Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “maintenance leakage rate test”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

3-60B Type-B shipping cask enhanced operational features to facilitate leakage rate testing - 15585

EnergySolutions is fabricating a new 3-60B Type B Shipping Cask that will be ready for use in spring 2015, designed for shipping Type B quantities of activated and/or non-fuel-bearing reactor or accelerator components. EnergySolutions, in consult with Leak Testing Specialists, Inc., has implemented an improved design of the 3-60B cask closures to better facilitate periodic and maintenance leakage rate testing and to allow end users to more easily perform pre-shipment leakage rate testing to confirm proper assembly of the cask closures. A typical Type B cask closure lid design incorporates a double O-ring configuration, where the inner O-ring provides containment and the outer O-ring is used for leakage rate testing of the containment O-ring seal. Leakage rate testing of a double O-ring configuration is typically accomplished by filling the cask cavity with helium, pulling a vacuum on the annular space between the two O-rings and monitoring for helium leakage through the containment O-ring. One issue is the potential for helium saturation of the O-ring elastomeric material, which can result in leakage rate test failures. The cask cavity volume is typically large, and takes a significant amount of time to fill with helium. As a result, the saturation time for certain elastomeric compounds may be exceeded, leading to potential false-negative leakage rate testing results. To avoid this, that the cask cavity typically is loaded with sealed container(s) to reduce the free volume and the fill time. The improved 3-60B cask closure lid incorporates a triple O-ring seal configuration that facilitates maintenance leak rate testing of the closure lid containment O-ring seal and eliminates the issues discussed above. The triple O-ring configuration uses the middle O-ring as the containment seal, with the inner and outer test O-rings creating relatively small annular volumes for testing purposes. These small annular volumes are quick to fill, minimizing the issue of Helium saturation of the O-ring material. This seal configuration also makes it possible to detect and replace a damaged O-ring seal during loading operations, or dress a damaged sealing surface, and perform the required maintenance leakage rate testing of the replacement O-ring at the plant site without the need to unload the cask and send it to a maintenance facility. Also, a second test port has been added to each O-ring annulus to allow leakage rate testing to be accomplished using a formal system calibration that complies with the requirements and recommendations of ASME Section V, Article 10 [4], ANSI N14.5-97 [2], and ANSI N14.5-2014 [3]. This provides a simple, reliable, and accurate means to perform leakage rate testing with a test confidence level that cannot be achieved without the second test port. The improved closure and test port design simplifies and shortens the time required to perform leakage testing, resulting in reduced operating costs, greater schedule security, and dose savings for the cask users. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

RH Packaging Maintenance Manual (Rev. 0)

This document provides instructions for performing (1) Inner containment vessel (IV) and outer containment vessel (OC) maintenance leakage rate test on packaging seals and corresponding seal surfaces using a nondestructive helium (He) leak test; (2) IV and OC periodic leakage rate test using nondestructive He leak test; and (3) IV and OC structural pressure tests.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

CH Packaging Maintenance Manual (Rev. 1)

This procedure provides instructions for performing inner containment vessel (ICV) and outer containment vessel (OCV) maintenance leakage rate testing on the following packaging seals and corresponding seal surfaces using a nondestructive helium(He) leak test: ICV upper main O-ring seal, ICV outer vent port plug O-ring seal, OCV upper main O-ring seal, and OCV vent port plug O-ring seal.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

RH Packaging Maintenance Manual (Rev. 4)

This part of the manual provides instructions for performing inner containment vessel (IV) and outer containment vessel (OC)maintenance leakage rate tests on the following packaging seals and corresponding seal surfaces using a non-destructive helium(He) leak test: IV middle main O-ring seal, IV gas sampling port closure bolt O-ring seal, IV backfill port closure bolt O-ring seal, OC lower main O-ring seal, OC gas sampling port closure bolt O-ring seal.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

RH Packaging Program Guidance (Rev. 3)

