Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “leak check”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Technical basis for inner container leak detection sensitivity goals in 3013 DE surveillance

Helium leak checking of 3013 inner container lids is under consideration for addition to DE Surveillance tasks as an improved means to detect any through-wall flaws that may have formed during storage. This white paper evaluates whether leak checking at DE could replace and improve upon the current method of comparing gas compositions and pressures within the inner and outer containers. We have used viscous and molecular flow equations in ANSI N14.5 to calculate what the measured standard helium leak rate would be for hypothetical leaks of three different sizes. For comparison, we have also calculated the effects on gas composition and pressure differences as a function of pre-DE storage time for the same three leak sizes, using molecular and viscous flow equations as well as diffusion equations to predict the relevant gas transport. For a hypothetical leak that would be measured at 1x10 -7 std cc/sec, likely an achievable sensitivity using helium leak checking at DE, the calculations predict no measurable effect on pressure difference or gas composition as measured by DE gas analysis. We also calculate that it would take over 200 years for water vapor to diffuse through a 10 -7 std cc/sec leak enough to raise the RH outer container to half the RH value in the inner container. A leak 100 times larger, which would be measured at 1x10 -5 std cc/sec, the same water vapor diffusion would take at least 14 years. Our conclusion is that helium leak checking will be useful even at a sensitivity of 1x10 -5 std cc/sec, and a significant improvement over current DE methods at a sensitivity of 1x10 -7 std cc/sec.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

HELIUM LEAK TEST MODELING OF A SPENT NUCLEAR FUEL CANISTER

The U.S. Department of Energy (DOE) is considering the development of one or more federal consolidated interim storage facilities (CISFs) to be used to store commercial spent nuclear fuel (SNF) at locations in the U.S. One of the first technical challenges of a CISF is performing an inspection of SNF canisters upon their receipt to confirm they can be placed into the CISF’s licensed storage configuration. The canister receipt inspection is critical to CISF site operations. The test is conceived as being a helium (He) leak check, intended to confirm that the confinement boundary of a SNF canister is intact. SNF canisters are filled with He when they are sealed, so detection of a He leak indicates that a through-wall flaw has occurred in the canister confinement boundary. Other measurements are planned to occur upon canister receipt in addition to the He leak check such as krypton-85 measurements, which would indicate confinement breaches of one or more fuel rods in addition to a breach of the SNF canister. However, the He leak check has been identified as one of such high importance and has such significant technical challenges that a full-scale demonstration is needed to confirm the He leak test’s viability and to assist in planning relative to its operational requirements. A modeling methodology for simulating the He detection test was developed to help inform the test plan and the design of the test vessels. To develop the modeling methodology a detailed computational fluid dynamics (CFD) benchmark model was constructed to compare against leak rate test data from a transportation package for radioactive material. This report is focused on modeling efforts to simulate the benchmark leak test.

Suffield, Sarah R.↗

Analysis of the MST-16 crimp process on cold 304L stainless steel

The purpose of this report is to assess the quality of the MST-16 crimp process through a series of cold experiments and metallographic analyses. Common practice in MST-16 uses a mechanical crimp on 304L stainless steel tubes to prevent radioactive contamination from escaping the tube interior for a variety of experiments. The crimped tubes must pass a leak check to demonstrate their radiological safety. Cold (i.e. non-radioactive samples) 304L tube samples were tested using two different approved crimping devices to assess the quality of the crimps. Each crimp was leak checked, followed by destructive metallographic analysis to determine the quality of both the crimp equipment and procedures used by MST-16 personnel.

42 ENGINEERING↗

Advancement Of Tritium Powered Betavoltaic Battery Systems FY16 EOY Report

The goal of this work is to increase the power output of tritium-powered betavoltaic batteries and investigate the change in power output and film resistance in real-time during tritium loading of adsorbent films. To this end, several tritium-compatible test vessels with the capability of measuring both the resistivity of a tritium trapping film and the power output of a betavoltaic device in-situ have been designed and fabricated using four electrically insulated feedthroughs in tritium-compatible load cells. Energy conversion devices were received from Widetronix, a betavoltaic manufacturing firm based in Ithaca, NY. Thin films were deposited on the devices and capped with palladium to facilitate hydrogen loading. Gold contacts were then deposited on top of the films to allow resistivity measurements of the film during hydrogen loading. Finally, the chips were wire bonded and installed in the test cells. The cells were then baked-out under vacuum and leak checked at temperature to reduce the chances of tritium leaks during loading. Following the bake-out, IV curves were measured to verify no internal wires were compromised, and the cells were delivered to Tritium for loading. Tritium loading is anticipated in October, 2017.

