Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “main control room”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Review of Reactor Facilities without Main Control Rooms

Small, advanced reactors may require few, if any, safety-related human actions (HAs) and fewer HAs to monitor and control the plant. In comparison to large light water reactors, these are significant changes that have implications for many aspects of an applicant's human factors engineering (HFE), including control room design, plant staffing, and the management of safety functions. To support the Nuclear Regulatory Commission's (NRC) ability to evaluate these changes, information needs to be developed addressing the characteristics and potential issues. The objectives of our research were to (1) identify when a traditional main control room (MCR) may not be necessary, (2) identify workplace design alternatives to traditional MCRs, and (3) develop guidance for reviewing an applicant's workplace designs with and without a MCR. We determined that the safety question isn't so much justifying why a design has no MCR, but rather verifying that important human actions can be accurately and reliably performed under a range of challenging conditions using the HSIs provided regardless of their location. We developed guidance to review alternatives to MCRs based on HFE analyses for determining workplace location and design.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

3D Modeling of Safety-Related Upgrade Pilot Project

Constellation Energy and the United States Department of Energy (DOE) have established a public/private partnership to implement a pilot digital upgrade to replace legacy analog, safety-related reactor protection and emergency safety feature actuation systems (RPS/ESFAS) with modern digital systems. This effort is occurring at Constellation’s Limerick Generating Station. This project is being performed in accordance with industry processes that have been adapted to better support digital upgrades. These processes include IP-ENG-001, Standard Design Process, NISP-EN-04, Standard Digital Engineering Process and Electric Power Research Institute Report 3002011816, Digital Engineering Guide. The Light Water Reactor Sustainability (LWRS) Program at the Idaho National Laboratory (INL) has been supporting this effort. Latest INL HFE efforts in support of this project have focused on definition and implementation of the Human Factors Engineering (HFE) Program in support of Constellation design and related licensing efforts. This paper will present the development of the HFE 3D modeling execution of the Main Control Room safety upgrades. New equipment and modifications are planned for upgrading the new safety systems. 3D modeling allows for visualization of the new equipment and modifications to be shared with engineering and design teams for evaluation and review. Anthropometric considerations such as sight lines and functional reach can be evaluated directly using the 3D model. This effort has helped to provide visualizations for additional review with operations personnel and project stakeholders.

3D Modeling↗

Utility and Industry Perceptions of Control Room Modernization Over the Last 10 Years

Within the current United States (U.S.) nuclear power fleet, main control room modernization (CRM) is an important step towards cost savings. In recent decades, plants have been engaged in upgrades to varying degrees. This process requires a nuanced, balanced, and timely approach that ensures continued safety and long-term sustainability. In 2012 a survey was issued to individuals from the nuclear industry to learn their perspectives on a range of CRM issues. The survey targeted the benefits and challenges for utilities undertaking this process, including the main drivers and barriers to technology upgrades, regulatory compliance, and the effects these factors have on concepts of operations, strategic approaches, and staffing. In 2022, the survey was issued again to understand whether CRM perceptions had changed in the last 10 years. Our findings identify changes in industry thinking from a decade ago. Here we reveal perspective shifts that represent increased optimism and, in some instances, increased doubt regarding the opportunities and challenges inherent in CRM and implementation. We also report nuanced differences in CRM perspectives between utility and surrounding nuclear industry respondents.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Simulator Data Analysis to Inform Digitalized Environment Impacts on Human Reliability

