Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “leak test”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Fabrication and Testing of DOE Standard Canister Closure Leak Test Assembly

DOE manages over 300 types of SNF, most of which are located at the INL site. “Road-ready dry storage” is a management concept where SNF is packaged into dry, sealed canisters, which are then placed in on-site storage in anticipation of later removal. The Idaho Cleanup Project and INL are collaborating on the Road-Ready Capability Demonstration Project, which will develop and demonstrate the designs, technology, processes, and regulatory framework for packaging DOE SNF for road-ready dry storage. In support of establishing a large-scale road-ready dry storage program at the INL site, the demonstration will package a select amount of DOE-managed SNF into DOE Standard Canisters. The closure process for the DOE Standard Canisters will include fuel and basket loading, welding, inspection, leak testing, and if needed, repair. As a follow-up to previous discussion on the design of the DOE Closure Leak Test Assembly, this report describes recent fabrication and testing efforts performed at INL. DOE Standard Canisters are sealed by two sequential gas tungsten arc welds. Both are performed by remotely operated and semi-autonomous welding systems. The first weld is a circumferential pipe weld that completes assembly of the canister body and lid assembly. The second and final closure weld connects the vent plug to the vent port with an identical butt joint to the circumferential pipe weld. After the second weld is performed on the vent port, these welds are helium leak tested using an inside-out technique. In addition to the commercially available vacuum and leak detector systems, the DOE Standard Canister Closure Leak Test Assembly was designed for both remote and manual operation. This report describes fabrication and performance testing associated with the inside-out technique. INL staff designed and tested systems to accomplish these tasks. Hardware fabrication occurred at INL facilities. Forthcoming work includes design optimization, integration to existing systems, and implementation to packaging demonstration operations.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Fabrication and Testing of DOE Standard Canister Closure Leak Test Assembly

DOE manages over 300 types of spent nuclear fuel (SNF), many of which are located at the Idaho National Laboratory (INL) site. Managing this large variety of SNF for storage, transportation, and disposal poses a challenge to DOE. The Idaho Cleanup Project and INL are collaborating on the DOE SNF Road-Ready Demonstration (“Road-Ready Demonstration”), which will develop and demonstrate the designs, technology, processes, and regulatory framework for packaging DOE-managed SNF for “road-ready dry storage.” Road-ready dry storage is an SNF management concept in which SNF is packaged into dry, sealed canisters that are then placed in onsite storage in anticipation of later transport and disposition. The forward-looking goal of the Road-Ready Demonstration is to establish the foundation for a large-scale road-ready dry storage program at the INL site. In support of establishing a large-scale road-ready dry storage program at the INL site, the Road-Ready Demonstration will first package Fort St. Vrain SNF currently in dry storage at INL into several DOE Standard Canisters (DOESCs). These DOESCs will in turn be loaded into another containment similar to commercial multi-purpose canisters. This multi-purpose canister will then be compatible with a transportation or storage system, such as a storage cask for interim storage or transportation package for offsite transport. These DOESCs will remain sealed over the course of their storage, transportation, and applicable disposal functions. The closure process for the DOESC will include fuel and basket loading, welding, inspection, leak testing, and, if needed, repair. As a follow-up to previous discussions on the design of the DOE Closure Leak Test Assembly (LTA), this report describes recent fabrication and testing efforts performed at INL. DOESCs are sealed by two sequential gas tungsten arc welds, both of which are performed by remotely operated and semiautomatic welding systems. The first weld is a circumferential pipe weld that completes the assembly of the canister body and lid assembly. The second and final closure weld attaches the vent plug to the vent socket via a butt joint. After the second weld is performed, the welds are helium leak tested using an evacuated envelope technique. The LTA was designed for both remote and manual operation. This report describes the fabrication and performance testing associated with the evacuated envelope technique. INL staff designed, fabricated, and tested the LTA at INL facilities. This testing included establishing technique and system sensitivities in accordance with ASME and American National Standards Institute N14.5 requirements. Forthcoming work will cover such areas as design optimization, process and personnel qualification, and implementation in Road-Ready Demonstration operations.

