Results for “leasing and permitting”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

PNNL Review of Federal and State Agency Regulatory Streamlining Practices

All major federal actions that have the potential to significantly affect the environment (e.g., land purchases and/or issuing grants, permits, leases, or licenses) are subject to multiple statutes including the following: • an environmental analysis under the National Environmental Policy Act (NEPA) • potential consultations with the U.S. Fish and Wildlife Service (USFWS) and/or National Marine Fisheries Service (NMFS) under the Endangered Species Act of 1973, as amended (ESA) • potential consultations with State Historical Preservation Officers (SHPOs) and/or tribal nations [often Tribal Historic Preservation Officers (THPOs)] under the National Historic Preservation Act of 1966 (NHPA). Given the size of the federal government and the corresponding variability and complexity in its missions, different branches within the federal government have a fairly wide range of approaches to fulfill their NEPA and consultation requitements. Many of these approaches are founded on the desire to streamline their NEPA and consultation processes while meeting the spirit and letter of the regulations. Some federal and state environmental/engineering agencies have developed web-based dashboards that provide a single web location for permit application submittals. They also use general permits in their various permitting processes. General permits can streamline the permitting process by establishing identical requirements for all eligible applicants. This reduces the time these agencies need to spend reviewing individual permits and setting specific requirements. In addition, general permits do not require a case-specific permit application. This paper presents a sampling of effective agency examples of streamlining the NEPA process and associated agency consultations. It also includes several examples of federal and state agency web portals, online application systems, and general permits that make application processes more efficient and accessible.

54 ENVIRONMENTAL SCIENCES↗

Assessment of Economic Impact of Permitting Timelines on Produced Geothermal Power in Imperial County, California

Despite having a large geothermal power potential in the United States, only a small fraction has been developed for power generation. Various barriers, including technical, financial, and regulatory permit delays, are attributed to lower contribution of geothermal energy in the national grid. Unpredictable environmental reviews and permitting timelines are some of the non-technical barriers that can cause delays in geothermal exploration and utilization plans. Our study shows that the geothermal permitting timelines can vary from six months to several years, depending on the presence or absence of biological resources, cultural resources, and sensitive environmental issues at the project site. The potential impacts of these permit barriers can range from investors abandoning geothermal development to making the product (i.e., electricity) more expensive and uncompetitive. In this study, we conducted economic analysis to assess the impact of permitting timelines on cost of produced electricity from geothermal resources using data from existing geothermal plants as well as prospective sites. In this paper, we present collected timelines data, approach, and results of economic impact of permitting timelines on geothermal power. We evaluated the various environmental management and permit review processes by considering a hypothetical geothermal project in the Salton Sea Known Geothermal Resource Area. Because of the variety of the biological and environmental issues and the involvement of local, state, and federal agencies with overlapping jurisdictions, this project could go through one of the many California Environmental Quality Act (CEQA) and National Environmental Policy Act (NEPA) review scenarios that range from the least to the most complex in its circumstances. The fastest CEQA/NEPA review timelines would have the project completed in six years. In contrast, the project would substantially need longer time to complete if it were located in an area with significant environmental resources or cultural issues that required permitting from various agencies. With increasing project completion timelines, the simplified levelized cost of electricity (sLCOE) can be 4 to 11% higher with longer CEQA/NEPA review timelines than the sLCOE value with the fastest CEQA/NEPA review timeline. Lengthier CEQA/NEPA review timelines could also result in loss of $64 million to $227 million in potential revenue. Such significant economic impacts could determine the success of a geothermal project.

15 GEOTHERMAL ENERGY↗

Optimizing cost-effective and benchmarked industry standards to quantify nutrient bioextraction by seaweed

Interest in the utility of seaweed farms to mitigate coastal eutrophication, or nutrient loading, has grown commensurate with the recent rise of the farmed seaweed industry in the U.S. But economic valuation of this ecosystem service remains elusive in part because of challenges in quantifying this spatiotemporally variable biological process with reproducible and comparable metrics. Regulatory bodies that permit wastewater discharge or lease area for aquaculture farms require water quality testing and reporting of dissolved total nitrogen (N) in nearshore marine environments. These metrics must meet EPA standards for testing and reporting (e.g., Total Kjeldahl Nitrogen - TKN). However, these metrics are inherently highly variable over space and time in dynamic nearshore systems, and expensive to evaluate with sufficient breadth to constrain this variance, creating a critical bottleneck to direct quantification of farmed seaweed net uptake rates in situ.

