Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “landsat 7”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

On-Orbit ACDS Performance of the Landsat 7 Spacecraft

Landsat 7 is part of NASA's Earth Science Enterprise (ESE). The ESE is committed to developing an understanding of the total Earth system, the effects of natural and human-induced changes on the global environment, and how natural processes affect humans and how humans affect them. The Landsat 7 satellite consists of the spacecraft bus which was provided under a NASA contract with Lockheed Martin Missiles and Space in Philadelphia, PA, and the Enhanced Thematic Mapper-Plus (ETM+) instrument, procured under a NASA contract with Raytheon Santa Barbara Remote Sensing, in Santa Barbara, CA. The Landsat 7 Attitude Control and Determination System (ACDS) provides many essential functions for the operation of the spacecraft bus and for ETM+. The ACDS maintains the required attitude and orbit at the degree of accuracy necessary for power generation, command and telemetry, thermal balance, image acquisition, Gimbaled X-Band Antenna (GXA) pointing and data for image post-processing. Descriptions of the Landsat 7 mission and the ACDS modes and requirements are presented. A brief summary of significant events of the on-orbit initialization and validation period are provided. Finally, the Landsat 7 product generation system is described and the impact that the ACDS performance has on the ground based image processing system is explored.

Sabelhaus, Phillip↗

Landsat 7 Science Data Processing: An Overview

The Landsat 7 Science Data Processing System, developed by NASA for the Landsat 7 Project, provides the science data handling infrastructure used at the Earth Resources Observation Systems (EROS) Data Center (EDC) Landsat Data Handling Facility (DHF) of the United States Department of Interior, United States Geological Survey (USGS) located in Sioux Falls, South Dakota. This paper presents an overview of the Landsat 7 Science Data Processing System and details of the design, architecture, concept of operation, and management aspects of systems used in the processing of the Landsat 7 Science Data.

Schweiss, Robert J.↗

On-Orbit Spatial Performance Characterization for Thermal Infrared Imagers of Landsat 7, 8, and 9, ECOSTRESS and CTI

In this analysis of the spatial resolving power of thermal imagery products we focus on four satellite instruments that are used in research and applications, for example to monitor land surface temperature and derive evapotranspiration. These are thermal imagers on Landsat 7, Landsat 8, and Landsat 9, as well as the ECOsystem Spaceborne Thermal Radiometer Experiment on Space Station (ECOSTRESS). We compiled sets of close-in-time, day-time images of bridges surrounded by open water bodies, captured by each of the satellite imagers during cloud-free moments. Where possible, we also included some images captured by the Compact Thermal Imager (CTI), a technology demonstrator that was co-located with ECOSTRESS on the International Space Station in 2019. Bridges were found to provide a sufficient thermal contrast with the water surface to quantify the line-spread function of satellite-based thermal products. The full-width-at-half-max of a gaussian beam model fitted to this transect quantifies the on-orbit spatial resolution of different imagers. The results show some loss of spatial resolving power in the final product delivered to end-users as compared to the at-sensor characterization of spatial resolution. For Landsat 7, 8 and 9, the spatial resolution of the thermal bands is 1.5 times the ground sampling distance of 60 m and 100 m respectively. For the ECOSTRESS the difference is up to twice the sampling distance of 78 by 69 m2. Since spatial resolution is a main driver for instrument design it is important to understand and communicate this discrepancy between pre-flight design parameters and the characteristics of the surface imagery delivered to the user community. The goal of this research is to facilitate an improved fusion of current and future satellite observations into harmonized products with superior temporal and spatial characteristics.

thermal infrared↗

Assessment of the Short-Term Radiometric Stability between Terra MODIS and Landsat 7 ETM+ Sensors

