Engineering PapersSearch

SEARCH · Engineering Papers

Results for “market structure”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Determinants of Market Structure and the Airline Industry

The general economic determinants of market structure are outlined with special reference to the airline industry. Included are the following facets: absolute size of firms; distributions of firms by size; concentration; entry barriers; product and service differentiation; diversification; degrees of competition; vertical integration; market boundaries; and economies of scale. Also examined are the static and dynamic properties of market structure in terms of mergers, government policies, and economic growth conditions.

Raduchel, W.

Accelerating the commercialization on new technologies

It is suggested that federal programs for hastening the adoption of alternative energy sources must operate within the free market structure. Five phases of the free market commercialization process are described. Federal role possibilities include information dissemination and funding to stimulate private sector activities within these five phases, and federally sponsored procedures for accelerating commercialization of solar thermal small power systems are considered.

Kuehn, T. J.

Effectively Considering the Distribution System in Integrated Resource Plans

While electricity planning practices vary by state and utility based on utility type and market structure, integrated resource planning (IRP) remains a prominent vehicle — even in states with centrally-organized wholesale electricity markets. IRP focuses on meeting forecasted long-term electricity needs. Typically, utilities have not considered impacts of design and operation of the low-voltage distribution network in IRP. With advanced capabilities of grid-edge technologies to generate and store electricity and provide load flexibility, and large utility investments in distribution systems, it's increasingly important to consider at least some distribution planning elements in IRP. This report considers the value proposition for doing so, such as reducing utility costs through resource co-optimization and strategic siting of grid-edge resources, and idenfities the most important touchpoints between planning for bulk power and distribution systems and provide a range of tactics for integrating these two processes.

Relf, Grace [Lawrence Berkeley National Laboratory

Generator Interconnection Costs to the Transmission System in non-ISO Balancing Authorities [Slides]

Electric transmission system operators—including Independent System Operators (ISOs), Regional Transmission Organizations (RTOs), and utilities—require proposed power plants to undergo a series of interconnection studies before connecting to the grid. These studies assess what transmission upgrades or new infrastructure may be necessary and assign the associated costs to the project. Lawrence Berkeley National Laboratory has compiled, aggregated, and cleaned interconnection cost data, originally for ISOs/RTOs, and now for five non-ISO Balancing Authorities: PacifiCorp, Bonneville Power Authority, Duke Energy Progress, Duke Energy Carolinas and Duke Energy Florida. Insufficient transparency in interconnection cost data may contribute to rapidly expanding interconnection queues, with active queue capacities tripling between 2020 and 2024 in the studied BAs. Most projects withdraw after receiving high interconnection cost estimates. Interconnection costs have increased since the early 2000s, with average costs for "complete" projects reaching $194/kW between 2018 and 2024. Active queue projects and withdrawn projects incur substantially higher costs, primarily due to rising network upgrade costs. Recent interconnection costs in non-ISO balancing authorities are higher than in ISO regions, potentially due to a greater willingness to pay among developers. Utility-scale solar, wind, and storage projects have interconnection costs that exceed those for natural gas. However, when focusing on projects that do not withdraw from the queue, the interconnection costs for these technologies are more similar to natural gas projects. Other key findings include: (1) Larger generation projects benefit from lower proportional interconnection costs, (2) capacity transmission service (NRIS) often requires additional network investments, and (3) projects with high network upgrade costs are often clustered geographically. The dataset includes results from 2,104 interconnection studies conducted between 2000 and 2024, covering projects that are operational, withdrawn, or still progressing through the study process. The Excel file contains (a) the complete project-level interconnection cost dataset, and (b) seven additional tabs summarizing cost metrics across dimensions such as time, market structure, cost category (point of interconnection vs. broader network upgrades), fuel type, service type (ERIS vs. NRIS), generator size, and geography.

24 POWER TRANSMISSION AND DISTRIBUTION

Aircraft requirements for low/medium density markets

A study was conducted to determine the demand for and the economic factors involved in air transportation in a low and medium density market. The subjects investigated are as follows: (1) industry and market structure, (2) aircraft analysis, (3) economic analysis, (4) field surveys, and (5) computer network analysis. Graphs are included to show the economic requirements and the aircraft performance characteristics.