59 BASIC BIOLOGICAL SCIENCES↗

Geothermal Energy

This fact sheet describes geothermal energy and the Bureau of Land Management's geothermal program.

GEOTHERMAL ENERGY↗

Oilwell Conversion (Well API 121913310501) to Geothermal Heat Storage Well for Flexible Electricity Storage

Geothermal growth is limited by a lack of geographically dispersed high-temperature thermal resources and high initial upfront investment in characterization and well construction. This project intended to address the challenges of energy supply intermittency and enhance grid resilience, reliability, and energy security by storing energy provided from currently available renewable resources in the subsurface to harvest it a later time during at-peak energy demand. This project intended to improve geothermal adoption, reduce initial project risk, and improve price competitiveness through utilizing existing oil and gas infrastructure such as non-productive wells, non-economic fields, dry holes, and orphaned wells. The project also intended to address the lack of geographically dispersed thermal resources and enhance grid resilience, reliability, and energy security by introducing an economical method for storing energy from currently available renewable resources in the subsurface for usage during at-peak energy demand. During this research, the project furthered the understanding of the feasibility of utilizing abandoned oil and gas wells as geothermal heat storage wells. The project team investigated the heat storage and hydrogeological characteristics of subsurface reservoirs in the Illinois Basin to evaluate their response to heat injection for determining the evolution of temperature profiles and heat losses over time using existing and available data sets. The project team then performed modeling and simulation to evaluate the heat losses of returning fluids during heat extraction. The outputs were used to select an optimal candidate reservoir and location in Southern Illinois. The team designed and performed a small-scale field test in an existing oil well to refine the model and to demonstrate the permitting and regulatory pathways necessary for the conversion of oil and gas assets to geothermal use. The field test also serves as a proof of concept and can guide the procedures for future research and implementation. Additionally, the project team, conducted initial market research and customer discovery to develop a go to market strategy for an Advanced Geothermal Energy Storage (AGES) system. The project team in this research also identified the parameters to be refined in future research, to improve the current go to market strategy economic model. To this end several subject matter experts were also identified to assist in future research with geothermal infrastructure setup, energy storage policy and law, energy storage market demand, potential siting based on demand etc. Future research will involve further sophistication of the site commercial modeling, implementing a larger-scale test, and further refinement of the thermodynamic modeling/simulation process. The output will be lifecycle costs and economics suitable for comparison to alternative approaches from a validated full-scale demonstration for venture capital investment into this technology. The project successfully demonstrated the ability to leverage existing oilfield infrastructure, permits, and land access and leasing agreements, to enable geothermal storage projects to come online faster and cheaper than a greenfield development could. This technology could allow for greater energy independence and security through long-term energy storage solutions. The longer duration allows for greater storage for renewables currently limited by hours-long storage durations of lithium-ion. The AGES system would support the growth of renewable energy farms, and provide greater opportunities for a cleaner energy infrastructure.

15 GEOTHERMAL ENERGY↗

Pilot-Scale Algal Oil Production

The main objective of the project is complete: development of a preliminary planning and design for a pilot-scale algal oil cultivation and processing facility, FEL-3 design with -5% / +15% cost estimate accuracy, and conversion of the algal oil to biofuel in an off-site existing bio-oil refinery. The design basis includes 10 tons per day of dried algae cultivated with CO 2 supplied by direct air capture, electricity supplied solar power, well water supply, zero liquid discharge, off-site extraction, and off-site conversion of oil to biofuel. The design and permitting package is an important milestone in the path to commercialization of algal biofuels and bioproducts as it provides the preliminary design, permitting path, long-term land lease, planning documents, and team needed for success in future engineering, construction, start-up and operations of a pilot-scale farm at a site in Paso Robles, CA. Outcomes of the business assessment include (i) identification of a product spectrum for economical algal biofuels using co-products with markets that are commensurate with production of 6-7 billion gallons per year of sustainable aviation fuel (SAF), renewable diesel, and renewable gasoline, (ii) a path toward near-term contribution of algae oil to SAF, and (iii) an approach for long-term operation of a pilot-scale farm.