The Landsat 7 (L7) Enhanced Thematic Mapper (ETM+) sensor was launched on April 15th, 1999 and has been in operation for over nine years. It has six reflective solar spectral bands located in the visible and shortwave infrared part of the electromagnetic spectrum (0.5 - 2.5 micron) at a spatial resolution of 30 m. The on-board calibrators are used to monitor the on-orbit sensor system changes. The ETM+ performs solar calibrations using on-board Full Aperture Solar Calibrator (FASC) and the Partial Aperture Solar Calibrator (PASC). The Internal Calibrator Lamp (IC) lamps, a blackbody and shutter optics constitute the on-orbit calibration mechanism for ETM+. On 31 May 2003, a malfunction of the scan-line corrector (SLC) mirror assembly resulted in the loss of approximately 22% of the normal scene area. The missing data affects most of the image with scan gaps varying in width from one pixel or less near the centre of the image to 14 pixels along the east and west edges of the image, creating a wedge-shaped pattern. However, the SLC failure has no impacts on the radiometric performance of the valid pixels. On December 18, 1999, the Moderate Resolution Imaging Spectroradiometer (MODIS) Proto-Flight Model (PFM) was launched on-board the NASA's EOS Terra spacecraft. Terra MODIS has 36 spectral bands with wavelengths ranging from 0.41 to 14.5 micron and collects data over a wide field of view angle (+/-55 deg) at three nadir spatial resolutions of 250 m, 500 in 1 km for bands 1 to 2, 3 to 7, and 8 to 36, respectively. It has 20 reflective solar bands (RSB) with spectral wavelengths from 0.41 to 2.1 micron. The RSB radiometric calibration is performed by using on-board solar diffuser (SD), solar diffuser stability monitor (SDSM), space-view (SV), and spectro-radiometric calibration assembly (SRCA). Through the SV port, periodic lunar observations are used to track radiometric response changes at different angles of incidence (AOI) of the scan mirror. As a part of the AM Constellation satellites, Terra MODIS flies approximately 30 minutes behind L7 ETM+ in the same orbit. The orbit of L7 is repetitive, circular, sunsynchronous, and near polar at a nominal altitude of 705 km (438 miles) at the Equator. The spacecraft crosses the Equator from north to south on a descending node between 10:00 AM and 10:15 AM. Circling the Earth at 7.5 km/sec, each orbit takes nearly 99 minutes. The spacecraft completes just over 14 orbits per day, covering the entire Earth between 81 degrees north and south latitude every 16 days. The longest continuous imaging swath that L7 sensor can collect is for a 14-minute subinterval contact period which is equivalent to 35 full WRS-2 scenes. On the other hand, Terra can provide the entire corresponding orbit with wider swath at any given ETM+ collection without contact time limitation. There are six spectral matching band pairs between MODIS (bands 3, 4, 1, 2, 6, 7) and ETM+ (bands 1, 2, 3, 4, 5, 7) sensor. MODIS has narrower spectral responses than ETM+ in all the bands. A short-term radiometric stability was evaluated using continuous ETM+ scenes within the contact period and the corresponding half orbit MODIS scenes. The near simultaneous earth observations (SNO) were limited by the smaller swath size of ETM+ (187 km) as compared to MODIS (2330 km). Two sets of continuous granules for MODIS and ETM+ were selected and mosaiced based on pixel geolocation information for non cloudy pixels over the North American continent. The Top-of- Atmosphere (TOA) reflectances were computed for the spectrally matching bands between ETM+ and MODIS over the regions of interest (ROI). The matching pixel pairs were aggregated from a finer to a coarser pixel resolution and the TOA reflectance values covering a wide dynamic range of the sensors were compared and analyzed. Considering the uncertainties of the absolute calibration of the both sensors, radiometric stability was verified for the band pairs. The Railroad Valley Playa, Nada (RVPN) was included in the path of this continuous orbit, which served as a verification point between the shortterm and the long-term trending results from previous studies. This work focuses on monitoring the short-term on-orbit stability of MODIS and the ETM+ RSB. It also provides an assessment of the absolute calibration differences between the two sensors over their wide dynamic ranges.

Choi, Taeyoung↗

Landsat 7 Science Data Processing: A System's Overview

The Landsat Science Data Processing System, developed by NASA for the Landsat 7 Project provides science data handling infrastructure used at the EROS Data Center Landsat 7 Data Handling Facility of the USGS Department of Interior. This paper presents an overview the designs, architectures, and details of the various systems used in the processing of the Landsat 7 Science Data.