Ausrotas, R.

NASA SBIR product catalog, 1990

Since 1983 the NASA Small Business Innovation Research (SBIR) program has benefitted both the agency and the high technology small business community. By making it possible for more small businesses to participate in NASA's research and development, SBIR also provides opportunities for these entrepreneurs to develop products which may also have significant commercial markets. Structured in three phases, the SBIR program uses Phase 1 to assess the technical feasibility of novel ideas proposed by small companies and Phase 2 to conduct research and development on the best concepts. Phase 3, not funded by SBIR, is the utilization and/or commercialization phase. A partial list of products of NASA SBIR projects which have advanced to some degree into Phase 3 are provided with a brief description.

Schwenk, F. Carl

Dual-Use Space Technology Transfer Conference and Exhibition, Volume 1

This document contains papers presented at the Dual-Use Space Technology Transfer Conference and Exhibition held at the Johnson Space Center February 1-3, 1994. Possible technology transfers covered during the conference were in the areas of information access; innovative microwave and optical applications; materials and structures; marketing and barriers; intelligent systems; human factors and habitation; communications and data systems; business process and technology transfer; software engineering; biotechnology and advanced bioinstrumentation; communications signal processing and analysis; new ways of doing business; medical care; applications derived from control center data systems; human performance evaluation; technology transfer methods; mathematics, modeling, and simulation; propulsion; software analysis and decision tools systems/processes in human support technology; networks, control centers, and distributed systems; power; rapid development perception and vision technologies; integrated vehicle health management; automation technologies; advanced avionics; ans robotics technologies. More than 77 papers, 20 presentations, and 20 exhibits covering various disciplines were presented b experts from NASA, universities, and industry.

Kumar Krishen

Dual-Use Space Technology Transfer Conference and Exhibition

This is the second volume of papers presented at the Dual-Use Space Technology Transfer Conference and Exhibition held at the Johnson Space Center February 1-3, 1994. Possible technology transfers covered during the conference were in the areas of information access; innovative microwave and optical applications; materials and structures; marketing and barriers; intelligent systems; human factors and habitation; communications and data systems; business process and technology transfer; software engineering; biotechnology and advanced bioinstrumentation; communications signal processing and analysis; medical care; applications derived from control center data systems; human performance evaluation; technology transfer methods; mathematics, modeling, and simulation; propulsion; software analysis and decision tools; systems/processes in human support technology; networks, control centers, and distributed systems; power; rapid development; perception and vision technologies; integrated vehicle health management; automation technologies; advanced avionics; and robotics technologies.

Krishen, Kumar

Power now, pay later: the evolution of U.S. residential solar financing

Most U.S. residential rooftop solar customers finance their solar purchases through loans or by buying power from third-party owned systems. Prior research demonstrates how third-party ownership (TPO) models such as leases emerged in the early 2010s and accelerated solar adoption by low- and moderate-income households while driving market concentration in the installation industry. Since 2015, loans have emerged as a prevalent financing alternative, but the potential effects of loans on the customer base and industry remain understudied. Here, we fill that research gap by developing a methodology to identify loan-financed and third-party owned systems in a household-level solar adopter data set. The data suggest that loans accounted for increasing solar market shares from 2017 until reaching as high as 70% in 2022, but that the market has since shifted back to TPO. The data show that TPO adopters in our sample earned about 16%–18% less and loan recipients earned 3%–7% less, at the median, than customers who self-financed systems. These results reaffirm prior research showing that TPO has accelerated low- and moderate-income adoption and that loans have likewise expanded the customer base to a lesser extent. The results suggest that loan-financed systems entail around a 16%–26% price premium that is only partly explained by loan fees. Finally, the data suggest that the emergence of loans has likely reduced market concentration in the rooftop solar industry.

financing

Prospects for a civil/military transport aircraft

The similarities and disparities between commercial and military payloads, design features, missions, and transport aircraft are enumerated. Two matrices of civil/military transport aircraft designs were evaluated to determine the most cost effective payloads for a projected commercial route structure and air freight market. The probability of this market developing and the prospects for alternate route structures and freight markets are evaluated along with the possible impact on the aircraft designs. Proposals to stimulate the market and increase the viability of the common aircraft concept are reviewed and the possible impact of higher cargo demand on prospects for common civil/military freighters is postulated. The implications of planned advanced technology developments on the aircraft performance and cost are also considered.