09 BIOMASS FUELS↗

Video distribution system cost model

A cost model that can be used to systematically identify the costs of procuring and operating satellite linked communications systems is described. The user defines a network configuration by specifying the location of each participating site, the interconnection requirements, and the transmission paths available for the uplink (studio to satellite), downlink (satellite to audience), and voice talkback (between audience and studio) segments of the network. The model uses this information to calculate the least expensive signal distribution path for each participating site. Cost estimates are broken downy by capital, installation, lease, operations and maintenance. The design of the model permits flexibility in specifying network and cost structure.

Gershkoff, I.↗

NORTH DAKOTA CARBONSAFE PHASE III: SITE CHARACTERIZATION AND PERMITTING OF GEOLOGIC STORAGE OF CARBON DIOXIDE

The Energy & Environmental Research Center (EERC), in partnership with Minnkota Power Cooperative Inc. (Minnkota), SLB, and Computer Modelling Group Ltd. (CMG), supported wide-scale deployment of carbon capture and storage (CCS) as part of the U.S. Department of Energy (DOE) National Energy Technology Laboratory Carbon Storage Assurance Facility Enterprise (CarbonSAFE) Initiative Phase III. This phase included the acquisition, analysis, and development of information to fully characterize two storage complexes to demonstrate viable storage resources for commercial volumes of CO2 (defined by DOE as a minimum of 50 million tonnes [MMt] of CO2 within a 30-year period) (National Energy Technology Laboratory, 2024). Phase III also involved the preparation, submission, and approval of North Dakota underground injection control (UIC) Class VI storage facility permits (SFPs)—required precursors to applications for Class VI injection well permits. The presumed viability of commercial-scale CCS, situated adjacent to Minnkota’s Milton R. Young Station (MRYS), is validated by Minnkota’s continued pursuit of Project Tundra—an initiative to build the world’s largest lignite-based CCS project in central North Dakota (www.projecttundrand.com). Project Tundra comprises two scopes of work, Tundra Capture (installation of postcombustion CO2 capture at MRYS) and Tundra SGS (secure geologic storage). The efforts of North Dakota CarbonSAFE Phase III, Site Characterization and Permitting, supported Tundra SGS. Extensive site-specific characterization activities included a successful multimeasurement geophysical approach and drilling a stratigraphic test well (J-ROC 1, subsequently renamed Liberty-1) adjacent to MRYS. Core collection and analyses, downhole testing and fluid sampling, and geophysical logging were performed on J-ROC 1 and on a nearby stratigraphic test well (known as J-LOC 1), which was drilled, cored, and tested under a complementary project funded by the North Dakota Lignite Research Program. The injection tests performed on J-LOC 1 positively impacted the CarbonSAFE project, resulting in fewer proposed injection wells and significant construction, operations, and monitoring cost savings. The characterization data collected and analyses performed were integrated into geologic models, and successive numerical simulations were run to determine CO2 plume extent and subsurface pressure buildup associated with the planned CO2 injection rate of nearly 4 MMt per year. The latter doubles the CarbonSAFE Initiative goal