Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “leak check”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

A voice-actuated wind tunnel model leak checking system

A computer program has been developed that improves the efficiency of wind tunnel model leak checking. The program uses a voice recognition unit to relay a technician's commands to the computer. The computer, after receiving a command, can respond to the technician via a voice response unit. Information about the model pressure orifice being checked is displayed on a gas-plasma terminal. On command, the program records up to 30 seconds of pressure data. After the recording is complete, the raw data and a straight line fit of the data are plotted on the terminal. This allows the technician to make a decision on the integrity of the orifice being checked. All results of the leak check program are stored in a database file that can be listed on the line printer for record keeping purposes or displayed on the terminal to help the technician find unchecked orifices. This program allows one technician to check a model for leaks instead of the two or three previously required.

Larson, William E.↗

A voice-actuated wind tunnel model leak checking system

A voice-actuated wind tunnel model leak checking system was developed. The system uses a voice recognition and response unit to interact with the technician along with a graphics terminal to provide the technician with visual feedback while checking a model for leaks.

Larson, W. E.↗

Wind-Tunnel-Model Leak-Checking System

Voice-actuated system allows one operator to do work of three. System uses voice-recognition-and-response unit and graphics terminal to interact with technician and to provide technician visual feedback. Computer-based Leakcheck system allows computer to do more of total work in checking model for leaks to reduce time and manpower required to perform task.

Larson, W. E.↗

Development of the helium signature test for orbiter main propulsion system revalidation between flights

This paper presents the development of a test technique for revalidation of the Space Shuttle Orbiter Main Propulsion System during ground turnaround operations between flights of the Space Transportation System (STS). The Main Propulsion System consists of the three Space Shuttle Main Engines (SSME's) and the Main Propulsion System (MPS) connecting the SSME's to the orbiter/ground and orbiter/External Tank (ET) interfaces. The Helium Signature Test (HST) performs an end-to-end leak check of the MPS/SSME subsystems that serves as a final validation of those systems for reuse. The test was initially developed during the ground processing flow prior to the STS-6 launch of orbiter Challenger. The test was developed to fulfill a requirement for an overall subsystem leak check as a result of experience gained during the STS-6 Challenger Flight Readiness Firing (FRF) series, during which leaks were encountered in the SSME's that were not detected by routine fluid joint leak checks. The HST technique is described in detail, including orbiter and test equipment configuration, and compared to other leak detection methods used to revalidate MPS/SSME systems for reuse. The HST data base accumulated since STS-6 is summarized and future test applications are described.

Bilardo, Vincent J., Jr.↗

Detection, Location, and Classification of Space Shuttle Main Engine Nozzle Leaks by Transient Thermographic Inspection

Leak checking and evaluation of pressure vessels by observing the slight temperature changes resulting from structural anomalies has been made possible through developments in high resolution infrared cameras and advanced image processing. These developments have made thermal nondestructive analysis a very practical and efficient method to determine material consistency and structural quality as well as monitor processes. The Space Shuttle Main Engine Nozzle has regions which can not be inspected with standard leak check methods. The Thermographic methods being developed to nondestructively test the Nozzle for leaks in inaccessible regions are reported. Also, a flash heating Thermographic investigation of the braze line bonding the cooling tubes to the outer structural jacket of the nozzle is reported.

Russell, Samuel S.↗

Sodium Heat Pipe Module Processing For the SAFE-100 Reactor Concept

To support development and hardware-based testing of various space reactor concepts, the Early Flight Fission-Test Facility (EFF-TF) team established a specialized glove box unit with ancillary systems to handle/process alkali metals. Recently, these systems have been commissioned with sodium supporting the fill of stainless steel heat pipe modules for use with a 100 kW thermal heat pipe reactor design. As part of this effort, procedures were developed and refined to govern each segment of the process covering: fill, leak check, vacuum processing, weld closeout, and final "wet in". A series of 316 stainless steel modules, used as precursors to the actual 321 stainless steel modules, were filled with 35 +/- 1 grams of sodium using a known volume canister to control the dispensed mass. Each module was leak checked to less than10(exp -10) std cc/sec helium and vacuum conditioned at 250 C to assist in the removal of trapped gases. A welding procedure was developed to close out the fill stem preventing external gases from entering the evacuated module. Finally the completed modules were vacuum fired at 750 C allowing the sodium to fully wet the internal surface and wick structure of the heat pipe module.