Jobe, C. E.

An analysis of long and medium-haul air passenger demand, volume 1

A basic model was developed which is a two equation pair econometric system in which air passenger demand and airline level-of-service are the endogenous variables. The model aims to identify the relationship between each of these two variables and its determining factors, and to identify the interaction of demand and level-of-service with each other. The selected variable for the measure of air passenger traffic activity in a given pair market is defined as the number of passengers in a given time that originate in one region and fly to the other region for purposes other than to make a connection to a third region. For medium and long haul markets, the model seems to perform better for larger markets. This is due to a specification problem regarding the route structure variable. In larger markets, a greater percentage of nonlocal passengers are accounted for by this variable. Comparing the estimated fare elasticities of long and medium haul markets, it appears that air transportation demand is more price elastic in longer haul markets. Long haul markets demand will saturate with a fewer number of departures than will demand in medium haul markets.

Eriksen, S. E.

Nine Canyon Long-Duration Energy Storage: A Feasibility Study

The Nine Canyon Long Duration Energy Storage (LDES) Feasibility Study explores the technical and economic viability of deploying advanced energy storage technologies at Energy Northwest's (EN) Nine Canyon (9C) Wind Project site in Benton County, Washington. Supported by the Washington State Department of Commerce and the U.S. Department of Energy’s Office of Electricity under its LDES Voucher Program, the study represents a collaborative effort between EN, Pacific Northwest National Laboratory (PNNL), and ARES North America. At the core of this effort is the development of a generalized techno-economic modeling framework and evaluation tool designed to assess the value proposition of LDES projects across a variety of contexts. The modeling tool is technology-agnostic and accommodates user-defined parameters such as rated power, energy duration, round-trip efficiency, capital and operational costs, and dispatch constraints. It also integrates economic inputs, including market prices, energy revenue structures, and financing parameters to evaluate performance through key metrics. The tool provides utilities with a transparent, adaptable platform to support decision-making, investment prioritization, and portfolio planning for various storage technologies. To guide scenario design and interpretation, the study first surveyed the LDES technology landscape, including lithium-ion batteries, flow batteries, non-hydro gravity storage, and thermo-mechanical systems, comparing cost trajectories, technical performance, safety and hazards, materials sourcing and recyclability, and spatial/siting considerations. This literature-grounded review highlights technology trade-offs and reinforces the need to align technology choice with site characteristics, use cases, and project objectives. A companion chapter examines ownership structures (EN ownership, third-party ownership, shared models) and offtake options (energy marketing, capacity/energy PPAs, time-of-use PPAs, block-delivery PPAs, and tolling), where PPAs (power purchase agreements) represent contractual arrangements for buying and selling electricity. The chapter also highlights implications for risk allocation, capital access, operational control, and revenue certainty. The study also evaluates supervisory control and data acquisition (SCADA) and transmission interconnection pathways, options include upgrading the existing SCADA or deploying a dedicated LDES controller, with attention to protection schemes, data telemetry, cybersecurity, and regulatory coordination with BPA. In addition, an ARES-specific geotechnical and hydrology assessment presented in the appendix screens multiple corridors for slope stability, bearing capacity, cut-and-fill magnitude, and stormwater behavior.

25 ENERGY STORAGE

Research requirements to reduce empty weight of helicopters by use of advanced materials

Utilization of the new, lightweight, high-strength, aerospace structural-composite (filament/matrix) materials, when specifically designed into a new aircraft, promises reductions in structural empty weight of 12 percent at recurring costs competive with metals. A program of basic and applied research and demonstration is identified with the objective of advancing the state of the art to the point where civil helicopters are confidently designed, produced, certified, and marketed by 1985. A structural empty-weight reduction of 12 percent was shown to significantly reduce energy consumption in modern high-performance helicopters.

Hoffstedt, D. J.