with an estimated 100 MMt of CO2 stored in 20 years. Application of the U.S. Environmental Protection Agency’s (EPA’s) method for estimating the Class VI Rule area of review (AOR) to the overpressurized Broom Creek Formation inspired an alternative method of calculation, called risk-based AOR delineation. This peer-reviewed method was applied for the first time during the storage facility-permitting process. The two SFP applications submitted in 2021 successfully resulted in North Dakota Industrial Commission (NDIC) orders in 2022 authorizing the creation of the storage facility areas and amalgamation of pore space as well as establishing financial responsibility requirements. After approval of the SFPs, Minnkota filed in 2022 applications for permits to reenter the J-ROC 1 well and to drill two new wells—all with the intended purpose to become Class VI injection wells. To establish eligibility under the Internal Revenue Code for Section 45Q tax incentives, a monitoring, reporting, and verification (MRV) plan was prepared and submitted by Minnkota to EPA in 2022, resulting in the first such plan approved in North Dakota. Also in 2022, under the National Environmental Policy Act (NEPA), Minnkota prepared and submitted an environmental information volume (EIV) describing the proposed CCS project and associated potential environmental impacts. Based on the EIV, DOE determined that the proposed construction project required an environmental assessment, and Minnkota submitted the first draft in 2023 and a revised draft in 2024. Both submissions were followed by a public comment period. Subsequently, DOE issued a finding of no significant impact (FONSI) on September 13, 2024. A successful outreach program, strongly based in the production, presentation, and dissemination of informational material, fostered an environment to aid stakeholders in making informed decisions regarding the planned project. Opportunities for public input were provided at various steps along the way, including at county planning and zoning meetings, before and during the SFP administrative hearing, and during environmental assessment public comment periods. In addition, land/pore space owners and mineral owners had various points of contact, including granting access rights, securing pore space leasing, and mineral owner notifications. Based upon the successful storage facility permitting issued by NDIC, approval of the MRV plan by EPA, and receipt of a FONSI under the NEPA, Minnkota is continuing its pursuit of Project Tundra. In December 2023, the Office of Clean Energy Demonstrations under its Carbon Capture Demonstrations Projects Program announced funding for the capture system (Office of Clean Energy Demonstrations, 2023) and a proposal for CarbonSAFE Phase IV: Construction funding was submitted in March 2024 for the storage project. A go/no-go decision to proceed with construction and operations in the Broom Creek Formation is anticipated in 2024. References National Energy Technology Laboratory, CarbonSafe Initiative, https://netl.doe.gov/carbon-management/carbon-storage/carbonsafe (accessed August 2024). Office of Clean Energy Demonstrations, 2023, OCED selects three projects in CA, ND, and TX to reduce harmful carbon pollution, create new economic opportunities, and advance carbon reducing technologies, December, www.energy.gov/oced/articles/oced-selects-three-projects-ca-nd-and-tx-reduce-harmful-carbon-pollution-create-new (accessed August 2024).