The purpose of this program guidance document is to provide the technical requirements for use, operation, inspection, and maintenance of the Remote Handled-Transuranic (RH-TRU) 72-B Waste Shipping Package (also known as the "RH-TRU 72-B") and directly related components. This document complies with the requirements as specified in the RH-TRU 72-B Safety Analysis Report for Packaging (SARP), and Nuclear Regulatory Commission (NRC) Certificate of Compliance (C of C) 9212. If there is a conflict between this document and the SARP and/or C of C, the C of C shall govern. The C of C states: "...each package must be prepared for shipment and operated in accordance with the procedures described in Chapter 7.0, Operating Procedures, of the application." It further states: "...each package must be tested and maintained in accordance with the procedures described in Chapter 8.0, Acceptance Tests and Maintenance Program of the Application." Chapter 9.0 of the SARP tasks the Waste Isolation Pilot Plant (WIPP) Management and Operating (M&O) Contractor with assuring the packaging is used in accordance with the requirements of the C of C. Because the packaging is NRC-approved, users need to be familiar with Title 10 Code of Federal Regulations (CFR) §71.8, "Deliberate Misconduct." Any time a user suspects or has indications that the conditions of approval in the C of C were not met, the U.S. Department of Energy (DOE) Carlsbad Field Office (CBFO) shall be notified immediately. The CBFO will evaluate the issue and notify the NRC if required. In accordance with 10 CFR Part 71, "Packaging and Transportation of Radioactive Material," certificate holders, packaging users, and contractors or subcontractors who use, design, fabricate, test, maintain, or modify the packaging shall post copies of (1) 10 CFR Part 21, "Reporting of Defects and Noncompliance," regulations, (2) Section 206 of the Energy Reorganization Act of 1974, and (3) NRC Form 3, Notice to Employees. These documents must be posted in a conspicuous location where the activities subject to these regulations are conducted. This document details the instructions to be followed to operate, maintain, and test the RH-TRU 72-B packaging. This Program Guidance standardizes instructions for all users. Users shall follow these instructions or equivalent approved instructions. Following these instructions assures that operations meet the requirements of the SARP.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

RH Packaging Program Guidance (Rev. 3.1)

The purpose of this program guidance document is to provide the technical requirements for use, operation, inspection, and maintenance of the Remote-Handled Transuranic (RH-TRU) 72-B Waste Shipping Package (also known as the "RH-TRU 72-B") and directly related components. This document complies with the requirements as specified in the RH-TRU 72-B Safety Analysis Report for Packaging (SARP), and Nuclear Regulatory Commission (NRC) Certificate of Compliance (C of C) 9212. If there is a conflict between this document and the SARP and/or C of C, the C of C shall govern. The C of C states, "each package must be prepared for shipment and operated in accordance with the procedures described in Chapter 7.0, Operating Procedures, of the application." It further states: "…each package must be tested and maintained in accordance with the procedures described in Chapter 8.0, Acceptance Tests and Maintenance Program of the Application." Chapter 9.0 of the SARP tasks the Department of Energy Carlsbad Field Office or the Waste Isolation Pilot Plant (WIPP) Management and Operating (M&O) Contractor with assuring the packaging is used in accordance with the requirements of the C of C. Because the packaging is NRC approved, users need to be familiar with Title 10 Code of Federal Regulations (CFR) §71.8, "Deliberate Misconduct." Any time a user suspects or has indications that the conditions of approval in the C of C were not met, the U.S. Department of Energy (DOE) Carlsbad Field Office (CBFO) shall be notified immediately. The CBFO will evaluate the issue and notify the NRC if required. In accordance with 10 CFR Part 71, "Packaging and Transportation of Radioactive Material," certificate holders, packaging users, and contractors or subcontractors who use, design, fabricate, test, maintain, or modify the packaging shall post copies of (1) 10 CFR Part 21, "Reporting of Defects and Noncompliances," regulations, (2) Section 206 of the Energy Reorganization Act of 1974, and (3) NRC Form 3, Notice to Employees. These documents must be posted in a conspicuous location where the activities subject to these regulations are conducted. This document details the instructions to be followed to operate, maintain, and test the RH-TRU 72-B packaging. This Program Guidance standardizes instructions for all users. Users shall follow these instructions or equivalent approved instructions. Following these instructions assures that operations meet the requirements of the SARP.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