Electricity Markets and Long-Duration Energy Storage: A Survey of Grid Services and Revenue Streams

Purpose of Review Long Duration Energy Storage (LDES) is increasingly viewed as a potential resource for providing grid services that enhance the stability and flexibility of electricity systems. While some LDES services are integrated into existing market frameworks, traditional mechanisms may not fully account for their operational characteristics, potentially leading to undervaluation. Within this context, this paper reviews the literature and industry practices to assess potential grid services for LDES, evaluates existing compensation mechanisms, and identifies challenges to full market integration. Recent Findings We first review existing literature and identify key grid services unique to LDES, including enhancing grid resilience during extreme weather events, enabling long-term energy shifting, and providing flexible and firm energy in systems with limited dispatchable resources. Here, we also review how LDES services are compensated in current market frameworks and the challenges associated with the full realization of LDES values. Additionally, we summarize market mechanisms for storage technologies across U.S. wholesale markets. We find that some markets are adjusting incentive structures, such as incorporating storage duration in capacity accreditation, to better align with system needs and LDES contributions to the grid. However, further refinements in capacity remuneration and dispatch timeframes may be needed for more effective realization of LDES value. Summary This review evaluates potential grid services for LDES, examines existing compensation mechanisms for LDES technologies, and identifies gaps between these mechanisms and LDES operational characteristics. The review concludes by outlining potential market enhancements for more effective LDES integration and articulating additional research needs to support its efficient participation in future power systems.

Flexible resources

Longer Life for Steel Structures

IC 531 is a coating manufactured and marketed by Inorganic Coatings, Inc. The coating was developed by Goddard to protect structures at Kennedy Space Center. It is a high ratio potassium silicate formula. The coating is water based, nontoxic, and nonflammable. It generates no volatile organic compounds nor hazardous chemical waste, and bonds to steel in 30 minutes. At the present time, no one can say for sure how long IC 531's effective lifetime is. Some of the original Goddard test applications of 1976 are still going strong after lengthy exposure to the Sun, salt and moisture. Says IC in company literature: 'IC 531 offers virtually permanent protection for steel. We predict it will protect structures for well beyond 25 years. If necessary, it is infinitely maintainable; if damaged, it can easily be touched up with more IC 531.'

Source record

Communications satellites - The experimental years

Only eight years after the launc of Sputnik-1 by the Soviet Union, the first commercial satellite, 'Early Bird', entered service. In just twelve years commercial satellite service extended around the earth and became profitable. The reasons for the successful development of the communications satellite services in a comparatively short time are considered. These reasons are related to the presence of three ingredients, taking into account technology to create the system, communications requirements to form a market, and a management structure to implement the system. The formation of the concept of using earth orbiting satellites for telecommunications is discussed. It is pointed out that the years from 1958 to 1964 were the true 'experimental years' for satellite communications. The rapid development of technology during this crucial period is described, giving attention to passive satellites, active systems, and development satellites.

Edelson, B. I.

The design of a commercial space infrastructure

Space Services and Logistics, Inc. represents the complete engineering design of a technically and financially viable commercial space company. The final proposal offers an economically sound program of space vehicles and systems designed to substantially affect a variety of space markets and produce a vertically integrated structure within the next 20 years. Throughout this design process, particular stress has been placed on attaining the highest possible levels of safety and reliability. The final program financial design requires a considerable initial outlay, but promises a relatively quick return on invested capital, culminating in large annual profits by the end of the 20-year scope of the cost outlook. The overall design has been extensively researched and was primarily driven by the present and near-term projected market demands for services uniquely or competitively offered only by space-oriented operations. Heretofore, available capabilities, rather than these market demands, have determined the degree and type of commercial market access. Removing this limitation through extensive use of modularity and reconfigurability allows the company to gear itself to the market, while still remaining extremely competitive with existing systems. The markets identified as lucrative, and that have governed much of the design requirements, are: low-cost launch services to LEO over a wide range of payload masses and inclinations; upper stage payload delivery from LEO to GEO; manned space operations and human transport to and from orbit; EVA assembly and maintenance of large space structures; satellite servicing and repair by both humans and telerobotic operations; a line of customized satellites designed for extended life and capable of reconfiguration or technology upgrade on orbit; small-scale microgravity experimentation and manufacturing supported by spacecraft retrieval capabilities for experimental specimens and manufactured goods; and a full-range of payload integration, testing, design, and support services before launch and once in orbit.

Source record