42 ENGINEERING↗

Fabrication and Testing of DOE Standard Canister Closure Leak Test Assembly – 24139

DOE manages over 300 types of spent nuclear fuel (SNF), many of which are located at the Idaho National Laboratory (INL) site. Managing this large variety of SNF for storage, transportation, and disposal poses a challenge to DOE. The Idaho Cleanup Project and INL are collaborating on the DOE SNF Road-Ready Demonstration (“Road-Ready Demonstration”), which will develop and demonstrate the designs, technology, processes, and regulatory framework for packaging DOE-managed SNF for “road-ready dry storage.” Road-ready dry storage is an SNF management concept in which SNF is packaged into dry, sealed canisters that are then placed in onsite storage in anticipation of later transport and disposition. The forward-looking goal of the Road-Ready Demonstration is to establish the foundation for a large-scale road-ready dry storage program at the INL site. In support of establishing a large-scale road-ready dry storage program at the INL site, the Road-Ready Demonstration will first package Fort St. Vrain SNF currently in dry storage at INL into several DOE Standard Canisters (DOESCs). These DOESCs will in turn be loaded into another containment similar to commercial multi-purpose canisters. This multi-purpose canister will then be compatible with a transportation or storage system, such as a storage cask for interim storage or transportation package for offsite transport. These DOESCs will remain sealed over the course of their storage, transportation, and applicable disposal functions. The closure process for the DOESC will include fuel and basket loading, welding, inspection, leak testing, and, if needed, repair. As a follow-up to previous discussions on the design of the DOE Closure Leak Test Assembly (LTA), this report describes recent fabrication and testing efforts performed at INL. DOESCs are sealed by two sequential gas tungsten arc welds, both of which are performed by remotely operated and semiautomatic welding systems. The first weld is a circumferential pipe weld that completes the assembly of the canister body and lid assembly. The second and final closure weld attaches the vent plug to the vent socket via a butt joint. After the second weld is performed, the welds are helium leak tested using an evacuated envelope technique. The LTA was designed for both remote and manual operation. This report describes the fabrication and performance testing associated with the evacuated envelope technique. INL staff designed, fabricated, and tested the LTA at INL facilities. This testing included establishing technique and system sensitivities in accordance with ASME and American National Standards Institute N14.5 requirements. Forthcoming work will cover such areas as design optimization, process and personnel qualification, and implementation in Road-Ready Demonstration operations.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

DOESC Closure Leak Test Assembly

This conceptual design report is for the DOESC Closure Leak Test Assembly, which satisfies a portion of the milestone "Preliminary Design Report for Remote Helium Leak Test System". This CDR is part of the Preliminary Design Report/Package.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

HELIUM LEAK TEST MODELING OF A SPENT NUCLEAR FUEL CANISTER

The U.S. Department of Energy (DOE) is considering the development of one or more federal consolidated interim storage facilities (CISFs) to be used to store commercial spent nuclear fuel (SNF) at locations in the U.S. One of the first technical challenges of a CISF is performing an inspection of SNF canisters upon their receipt to confirm they can be placed into the CISF’s licensed storage configuration. The canister receipt inspection is critical to CISF site operations. The test is conceived as being a helium (He) leak check, intended to confirm that the confinement boundary of a SNF canister is intact. SNF canisters are filled with He when they are sealed, so detection of a He leak indicates that a through-wall flaw has occurred in the canister confinement boundary. Other measurements are planned to occur upon canister receipt in addition to the He leak check such as krypton-85 measurements, which would indicate confinement breaches of one or more fuel rods in addition to a breach of the SNF canister. However, the He leak check has been identified as one of such high importance and has such significant technical challenges that a full-scale demonstration is needed to confirm the He leak test’s viability and to assist in planning relative to its operational requirements. A modeling methodology for simulating the He detection test was developed to help inform the test plan and the design of the test vessels. To develop the modeling methodology a detailed computational fluid dynamics (CFD) benchmark model was constructed to compare against leak rate test data from a transportation package for radioactive material. This report is focused on modeling efforts to simulate the benchmark leak test.