RH Packaging Operations Manual (Rev. 5)

This procedure provides operating instructions for the remote-handled transuranic (RH-TRU) 72-B Waste Shipping Package (hereinafter referred to as "RH-TRU 72-B"). In this document, "Packaging" refers to the assembly of components necessary to ensure compliance with the packaging requirements (not loaded with a payload). "Package" refers to a Type B packaging that, with its radioactive contents, is designed to retain the integrity of its containment and shielding when subject to the normal conditions of transport and hypothetical accident test conditions set forth in 10 CFR Part 71. Before RH-TRU 72-B loading operations begin, loading procedures and revisions must be sent to the DOE Carlsbad Field Office (CBFO) at site.documents@wipp.ws for approval. Loading of the RH-TRU 72-B can be done one of two ways: on the cask trailer in the vertical position or by removing the cask from the trailer and loading it in an area designated for remote-handling. Two types of trailers were specially designed to transport the RH-TRU 72-B: a spread-axle trailer requiring a crane to rotate the cask and a cask uprighting trailer designed with built-in hydraulics to rotate the RH-TRU 72-B into the vertical position while on the trailer. The hydraulic power unit is a separate piece of equipment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

RH Packaging Operations Manual (Rev. 6)

This procedure provides operating instructions for the remote-handled transuranic (RH-TRU) 72-B Waste Shipping Package (hereinafter referred to as "RH-TRU 72-B"). In this document, "Packaging" refers to the assembly of components necessary to ensure compliance with the packaging requirements (not loaded with a payload). "Package" refers to a Type B packaging that, with its radioactive contents, is designed to retain the integrity of its containment and shielding when subject to the normal conditions of transport and hypothetical accident test conditions set forth in 10 CFR Part 71. Before RH-TRU 72-B loading operations begin, loading procedures and revisions must be sent to the DOE Carlsbad Field Office (CBFO) at site.documents@wipp.ws for approval. Loading of the RH-TRU 72-B can be done one of two ways: on the cask trailer in the vertical position or by removing the cask from the trailer and loading it in an area designated for remote-handling. Two types of trailers were specially designed to transport the RH-TRU 72-B: a spread-axle trailer requiring a crane to rotate the cask and a cask uprighting trailer designed with built-in hydraulics to rotate the RH-TRU 72-B into the vertical position while on the trailer. The hydraulic power unit is a separate piece of equipment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Fabrication Lessons Learned of Transportation Packaging from the Perspective of a Design Authority - 20322

This paper presents lessons learned regarding fabricating packaging systems from the perspective of a design authority (DA). Capturing and implementing lessons learned is critical for an organization to reduce systematic project risk and thereby promote the likelihood of project success. This paper defines the design authority as the organization responsible for technical design, resolving technical design issues, quality assurance program, and maintenance of the packaging system license. A package system is defined as the packaging, its contents, and auxiliary equipment. Packages are certified by the NRC under 10 CFR 71[1] for transportation by ground. The following lessons learned subjects are presented in the paper: quality assurance, interpretation of drawing dimensional requirements, execution of manufacturing processes, hardware dimensional inspection, and leakage rate testing. All discrepancies presented in this paper have been resolved as described in the appropriate final data package. All described package systems are in compliance with their Safety Analysis Report (SAR) and certificate of conformance requirements. The intent of this paper is to identify opportunities for improving the outcome of future projects and to mitigate fabrication challenges proactively. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Sealing technology for aircraft gas turbine engines