07 ISOTOPE AND RADIATION SOURCES↗

Modular, High-Volume Fuel Cell Leak-Test Suite and Process (Phase I)

Fuel cell stacks are typically hand-assembled and tested. As a result the manufacturing process is labor-intensive and time-consuming. The fluid leakage in fuel cell stacks may reduce fuel cell performance, damage fuel cell stack, or even cause fire and become a safety hazard. Leak check is a critical step in the fuel cell stack manufacturing. The fuel cell industry is in need of fuel cell leak-test processes and equipment that is automatic, robust, and high throughput. The equipment should reduce fuel cell manufacturing cost.

08 HYDROGEN↗

A Mobile Hot Cell for Conditioning Disused Sealed Radioactive Sources for Storage or Transportation

An innovative Mobile Hot Cell (MHC) has been developed for conditioning Disused Sealed Radioactive Sources (DSRS) category 1 and 2 for storage or transportation. The MHC is designed to provide both Radiological and Biological containment with a maximum capacity of 1000 Ci Co60 or 5000Ci Cs137 source and can be transported via standard cargo containers. This project has been supported through the National Nuclear Safety Administration (NNSA) Offsite Source Recovery Program (OSRP). The project is intended for the international community rather than domestic although domestic use is a possibility. Many countries have significant stockpiles of these devices that are often stored in less-than-optimal circumstances. This necessitates that these devices be addressed expeditiously, and the sources secured. The MHC utilizes robotics, automation, and other non-traditional methods for disassembling, characterizing, and packaging these sources that have reached end of life or are otherwise not needed. These innovative approaches are necessary to facilitate an expedited timeline to efficiently and safely secure these sources in a non-proliferation effort. Conditioning efforts include disassembling the device such as a teletherapy head used for cancer treatment, or blood/research irradiators such that the radioactive sources may be removed safely. The sources are then characterized. Leak checks are performed, dimensions are verified, and serial numbers are confirmed. Upon completion, the sources are typically placed into a Standard Forms Capsule which is seal welded closed. It is leak tested and placed into a Long-Term Storage Shield (LTSS) which can either be secured for storage directly or loaded into an appropriate cask for transportation. Further innovations include multiple deployment scenarios that include a full deployment of MHC components, deployment of the MHC automation internal components to an existing hot cell, deployment of minimally required MHC components and incorporation of sand for shielding, and integration of the MHC for Silo Storage, or Bore Hole Storage efforts. The MHC has evolved from a very specific use case to a “Swiss Army Knife” type of a tool in that it can be readily adapted to a large variety of situations. Innovative approaches such as the use of robotics, Computer Numeric Control (CNC) machining centers, automated welding equipment, HDMI Cameras, and LED lighting are some of the developed technologies incorporated into the MHC design. Shielding is accomplished with a steel walled Base Box which is surrounded by four nesting doll shield shells which when combined limits the external dose rate to 5mr/hr when a 1000 Ci Co60 source is exposed inside.

99 - GENERAL AND MISCELLANEOUS↗

Advanced Autonomous Welding for Refabrication and Follow-On Testing of Previously Irradiated Nuclear Fuel