The U.S. Nuclear Regulatory Commission (NRC) has developed a human reliability analysis (HRA) method, termed the Integrated Human Event Analysis System for Event and Condition Assessment (IDHEAS-ECA), in order to estimate human error probabilities (HEPs) in risk-informed regulatory applications. To update the quantification part of IDHEAS-ECA, the NRC required human performance and error data from fully digitalized main control rooms (MCRs); therefore, it requested that Idaho National Laboratory (INL) revisit previous data collection studies and investigate how the following three factors impact human reliability: self-checking, peer-checking, and automation. The HRA data collection studies revisited were the Human Reliability Data Extraction (HuREX) project, developed by the Korea Atomic Energy Research Institute (KAERI), and the Simplified Human Error Experimental Program (SHEEP), developed by INL. HuREX is a representative HRA data collection study that collects human reliability data from full-scope simulators staffed by licensed operators. SHEEP, on the other hand, has been proposed to complement such full-scope studies by collecting data via simplified simulators staffed by non-licensed student operators. In the HuREX study, KAERI collected HRA data from fully digitalized MCRs for the Advanced Power Reactor (APR)–1400. The SHEEP data were obtained from simplified simulators that partially mimicked the features of digitalized MCRs. The present report mainly discusses how the impacts of the aforementioned three factors on human errors were derived from these two data collection studies.

99 GENERAL AND MISCELLANEOUS↗

Preconceptual Designs of Coupled Power Delivery between a 4-Loop PWR and 100-500 MWe HTSE Plants

This study develops a preconceptual design for the integration between a large-scale high-temperature electrolysis facility and a NPP. Two hydrogen facility sizes are considered: 100 MWnom and 500 MWnom. Both steam supply designs use cold reheat steam extraction as a heat source. A reboiler inside the protected area of the power plant transfers steam heat to the demineralized water supply for the hydrogen plant. After the heat transfer, the extracted steam condenses and returns to the condenser while the process steam routes out of the protected area to the electrolyzers. Electrical power is tapped off from the high voltage side of the GSU transformer, where it is then transported via a 345-kV transmission line to the hydrogen facility. Circuit breakers and disconnects are located at both ends of the transmission line. Step down transformers and miscellaneous switchgear/buses are located at the end of the transmission line inside the HTEF boundary. Control capabilities for the steam interfacing equipment and electrical dispatch are accessible from the Main Control Room, and protective relays for the transmission line are located inside the Relay Room. Computer modeling was performed for the thermal and electrical designs. PEPSE analysis provided the steady-state parameters for thermal extraction from the turbine cycle. These parameters were used to inform transients and size equipment in combination with Applied Flow Technology (AFT) Arrow and AFT Fathom modeling for steam and water piping, respectively. Electrical transients were analyzed using PSCAD. An ETAP model was used to evaluate power flow and short circuit, which enabled the sizing of transformers and protective equipment. A cost estimate was developed for both integration designs when considering plant separation distances of 250 m and 500 m. From these estimates, the modifications for thermal and electrical interfacing of a first-of-a-kind nuclear-integrated hydrogen facility are anticipated to cost between $60–250/kWnom., where the subscript “nom” refers to the nominal size of the hydrogen plant. On a thermal power basis, the thermal power has a cost of approximately $8/MWth for a 500 MWnom high temperature electrolysis plant located 500 m distant from the NPP. That value decreases to approximately $7.5/MWth for a 250 m separation distance between the hydrogen plant and the NPP. This value is lower than previous estimates of the cost of heat extracted from NPPs primarily because in this work the steam is extracted from cold reheat instead of the main steam line, which reduces the cost of the dispatched steam by approximately $3.5/MWth. Nuclear steam extraction can provide a profit avenue for many plants and is not restricted to hydrogen production. Ammonia production, oil refining, and paper production, among other industrial processes all require thermal energy, which can be provided by NPPs. Future work should look further at the details of thermal extraction for a variety of use cases. This can include increased levels of extraction and multiple simultaneous users. Additionally, site-specific studies should be performed to develop industry experience and improve cost accuracy.

08 HYDROGEN↗

Demonstration and Evaluation of the Human-Technology Integration Function Allocation Methodology