Experimental evaluation under simulated engine conditions revealed that conventional mainshaft seals have disadvantages of high gas leakage rates and wear. An advanced seal concept, the self-acting face seal, has a much lower gas leakage rate and greater pressure and speed capability. In endurance tests (150 hr) to 43 200 rpm the self-acting seal wear was not measurable, indicating noncontact sealing operation was maintained even at this high rotative speed. A review of published data revealed that the leakage through gas path seals has a significant effect on TSFC, stall margin and engine maintenance. Reducing leakages by reducing seal clearances results in rubbing contact, and then the seal thermal response and wear determines the final seal clearances. The control of clearances requires a material with the proper combination of rub tolerance (abradability) and erosion resistance. Increased rub tolerance is usually gained at the expense of reduced erosion resistance and vice versa.

Ludwig, L. P.↗

Sealing technology for aircraft gas turbine engines

Experimental evaluation under simulated engine conditions revealed that conventional mainshaft seals have disadvantages of high gas leakage rates and wear. An advanced seal concept, the self-acting face seal, has a much lower gas leakage rate and greater pressure and speed capability. In endurance tests (150 hr) to 43,200 rpm the self-acting seal wear was not measurable, indicating that noncontact sealing operation was maintained even at this high rotative speed. A review of published data revealed that the leakage through gas path seals has a significant effect on thrust specific fuel consumption, stall margin, and engine maintenance. Reducing leakages by reducing seal clearances results in rubbing contact, and then the seal thermal response and wear determines the final seal clearances.

Ludwig, L. P.↗

Ultracapacitor-Based Uninterrupted Power Supply System

The ultracapacitor-based uninterrupted power supply (UPS) system enhances system reliability; reduces life-of-system, maintenance, and downtime costs; and greatly reduces environmental impact when compared to conventional UPS energy storage systems. This design provides power when required and absorbs power when required to smooth the system load and also has excellent low-temperature performance. The UPS used during hardware tests at Glenn is an efficient, compact, maintenance-free, rack-mount, pure sine-wave inverter unit. The UPS provides a continuous output power up to 1,700 W with a surge rating of 1,870 W for up to one minute at a nominal output voltage of 115 VAC. The ultracapacitor energy storage system tested in conjunction with the UPS is rated at 5.8 F. This is a bank of ten symmetric ultracapacitor modules. Each module is actively balanced using a linear voltage balancing technique in which the cell-to-cell leakage is dependent upon the imbalance of the individual cells. The ultracapacitors are charged by a DC power supply, which can provide up to 300 VDC at 4 A. A constant-voltage, constant-current power supply was selected for this application. The long life of ultracapacitors greatly enhances system reliability, which is significant in critical applications such as medical power systems and space power systems. The energy storage system can usually last longer than the application, given its 20-year life span. This means that the ultracapacitors will probably never need to be replaced and disposed of, whereas batteries require frequent replacement and disposal. The charge-discharge efficiency of rechargeable batteries is approximately 50 percent, and after some hundreds of charges and discharges, they must be replaced. The charge-discharge efficiency of ultracapacitors exceeds 90 percent, and can accept more than a million charges and discharges. Thus, there is a significant energy savings through the efficiency improvement, and there is far less downtime for applications and labor involved in replacing an ultracapacitor versus batteries. Also, the lengthy lifespan of this design would greatly reduce the disposal problems posed by lead acid, nickel cadmium, lithium, and nickel metal hydride batteries. This innovation is recyclable by nature, which further reduces system costs. The disposal of ultracapacitors is simple, as they are constructed of non-hazardous components. They are also safer than batteries in that they can be easily discharged, and left indefinitely in a safe, discharged state where batteries cannot.