Suffield, Sarah R.↗

DOESC Closure Leak Test Assembly

This is the functional and operational requirements document (FOR) for the DOESC Closure Leak Test Assembly ("Bell Jar"), as required per LWP-10000.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Leak test for solid oxide fuel cells and solid oxide electrolysis cells

A simple, fast, and economical alcohol penetration method for assessing the solid oxide cell to metal window frame seal in a typical planar design is presented. An alcohol such as ethanol or isopropanol is placed into the cavity of a cell sealed to the window frame. Within 3–5 min, one can determine if the glass seal is hermetic by visual observation along the seal edges on the side of the sealed frame. Cross bubbling and open circuit voltage methods for determining whether the seal failed or cracked at high temperature after final stack firing are also discussed.

25 ENERGY STORAGE↗

He Leak Testing of 3013 Inner Container Lids

The 3013-container package is used for the long-term storage of plutonium bearing materials at Department of Energy (DOE) sites. The package consists of three nested stainless-steel containers: outer, inner and convenience, which are made of stainless steel. The requirements of the DOE 3013 Standarda, also entail the development of a surveillance program, tasked to ensure structural integrity of the outer container for at least 50 years. The Materials Identification and Surveillance Working Group (MIS-WG) is specified to be responsible for selecting the containers for the surveillance as well as analyzing results. The MIS-WG determined that corrosion is a potential mechanism for container degradation with the most credible type of failure to be stress corrosion cracking (SCC) through wall breach of the inner container closure weld region (ICCWR). A breach of the inner container has the potential of allowing corrosive gases to be released into the safety class outer container.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Container Evaluation: Analysis of the Swagelok Knuckle with Viewport as an Approved Hermetically Sealed Inner Container

This report outlines the results from the water ingress test, helium leak test and additional atmosphere testing for the Swagelok knuckle with viewport container further referred to as the SKV. This container is constructed from a standard union vacuum fitting, 1.33” conflat to 0.5” male VCR, a 1.33” conflat fused silica lensed viewport fitting, and a 0.5 inch VCR cap. The primary intended use of this container is to store Pu metal samples in the vault for a time interval exceeding 40 years. The samples need to be contained in an air free environment to ensure that the material does not oxidize over time. The container viewport is a critical design feature that will help the operators visually inspect and evaluate the state of the metal samples prior to opening the container. These containers are advertised as leak tight, but experimental tests were performed to test the water resistant criteria and the gas leaking criteria set forth by the TA-55 Criticality Safety Program. The results of the water ingress test show that the container is water-tight, with no signs of water penetrating the container within the required guidelines outlined in TA55-AP-522. The preliminary He leak test performed demonstrate that the conflat window port and VCR cap are able to maintain a hermetic seal. Additionally, all containers will be He leak tested independently by the manufacturer prior to shipping to LANL. A third voluntary test was added to assess the container’s ability to hold atmosphere, with successful results indicating the container is able to hold inert atmosphere to prevent lanthanum metal oxidation. It is the conclusion of the authorsthat there is enough evidence through the test conducted and outlined within this document that the proposed container meets the definition of a water-tight container, and it is able to provide a hermetic seal.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Test Report for the Regulatory Testing of the Welded Isotek-SFC-W-3 Special Form Capsule

Two prototypes the welded ISOTEK-SFC-W-3 special form capsules (SFCs) of the same design were evaluated to determine if the requirements of Title 49, Code of Federal Regulations (CFR), Part 173.469, Tests for Special Form Class 7 (Radioactive) Materials, were met. The results of the special form tests are documented in this test report. This report describes the special form testing activities performed on the two welded ISOTEK-SFC-W-3 capsules. The test units were designated as TU-1 and TU-2. TU-1 was subjected to leak testing, percussion testing, and impact testing. TU-1 was leak tested using the leak rate test specified in 49 CFR 173.469(a)(4)(i). The impact test on TU-1 was conducted according to the requirements in 49 CFR 173.469 (b)(1). The percussion test that was carried out on TU-1 was conducted in accordance with 49 CFR 173.469 (b)(2). TU-2 was subjected to a leak rate test as specified in 173.469(a)(4)(i) and a heat test as specified in 49 CFR 173.469(b)(4). Each test unit was leak tested before and after these respective tests. The leak rate tests performed were helium back-pressure tests and bubble tests, as specified in American National Standards Institute (ANSI) N14.5-2014. The measured leak rates were converted to standard condition leak rates as specified in American Society for Testing and Measurement (ASTM) E 493. The determined standardized leak rates obtained from the test and the calculations for all the test units met the requirements for special form certification. The testing was performed under the direction of the Oak Ridge National Laboratory (ORNL) Package Testing Program (PTP).