There is an imminent need for the existing nuclear power plants to reduce their operating and maintenance (O&M) costs to remain economically viable. Digital technology, including automation, provides a significant opportunity for the existing nuclear power plant fleet to transform the way in which work is accomplished, reducing O&M costs, and allowing the fleet to remain economically competitive. One notable opportunity to significantly reduce O&M costs pertains to modifications to the plant equipment and main control room (MCR). Existing instrumentation and control (I&C) technologies in the MCR are highly analog, costly to operate and maintain, and demand a high cognitive and physical workload from plant staff (i.e., operators). Digitalizing the MCR has a range of broad economic benefits, including improved plant performance and reduced manual work. Further, digital I&C systems can fundamentally change the way in which plant staff operate the plant; this is the concept of operation. Human-technology integration is important to ensure that impacts to the concept of operation are done in a way that account for capabilities of people and technology. Human-technology integration employs human factors engineering (HFE) methods and principles to maximize the benefits of digital technology, reducing human error, improving overall decision-making and usability. The U.S. Department of Energy Light Water Reactor Sustainability Program is applying human-technology integration research to ensure digital technologies are safe, reliable, and efficient. This paper documents the demonstration of the human-technology guidance developed by the Light Water Reactor Sustainability Program from a first-of-a-kind digital I&C upgrade, specifically addressing function analysis and allocation for a new digital I&C system that included changes in automation levels. The program’s specific approach is included in this work, following lessons learned. This document serves as a resource for industry to follow in applying human-technology integration and HFE to digital modifications, specific to function analysis and allocation. The lessons learned should be considered in the planning and execution of HFE activities that support such digital modifications.

99 GENERAL AND MISCELLANEOUS↗

Human and Technology Integration Evaluation of Advanced Automation and Data Visualization

While the existing United States (U.S.) light water reactors are highly reliable, safe, and provide a significant proportion of carbon-free electricity, the cost of operating and maintaining them has become less competitive compared to other electricity generating sources. The reason for the gap in operating and maintenance (O&M) costs can be at least in part attributed to the advent of new digital technologies that other electricity generating industries are currently using. Advanced capabilities including digital instrumentation and control (I&C) systems, advanced automation and analytics, and greater span of data integration (i.e., connectedness) across these non-nuclear plants has transformed the way work is performed and ultimately given them a competitive advantage in terms of the cost required for operating, maintaining, and supporting them. To reduce O&M cost and address obsolescence of the aging I&C infrastructure of the existing U.S. light water reactors, the U.S. Department of Energy (DOE) Light Water Reactor Sustainability (LWRS) Program Plant Modernization Pathway is conducting targeting multidisciplinary research that 1) delivers a sustainable business model to enable a cost-competitive U.S. nuclear industry and 2) is developing technology modernization solutions that address aging and obsolescence challenges. The work described in this report supports these two objectives and describes the demonstration of human and technology integration across recent industry collaborations to support their large-scale digital I&C modifications. This technical report describes the demonstration of the human and technology integration methodology in performing full-scale performance-based human-in-the-loop tests to evaluate plant-specific advanced automation and data visualization applications within these collaborators’ digital modifications. This technical report also documents future applications of human and technology integration that expand beyond main control room modernization and digital I&C upgrades, which have been a central focus to date. Thus, this technical report discusses how to implement human and technology integration across new business opportunities and how to develop an evaluation plan that defines measures and criteria, and documents key assumptions to support full plant modernization.

99 GENERAL AND MISCELLANEOUS↗

Human Factors for Advanced Reactors

Existing light water reactors in the U.S. are primarily large baseload electricity generating facilities. The concept of operations for these plants remains largely unchanged since the advent of commercial nuclear power—the main control room serves as the hub of plant activities and is staffed with multiple licensed operators who work in tandem under the shift supervisor, and staff such as field workers support the control room remotely. While newer plants have brought the advent of digital human-machine interfaces to replace earlier analog and mechanical instrumentation and controls, much of the control process remains unchanged and manual. It is simply a newer version of legacy concepts. Advanced reactors potentially bring considerable changes to the size, fuel type, automation, and staffing of nuclear power plants, necessitating a fundamental shift not just from analog to digital, but further from human to automation, from onsite to remote, from control to monitoring, and from many to few operators. Despite this multitude of parallel evolutions in reactor designs, many of the vendors developing the next generation of reactors represent smaller research and development enterprises. It is therefore not feasible to address all aspects of plant design at the same time. In particular, the competing design aspects of new reactors present a significant challenge to the development of robust and human factored systems at the plant. As vendors develop new reactor designs, much of the early focus is naturally on the fuel and reactor system technology. Looming behind these early advances is the daunting prospect of first-of-a-kind control concepts that have not yet been developed or validated. A failure to address the human element of reactor design early will lead to missed opportunities. The quickest development process is the replication of existing concepts of operations at legacy plants, even when such systems were long ago surpassed by better human-machine technologies outside the nuclear industry. Conversely, attempting to undertake novel concepts of operations late in the design life cycle of a plant could result in protracted development efforts and delays in licensing and deployment. This does not have to happen, and it is imperative that human factors be considered now, early in the design of new reactors.