The performance of follow-on experiments using irradiated nuclear fuel at any point in its lifecycle is a critical step in understanding phenomena and behavior. Transient experiments with high-burnup fuel can deepen the understanding of fuel fragmentation, relocations, and dispersal under loss-of-coolant accidents. An advanced autonomous welding process to refabricate commercial fuel rods inside a hot cell was created and tested to enable flexible experiment approaches on fuels irradiated in commercial and test reactors. Irradiated light water reactor fuel test pins from experiments performed at the Advanced Test Reactor (ATR) at Idaho National Laboratory were used to demonstrate the refabrication process. The welding process was found to be sensitive to welding parameters but flexible such that multiple passes could be performed on the same location until a hermetic weld was obtained. The refabrication of rodlets and successful welds was also found to be sensitive to the preparation of the irradiated cladding and endcaps. Thorough defueling of the fuel at the weld location and proper sizing of the endcaps and backing material mitigated these issues. The use of strategically located heat sinks in contact with the cladding and endcap materials also increased welding and refabrication success. For this work, the test pins were sectioned to remove the original endcaps and fuel was removed from both ends of each rodlet. The reassembly of the rodlets was then completed in four steps, which included the press fitting of new endcaps, the circumferential welding of rodlet endcaps to the cladding, rodlet pressurization in a pressure chamber, and seal welding the rodlet under pressure. The integrity of the refabricated rodlets was then verified via helium leak checking inside a vacuum chamber. The advanced welding system is capable of refabricating rodlets up to 380 mm in length, and repressurizing them up to 15 500 kPa. The refabricated lengths of the rodlets used in this work ranged from 149 to 165 mm and the refabricated fuel stack heights ranged from 70.4 to 79.8 mm. Here, the rodlets were pressurized with argon to an average pressure of 3617 kPa, and the average leak rate after refabrication was 6.7 • 10 -8 cm 3 • s -1 .

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Special Form Testing of Sealed Source Encapsulation for High-Alpha-Activity Actinide Materials

In the United States all transportation of radioactive material is regulated by the U.S. Department of Transportation (DOT). Beginning in 2008 a new type of sealed-source encapsulation package was developed and tested by Oak Ridge National Laboratory (ORNL). These packages contain high-alpha-activity actinides and are regulated and transported in accordance with the requirements for DOT Class 7 hazardous material. The DOT provides specific regulations pertaining to special form encapsulation designs. The special form designation indicates that the encapsulated radioactive contents have a very low probability of dispersion even when subjected to significant structural events. The special form designs have been shown to simplify the delivery, transport, acceptance, and receipt processes. It is intended for these sealed-source encapsulations to be shipped to various facilities making it very advantageous for them to be certified as special form. To this end, DOT Certificates of Competent Authority (CoCAs) have been sought for the design suitable for containing high-alpha-activity actinide materials. This design consists of the high-alpha-activity material encapsulated within a triangular zirconia canister, referred to as a ZipCan, tile that is then enclosed by a spherical shell. The spherical shell design, with ZipCan tile inside, was tested for compliance with the special form regulations found in 49 CFR 173.469. The spherical enclosure was subjected to 9-m impact, 1 m percussion, and 10-minute thermal tests at the Packaging Evaluation Facility located at the National Transportation Research Center in Knoxville, TN USA and operated by ORNL. Before and after each test, the test units were subjected to a helium leak check and a bubble test. The ZipCan tiles and core were also subjected to the tests required for ISO 2919:2012(E), including a Class IV impact test and heat test and subsequently subjected to helium leakage rate tests [49 CFR 173.469(a)(4)(i)]. The impact-tile test unit contained a nonradioactive surrogate; however, the thermal test unit contained a radioactive source. This paper describes the regulatory special form tests and presents detailed impact and leak test results that demonstrate that the sealed source encapsulation designs satisfy the regulatory tests.

Martinez, Oscar A↗

Air-transfer production method for large-area picosecond photodetectors

We have designed and prototyped the process steps for the batch production of large-area micro-channel-plate photomultipliers (MCPPMT) using the “air-transfer” assembly process developed with single LAPPD TM modules. Results are presented addressing the challenges of designing a robust package that can transmit large numbers of electrical signals for pad or strip readout from inside the vacuum tube and of hermetically sealing the large-perimeter window–body interface. We have also synthesized a photocathode in a large-area low-aspect-ratio volume and have shown that the micro-channel plates recover their functionality after cathode synthesis. These steps inform a design for a multi-module batch facility employing dual nested low-vacuum and ultra-high-vacuum systems in a small-footprint. The facility design provides full access to multiple MCP-PMT modules prior to hermetic pinch-off for leak-checking and real-time photocathode optimization.