Schweiss, Robert↗

LANDSAT 7: Early on-Orbit Results

As this article was being submitted in mid-March, 1999, Landsat 7 had been cleared for an official launch date of April, 15, 1999, approximately 4 - 5 weeks prior to the Portland ASPRS conference. Although it is hoped that the presentation in Portland will be the first public status report on the in-orbit performance of the Landsat 7 spacecraft and the ETM+ instrument, it is impossible to discuss "early on-orbit performance" prior to launch. Therefore, we have chosen to summarize the overarching salient features of the Landsat 7 program, and we will point to some web sites where additional information about the program can be found (e.g., http://geo.arc.nasa.gov/sge/landsat/landsat. html). At this time, the Landsat Project Science Office is pleased to report that the performance of the ETM+ instrument appears to be very good. In addition to excellent instrument performance, a robust data acquisition plan has been developed with the goal of acquiring a seasonally-refreshed archive of global land observations at the EROS Data Center annually. A ground processing system is being implemented at EROS that will be capable of capturing, processing and archiving 250 Landsat scenes per day, and delivering 100 scene products to users each day. The cost of a systematically-processed Level 1 product will be less than $600, and there will be no copyright protection on the data. The net result is that the use of remote sensing data in our daily lives is expected to grow dramatically. This growth is expected to benefit all facets of the land remote sensing community.

Williams, D. L.↗

Comparing IKONOS and Landsat 7 Images

This work is a continuation of the simulations presented at the previous workshop.INformation is presented on the following: 20 IKONOS images compared with 10 Landsat 7 ETM+VNIR images acquired on the same days. Comparisons are based on simulations of the Landsat 7 images from the IKONOS data. IKONOS and Landsat 7 images used in simulations are on a similar processing level with radiometric correction, georeferenced with cubic-convolution resampling, and UTM projection with WGS-84 datum.

Blonski, Slawomir↗

Landsat 7: An Early Look at On-Orbit Performance

As this article was being submitted in mid-March, 1999, Landsat 7 had been cleared for an official launch date of April 15, 1999, approximately 2 and 1/2 months prior to the 21st Canadian Symposium on Remote Sensing. Since it is impossible to discuss "early on-orbit performance" prior to the actual launch of the satellite, we have chosen to briefly summarize the major features of the Landsat 7 program. Additional information can be found at several web sites which will summarized at the end of this paper. At this time, the Landsat Project Science Office is pleased to report that the performance of the ETM+ instrument appears to be very good. In addition to excellent instrument performance, a robust data acquisition plan has been developed with the goal of acquiring and systematically refreshing a global archive of land observations at the EROS Data Center annually. A ground processing system is being implemented at EROS that will be capable of capturing, processing and archiving 250 Landsat scenes per day, and delivering 100 scene products to users daily. In addition, the cost of a systematically-processed Level 1 product will be less than $600, and there will be no copyright protection on the data. The net result is that the use of remote sensing data in our daily lives is expected to grow dramatically. This growth is expected to benefit all facets of the land remote sensing community.

Williams, D. L.↗

Comparison of DMSP SSM/I and Landsat 7 ETM+ Sea Ice Concentrations During Summer Melt

As part of NASA's EOS Aqua sea ice validation program for the Advanced Microwave Scanning Radiometer (AMSR-E), Landsat 7 Enhanced Thematic Mapper (ETM+) images were acquired to develop a sea ice concentration data set with which to validate AMSR-E sea ice concentration retrievals. The standard AMSR-E Arctic sea ice concentration product will be obtained with the enhanced NASA Team (NT2) algorithm. The goal of this study is to assess the accuracy to which the NT2 algorithm, using DMSP Special Sensor Microwave Imager radiances, retrieves sea ice concentrations under summer melt conditions. Melt ponds are currently the largest source of error in the determination of Arctic sea ice concentrations with satellite passive microwave sensors. To accomplish this goal, Landsat 7 ETM+ images of Baffin Bay were acquired under clear sky conditions on the 26th and 27th of June 2000 and used to generate high-resolution sea ice concentration maps with which to compare the NT2 retrievals. Based on a linear regression analysis of 116 25-km samples, we find that overall the NT2 retrievals agree well with the Landsat concentrations. The regression analysis yields a correlation coefficient of 0.98. In areas of high melt ponding, the NT2 retrievals underestimate the sea ice concentrations by about 12% compared to the Landsat values.