Peck, Wesley↗

SECARB-USA: Needs Assessment Framework for Storage Complexes (Task 2.1.b)

A team of SECARB storage experts examined 63 formations at 39 sites that were selected to represent the range of diversity of newly assessed, as well as well-advanced, storage prospects in the SECARB region. We inventoried the data needs triggered by the requirements to obtain a Class VI UIC storage permit, the data needs that results from the requirement to create geocellular fluid flow models to support that permit, and by pragmatic and best practice inputs such as public acceptance, regulatory readiness, and pore space leasing. We anchored both the needs inventory and the processes for and cost of meeting the needs with data from 9 sites in in the SECARB area that have advanced far in characterization. Results show that the total cost of characterization prior to obtaining a permit is convergent, because the permit and modeling requirements drive projects to obtain the same types of data for all cases. The high cost data that control cost are 1) drilling, coring, core-testing, logging, sampling and testing a characterization well and 2) collection of a 3-D seismic survey to map reservoir and confining system properties over the area of the plume or the area of elevated pressure. In 5 of our case study sites we determined that one or both of these costs could be avoided because the needs are met by available data.

54 ENVIRONMENTAL SCIENCES↗

Environmental Effects Assessment for Proposed Offshore Wind Farm off the Coast of Grays Harbor, Washington

Grays Harbor Wind LLC (GHW) is proposing to develop a floating offshore wind farm offshore of west Grays Harbor County, Washington (Grays Harbor). The proposed GHW Offshore Wind Project (Project) would entail construction, installation and operation of a 1,000-megawatt (MW) offshore wind farm consisting of approximately 75 floating units, each containing a floating foundation and wind turbine generator (WTG). The Project location is approximately 25 miles (21.7 nautical miles [nmi]) offshore west of Grays Harbor, at waters depths of 360 to 700 feet. The Pacific Northwest National Laboratory (PNNL) was contracted by Herrera Environmental Consultants, Inc. on behalf of GHW to carry out this preliminary scoping study to evaluate baseline conditions and potential effects on fish and marine mammals from development and operation of a floating offshore wind farm installed within a designated area off the coast of Washington1. Floating offshore wind units installed in an ocean environment as part of the Project would interact with marine wildlife. This Study report provides an initial data aggregation and analysis, using publicly available data, of the Project effects, both negative and positive, on the marine environment. The scope of this assessment is limited by the fact that the Project development is presently at the conceptual level. Data on marine organisms were aggregated and evaluated; however seabirds were evaluated by Herrera Environmental Consulting and, along with bats, were not included in the scope of this study. Significant additional work is necessary to characterize ocean, seafloor, and environmental conditions; select appropriate floating offshore wind technologies; identify construction methods and locations; and assess facility locations, including electrical interconnection. Data aggregation and analysis of seabirds and bats is also needed. Evaluation of the full range of potential environmental effects would be conducted following an award of a lease from the Bureau of Ocean Energy Management (BOEM) as part of the leasing, National Environmental Policy Act (NEPA)/State Environmental Policy Act (SEPA) environmental review and permitting processes. While this initial data aggregation and analysis uses best available public scientific information and current assumptions about the Project configuration, the effects discussed herein are based on the status of review to-date and may change as Project-specific details are developed.

17 WIND ENERGY↗

Southeast Regional CO 2 Utilization and Storage Acceleration Partnership (SECARB-USA): Needs Assessment Framework for Storage Complexes

A team of SECARB storage experts examined 63 formations at 39 sites that were selected to represent the range of diversity of newly assessed, as well as well-advanced, storage prospects in the SECARB region. We inventoried the data needs triggered by the requirements to obtain a Class VI UIC storage permit, the data needs that results from the requirement to create geocellular fluid flow models to support that permit, and by pragmatic and best practice inputs such as public acceptance, regulatory readiness, and pore space leasing. We anchored both the needs inventory and the processes for and cost of meeting the needs with data from 9 sites in in the SECARB area that have advanced far in characterization.

42 ENGINEERING↗

Quantifying CO 2 Plume Stabilization at Carbon Storage Projects, North Dakota, USA

This study presents an approach for quantifying when injected carbon dioxide (CO 2 ) stabilizes pursuant to carbon capture and storage (CCS) project permitting and site closure requirements. The distribution of mobile-phase CO 2 (CO 2 plume) will evolve within the storage reservoir during and after injection through both physical and chemical trapping mechanisms. CCS policies generally agree that the CO 2 plume’s migratory behavior in post-injection should demonstrate nonendangerment to the environment but do not provide specific guidance on how to meet the definition of plume stabilization, generating some uncertainty for operators. Plume stability herein means the CO 2 plume 1) changes size minimally and predictably in the storage reservoir such that it will not cross key boundaries identified in the permit and 2) does not pose a threat to human health, underground sources of drinking water (USDWs), and the environment because of lateral migration to areas where leakage pathways may exist. Published literature on plume metrics was reviewed to determine which metric(s) may be most appropriate for determining CO 2 plume stability. A technical approach that defines plume stabilization by estimating the rate of change in the geographic footprint of the CO 2 plume with respect to time was developed and illustrated using a case study from North Dakota, USA, as a proposed solution for CCS operators to apply at the project permitting stage. Any prospective CCS operator may benefit from using the same approach to inform the selection of pore space lease and monitoring areas and develop post-injection site care plans.