47 OTHER INSTRUMENTATION↗

Aluminum and Other Coatings for the Passivation of Tritium Storage Vessels

Using a highly sensitive residual gas analyzer, the off-gassing of hydrogen, water, and hydrocarbons from surface-treated storage vessels containing deuterium was measured. The experimental storage vessels were compared to a low-off-gassing, electro-polished 304L canister. Alternative vessels were made out of aluminum, or were coatings on 304L steel. Coatings included powder pack aluminide, electro-plated aluminum, powder pack chromide, dense electro-plated chromium, copper plated, and copper plated with 25 and 50 percent nano-diamond. Vessels were loaded with low pressure deuterium to observe exchange with protium or hydrogen as observed with formation of HD and HDO. Off gas of D 2 O or possible CD 4 was observed at mass 20. The main off-gas in all of the studies was H 2 . The studies indicated that coatings required significant post-coating treatment to reduce off-gas and enhance the permeation barrier from gases likely added during the coating process. Dense packed aluminum coatings needed heating to drive off water. Electro-plated aluminum, chromium and copper coatings appeared to trap hydrogen from the plating process. Nano-diamond appeared to enhance the exchange rate with hydrogen off gas, and its coating process trapped significant amounts of hydrogen. Aluminum caused more protium exchange than chromium-treated surfaces. Aluminum coatings released more water, but pure aluminum vessels released small amounts of hydrogen, little water, and generally performed well. Chromium coating had residual hydrogen that was difficult to totally outgas but otherwise gave low residuals for water and hydrocarbons. Our studies indicated that simple coating of as received 304L metal will not adequately block hydrogen. The base vessel needs to be carefully out-gassed before applying a coating, and the coating process will likely add additional hydrogen that must be removed. Initial simple bake-out and leak checks up to 350° C for a few hours was found to be inadequate. All of the studies indicated that vessels needed several days of vacuum baking at 350-450° C to fully outgas the residual gases, which were mostly hydrogen. The current standard practice of out-gassing from ultra-clean, electro-polished 304L vessels with both vacuum bake-out and followed by an oxidative bake out to enhance the chromium surface performed the best in these studies.

08 HYDROGEN↗

BPM Button Testing

Initial testing was performed by P. Cameron. Ten assemblies were tested for the electrical resistance, stray capacitance, trapped mode frequency, dimensional tests, voltage standing wave ratio (VSWR), pin insertion/withdrawal force, and vacuum leak check. After satisfactory results the production run started. The acceptance tests are described below.

42 ENGINEERING↗

TEV-3349 "ATF-2 2A Loop Pin Cladding Requirements"

Industry partners, including Westinghouse, Framatome, General Electric, General Atomics, Toshiba, etc. require requirements for fuel pins they insert in the reactor for testing. This document contains those requirements. These requirements represent an agreement between ATR and NS&T, and include the requirements for pins fabricated at the INL. These include inspections such as radiography, helium leak check, etc.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Thermal Hydraulic Experimental Test Article - Report of THETA Commissioning for METL Testing

The Thermal Hydraulic Experimental Test Article (THETA) is a facility that will be used to develop sodium components and instrumentation as well as acquire experimental data for validation of reactor thermal hydraulic and safety analysis codes. The facility will simulate nominal conditions as well as protected/unprotected loss of flow accidents in a sodium-cooled fast reactor (SFR). High fidelity distributed temperature profiles of the developed flow field will be acquired with Rayleigh backscatter based optical fiber temperature sensors. The facility is being designed in partnership with systems code experts to tailor the experiment to ensure the most relevant and highest quality data for code validation. THETA is comprised of a traditional primary and secondary system. The primary system is submerged in the pool of sodium and consists of a pump, electrically heated core, intermediate heat exchanger, and connected piping and thermal barriers (redan). The secondary system, located outside of the sodium pool, consists of a pump, sodium to air heat exchanger, and connected piping and valves. Figure 1 illustrates the main components of the primary system. THETA has been installed in the Mechanisms Engineering Test Loop (METL) with the primary system in the 28 inch Test Vessel #4, Figure 2 and Figure 3. Since the FY20 THETA status report, [1], further water shakedown testing was performed, some final welding modifications were performed, all system components were sanitized, dry assembled, and commissioned before installing into METL test vessel #4. The THETA submersible electromagnetic flowmeter was welded closed to hermetically seal internal components from sodium followed by a helium leak check for the final time

