotechnology & Applied Microbiology

Financial Analysis of the Smallmouth Bass Flows implemented at the Glen Canyon Dam during Water Year 2024

The Glen Canyon Dam (GCD) is a Colorado River Storage Project (CRSP) power resource that is a component of the Salt Lake City Area Integrated Projects (SLCA/IP). The 2016 record of decision (ROD) for the GCD long-term experimental and management plan (LTEMP) final Environmental Impact Statement (EIS) specifies criteria for GCD monthly water releases, daily and hourly operating limits, and experimental releases. This report presents a financial analysis of the Smallmouth bass (Micropterus dolomieu) (SMB) flows implemented at GCD during Water Year (WY) 2024. These bypass flows were introduced by the U.S. Bureau of Reclamation (USBR) as an emergency response to the growing threat posed by invasive SMB in the Colorado River ecosystem downstream of the dam. SMB are a non-native predatory species that pose a significant threat to native fish populations, including the endangered humpback chub (Gila cypha). The thermal regime below GCD, typically cold due to hypolimnetic releases from Lake Powell, has historically served as a thermal barrier limiting SMB establishment. However, persistently low reservoir levels in recent years have reduced stratification in Lake Powell, allowing warmer water to be released downstream. This has enabled SMB to spawn successfully below the dam, prompting urgent ecological concerns. To mitigate the risk of SMB proliferation, the USBR implemented a series of bypass flows in WY 2024. Drawn from a lower elevation than the penstocks, the bypass structures released cooler water downstream. These short-duration bypass flows aimed to keep temperatures cool enough to prevent SMB from spawning, thereby reducing the ecological threat posed by this invasive species. Although motivated by ecological objectives, these bypass flows came with financial tradeoffs. Releasing water through the bypass structures instead of the turbines at GCD reduced hydropower generation, resulting in a significantly lower financial position for Western Area Power Administration (WAPA), which is responsible for marketing the electricity produced by the GCD Powerplant. This report analyzes the financial impact of the SMB flows implemented from July to November 2024. These experimental releases led to an estimated financial cost of approximately $18.9 million, primarily driven by the substantial volume of water diverted through the bypass structures. This study applies an integrated set of tools to estimate WAPA financial impacts by simulating GCD under two types of cases; namely, (1) a “With Experiment” case that mimics the water operations that actually occurred, including the SMB bypass flows, and (2) a “Without Experiment” case that simulates operations under the assumption that the SMB flows did not occur. Both cases comply with LTEMP hourly and daily operating criteria, and the monthly water release volumes are assumed to be identical under both cases. The Colorado River Storage Project Python-based model (CRiSPPy) model was the main modeling tool used to simulate the dispatch of the GCD hydropower plant and associated water releases from Lake Powell. In the modeling process, the research team used extensive data sets and historical information on SLCA/IP power plant characteristics, hydrologic conditions, and WAPA’s power purchases and sales prices.

13 HYDRO ENERGY

RAFT: Reconfigurable Array of High-Efficiency Ducted Turbines for Hydrokinetic Energy Harvesting

Diversifying the energy harvesting portfolio is crucial to achieving the ambitious goal of transitioning to clean energy by 2030. Marine hydrokinetic energy has garnered renewed interest due to its high harvesting potential in the U.S., and the resource's reliability and predictability—remaining relatively constant on a daily basis and available 24/7. However, there are currently few commercial devices capable of harnessing the energy from flowing water. This project aims to bridge that gap by designing and evaluating a novel hydrokinetic turbine concept that can efficiently harvest energy from both rivers and tidal streams. The RAFT (Reconfigurable Array of High-Efficiency Ducted Turbines) concept introduces a duct surrounding the turbine rotor and creates an array of small 5-kW units. The duct serves two primary purposes: (1) it enhances hydrodynamic efficiency by accelerating flow to the rotor, and (2) it functions as a structural component, facilitating the formation of modular arrays that lower costs. This project focuses on demonstrating this concept and validating these benefits through simulations and scaled prototype testing. The project team includes 8 faculty members and over 20 students from 3 universities, organized into three core areas: hydrodynamics, electrical systems, and structural analysis, with additional teams dedicated to system integration, environmental assessment and risk management, and tech-to-market strategy. The team successfully demonstrated the increased hydrodynamic efficiency of a ducted turbine compared to an unducted version using high-fidelity simulations and prototype tests. Moreover, design optimization efforts led to surpassing the SHARKS program's goal of 60% reduction of the levelized cost of energy with a significant margin.

13 HYDRO ENERGY

Interregional Transmission Operational Coordination (IRTOC)

This report presents a modeling and evaluation framework developed through the Inter-Regional Transmission Operational Coordination (IRTOC) project to study market-to-market (M2M) congestion management across day-ahead and real-time markets. The framework extends the Sienna platform through Sienna Decomposition, a multi-stage evaluation architecture that enables flexible representation of multiple regions and systematic assessment of alternative market coordination designs. Additional modeling capabilities include reserve deliverability constraints, High-Voltage Direct Current (HVDC) optimization for Alternating Current (AC) congestion management, and several real-time distributed coordination algorithms. Case studies using the RTS-GMLC test system and a large-scale Eastern Interconnection model demonstrate that the framework can evaluate alternative coordination structures and quantify their economic and operational impacts. The proposed framework provides a scalable platform for analyzing inter-regional coordination strategies in large-scale electricity markets.

29 ENERGY PLANNING, POLICY, AND ECONOMY