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

An initial effort to study the influence of pitting in SAVY containers

As part of a broader effort to investigate a critical pit depth, below which SAVY containers fail a leak test after a drop test, surrogate testing using pristine SAVY container material was investigated. The original study involved producing pits in a SAVY wall to depths 35% to 55% of the wall thickness and subjecting the pitted container to a drop test under prototypic conditions. Subsequent leak testing after drop testing showed the container passed and that the pit size distribution and drop conditions were not sufficient to cause a leak test failure in this specific container.

36 MATERIALS SCIENCE↗

REGULATORY TESTING AND 3D SCANNING METHODOLOGY OF THE DPP-1 TYPE SHIPPING CONTAINER FOR NCT AND HAC TESTS

The safe transportation of radioactive material using appropriately designed and certified transportation packages is important to protect the public and environment. In the United States of America all transportation of radioactive material is regulated by the Department of Transportation (DOT) along with input by the Nuclear Regulatory Commission (NRC). All packages that contain radioactive material requires that it be transported and regulated by the requirements set by the DOT Class 7 hazardous material transportation. Federal regulations place strict administrative controls on the transport of radioactive materials. The two main goals for transporting radioactive materials are 1. Safety should be the primarily focused on the package because it is the first line of defense. 2. Package integrity should be directly related to the degree of the hazard of the radioactive material contents. The two-part goal ensures that the right package is used. Type B packages are designed to transport radioactive materials with the highest level of radioactivity. Examples of material transported in Type B packagings include spent nuclear fuel, high-level radioactive waste, and high concentrations of other radioactive materials. The purpose of this test protocol is to determine the effects of drop and thermal testing on package performance in a Type B shipping package (DPP-1). Required physical tests for the DPP-1 package include free drop, crush, puncture, penetration, compression, vibration, water spray, water immersion, and thermal. The preparation, regulatory testing, and post-test evaluation of a Type B shipping package tested to the 10 CFR 71.71 and 10 CFR 71.73 requirements will be presented. Six packages were tested and the responses when subjected to the HAC sequence of free drop, puncture, and thermal tests according to 10 CFR 71.73(c)(1), (c)(2), (c)(3) and (c)(4) were measured. The Free Drop, Crush and Puncture tests were performed at the NTRC in Knoxville, TN, and the Thermal tests were performed Southwest Research Institute in San Antonio, TX. The test units were subjected to a pre-operational leak testing before the NCT and HAC tests and a post-operational leak test and a helium leak test once regulatory testing was complete. Finally, all test units were scanned with a handheld blue light scanner to capture a 3D CAD geometry of the test units in the deformed shape. The handheld scanner provided the most effective and reliable way to acquire accurate 3D measurements of the test unit. The scanned geometry was sectioned in areas with deformation and the cross-section profile was measured to determine accurate and repeatable results of the deformed shape of the test units.

Martinez, Oscar↗

316L Stainless Steel Wire Arc Additive Manufacturing and Characterization for Potential SNF Canister Production

In this paper, 316L stainless steel (316L SS) straight walls, curved walls, and vessels were printed by wire arc additive manufacturing (WAAM) using the 316L SS welding wire, to demonstrate the feasibility of spent nuclear fuel (SNF) canisters using this advanced manufacturing technique. Helium leak test with leak tight criteria of 1 × 10-7 ref-cc/s were performed on printed vessels with various wall thickness, and testing pressures were from 0.345 MPa (50 psi) to 1.724 MPa (250 psi). Printed wall microstructures were characterized using optical microscopy (OM) and scanning electron microscopy (SEM). Tensile specimens were machined out from printed walls along the length, height, and thickness directions, respectively, and tested at different temperature conditions, room temperature, 80 °C, 150 °C and 250 °C, respectively. Results showed t hat, all five WAAM-printed canisters with different thickness passed the helium leaktight criteria of radioactive materials containers by the ANSI N14.5; Dispersed micrometer-level size inclusions/voids were observed at printed wall cross sections, dendritic microstructures were found with grain size variation through the welding torch shifting direction, and very small amount of δ-ferrite and σ-phase were also observed in those cross sections; The printed walls were ductile, all tensile specimens broke with large plastic deformation/elongation and without brittle failure, and printed specimens yield strengths and tensile strengths under room temperature and 80 °C conditions are higher than minimum values of 316L SS for pressure vessels and for general applications at room temperature required by the ASTM standard, respectively.