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Thermal Hydraulic Experimental Test Article (FY21 Final Report)

The Thermal Hydraulic Experimental Test Article (THETA) is a facility that will be used to develop sodium components and instrumentation as well as acquire experimental data for validation of reactor thermal hydraulic and safety analysis codes. The facility will simulate nominal conditions as well as protected/unprotected loss of flow accidents in a sodium-cooled fast reactor (SFR). High fidelity distributed temperature profiles of the developed flow field will be acquired with Rayleigh backscatter based optical fiber temperature sensors. The facility is being designed in partnership with systems code experts to tailor the experiment to ensure the most relevant and highest quality data for code validation. THETA is comprised of a traditional primary and secondary system. The primary system is submerged in the pool of sodium and consists of a pump, electrically heated core, intermediate heat exchanger, and connected piping and thermal barriers (redan). The secondary system, located outside of the sodium pool, consists of a pump, sodium to air heat exchanger, and connected piping and valves. Figure 1 illustrates the main components of the primary system. THETA has been installed in the Mechanisms Engineering Test Loop (METL) with the primary system in the 28 inch Test Vessel #4, Figure 2 and Figure 3. Since the FY20 THETA status report, further water shakedown testing was performed, some final welding modifications were performed, all system components were sanitized, dry assembled, and commissioned. The THETA submersible electromagnetic flowmeter was welded closed to hermetically seal internal components from sodium followed by a helium leak check for the final time. Following installation of THETA into vessel #4, all data acquisition and control systems were brought online and commissioned at room temperature in the argon gas space of the empty vessel. The vessel zone 1 heaters were reinstalled and the flange was then insulated. The vessel 4 heaters were brought to a temperature of 100 °C and the THETA pump was jogged at 600 RPM to ensure it was functioning correctly. The secondary, AC Conduction based electromagnetic pump from CMI Novacast (product number CA-15) was ordered and will be delivered in late calendar year 2021. The custom designed permanent magnet based secondary flowmeter was designed, a drawing package and manufacturing specification created and quote requested from a machine shop. The intermediate heat exchanger design was completed and a drawing package is currently in progress. During the middle of calendar year 2021 the Building 308 sodium scrubber system was shut down in order to replaced some corroded piping and facilitate improvements on the system, thus requiring the sodium in METL to remain frozen. This has imposed a delay in filling vessel 4 with sodium to begin THETA testing. Sodium testing is expected to begin in early fiscal year 2022 as all THETA primary systems are operational.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Progress Report of Alloy 709 Performance in Liquid Sodium

With improved high-temperature properties, Alloy 709 shows great potential for advanced reactor applications. To understand the effects of sodium on A709, small tensile specimens were machined from two commercial heats and subject to sodium exposure in two forced convection loops operated by Argonne. Thermal aging experiments were also conducted in parallel to isolate any sodium-specific effects. An increasing trend in yield strength and a decrease trend in ultimate tensile strength can be seen with the increasing exposure time, suggesting microstructural changes at these temperatures. Nonetheless, the thermally aged and sodium exposed samples behaved similarly, implying no sodium-specific effect at these temperatures. In contrast, 316H SS exposed to sodium at 650°C showed a strong sodium effect. The different responses of A709 and 316H SS to sodium exposure is of interest and requires additional effort to understand. The cold traps of the sodium loop were replaced early in FY23. During a maintenance operation, an unexpected sodium leak incident occurred at one of the sodium loops, triggering an emergency response. An investigation into the incident revealed that the leak happened at a VCR fitting on the recently replaced cold trap. The metal gasket of the leaked VCR fitting was not compressed sufficiently. A dimensional mismatch between the new component and old piping configuration was responsible for a significant misalignment. A new cold trap with improved design is in production. The new design provides additional flexibility and an access point for post-installation helium leak check and for venting of trapped gas. These design features will make the system more error-tolerant and the installation quality verifiable. A thermodynamic analysis was performed to understand the carburization-decarburization behavior of A709 in sodium environment. The equilibrium carbon activity in the alloy was evaluated with M 23 C 6 , TiC, and NbC. The carburization-decarburization boundary was calculated with different methods developed previously. The results suggests that A709 will be carburized in SMT-1 and SMT-2, and can be decarburized in low-carbon-activity environments such as EBR-II at temperatures above 620-650°C. Nonetheless, A709 should be less likely to be decarburized than 316H SS when exposed to the same low-carbon-activity environment.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Laser Welded Burst Disk Weld Tooling