99 GENERAL AND MISCELLANEOUS↗

The output stage for the ground transmitter at Goonhilly

The power output amplifier of the transmitter for the Goonhilly project uses a travelling tube, type VX527 delivering 4 kW at 6,390 Me/s, with a bandwidth of about 100 Mc/s. This amplifier, together with its power supplies and driver stage is located in a cabin, situated on the turntable underneath the aerial. Input signals for the transmitter are received in the cabin from the main control room at a frequency of 70 Mc/s; they are converted to the to the nominal 6,390 Mc/s before being amplified to about 3 watts by the driver TWT and fed via a waveguide link to the output stage. The output stage, described below, was designed and manufactured by A.E.I. Electronic Apparatus Division, Leicester, England, during the first half of 1962.

TRAVELING WAVE AMPLIFIER↗

Human Performance Analysis Depending on Operator Expertise (Student vs. Operator) and Simulator Complexity (Rancor Microworld vs. Compact Nuclear Simulator)

Human reliability analysis (HRA) evaluates human errors and provides human error probabilities (HEPs) for application in probabilistic safety assessment (PSA), which is a comprehensive safety assessment method for nuclear power plants (NPPs). Generally, HRA methods estimate HEPs based on human reliability data collected from actual historical measurement, simulator experiments, or expert judgement. Most recent HRA data collection studies focus on collecting data via full-scope main control room (MCR) simulators with actual licensed reactor operators. Contrary to this, Idaho National Laboratory (INL) has adopted a different approach, which attempts to collect HRA data based on experiment using simplified simulators and student participants by following the Simplified Human Error Experimental Program (SHEEP). This approach has a couple of advantages compared to full-scope data collection. Representatively, it has relatively low entry point for collecting HRA data, and secures large sample sizes with reasonable cost and labor. In the previous studies, we developed the SHEEP framework, then verified whether the data collected through the framework could support a representative full-scope data collection study, i.e., the Human Reliability Data Extraction (HuREX) study. Also, we analyzed human performance measurements depending on participant type (i.e., student vs. operator). In this paper, we analyze human performance data collected from an experiment comparing operator expertise and simulator complexity when using the more simplified simulator developed by INL, i.e., Rancor Microworld and the less simplified simulator, i.e., Compact Nuclear Simulator (CNS) developed by Korea Atomic Energy Research Institute (KAERI). Analysis of variance (ANOVA) tests and correlation analysis are used for analyzing the experimental data.

99 GENERAL AND MISCELLANEOUS↗

AI-Enabled Operations at Fermi Complex: Multivariate Time Series Prediction for Outage Prediction and Diagnosis

The Main Control Room of the Fermilab accelerator complex continuously gathers extensive time-series data from thousands of sensors monitoring the beam. However, unplanned events such as trips or voltage fluctuations often result in beam outages, causing operational downtime. This downtime not only consumes operator effort in diagnosing and addressing the issue but also leads to unnecessary energy consumption by idle machines awaiting beam restoration. The current threshold-based alarm system is reactive and faces challenges including frequent false alarms and inconsistent outage-cause labeling. To address these limitations, we propose an AI-enabled framework that leverages predictive analytics and automated labeling. Using data from $2,703$ Linac devices and $80$ operator-labeled outages, we evaluate state-of-the-art deep learning architectures, including recurrent, attention-based, and linear models, for beam outage prediction. Additionally, we assess a Random Forest-based labeling system for providing consistent, confidence-scored outage annotations. Our findings highlight the strengths and weaknesses of these architectures for beam outage prediction and identify critical gaps that must be addressed to fully harness AI for transitioning downtime handling from reactive to predictive, ultimately reducing downtime and improving decision-making in accelerator management.

