At least 19 records

Cyclic moisture reactivation of calcium sorbents for long duration thermochemical energy storage

The transition to a flexible and reliable energy infrastructure, using electro-thermal energy generation technologies such as geothermal, concentrated solar power, and nuclear, usually demands simultaneous advancement of thermal energy storage (TES) to support on-demand electricity generation and industrial applications while mitigating the inherent intermittency of renewable energy sources and power outages from direct energy generation. Among TES technologies, thermochemical energy storage (TCES) based on calcium looping emerges as a compelling high-power energy storage candidate due to its high reaction enthalpy, compatibility with elevated operating temperatures, and abundance of low-cost materials. However, the long-term durability of calcium-based sorbents for TCES is hindered by surface sintering and particle aggregation, leading to performance degradation over repeated thermal cycles. This study explores a moisture hydration-based strategy to regenerate a degraded calcium sorbent and mitigate performance degradation for long duration TCES. The addition of moisture transforms calcium oxide into calcium hydroxide and produces intercalation water layers, associated with a regenerated surface area and reduced calcium oxide crystallite size. Both these effects are beneficial in restoring the sorbents' reactivity for carbonization. Additionally, an optimized hydration-assisted reactivation protocol balances the recovered energy storage capacity with heating penalty required for moisture removal from hydrated samples, resulting in an enhanced energy storage capacity up to 176% compared to benchmark sorbents that undergo cycling without reactivation after 60 cycles. In conclusion, these results highlight the potential of hydration-assisted reactivation to enhance the long-term performance of TCES, providing an effective pathway to advancing electro-thermal storage technologies.

36 MATERIALS SCIENCE

Exploring the Future Energy Value of Long-Duration Energy Storage

Long-duration energy storage is commonly viewed as a key technology for providing flexibility to the grid and broader energy systems over a multidecadal time frame. However, prior work has typically used present-day grid infrastructures to characterize the relationship between the duration and arbitrage value of storage in electricity markets. This study leverages established National Renewable Energy Laboratory grid planning and operations tools, analysis, and data to execute a price-taker model of an energy storage system for several 8760 h price series representative of current and future contiguous United States grid infrastructures with varying shares of variable renewable energy (VRE). We find that the total value of energy storage typically increases with VRE shares, but any increase in the relative value of longer storage durations over time depends on the region and grid mix. Some regions see incremental value increasing notably, up to 20–40 h in 2050, while others do not. The negative effect of lower roundtrip efficiency on value is also found to be scenario-dependent, with the energy value in higher VRE scenarios being less sensitive to roundtrip efficiency and more supportive of longer storage durations. Long-duration storage value and deployment potential are a function of evolving electricity sector infrastructure, markets, and policy, making it critical to consistently revisit potential long-duration storage contributions to the grid.

14 SOLAR ENERGY

A Comprehensive Comparison of Methods for Evaluating Dispatch of Long-Duration Energy Storage in Power Systems Models

Long-duration energy storage (LDES) could play a pivotal role in the transformation of electricity grids with high shares of variable renewable energy (VRE) such as solar and wind. However, the weather-dependent nature of VRE introduces challenges for grid balancing and stability, which LDES - along with short-duration energy storage (SDES) - can help address. However, modeling LDES in production cost models (PCMs) is particularly challenging due to the need for high temporal resolution over extended optimization windows while preserving chronology, which ensures the alignment of energy storage operations with VRE generation over multi-day periods. This report compares traditional dispatch methods with advanced LDES dispatch strategies, such as the extended horizon approach, across different PCM platforms and examines tradeoffs and scalability. The comparison reveals that the traditional 1-day optimization horizon within the PCM leads to inefficient utilization of LDES. In contrast, extending the optimization horizon as much as possible significantly reduces curtailment and improves storage dispatch, especially in renewable-dense systems. There is also promise in using state-of-charge or end volume targets set by an external model, however this requires an additional modeling set and generally increases computational burden. This paper presents a comparison of these various methods in a number of power systems, showing algorithms initially in small test systems and scaling up to large, country-wide simulations. Overall, the research presents the trade-offs of various computational methods and illustrates how LDES may play an essential role in power systems of the future.