A production run of 5550 hermetically sealed cylinder assemblies with precision pressure relief burst discs will be assembled and laser welded at a manufacturing lab at Sandia National Labs. Production of these cylinder assemblies requires many steps, including piece part machining, geometric inspection, cleaning, subassembly, complete assembly via laser welding, and finally leak checking. While this production run is large enough to invest in process optimization and specialized tooling, it is not quite large enough to dedicate new lab space and specify equipment specifically for this job. This study will investigate process parameters and their effects on quality and process flow time, as well as a fixturing design study with the goal of reducing process time while maintaining quality requirements.

42 ENGINEERING↗

Failure Evaluation of Savannah River Site High-Level Waste Evaporator 242-25H - Part I - 17366

(25H) in February 2016. Part I discusses the physical investigation to determine the nature and location of the leak site. Part II separately discusses the analytical work to determine the most plausible failure modes. The following investigation methods have been used to aid in determining the leak location: - Remote visual inspection: using remote cameras, inspection of both the inside of the evaporator pot and the evaporator cell, to see if leak locations are visible. Also, inspect the stainless steel insulation jacket for visible leakage. - Leak level check: filling the evaporator pot with flush water to determine at what elevation the pot stops leaking. - Enhanced remote visual inspection: utilizing dye penetrant on the inside of the evaporator pot, attempting to see if any defects in the primary containment are visible. - Grey Qb Gamma camera survey: to look for high radiation areas in the insulation of the evaporator pot. Parallel efforts are underway to develop a strategy for remotely removing the evaporator stainless steel lagging and insulation, locating the specific leak site and developing a repair method; and repairing the leak site if practicable. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

RH Packaging Program Guidance (Rev. 3)

The purpose of this program guidance document is to provide the technical requirements for use, operation, inspection, and maintenance of the Remote Handled-Transuranic (RH-TRU) 72-B Waste Shipping Package (also known as the "RH-TRU 72-B") and directly related components. This document complies with the requirements as specified in the RH-TRU 72-B Safety Analysis Report for Packaging (SARP), and Nuclear Regulatory Commission (NRC) Certificate of Compliance (C of C) 9212. If there is a conflict between this document and the SARP and/or C of C, the C of C shall govern. The C of C states: "...each package must be prepared for shipment and operated in accordance with the procedures described in Chapter 7.0, Operating Procedures, of the application." It further states: "...each package must be tested and maintained in accordance with the procedures described in Chapter 8.0, Acceptance Tests and Maintenance Program of the Application." Chapter 9.0 of the SARP tasks the Waste Isolation Pilot Plant (WIPP) Management and Operating (M&O) Contractor with assuring the packaging is used in accordance with the requirements of the C of C. Because the packaging is NRC-approved, users need to be familiar with Title 10 Code of Federal Regulations (CFR) §71.8, "Deliberate Misconduct." Any time a user suspects or has indications that the conditions of approval in the C of C were not met, the U.S. Department of Energy (DOE) Carlsbad Field Office (CBFO) shall be notified immediately. The CBFO will evaluate the issue and notify the NRC if required. In accordance with 10 CFR Part 71, "Packaging and Transportation of Radioactive Material," certificate holders, packaging users, and contractors or subcontractors who use, design, fabricate, test, maintain, or modify the packaging shall post copies of (1) 10 CFR Part 21, "Reporting of Defects and Noncompliance," regulations, (2) Section 206 of the Energy Reorganization Act of 1974, and (3) NRC Form 3, Notice to Employees. These documents must be posted in a conspicuous location where the activities subject to these regulations are conducted. This document details the instructions to be followed to operate, maintain, and test the RH-TRU 72-B packaging. This Program Guidance standardizes instructions for all users. Users shall follow these instructions or equivalent approved instructions. Following these instructions assures that operations meet the requirements of the SARP.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