Jain, Milan [PNL, Richland] (ORCID:000000021676111↗

Advanced Reactor Control and Operations (ARCO): A University Research Facility for Developing Optimized Digital Control Rooms

The Advanced Reactor Control and Operations (ARCO) facility was constructed in January 2018 to serve as a test bed for advanced reactor control rooms and operator support systems. Since then, it has supported human-machine interface user experience research, fault detection and mitigation technology development, control room concept of operations development, and remote operations research. ARCO serves as the control room for the Compact Integral Effects Test (CIET) facility, which replicates the primary-side flow paths and thermal-hydraulic behavior of a fluoride-salt-cooled high-temperature reactor (FHR) using simulant fluids and scaling principles. New reactor designs feature different operating conditions and scenarios than those in existing reactors. ARCO supports the research and development of digital tools for operator communications, intuitive real-time data analysis, online health monitoring and prognostics, and control room cybersecurity. By integrating these different technologies, ARCO acts as a prototypical control system to iteratively develop methods and tools of operation in advanced small modular nuclear reactors. This paper describes the features of and challenges to operating advanced small modular reactors underlying the design basis for ARCO and its operator support systems.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Analysis of human performance differences between students and operators when using the Rancor Microworld simulator

Here, from within the umbrella of the Simplified Human Error Experimental Program (SHEEP) framework, this paper analyzes human performance differences between professional and student operators when using a simplified simulator (i.e., Rancor Microworld). This paper represents a crucial step in understanding the fidelity of the simplified simulators and student operators within the SHEEP study. This paper explores a randomized factorial experimental design that features two independent variables: participant type and event class. Six human performance measurements are considered in the experiment. The experiment is conducted using 20 professional reactor operators employed at actual nuclear power plants (NPPs), along with 20 trained students. The experimental data are analyzed via statistical analysis methods. Finally, this paper examines the differences in human performance between actual operators and students when using Rancor Microworld.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Simulation Results of a Thermal Power Dispatch System from a Generic Pressurized Water Reactor in Normal and Abnormal Operating Conditions

Amid economic pressures in the U.S. electricity market, nuclear utilities are exploring new revenue streams, including hydrogen production. A generic pressurized water reactor simulator was modified to incorporate a novel design for a TPD system coupled to a hydrogen production plant. Standard malfunctions were included in the simulation design, including steam line breaks at various system locations and flow interruptions in the hydrogen plant due to multiple faults, reflecting anticipated operational challenges. It is imperative that the TPD system operation has a minimal effect on the reactor power, primary coolant system, and turbine system operation and performance. Due to the specific design and application of this TPD system, with the proposed turbine control system changes, the overall impact on the existing plant systems is low. Normal TPD operating scenarios resulted in minor effects on the existing plant systems: reactor power changes by at most 0.2%, and gross generator output changes by 20.5 MWe from 100 MWt of TPD. The most severe malfunction analyzed in this work is a full TPD steam line break downstream of the extraction location, which results in an increase in reactor power of about 0.5%. The gross generator output decreases by 36 MWe, a total decrease of 60 MWe from the full power steady state (FPSS) condition. These results indicate that an industrial hydrogen production plant could be coupled thermally to a nuclear power plant with limited effects on the existing system operation and safety.

08 HYDROGEN↗

Integrated Operations for Nuclear: Work Reduction Opportunity Demonstration Strategy