Cavalieri, Donald J.↗

Landsat 7 Solar Array Testing Experiences

This paper covers the extensive Landsat 7 solar array flight qualification testing effort. Details of the mechanical design of the solar array and its retention/release system are presented. A testing chronology is provided beginning with the onset of problems encountered at the subsystem level and carrying through the third and final powered-spacecraft ground deployment test. Design fixes and other changes are explained in the same order as they became necessary to flight-qualify the array. Some interesting lessons learned are included along with key references.

Helfrich, Daniel↗

Landsat 7 Solar Array Testing Experiences

This paper covers the extensive Landsat 7 solar array flight qualification testing effort. Details of the mechanical design of the solar array and its retention/release system are presented. A testing chronology is provided beginning with the onset of problems encountered at the subsystem level and carrying through the third and final powered-spacecraft ground deployment test. Design fixes and other changes are explained in the same order as they became necessary to flight-qualify the array. Some interesting lessons learned are included along with key references.

Helfrich, Daniel↗

The Potential of Using Landsat 7 Data for the Classification of Sea Ice Surface Conditions During Summer

During spring and summer, the Surface of the Arctic sea ice cover undergoes rapid changes that greatly affect the surface albedo and significantly impact the further decay of the sea ice. These changes are primarily the development of a wet snow cover and the development of melt ponds. As melt pond diameters generally do not exceed a couple of meters, the spatial resolutions of sensors like AVHRR and MODIS are too coarse for their identification. Landsat 7, on the other hand, has a spatial resolution of 30 m (15 m for the pan-chromatic band). The different wavelengths (bands) from blue to near-infrared offer the potential to distinguish among different surface conditions. Landsat 7 data for the Baffin Bay region for June 2000 have been analyzed. The analysis shows that different surface conditions, such as wet snow and meltponded areas, have different signatures in the individual Landsat bands. Consistent with in-situ albedo measurements, melt ponds show up as blueish whereas dry and wet ice have a white to gray appearance in the Landsat true-color image. These spectral differences enable the distinction of melt ponds. The melt pond fraction for the scene studied in this paper was 37%.

Markus, Thorsten↗

Validation of Landsat 7 ETM+ band 6 radiometric performance

Since shortly after launch the radiometric performance of band 6 of the ETM+ instrument on Landsat 7 has been evaluated using vicarious calbiration techniques for both land and water targets. This evaluation indicates the radiometric performance of band 6 has been both highly stable and accurate.

vicarious calibration↗

Science Writer's Guide to Landsat 7

The Earth Observing System (EOS), the centerpiece of NASA's Earth science program, is a suite of spacecraft and interdisciplinary science investigations dedicated to advancing our understanding of global change. The flagship EOS satellite, Terra (formerly EOS AM-1), scheduled for launch in July 1999, will provide key measurements of the physical and radiative properties of clouds; air-land and air-sea exchanges of energy, carbon, and water; trace gases; and volcanoes. Flying in formation with Terra, Landsat 7 will make global high spatial resolution measurements of land surface and surrounding coastal regions. Other upcoming EOS missions and instruments include QuikSCAT, to collect sea surface wind data; the Stratospheric Gas and Aerosol Experiment (SAGE III), to create global profiles of key atmospheric gases; and the Active Cavity Radiometer Irradiance Monitors (ACRIM) to measure the energy output of the Sun. The second of the major, multi-instrument EOS platforms, PM-1, is scheduled for launch in 2000. Interdisciplinary research projects sponsored by EOS use specific Earth science data sets for a broader investigation into the function of Earth systems. Current EOS research spans a wide range of sciences, including atmospheric chemistry, hydrology, land use, and marine ecosystems. The EOS program has been managed since 1990 by the Goddard Space Flight Center in Greenbelt, Md., for NASA's Office of Earth Science in Washington, D. C. Additional information on the program can be found on the EOS Project Science Office Web site (http://eospso.gsfc.nasa.gov).