Tang, Wei↗

Testing and Qualification of Molybdenum Subcapsule Welds for MiniFuel Experiments

This report documents the testing and qualification efforts for welding molybdenum components to support MiniFuel irradiation campaigns. Other details such as general weld parameters, weld joint geometries, and performance limits are also provided in this report. The American Welding Society’s specifications were used to select the nondestructive and destructive tests, which include: gross and fine leak testing, internal pressure proof testing, and creating metallographic mounts of welds. Leak testing and metallographic mounts provide qualitative information about the weld integrity, while the proof testing indicated pressure/usage limits of the molybdenum subcapsule. Based on the testing results provided in the is report, the capsule can be exposed to an internal pressure of at least 20.7 MPa (3000 psi). A sealed capsules is also capable of withstanding the 3.2 MPa (468 psi) external hydrostatic operating pressure of the High Flux Isotope Reactor.

42 ENGINEERING↗

FY2025 Status Report: Model 9975 O Ring Fixture Long-Term Leak Performance

Leak testing experiments to monitor the aging performance of Viton® GLT and GLT-S O-rings used in the model 9975 shipping package have been ongoing since 2004 at Savannah River National Laboratory. Seventy tests using mock-up 9975 primary containment vessels (PCVs) with GLT O-rings were assembled and heated to temperatures ranging from 200 to 450 °F. Due to material substitution, fourteen tests with GLT-S O-rings were initiated in 2008 and heated to temperatures ranging from 200 to 400 °F. The conditioning temperatures are elevated compared to the calculated maximum O-ring temperature in a 9975 package in storage, 158 °F, to accelerate aging and enable observations of O-ring failures in a reasonable time frame. The mock-up PCV fixtures are leak tested periodically, and all GLT O-ring fixtures aged at 350 °F or above have failed to maintain a leak-tight seal. Eight GLT O-ring fixtures aged at 300 °F have failed after 2.8 to 5.7 years at temperature while the remaining fixtures at 300 °F were retired from testing following more than five years of aging without failure. Two of these retired fixtures were returned to testing and heated to 350 °F to evaluate the impact of additional heating at higher temperature for aged O-rings. Fixture #20 failed after 3 months while fixture #18 failed after 9 months at 350 °F. These O-rings demonstrated that aged and in-service O-rings can continue to be used, even at higher temperatures, after being in storage, and their leak performance are consistent with other samples at 350 °F. There has been one GLT O-ring fixture which failed after 13.4 years of aging at 200 °F. However, 20 other GLT O-rings aging at 200 °F have remained leak-tight for over 16.9 years and remain in test. There are two GLT O-ring fixtures at 270 °F; one fixture has failed after 12.9 years while the other fixture remains in test after 12.5 years. All GLT-S O-ring fixtures aged at 300 °F or above have failed their leak test. No failures have yet been observed in GLT-S O-ring fixtures aging at 250 °F for 14.9 years, while one GLT-S O-ring fixture failed after 12.4 years at 200 °F. The leak testing data to date suggest the GLT and GLT-S O-rings aging in the K-Area Complex (KAC) storage at temperatures of 158 °F might maintain a leak-tight seal for up to 59 years. Data from the O-ring fixtures are generally consistent with results from compression stress-relaxation testing and provide confidence in the predictive models based on those results. However, uncertainty exists in extrapolating these elevated temperature results to the lower temperatures of interest for normal storage in KAC. The collective data from these test efforts suggest the minimum O-ring service life at KAC normal storage conditions should be at least 34 years for GLT and GLT-S O-rings. Measurement of compression set in O-rings removed from failed fixtures, compared to that from KAC surveillance O-rings, indicate significant margin remains for O-rings still in service in 9975 packages in KAC. Aging and periodic leak testing will continue for the remaining 24 mock-up PCV fixtures.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Model 9975 O-Ring Fixture Long-Term Leak Performance (FY2022 Status Report)