Eichenberg, Dennis J.↗

Experimental Comparison of Elastomeric Materials for Hydraulic Seal Durability under Reciprocating Conditions

Wave Energy Converters (WECs) rely on hydraulic Power Take-Off (PTO) systems to transform the kinetic energy of ocean waves into electricity, where hydraulic seals play a critical role in preventing fluid leakage and ensuring watertight operation under harsh marine conditions. However, seal degradation due to wear, fatigue, and corrosion remains a key challenge limiting system reliability and increasing maintenance costs. In this study, the tribological performance of elastomeric materials for hydraulic sealing applications that are based on commercial polyurethane and custom-compounded Ethylene Propylene Diene Monomer (EPDM) is investigated. Using a CSM tribometer, reciprocating wear tests were conducted in accordance with ASTM G133 under dry sliding conditions, with normal loads ranging from 3 to 10 N, and sliding speeds of 10 to 30 mm/s. Coefficient of friction (COF), specific wear rate, and worn surface morphology are evaluated to understand how load, velocity, and material composition affect seal durability. Improved wear stability and high Shore A hardness (93–94) were demonstrated by the commercial thermoplastic polyurethane (Duralast 4203 and 4758). EPDM-based compounds showed different filler-dependent behaviors, formulations filled with carbon black (E3) had the lowest wear rate (1.45 × 10?4 mm³ N?¹ m?¹) and increased load-bearing capacity, while samples modified with silica and plasticizer (E4, E5) had better conformability and damping but less hardness. Compounded EPDMs showed wider deformation zones because of their lower modulus and filler-matrix interfacial fluctuations, while commercial grades exhibited shallower wear scars (= 380 µm), according to optical profilometry. The Archard model-based lifetime estimation showed that, under 10 N and 30 mm/s, operational endurance ranged from 3.1 to 6.2 years. Because of its low wear rate and steady interfacial behavior, E3 had the longest anticipated life. For medium-load hydraulic sealing applications, these results demonstrate the possibility of customized EPDM formulations as affordable substitutes for commercial polyurethanes. They also offer a quantitative foundation for material selection and lifespan prediction.

Durability↗

Advanced Seal Development for Large Industrial Gas Turbines

Efforts are in progress to develop advanced sealing for large utility industrial gas turbine engines (combustion turbines). Such seals have been under developed for some time for aero gas turbines. It is desired to transition this technology to combustion turbines. Brush seals, film riding face and circumferential seals, and other dynamic and static sealing approaches are being incorporated into gas turbines for aero applications by several engine manufacturers. These seals replace labyrinth or other seals with significantly reduced leakage rates. For utility industrial gas turbines, leakage reduction with advanced sealing can be even greater with the enormous size of the components. Challenges to transitioning technology include: extremely long operating times between overhauls; infrequent but large radial and axial excursions; difficulty in coating larger components; and maintenance, installation, and durability requirements. Advanced sealing is part of the Advanced Turbine Systems (ATS) engine development being done under a cooperative agreement between Westinghouse and the US Department of Energy, Office of Fossil Energy. Seal development focuses on various types of seals in the 501ATS engine both at dynamic and static locations. Each development includes rig testing of candidate designs and subsequent engine validation testing of prototype seals. This presentation gives an update of the ongoing ATS sealing efforts with special emphasis on brush seals.