Source record↗

A Photo Album of Earth Scheduling Landsat 7 Mission Daily Activities

Landsat7 is a member of a new generation of Earth observation satellites. Landsat7 will carry on the mission of the aging Landsat 5 spacecraft by acquiring high resolution, multi-spectral images of the Earth surface for strategic, environmental, commercial, agricultural and civil analysis and research. One of the primary mission goals of Landsat7 is to accumulate and seasonally refresh an archive of global images with full coverage of Earth's landmass, less the central portion of Antarctica. This archive will enable further research into seasonal, annual and long-range trending analysis in such diverse research areas as crop yields, deforestation, population growth, and pollution control, to name just a few. A secondary goal of Landsat7 is to fulfill imaging requests from our international partners in the mission. Landsat7 will transmit raw image data from the spacecraft to 25 ground stations in 20 subscribing countries. Whereas earlier Landsat missions were scheduled manually (as are the majority of current low-orbit satellite missions), the task of manually planning and scheduling Landsat7 mission activities would be overwhelmingly complex when considering the large volume of image requests, the limited resources available, spacecraft instrument limitations, and the limited ground image processing capacity, not to mention avoidance of foul weather systems. The Landsat7 Mission Operation Center (MOC) includes an image scheduler subsystem that is designed to automate the majority of mission planning and scheduling, including selection of the images to be acquired, managing the recording and playback of the images by the spacecraft, scheduling ground station contacts for downlink of images, and generating the spacecraft commands for controlling the imager, recorder, transmitters and antennas. The image scheduler subsystem autonomously generates 90% of the spacecraft commanding with minimal manual intervention. The image scheduler produces a conflict-free schedule for acquiring images of the "best" 250 scenes daily for refreshing the global archive. It then equitably distributes the remaining resources for acquiring up to 430 scenes to satisfy requests by international subscribers. The image scheduler selects candidate scenes based on priority and age of the requests, and predicted cloud cover and sun angle at each scene. It also selects these scenes to avoid instrument constraint violations and maximizes efficiency of resource usage by encouraging acquisition of scenes in clusters. Of particular interest to the mission planners, it produces the resulting schedule in a reasonable time, typically within 15 minutes.

Potter, William↗

Viability of NLCD Products From IRS-P6, And From Landsat 7 Scan-gap Data

Landcover test on Salt Lake test site illustrates potential issues with AWiFS/LISS-III for classification of certain land cover classes (evergreen, shrub/scrub, woody wetlands, emergent wetlands). Canopy and impervious graphs of product differences from source indicate slightly lower overall accuracies (shorter peaks, wider bases) for AWiFS/LISS-III, compared to L5/L7. Inspection of individual products from canopy and impervious estimate tests revealed issues with combining AWifs quadrants, and similar but less severe effects with combining multiple dates of L7 scan gap data.

Coan, Michael↗

Multitemporal Cross-Calibration of the Terra MODIS and Landsat 7 ETM+ Reflective Solar Bands

In recent years, there has been a significant increase in the use of remotely sensed data to address global issues. With the open data policy, the data from the Moderate Resolution Imaging Spectroradiometer (MODIS) and Enhanced Thematic Mapper Plus (ETM+) sensors have become a critical component of numerous applications. These two sensors have been operational for more than a decade, providing a rich archive of multispectral imagery for analysis of mutitemporal remote sensing data. This paper focuses on evaluating the radiometric calibration agreement between MODIS and ETM+ using the near-simultaneous and cloud-free image pairs over an African pseudo-invariant calibration site, Libya 4. To account for the combined uncertainties in the top-of-atmosphere (TOA) reflectance due to surface and atmospheric bidirectional reflectance distribution function (BRDF), a semiempirical BRDF model was adopted to normalize the TOA reflectance to the same illumination and viewing geometry. In addition, the spectra from the Earth Observing-1 (EO-1) Hyperion were used to compute spectral corrections between the corresponding MODIS and ETM+ spectral bands. As EO-1 Hyperion scenes were not available for all MODIS and ETM+ data pairs, MODerate resolution atmospheric TRANsmission (MODTRAN) 5.0 simulations were also used to adjust for differences due to the presence or lack of absorption features in some of the bands. A MODIS split-window algorithm provides the atmospheric water vapor column abundance during the overpasses for the MODTRAN simulations. Additionally, the column atmospheric water vapor content during the overpass was retrieved using the MODIS precipitable water vapor product. After performing these adjustments, the radiometric cross-calibration of the two sensors was consistent to within 7%. Some drifts in the response of the bands are evident, with MODIS band 3 being the largest of about 6% over 10 years, a change that will be corrected in Collection 6 MODIS processing.

MODIS↗