03 NATURAL GAS↗

A phased workflow to define permit‐ready locations for large volume CO 2 injection and storage

Abstract To‐date, only two UIC Class VI permits have been issued by the US Environmental Protection Agency. We illustrate a four‐phase workflow to first identify regional storage resources and then down‐select sites to yield permit‐ready locations that can accept and store large volumes of CO 2 . Specific permit requirements should guide objectives and define deliverables of respective workflow phases. In the first phase we used available regional data and screened structure and injection zones to locate resources that match CO 2 volumes planned to be captured. Available data were also used to assess presence and depth of usable groundwater, the key resource being protected via permitting. We then used advanced, closed‐form, analytical solutions (EASiTool) to estimate CO 2 injectivity into each hydrologically connected injection compartment. In the second phase we acquired and conditioned additional wireline logs and leased available seismic datasets. We interpreted the depositional systems from wireline well‐log character and mapped sandbody geometry to interpolate injection and confining‐zone distribution. Using available data, we mapped faults and locations of freshwater and overpressure (or other capacity‐limiting geologic parameters) in more detail. In the third phase, we used the augmented geologic data to develop a static model for the selected area, extracted the areas of highest interest, and generated and ran dynamic (flow) models. In a fourth phase, we reduced major uncertainties identified in earlier phases. Our case study indicates that to complete preparation of a permit application requires (1) improved lithologic characterization information (thicknesses and horizontal and vertical connectivity) and (2) better definition of poorly defined local faults. © 2023 The Authors. Greenhouse Gases: Science and Technology published by Society of Chemical Industry and John Wiley & Sons Ltd.

58 GEOSCIENCES↗

Mapping existing wellbore locations to compare technical risks between onshore and offshore CCS activities in Texas

Carbon dioxide capture and geologic storage (CCS; geologic sequestration) is a promising technology for reducing anthropogenic greenhouse gas emissions to the atmosphere from industrial point sources. Aspects of CCS have been investigated for over two decades, and many large- and small-scale geologic storage field demonstration projects are now underway globally. Interest in offshore CCS has been increasing in recent years (e.g., European Union, Australia, Japan, and the United States). Deep geologic storage in offshore settings is analogous to onshore CCS activities in many respects (i.e., geologic and geotechnical aspects), but is distinct from previously explored seabed sediment CO 2 storage) or deep marine dissolution). Given the large subsurface geologic storage volumes available in offshore settings, much discussion of offshore CCS is focused on the benefits and risks of such activity compared to onshore settings. Similar to onshore settings, existing (legacy) wells likely present the most direct migration pathway and largest risk of noncontainment in offshore settings. As part of current studies to evaluate geologic storage options in offshore settings along the Texas coast and greater Gulf of Mexico (GoM), mapping of the geographic distribution and ages of wells in a region containing coastal counties and extending 30 miles offshore Texas indicates that both well spatial density and well age decrease moving from onshore to offshore. Results suggest reduced risk of leakage owing to more rigorous and documented well completion and abandonment practices for these generally younger wells (although many are decades old). A result of decreased well density is that larger areas are available for leasing for CCS projects that avoid legacy wells altogether (> 1 mile from any existing well). The one-mile designation is used as an arbitrary convention, and while it is recognized that this is smaller than a typical area of review (AoR) for permitting, each site will have a different AoR radius for consideration. Finally, the combination of large subsurface storage volumes under control of a single landowner and reduced risks from legacy wells makes offshore CCS attractive in the GoM.

58 GEOSCIENCES↗

A national voice network with satellite and small transceivers

A geostationary satellite utilizing a large multiple-beam UHF antenna is shown to be potentially capable of providing tens of thousands of voice channels for hundreds of thousands of mobile ground terminals using hand-held or vehicular-mounted transceivers with whip antennas. Inclusion of on-board network switching facilities permits full interconnection between any terminal pair within the continental United States (CONUS). Configuration tradeoff studies at selected frequencies from 150 to 1500 MHz, with antenna diameters ranging from 20 to 200 m, and CONUS-coverage multiple beams down to 0.3 deg beamwidth, establish that monthly system user costs in the range of $90 to $150, including leased and maintained ground equipment, are feasible.