Martin, James↗

STS-55 pad abort: Engine 2011 oxidizer preburner augmented spark igniter check valve leak

The STS-55 initial launch attempt of Columbia (OV102) was terminated on KSC launch pad A March 22, 1993 at 9:51 AM E.S.T. due to violation of an ME-3 (Engine 2011) Launch Commit Criteria (LCC) limit exceedance. The event description and timeline are summarized. Propellant loading was initiated on 22 March, 1993 at 1:15 AM EST. All SSME chill parameters and launch commit criteria (LCC) were nominal. At engine start plus 1.44 seconds, a Failure Identification (FID) was posted against Engine 2011 for exceeding the 50 psia Oxidizer Preburner (OPB) purge pressure redline. The engine was shut down at 1.50 seconds followed by Engines 2034 and 2030. All shut down sequences were nominal and the mission was safely aborted. The OPB purge pressure redline violation and the abort profile/overlay for all three engines are depicted. SSME Avionics hardware and software performed nominally during the incident. A review of vehicle data table (VDT) data and controller software logic revealed no failure indications other than the single FID 013-414, OPB purge pressure redline exceeded. Software logic was executed according to requirements and there was no anomalous controller software operation. Immediately following the abort, a Rocketdyne/NASA failure investigation team was assembled. The team successfully isolated the failure cause to the oxidizer preburner augmented spark igniter purge check valve not being fully closed due to contamination. The source of the contaminant was traced to a cut segment from a rubber O-ring which was used in a fine clean tool during valve production prior to 1992. The valve was apparently contaminated during its fabrication in 1985. The valve had performed acceptably on four previous flights of the engine, and SSME flight history shows 780 combined check valve flights without failure. The failure of an Engine 3 (SSME No. 2011) check valve to close was sensed by onboard engine instruments even though all other engine operations were normal. This resulted in an engine shutdown and safe sequential shutdown of all three engines prior to ignition of the solid boosters.

Source record↗

Permeability Testing of Impacted Composite Laminates for Use on Reusable Launch Vehicles

Since composite laminates are beginning to be identified for use in reusable launch vehicle propulsion systems, an understanding of their permeance is needed. A foreign object impact event can cause a localized area of permeability (leakage) in a polymer matrix composite, and it is the aim of this study to assess a method of quantifying permeability-after-impact results. A simple test apparatus is presented, and variables that could affect the measured values of permeability-after-impact were assessed. Once it was determined that valid numbers were being measured, a fiber/resin system was impacted at various impact levels and the resulting permeability measured, first with a leak check solution (qualitative) then using the new apparatus (quantitative). The results showed that as the impact level increased, so did the measured leakage. As the pressure to the specimen was increased, the leak rate was seen to increase in a nonlinear fashion for almost all the specimens tested.

Nettles, A. T.↗

Permeability Testing of Impacted Composite Laminates for Use on Reusable Launch Vehicles

Since composite laminates are beginning to be identified for use in reusable launch vehicle propulsion systems, an understanding of their permeance is needed. A foreign object impact event can cause a localized area of permeability (leakage) in a polymer matrix composite, and it is the aim of this study to assess a method of quantifying permeability-after-impact results. A simple test apparatus is presented, and variables that could affect the measured values of permeability-after-impact were assessed. Once it was determined that valid numbers were being measured, a fiber/resin system was impacted at various impact levels and the resulting permeability measured, first with a leak check solution (qualitative) then using the new apparatus (quantitative). The results showed that as the impact level increased, so did the measured leakage. As the pressure to the specimen was increased, the leak rate was seen to increase in a nonlinear fashion for almost all the specimens tested.