Chupp, Raymond E.↗

CH Packaging Program Guidance

The purpose of this document is to provide the technical requirements for preparation for use, operation, inspection, and maintenance of a Transuranic Package Transporter Model II (TRUPACT-II), a HalfPACT shipping package, and directly related components. This document complies with the minimum requirements as specified in the TRUPACT-II Safety Analysis Report for Packaging (SARP), HalfPACT SARP, and U.S. Nuclear Regulatory Commission (NRC) Certificates of Compliance (C of C) 9218 and 9279, respectively. In the event of a conflict between this document and the SARP or C of C, the C of C shall govern. The C of Cs state: "each package must be prepared for shipment and operated in accordance with the procedures described in Chapter 7.0, Operating Procedures, of the application." They further state: "each package must be tested and maintained in accordance with the procedures described in Chapter 8.0, Acceptance Tests and Maintenance Program of the Application." Chapter 9.0 of the SARP charges the U.S. Department of Energy (DOE) or the Waste Isolation Pilot Plant (WIPP) management and operating (M&O) contractor with assuring packaging is used in accordance with the requirements of the C of C. Because the packaging is NRC-approved, users need to be familiar with Title 10 Code of Federal Regulations (CFR) §71.8. Any time a user suspects or has indications that the conditions of approval in the C of C were not met, the Carlsbad Field Office (CBFO) shall be notified immediately. The CBFO will evaluate the issue and notify the NRC if required. In accordance with 10 CFR Part 71, certificate holders, packaging users, and contractors or subcontractors who use, design, fabricate, test, maintain, or modify the packaging shall post copies of (1) 10 CFR Part 21 regulations, (2) Section 206 of the Energy Reorganization Act of 1974, and (3) NRC Form 3, Notice to Employees. These documents must be posted in a conspicuous location where the activities subject to these regulations are conducted. This document provides the instructions to be followed to operate, maintain, and test the TRUPACT-II and HalfPACT packaging. The intent of these instructions is to standardize operations. All users will follow these instructions or equivalent instructions that assure operations are safe and meet the requirements of the SARPs.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

CH Packaging Program Guidance

The purpose of this document is to provide the technical requirements for preparation for use, operation, inspection, and maintenance of a Transuranic Package Transporter Model II (TRUPACT-II), a HalfPACT shipping package, and directly related components. This document complies with the minimum requirements as specified in the TRUPACT-II Safety Analysis Report for Packaging (SARP), HalfPACT SARP, and U.S. Nuclear Regulatory Commission (NRC) Certificates of Compliance (C of C) 9218 and 9279, respectively. In the event of a conflict between this document and the SARP or C of C, the C of C shall govern. The C of Cs state: "each package must be prepared for shipment and operated in accordance with the procedures described in Chapter 7.0, Operating Procedures, of the pplication." They further state: "each package must be tested and maintained in accordance with the procedures described in Chapter 8.0, Acceptance Tests and Maintenance Program of the Application." Chapter 9.0 of the SARP charges the U.S. Department of Energy (DOE) or the Waste Isolation Pilot Plant (WIPP) management and operating (M&O) contractor with assuring packaging is used in accordance with the requirements of the C of C. Because the packaging is NRC-approved, users need to be familiar with Title 10 Code of Federal Regulations (CFR) §71.8. Any time a user suspects or has indications that the conditions of approval in the C of C were not met, the Carlsbad Field Office (CBFO) shall be notified immediately. The CBFO will evaluate the issue and notify the NRC if required. In accordance with 10 CFR Part 71, certificate holders, packaging users, and contractors or subcontractors who use, design, fabricate, test, maintain, or modify the packaging shall post copies of (1) 10 CFR Part 21 regulations, (2) Section 206 of the Energy Reorganization Act of 1974, and (3) NRC Form 3, Notice to Employees. These documents must be posted in a conspicuous location where the activities subject to these regulations are conducted. This document provides the instructions to be followed to operate, maintain, and test the TRUPACT-II and HalfPACT packaging. The intent of these instructions is to standardize operations. All users will follow these instructions or equivalent instructions that assure operations are safe and meet the requirements of the SARPs.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Leakage Rate Testing Considerations and Implementation of ANSI N 14.5-2014 Standard within EnergySolutions Type (B) cask fleet - 18629