Reilly, N. B.↗

Additional Testing of the DHC-6 Twin Otter Tailplane Iced Airfoil Section in the Ohio State University 7x10 Low Speed Wind Tunnel

The need for fundamental research in Ice Contaminated Tailplane Stall (ICTS) was established through three international conferences sponsored by the FAA. A joint NASA/FAA Tailplane Icing Program was formed in 1994 with the Ohio State University playing a critical role for wind tunnel and analytical research. Two entries of a full-scale 2-dimensional tailplane airfoil model of a DHC-6 Twin Otter were made in The Ohio State University 7x10 ft wind tunnel. This report describes the second test entry that examined additional ice shapes and roughness, as well as airfoil section differences. The addition data obtained in this test fortified the original database of aerodynamic coefficients that permit a detailed analysis of flight test results with an OSU-developed analytical program. The testing encompassed a full range of angles of attack and elevator deflections at flight Reynolds number conditions. Aerodynamic coefficients, C(L), C(M), and C(He), were obtained by integrating static pressure coefficient, C(P), values obtained from surface taps. Comparisons of clean and iced airfoil results show a significant decrease in the tailplane aeroperformance (decreased C(Lmax), decreased stall angle, increased C(He)) for all ice shapes with the grit having the lease affect and the LEWICE shape having the greatest affect. All results were consistent with observed tailplane stall phenomena and constitute an effective set of data for comprehensive analysis of ICTS.

Gregorek, Gerald↗

Calibration of long term satellite ozone data sets using the space shuttle

Trends in atmospheric ozone continue to be an environmental concern. Drifts in satellite observations are the major obstacle in the detection of changes in global ozone over the long term. Careful re-analysis of satellite ozone data along with groundbased observations have more or less corroborated photochemical models which predict ozone depletion. However, there remains the margin of error in the observations that is as large as the trend itself. The National Plan for Stratospheric Monitoring calls for monitoring global ozone for at lease the next ten years employing the NOAA polar orbiting satellites. Ozone observations will be made with the Solar Backscatter Ultraviolet Spectral Radiometer Mod 2 (SBUV/2) which ia a refinement of the SBUV instrument flying on NASA's Nimbus-7 satellite. The first instrument in the operational series began taking data from the NOAA-9 spacecraft in February 1985. A second instrument was launched on NOAA-11 in September 1988. Both continue to operate. Earlier attempts to calibrate satellite data relied on comparisons with ground based observations. However, differences in instrumental techniques severely complicated these efforts. This problem will be over come by regular flights, about once per year, of the Shuttle Solar Backscatter Ultraviolet radiometer (SSBUV). The data from the SSBUV instrument will be compared with nearly coincident data taken by the NOAA satellite instruments. This procedure will permit a direct calibration transfer in space, since the two instruments observe the same qualities thereby bypassing the inversion algorithm which converts the observations to ozone amounts.

Hilsenrath, Ernest↗

Evaluating the Impact of Residential Solar Contract Cancellations in the United States

The residential solar photovoltaic (PV) market in the United States is growing, despite frequent customer cancellations. Contract cancellations result in lost time and costs that must be borne by installers, often in the form of higher "soft costs" (i.e., non-equipment costs). These costs are often passed on to customers who successfully install PV systems. To date, few studies have attempted to estimate national cancellation rates or model the impacts on installed system costs. In this report, we utilize an installer-provided dataset of 199,665 residential PV-only projects representing about 10% of U.S. installs each year from 2017-2019. With this data, we evaluate cancellation rates and trends from contract signing to install. Next, by leveraging NREL's soft cost model for residential solar, we estimate installer spending through each phase of the pre-install process. Applying our findings on cancellation timelines and rates, we then estimate the potential cost impacts to successful installs from contract cancellations. Our work suggests that the rates and impacts of contract cancellations have been previously underestimated. Namely, we find that cancellations/unsuccessful project are; more common than previous estimates suggest; occur earlier in project timelines, though a significant number happen even after permit/ATB approvals; and contribute significantly to customer acquisition and other soft costs. We also find that cancellation do not appear to be driven by review delays in permitting and interconnection applications.

14 SOLAR ENERGY↗