14 SOLAR ENERGY

Using time reversal with long duration broadband noise signals to achieve high amplitude and a desired spectrum at a target location

Time Reversal (TR) is a signal processing technique that can be used to focus acoustic waves to a specific location in space, with most applications aiming to create an impulsive focus. Here, this study instead aims to focus long-duration noise signals using TR. This paper seeks to generate higher amplitude noise at a desired location over an existing method of broadcasting equalized noise. Additionally, this paper explores various characteristics associated with focusing long duration noise using TR. The dependence of the focal amplitude on the duration of the focused signal is explored as well as the implications of using multiple sources when focusing noise. The focal amplitude decreases with longer duration and then levels off when the duration exceeds a few seconds. Coherent addition of focused noise is observed if all loudspeakers have coherent noise signals convolved with their reversed impulse responses. Lastly, focusing noise with a desired spectrum is explored.

42 ENGINEERING

Nine Canyon Long-Duration Energy Storage: A Feasibility Study

The Nine Canyon Long Duration Energy Storage (LDES) Feasibility Study explores the technical and economic viability of deploying advanced energy storage technologies at Energy Northwest's (EN) Nine Canyon (9C) Wind Project site in Benton County, Washington. Supported by the Washington State Department of Commerce and the U.S. Department of Energy’s Office of Electricity under its LDES Voucher Program, the study represents a collaborative effort between EN, Pacific Northwest National Laboratory (PNNL), and ARES North America. At the core of this effort is the development of a generalized techno-economic modeling framework and evaluation tool designed to assess the value proposition of LDES projects across a variety of contexts. The modeling tool is technology-agnostic and accommodates user-defined parameters such as rated power, energy duration, round-trip efficiency, capital and operational costs, and dispatch constraints. It also integrates economic inputs, including market prices, energy revenue structures, and financing parameters to evaluate performance through key metrics. The tool provides utilities with a transparent, adaptable platform to support decision-making, investment prioritization, and portfolio planning for various storage technologies. To guide scenario design and interpretation, the study first surveyed the LDES technology landscape, including lithium-ion batteries, flow batteries, non-hydro gravity storage, and thermo-mechanical systems, comparing cost trajectories, technical performance, safety and hazards, materials sourcing and recyclability, and spatial/siting considerations. This literature-grounded review highlights technology trade-offs and reinforces the need to align technology choice with site characteristics, use cases, and project objectives. A companion chapter examines ownership structures (EN ownership, third-party ownership, shared models) and offtake options (energy marketing, capacity/energy PPAs, time-of-use PPAs, block-delivery PPAs, and tolling), where PPAs (power purchase agreements) represent contractual arrangements for buying and selling electricity. The chapter also highlights implications for risk allocation, capital access, operational control, and revenue certainty. The study also evaluates supervisory control and data acquisition (SCADA) and transmission interconnection pathways, options include upgrading the existing SCADA or deploying a dedicated LDES controller, with attention to protection schemes, data telemetry, cybersecurity, and regulatory coordination with BPA. In addition, an ARES-specific geotechnical and hydrology assessment presented in the appendix screens multiple corridors for slope stability, bearing capacity, cut-and-fill magnitude, and stormwater behavior.

25 ENERGY STORAGE

Electricity Markets and Long-Duration Energy Storage: A Survey of Grid Services and Revenue Streams

Purpose of Review Long Duration Energy Storage (LDES) is increasingly viewed as a potential resource for providing grid services that enhance the stability and flexibility of electricity systems. While some LDES services are integrated into existing market frameworks, traditional mechanisms may not fully account for their operational characteristics, potentially leading to undervaluation. Within this context, this paper reviews the literature and industry practices to assess potential grid services for LDES, evaluates existing compensation mechanisms, and identifies challenges to full market integration. Recent Findings We first review existing literature and identify key grid services unique to LDES, including enhancing grid resilience during extreme weather events, enabling long-term energy shifting, and providing flexible and firm energy in systems with limited dispatchable resources. Here, we also review how LDES services are compensated in current market frameworks and the challenges associated with the full realization of LDES values. Additionally, we summarize market mechanisms for storage technologies across U.S. wholesale markets. We find that some markets are adjusting incentive structures, such as incorporating storage duration in capacity accreditation, to better align with system needs and LDES contributions to the grid. However, further refinements in capacity remuneration and dispatch timeframes may be needed for more effective realization of LDES value. Summary This review evaluates potential grid services for LDES, examines existing compensation mechanisms for LDES technologies, and identifies gaps between these mechanisms and LDES operational characteristics. The review concludes by outlining potential market enhancements for more effective LDES integration and articulating additional research needs to support its efficient participation in future power systems.