Nettles, Alan T.↗

Permeability After Impact Testing of Composite Laminates

Since composite laminates are beginning to be identified for use in reusable launch vehicle propulsion systems, an understanding of their permeance is needed. A foreign object impact event can cause a localized area of permeability (leakage) in a polymer matrix composite and it is the aim of this study to assess a method of quantifying permeability-after-impact results. A simple test apparatus is presented and variables that could affect the measured values of permeability-after-impact were assessed. Once it was determined that valid numbers were being measured, a fiber/resin system was impacted at various impact levels and the resulting permeability measured, first with a leak check solution (qualitative) then using the new apparatus (quantitative). The results showed that as the impact level increased, so did the measured leakage. As the pressure to the specimen was increased, the leak rate was seen to increase in a non-linear fashion for almost all of the specimens tested.

Nettles, A.T.↗

Permeability After Impact Testing of Composite Laminates

Since composite laminates are beginning to be identified for use in reusable launch vehicle propulsion systems, an understanding of their permeance is needed. A foreign object impact event can cause a localized area of permeability (leakage) in a polymer matrix composite and it is the aim of this study to assess a method of quantifying permeability-after-impact results. A simple test apparatus is presented and variables that could affect the measured values of permeability-after-impact were assessed. Once it was determined that valid numbers were being measured, a fiber/resin system was impacted at various impact levels and the resulting permeability measured, first with a leak check solution (qualitative) then using the new apparatus (quantitative). The results showed that as the impact level increased, so did the measured leakage. As the pressure to the specimen was increased, the leak rate was seen to increase in a non-linear fashion for almost all of the specimens tested.

Nettles, Alan T.↗

Blind Leak Detection for Closed Systems

The current inspection technique for locating interstitial leaking in the Space Shuttle Main Engine nozzles is the application of a liquid leak check solution in the openings where the interstitials space between the tubing and the structural jacket vent out the aft end of the nozzle, while its cooling tubes are pressurized to 25 psig with Helium. When a leak is found, it is classified, and if the leak is severe enough the suspect tube is cut open so that a boroscope can be inserted to find the leak point. Since the boroscope can only cover a finite tube length and since it is impossible to identify which tube (to the right or left of the identified interstitial) is leaking, many extra and undesired repairs have been made to fix just one leak. In certain instances when the interstitials are interlinked by poor braze bonding, many interstitials will show indications of leaking from a single source. What is desired is a technique that can identify the leak source so that a single repair can be performed. Dr, Samuel Russell and James Walker, both with NASA/MSFC have developed a thermographic inspection system that addresses a single repair approach. They have teamed with Boeing/Rocketdyne to repackage the inspection processes to be suitable to address full scale Shuttle development and flight hardware and implement the process at NASA centers. The methods and results presented address the thermographic identification of interstitial leaks in the Space Shuttle Main Engine nozzles. A highly sensitive digital infrared camera (capable of detecting a delta temperature difference of 0.025 C) is used to record the cooling effects associated with a leak source, such as a crack or pinhole, hidden within the nozzle wall by observing the inner hot wall surface as the nozzle is pressurized, These images are enhanced by digitally subtracting a thermal reference image taken before pressurization. The method provides a non-intrusive way of locating the tube that is leaking and the exact leak source position to within a very small axial distance. Many of the factors that influence the inspectability of the nozzle are addressed; including pressure rate, peak pressure, gas type, ambient temperature and surface preparation. Other applications for this thermographic inspection system are the Reinforced-Carbon-Carbon (RCC) leading edge of the Space Shuttle orbiter and braze joint integrity.

Oelgoetz, Peter↗

Investigative techniques used to locate the liquid hydrogen leakage on the Space Shuttle Main Propulsion System

Standard leak detection methods at ambient temperature have been developed in order to prevent excessive leakage from the Space Shuttle liquid oxygen and liquid hydrogen Main Propulsion System. Unacceptable hydrogen leakage was encountered on the Columbia and Atlantis flight vehicles in the summer of 1990 after the standard leak check requirements had been satisfied. The leakage was only detectable when the fuel system was exposed to subcooled liquid hydrogen during External Tank loading operations. Special instrumentation and analytical tools were utilized during a series of propellant tanking tests in order to identify the sources of the hydrogen leakage. After the leaks were located and corrected, the physical characteristics of the leak sources were analyzed in an effort to understand how the discrepancies were introduced and why the leakage had evaded the standard leak detection methods. As a result of the post-leak analysis, corrective actions and leak detection improvements have been implemented in order to preclude a similar incident.