In March 2016, Nuclear Regulatory Commission (NRC) staff issued Information Notice 2016-04: 'ANSI N14.5-2014 Revision and leakage rate testing considerations'. American National Standards Institute (ANSI) N14.5, 'American National Standard for Radioactive Materials-Leakage Tests on Packages for Shipment', applies to leakage rate testing of Low Level Radioactive Waste (LLRW) Type B packages operated under 10CFR71. In their information notice NRC is encouraging Type B cask license holders and licensees (cask users) to adapt a new version of ANSI N 14.5 standard. Typically, leakage rate testing for Type B packages (or casks) is performed at different stages of cask development (design and fabrication leak tests) and operations (periodic/maintenance and pre-shipment leak tests) with the purpose to reasonably assure that the packaging will contain radioactive material under both normal and hypothetical accident conditions of transport described in 10CFR71. The standard was updated to provide a modern, robust and standardized approach for performance of leak rate testing on Type B casks by the industry stakeholders. Although implementation of new version of the leak testing standard may not be problematic for a modern Type B package designs, it may be extremely challenging to apply its principles to the existing legacy Type B casks which were designed/fabricated more then 20-30 years ago based on older requirements. Majority of such casks are not 'leak test' friendly. Some of legacy Type B packages may not readily available to meet newer ANSI N 14.5 standard requirements and will require implementation of alternative compensatory measures in lieu of the standard's requirements. In addition, the new standard mandates implementation of additional requirements for leak rate testing performance and personnel qualifications during routine maintenance of Type B casks by owner and during operations of casks by users. The focus of the paper will be to discuss ANSI N 14.5-2014 requirements and provide specific examples on how these requirements will impact the current leak rate test practices. This will be illustrated based on several Type B cask models operated within EnergySolutions fleet (both newer and legacy cask designs). Finally, the paper will cover considerations of the cask closure design features that have to be considered by Type B cask designers in order to ensure robustness of leak testing during design, fabrication and, most importantly, operation of a package. This information shall benefit both owners and users of Type B casks with respect to improvement of the cask designs and Type B cask operational experience. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Design of a welded joint for robotic, on-orbit assembly of space trusses

In the future, some spacecraft will be so large that they must be assembled on-orbit. These spacecraft will be used for such tasks as manned missions to Mars or used as orbiting platforms for monitoring the Earth or observing the universe. Some large spacecraft will probably consist of planar truss structures to which will be attached special purpose, self-contained modules. The modules will most likely be taken to orbit fully outfitted and ready for use in heavy-lift launch vehicles. The truss members will also similarly be taken to orbit, but most unassembled. The truss structures will need to be assembled robotically because of the high costs and risks of extra-vehicular activities. Some missions will involve very large loads. To date, very few structures of any kind have been constructed in space. Two relatively simple trusses were assembled in the Space Shuttle bay in late 1985. Here the development of a design of a welded joint for on-orbit, robotic truss assembly is described. Mechanical joints for this application have been considered previously. Welded joints have the advantage of allowing the truss members to carry fluids for active cooling or other purposes. In addition, welded joints can be made more efficient structurally than mechanical joints. Also, welded joints require little maintenance (will not shake loose), and have no slop which would cause the structure to shudder under load reversal. The disadvantages of welded joints are that a more sophisticated assembly robot is required, weld flaws may be difficult to detect on-orbit, the welding process is hazardous, and welding introduces contamination to the environment. In addition, welded joints provide less structural damping than do mechanical joints. Welding on-orbit was first investigated aboard a Soyuz-6 mission in 1969 and then during a Skylab electron beam welding experiment in 1973. A hand held electron beam welding apparatus is currently being prepared for use on the MIR space station. Presently, Marshall Space Flight Center is evaluating processes appropriate for on-orbit welding. A low gravity environment has been found to have very minor effects on the welding processes appropriate for this application. This is based on tests run on-orbit as well as low gravity environments achieved by flying aircraft in parabolic trajectories. It appears that a modified form of gas tungsten arc welding (GTAW) will be most appropriate for welding together structures on-oribt. The process has been modified to work in a vacuum by providing gas to the arc zone by means of a hollow tungsten electrode with special shielding. A commercial tube welding head has been successfully modified for use on-orbit with a gas leakage rate of approximately 2.5 liters/min. To develop as realistic a joint as possible, a specific truss structure was selected on which to base the design. The structure considered was based on the 120 foot diameter aerobrake tetrahedral truss structure. The truss members were assumed to consist of graphite/epoxy tubes. Also, it was assumed that the nodes were constructed of 2219-T87 aluminum alloy. The magnitude of the member load assumed for design purposes was 100 kips.

Rule, William K.↗