Flexible resources

Long-Duration Energy Storage Grid Integration-Valuation Framework and Incentive Gaps

Given these challenges and current modeling gaps on Long Duration Energy Storage (LDES), enhancing the structure and design of existing planning, operations, and organized wholesale markets can better characterize the value of LDES to the power system. To more thoroughly assess the gaps and barriers to LDES investment and readiness for integration into a future grid, we conducted stakeholder outreach through an online survey, interviews with individual independent system operators/regional transmission organizations, and a literature review. Based on this assessment, we identified a set of opportunities for LDES focused development, including a framework to quantify the contributions of LDES on resource adequacy, reliability, and resiliency. Specifically, we identify the potential demand for and benefits of an open-source, LDES-centric evaluation framework that can guide future planning, operations, market design, and policy reforms.

24 POWER TRANSMISSION AND DISTRIBUTION

Kilonovae and Long-duration Gamma-Ray Bursts

Recent detections of kilonova-like emission following long-duration gamma-ray bursts GRB 211211A and GRB 230307A have been interpreted as originating from the merger of two neutron stars. In this work, we demonstrate that these observations are also consistent with nucleosynthesis originating from a collapsar scenario. Our model is capable of reproducing the observed optical and infrared light curves using a single, weak r-process component. The absence of lanthanide-rich material in our model, consistent with the data, challenges the prevailing interpretation that a red evolution in such transients necessarily indicates the presence of heavy r-process elements.

79 ASTRONOMY AND ASTROPHYSICS

Long Duration Energy Storage Viability Survey

Energy storage technologies that can economically store and provide electricity over multi-day and seasonal timescales are likely to be a critical component of a sustainable and resilient energy system. This analysis performs a broad survey of energy storage technologies to find storage media that are promising for these long-duration energy storage applications.

levelized cost of storage

The 2024 July 16 solar event: a challenge to the coronal mass ejection origin of long-duration gamma-ray flares

We present a multi-spacecraft analysis of the 2024 July 16 long-duration gamma-ray flare (LDGRF) detected by the Large Area Telescope on the Fermi satellite. The measured > 100 MeV γ-ray emission persisted for over seven hours after the flare impulsive phase, and was characterized by photon energies exceeding 1 GeV and a remarkably hard parent-proton spectrum. In contrast, the phenomena related to the coronal mass ejection (CME)-driven shock linked to this eruption were modest, suggesting an inefficient proton acceleration unlikely to achieve energies well above the 300 MeV pion-production threshold to account for the observed γ-ray emission. Specifically, the CME was relatively slow (∼600 km/s) and the accompanying interplanetary type-II/III radio bursts were faint and short-lived, unlike those typically detected during large events. In particular, the type-II emission did not extend to kilohertz frequencies and disappeared ∼5.5 hours prior to the LDGRF end time. Furthermore, the associated solar energetic particle (SEP) event was very weak, short-duration, and limited to a few tens of MeV, even at magnetically well-connected spacecraft. These findings demonstrate that a very fast CME resulting in a high-energy SEP event is not a necessary condition for the occurrence of LDGRFs, challenging the idea that the high-energy γ-ray emission is produced by the back-precipitation of shock-accelerated ions into the solar surface. The alternative origin scenario based on local particle trapping and acceleration in large-scale coronal loops is instead favored by the observation of giant arch-like structures of hot plasma over the source region that persisted for the entire duration of this LDGRF.