Hammock, William R., Jr.↗

Fitting Leak Test Report: Ground-Based Cryogenic Leak Test of Fittings for Cryogenic Fluid Management

EXECUTIVE SUMMARY Mechanically connected joints used in cryogenic fluid lines as part of space flight elements need to survive launch vibrations and remain leak-free to minimize the loss of on-board commodity and hazardous gas accumulation. In 2020, a cryogenic test apparatus was developed which can evaluate the leak performance of pressurized threaded fluid fittings. The fittings were mounted in the TVAC and cooled to cryogenic test temperature and pressurized with helium while the leak rate was measured using a calibrated GHe leak detector. The test articles for the initial proof of concept testing were ¼ and 1 inch Swagelok VCR fittings with three different types of seal rings copper, nickel, and Ni. Each fitting configuration (size/seal material) was subjected to two consecutive cryogenic thermal cycles, followed by exposure to a launch vibration profile at ambient temperature, after which two additional TVAC cycle tests were performed. The testing reported here is a continuation of the 2020 tests with a statistically significant large number of samples and test runs. Three Swagelok VCR fitting sizes were tested ¼, ½ and 1 inch, and five (5) samples of each fitting size, each sample was tested with SST and Ni seal rings (Total of 30 unique test articles). Each test article was subjected to four (4) thermal cycles. Half of these cycles were performed before vibration testing and half were performed after vibration testing. The vibration testing was performed to evaluate the ability of the fittings to survive launch-type vibration profiles and remain leak-free. Leak checking of each fitting was completed at temperatures between 20K – 30K. The test procedure in Section 8.0 was designed to facilitate a qualification test program by allowing a higher test throughput rate coupled with repeatable test profiles. Results were very positive and show that out of the 30 samples they all passed with leak rates a factor of 2-3 lower than the established 10-6sccs GHe leak threshold. The result showed the Ni seals had lower leak rate, but the SST was more rugged. There were two deviations where damage to the Ni seal ring during assembly resulted in a leaky fitting, this is discussed in Section 10.7 Test Deviations. These fittings show great promise for space flight use and further testing is recommended to fully qualify the fittings per the ASTM F1387-19 and/or other relevant NASA specifications. The test equipment hardware and software capability developed for this testing is generic and not restricted to VCR fittings. It can be employed to evaluate/qualify the leak performance of other types of fittings and a wide range of other cryogenic fluid components such as valves, gages, connectors, etc.