Leak testing experiments to monitor the aging performance of Viton® GLT and GLT-S O-rings used in the model 9975 shipping package has been ongoing since 2004 at Savannah River National Laboratory. Seventy tests using mock-up 9975 primary containment vessels (PCVs) with GLT O-rings were assembled and heated to temperatures ranging from 200 to 450 °F. Due to material substitution, fourteen tests with GLT-S O-rings were initiated in 2008 and heated to temperatures ranging from 200 to 400 °F. The conditioning temperatures are elevated compared to the calculated maximum O-ring temperature in a 9975 package in storage, 158 °F, to accelerate aging and enable observations of O-ring failures in a reasonable time frame. The fixtures are leak tested periodically and all GLT O-ring fixtures aging at 350 °F or above have failed to maintain a leak-tight seal. Eight GLT O-ring fixtures aging at 300 °F have failed after 2.8 to 5.7 years at temperature while the remaining fixtures at 300 °F were retired from testing following more than five years without failure. There has been one GLT O-ring fixture which failed after 13.4 years aging at 200 °F. However, 20 other GLT O-rings aging at 200 °F have remained leak-tight for over 14 years and remain in test. No failures have yet been observed in GLT O-ring fixtures aging at 270 °F for 10.4 years. All GLT-S O-ring fixtures aging at 300 °F or above have failed their leak test. No failures have yet been observed in GLT-S O-ring fixtures aging at 250 °F for 12.5 years. This year, one GLT-S O-ring fixture failed after 12.4 years aging at 200 °F. Data from the O-ring fixtures are generally consistent with results from compression stress-relaxation testing, and provide confidence in the predictive models based on those results. However, uncertainty exists in extrapolating these elevated temperature results to the lower temperatures of interest for normal storage in K-Area Complex (KAC). Oxygen consumption testing, which includes results from temperatures near KAC normal storage temperatures, is ongoing to provide further confidence and corroborate these extrapolations. The collective data from these test efforts suggest the minimum O-ring service life at KAC normal storage conditions should be at least 34 years for GLT and GLT-S O-rings. Measurement of compression set in O-rings removed from failed fixtures, compared to that from KAC surveillance O-rings, indicate significant margin remains for O-rings still in service in 9975 packages in KAC. Aging and periodic leak testing will continue for the remaining 25 mock-up PCV fixtures.

36 MATERIALS SCIENCE↗

Model 9975 O Ring Fixture Long-Term Leak Performance (FY2024 Status Report)

Leak testing experiments to monitor the aging performance of Viton ® GLT and GLT-S O-rings used in the model 9975 shipping package have been ongoing since 2004 at Savannah River National Laboratory. Seventy tests using mock-up 9975 primary containment vessels (PCVs) with GLT O-rings were assembled and heated to temperatures ranging from 200 to 450 °F. Due to material substitution, fourteen tests with GLT-S O-rings were initiated in 2008 and heated to temperatures ranging from 200 to 400 °F. The conditioning temperatures are elevated compared to the calculated maximum O-ring temperature in a 9975 package in storage, 158 °F, to accelerate aging and enable observations of O-ring failures in a reasonable time frame. The mock-up PCV fixtures are leak tested periodically, and all GLT O-ring fixtures aging at 350 °F or above have failed to maintain a leak-tight seal. Eight GLT O-ring fixtures aging at 300 °F have failed after 2.8 to 5.7 years at temperature while the remaining fixtures at 300 °F were retired from testing following more than five years of aging without failure. Two of these retired fixtures were returned to testing and heated to 350 °F to evaluate the impact of additional heating at higher temperature for aged O-rings. Fixture #20 failed after 3 months of testing while fixture #18 remained leak tight. These O-rings demonstrated that aged and in-service O-rings can continue to be used, even at higher temperatures, after being in storage, and their leak performance are consistent with other samples at 350 °F.

42 ENGINEERING↗