Sun: UV radiation

Long-Duration High-Resolution Large-Eddy Simulations of Hurricane Laura (2020) for Infrastructure Design

This dataset provides long-duration large-eddy simulations (LES) of Hurricane Laura (2020), capturing the turbulent boundary-layer wind field during the storm's passage at horizontal grid spacings of 55.55 m and 10 m. Hurricane Laura made landfall as a Category 4 storm in southwestern Louisiana at 06:00 UTC on 27 August 2020, producing widespread damage to coastal infrastructure. The simulations characterize the spatial and temporal variability of the turbulent wind at heights spanning the lowest 300 m of the boundary layer, throughout the approach and passage of the storm's eyewall over a fixed location. To resolve the spatial heterogeneity of wind and turbulence conditions across the storm, seven independent refined LES runs are performed at radial locations spanning the storm relative to its direction of motion. The refinement positions are defined on a normalized radial coordinate r ̂=r/R, where R≈21 km is Laura's radius of maximum wind, and lie between r ̂=-1.5 and r ̂=+1.5 in ∆r ̂=0.5 increments along a line perpendicular to the storm's track at the midpoint of the simulation. Negative r ̂ corresponds to locations south-southwest of the storm center and positive r ̂ to locations north-northeast. The dataset is segmented into seven radial refinement groups.

17 WIND ENERGY

LDES-Sizing-and-siting-model (Power grid test cases for long-duration energy storage (LDES) siting) [SWR-25-75]

This repository contains code and data for performing a siting analysis of long-duration energy storage (LDES) in the 5-bus and RTS systems using the Sienna suite developed by the National Renewable Energy Laboratory for production cost modeling (PCM). This analysis involves moving the LDES component to different buses in the system, running a simulation, and considering the production cost of the simulation. Different system configurations are also analyzed with these scripts (such as moving load or renewable dispatch generators to different buses) to observe the impacts the system configuration has on optimal siting. This repository contains three sub directories discussed below. Both the 5-bus and RTS systems have two different initial configurations for the renewable energy components in them, one that is predominantly PV-driven and one that is predominantly wind-driven. Sienna suite can be found here: https://github.com/NREL-Sienna

Cole, David [University of Wisconsin]

Deployment Pathways for Long Duration Energy Storage

We apply a least-cost generation expansion model of the continental United States to assess how optimal investments in long-duration energy storage (LDES) technologies are impacted by changes in system generation portfolios and technology costs, assessing 369 capacity expansion scenarios in total. The expansion model considers 8,760 h of chronological operations for the entire target year, 2040. We find that low-cost LDES technologies can reduce generation investments and system costs. Specifically, once the costs for 24- and 100-h storage reach $38/kWh and $14/kWh, respectively, substantial deployments are observed. The distribution of storage investments across durations is strongly influenced by the system generation portfolio. We also demonstrate that a high-fidelity temporal representation is required to capture the value of LDES in generation expansion. Finally, we conduct a regression analysis of our capacity expansion results and find that LDES deployments are positively correlated with the combined wind and solar capacity share and negatively correlated with peaking and baseload shares.

Levin, Todd

CEC Quest: Long Duration Energy Storage Impact Analysis Tool

SAND2025-14389O CEC Quest is a Python tool with a user interface designed to analyze the greenhouse gas impacts of long-duration energy storage projects in California. The tool automates data collection from public sources and uses an Application Programming Interface (API) to enable users to download photovoltaic resource availability, marginal operating emissions rate, and utility rate data. It guides users in inputting parameters for a battery energy storage model and uploading site electrical load data, while also prompting for relevant analysis parameters like timestep and grid limits. CEC Quest performs monthly optimization of one year of data to assess impacts on the site’s electrical bill and the grid’s greenhouse gas emissions. Finally, it conducts a lifecycle analysis to evaluate changes over a defined quantification period, with results aggregated through automated report generation. Sandia National Laboratories is a multimission laboratory managed and operated by National Technology & Engineering Solutions of Sandia, LLC, a wholly owned subsidiary of Honeywell International Inc., for the U.S. Department of Energy’s National Nuclear Security Administration under contract DE-NA0003525.

Rosewater, David [Sandia National Lab. (SNL-CA), L