Cryogenic↗

CryoCart Restoration and Vacuum Pipe Construction

Propulsion systems that utilize hypergolic propellants have been used to power space vehicles since the beginning of the space program. Liquid methane and oxygen propulsion systems have emerged as an alternative and have proven to be more environmentally friendly. The incorporation of liquid methane/liquid oxygen (LOX) into the propulsion system has demonstrated an increase in engine performance, as well as a reduction in the volume, size and complexity of the system. Consequently, reducing the total mass of the vehicle which is a crucial aspect that is considered when planning space missions to both the Moon and Mars [1]. Project Morpheus has made significant advancements in liquid oxygen/liquid methane propulsion system technologies by incorporating a LOX/methane propulsion system to a vertical test bed. The vehicle consisted of a 5,000 lb main engine and four 20 lb remote control system (RCS) engines that utilize liquid methane/LOX as its propellant [1]. The vehicle completed successful flight testing at Kennedy Space Center in 2014 which marked the completion of the Morpheus project. Subsequent projects utilizing Morpheus' vertical test bed have been developed to make further advancements. One of the subsequent projects consisted of the addition of a smaller 2,000 lb main engine and a cold helium heat exchanger which would make it possible for a pressurant tank systems to be send to Mars or the Moon by significantly decreasing the overall mass and volume of the pressurant tank. The hot fire tests of the integrated system with the smaller main engine and cold helium heat exchanger were successful at sea level, but further studies are being conducted to better understand how the vertical test bed will behave under thermal-vacuum conditions. For this reason, the integrated vehicle will be taken to Plum Brook to be tested in a chamber capable of simulating these conditions. To ensure that the vehicle will function properly under vacuum conditions, testing will be first completed at the component level. During this process, the igniter of the main engine and the RCS thrusters will be tested under a vacuum. To complete the testing of the components, the test setup first needed to be finalized. The CryoCart is being used to feed the propellants to the test article. The CryoCart is a movable test set-up that was developed in 2009 to provide a mobile platform for testing oxygen/methane systems with hot-fire capability up to 100 lbf. The CryoCart consists of three different systems: Oxygen, Methane, and liquid Nitrogen. The Oxygen and Methane systems are placed into two different carts while the liquid nitrogen system is mainly located in the methane cart. Over the years, the CryoCart has been utilized for different projects and has undergone deterioration. For this reason, a new phase has been developed to rebuild it to working conditions once again. During my internship, I was aiding in the construction and restoration of the CryoCart. In the initial stages of the process, I updated the fluid and electrical schematics for the oxygen, methane, and test article systems. The original CryoCart consisted of an electrical panel that utilized electromechanical relays and a terminal to drive the igniter power and signal, as well as the main fuel and oxygen valves. This electrical panel connected to the CryoCart through various wire harnesses that could be found exiting from the CryoCart. First, it was determined how these harnesses connected to the electromechanical relays so that they worked correctly. Once the electrical system was understood, an alternative for the electromechanical relays and the Molex connectors used throughout the system was sought since these components can often prove to be unreliable. Solid State relays and MIL connectors were purchased to serve as replacements. Upon arrival of the parts, crimping and wiring was completed to install the new solid state relays and MIL connectors. During the replacement of the relays and connectors, system checks of the electrical system were ran to ensure that the system was working correctly. While completing system checks, the pressure transducers that were not functioning properly were also replaced and any issue with the wiring or signal was addressed. Once the electrical components were replaced, the restoration of the fluid system began. Parts of the tubing in the CryoCart had to be rebuild and often consisted of sizing, cutting, bending, filing, and sanding the tubing to prepare it to be flared. Many components had to be proof-tested to bring their certifications up to date, and several components had to be replaced. Various flex hoses, valves, and fittings were send to the Clean Lab because they were new, dirty, or had gone through proof-testing. Once they arrived from the cleaning lab they had to be put back to the system and leak checks and functional tests were conducted. In the Nitrogen system, the copper tubing located in the Oxygen cart was rebuild and Aerogel insulation was added to this section. A new gaseous nitrogen system was added to the CryoCart to purge the vacuum tube which will serve as the test chamber. Once the CryoCart was completed, construction of parts of the vacuum tube began. A flange was manufactured with welded fittings to hold the line of the vacuum pump as well as some extra fittings which will serve as extra inlets used to introduce fluid lines to the vacuum tube. Stress analysis was ran in this flange to ensure that it would not fail under vacuum conditions. The fluid lines leading from the air side of the vacuum to the test article were also constructed and added to the mount that had already been manufactured. Three different sets of tubing were constructed to accommodate the seven different RCS thruster and the main engine igniter that are going to be tested. Full electrical system checks were completed to ensure that all the wire harnesses and valves were functioning. Upon the completion of the CryoCart and the vacuum tube, hot fire testing for the RCS thrusters and the main engine igniter are going to begin. During this time any issues encountered with the engines or igniter will be addressed to ensure that the components function under vacuum conditions. After successful completion of testing, the vertical test bed, Morpheus, will be rebuilt and prepared to be sent to Plum Brook. In Plum Brook, the vehicle will be tested in the thermal-vacuum chamber to demonstrate that integrated lox-methane propulsion system operation in space-like conditions. This internship has allowed me the opportunity to gain valuable hands on experience and to develop skills that will aid in my education as well as in the workforce, while at the same time helping me determine that I would like to further pursue a career in propulsion engineering.

Chaidez, Mariana↗

Apollo experience report: Processing of lunar samples in a sterile nitrogen atmosphere

A sterile nitrogen atmosphere processing cabinet line was installed in the Lunar Receiving Laboratory to process returned lunar samples with minimum organic contamination. Design and operation of the cabinet line were complicated by the requirement for biological sterilization and isolation, which necessitated extensive filtration, leak-checking, and system sterilization before use. Industrial techniques were applied to lunar sample processing to meet requirements for time-critical experiments while handling a large flow of samples.

Mcpherson, T. M.↗