EXECUTIVE SUMMARY The Light Water Reactor Sustainability Program Plant Modernization Pathway has been working with industry for a number of years to leverage digital technology to extend the life and improve the performance of the existing fleet through modernized technologies and improved processes for plant operation and power generation. This includes development of modernization solutions to improve reliability and economic performance while addressing US nuclear industry’s aging and obsolescence challenges. The objective of these efforts is to deliver a sustainable business model that enables US nuclear industry to remain competitive. Digital Infrastructure (DI) research has established a technical foundation for these efforts. This effort began with technical analysis and support for a safety-related instrumentation and control (I&C) pilot upgrade being performed at Constellation Energy Generation’s Limerick Nuclear Plant. The following publicly available reports were produced as part of this effort. • INL/EXT-20-61079, Vendor-Independent Design Requirements for a Boiling Water Reactor Safety System Upgrade [1] • INL/EXT-20-59371, Business Case Analysis for Digital Safety-Related Instrumentation & Control System Modernizations [2] • INL/EXT-20-59809, “Safety-Related Instrumentation and Control Pilot Upgrade: Initial Scoping Phase Implementation Report and Lessons Learned [3] • INL/RPT-23-72105, Safety-Related Instrumentation and Control Upgrade: Conceptual – Detailed Design Phase Report and Lessons Learned [4]

99 GENERAL AND MISCELLANEOUS↗

Advanced Human-System Interface Risk Analysis Based on Redundancy-guided Systems-theoretic Hazard Analysis and Human Reliability Analysis

Human-system interfaces (HSIs) play an important role in enabling operators to communicate with the nuclear power plant (NPP) side. Getting the information required to understand a NPP’s current status or perform necessary actions for responding to a given operational context are representative operator tasks performed using HSIs. To date, HSIs have been mainly evaluated in the context of human reliability analysis (HRA). However, the current HSI evaluation that occurs during HRA may be challengeable on two fronts: (1) reflecting the unique characteristics of HSI systems and (2) considering situations in which HSIs are poorly operated due to software/hardware malfunctions. Accordingly, this study proposes an approach for specifically evaluating HSIs for digital instrumentation and controls (DI&C) systems, using Redundancy-guided Systems-theoretic Hazard Analysis (RESHA) and HRA. RESHA is a method for analyzing DI&C systems with redundancy features. In this study, we investigate how HSIs are evaluated in existing HRA methods, and what challenges exist in the current approaches. To better evaluate HSIs for DI&C systems, this study modifies the existing HSI evaluation process by additionally modeling the HSI back- and front- ends. In this paper, a HSI fault tree for the APR1400 DI&C system is introduced through a piping and instrumentation diagram. It then touches upon what aspects of the suggested method must be further researched.

99 GENERAL AND MISCELLANEOUS↗

KATE: From the lab to the firing room

For the past 9 years, the AI group at NASA's Kennedy Space Center (KSC) has been developing a real-time model-based reasoning (MBR) system that can diagnose faults and provide control advisories. The system resulting from this effort is called KATE (Knowledge-based Autonomous Test Engineer). This article describes the transition of KATE from the applied research lab to the firing room (the firing room is the main control and monitoring center for all Shuttle ground support and launch processing). Because the problems that were countered along the way are not unique, we decided to share some of our experiences. This article also includes a brief overview of the latest application of KATE.

Pepe, Charles↗

Modernization and Activation of the NASA Ames 11- by 11-Foot Transonic Wind Tunnel

The Unitary Plan Wind Tunnel (UPWT) was modernized to improve performance, capability, productivity, and reliability. Automation systems were installed in all three UPWT tunnel legs and the Auxiliaries facility. Major improvements were made to the four control rooms, model support systems, main drive motors, and main drive speed control. Pressure vessel repairs and refurbishment to the electrical distribution system were also completed. Significant changes were made to improve test section flow quality in the 11-by 11-Foot Transonic leg. After the completion of the construction phase of the project, acceptance and checkout testing was performed to demonstrate the capabilities of the modernized facility. A pneumatic test of the tunnel circuit was performed to verify the structural integrity of the pressure vessel before wind-on operations. Test section turbulence, flow angularity, and acoustic parameters were measured throughout the tunnel envelope to determine the effects of the tunnel flow quality improvements. The new control system processes were thoroughly checked during wind-off and wind-on operations. Manual subsystem modes and automated supervisory modes of tunnel operation were validated. The aerodynamic and structural performance of both the new composite compressor rotor blades and the old aluminum rotor blades was measured. The entire subsonic and supersonic envelope of the 11-by 11-Foot Transonic leg was defined up to the maximum total pressure.

Kmak, Frank J.↗