Small Hydropower Interconnections: Analysis of Interconnection Processes

Small hydropower projects have faced the challenge of navigating the process to interconnect their generation source to electricity distribution and transmission grids. Small hydropower developers have found interconnection procedures to be opaque and ultimately result in unexpected cost surprises and long timelines. Noting these challenges, the U.S. Department of Energy Water Power Technologies Office enlisted Pacific Northwest National Laboratory (PNNL) and Oak Ridge National Laboratory (ORNL) to investigate the small hydropower interconnection landscape across the United States. After reviewing the status of small hydropower (“Small Hydropower Interconnections: Small Hydropower in the United States”) and the interconnection procedures across the United States (“Small Hydropower Interconnections: State Interconnection Processes”) in the first two white papers of this series, this paper uses recent data from small hydropower interconnection applications to benchmark the efficacy of the process. Using data from interconnection queues hosted by utilities, balancing authorities, independent system operators (ISOs), and regional transmission organizations (RTOs), this paper provides context for the costs, timelines, and types of upgrades required for small hydropower projects. Interconnection applications and study reports for small hydropower projects were analyzed to collect key pieces of information about the interconnection process, timeline, costs, and type of upgrades required for interconnection. Information sourced from the reports was entered into an Interconnection Benchmarking database (IBdb), which may be found in Appendix A.1. Information from this database was used to evaluate the performance and challenges associated with interconnecting small hydropower projects. This white paper presents a description of the sources contained in the interconnection database (Section 2.0), an analysis of the interconnection timeline (Section 3.0), an evaluation the cost of interconnection upgrades (Section 4.0), and a description of the types of infrastructure upgrades (Section 5.0). The final paper in this series (“Small Hydropower Interconnections: Best Practices”) will use the analysis described here to outline best practices for interconnection processes that will help overcome barriers to future small hydropower development.

13 HYDRO ENERGY↗

The future evolution of energy-water-agriculture interconnectivity across the US

Abstract Energy, water, and agricultural resources across the globe are highly interconnected. This interconnectivity poses science challenges, such as understanding and modeling interconnections, as well as practical challenges, such as efficiently managing interdependent resource systems. Using the US as an example, this study seeks to define and explore how interconnectivity evolves over space and time under a range of influences. Concepts from graph theory and input–output analysis are used to visualize and quantify key intersectoral linkages using two new indices: the ‘Interconnectivity Magnitude Index’ and the ‘Interconnectivity Spread Index’. Using the Global Change Analysis Model (GCAM-USA), we explore the future evolution of these indices under four scenarios that explore a range of forces, including socioeconomic and technological change. Analysis is conducted at both national and state level spatial scales from 2015 to 2100. Results from a Reference scenario show that resource interconnectivity in the US is primarily driven by water use amongst different sectors, while changes in interconnectivity are driven by a decoupling of the water and electricity systems, as power plants become more water-efficient over time. High population and GDP growth results in relatively more decoupling of sectors, as a larger share of water and energy is used outside of interconnected sector feedback loops. Lower socioeconomic growth results in the opposite trend. Transitioning to a low-carbon economy increases interconnectivity because of the expansion of purpose-grown biomass, which strengthens the connections between water and energy. The results highlight that while some regions may experience similar sectoral stress projections, the composition of the intersectoral connectivity leading to that sectoral stress may call for distinctly different multi-sector co-management strategies. The methodology we introduce here can be applied in diverse geographical and sectoral contexts to enable better understanding of where, when, and how coupling or decoupling between sectors could evolve and be better managed.

Khan, Zarrar (ORCID:0000000281478553)↗

Transmission Interconnection Roadmap: Transforming Bulk Transmission Interconnection by 2035

The U.S. electricity system is amid a rapidly occurring and widespread energy transition. Regional, Tribal, state, and customer demand for new energy resources, combined with favorable policies, is driving a rapid rise of interconnection requests. Interconnection processes will need to evolve to handle this larger number of requests today and into the future, as policy and economic drivers continue to motivate significant resource development. This roadmap identifies and organizes nearer- and longer-term solutions to enable transmission interconnection processes to meet this expected demand, and it is intended for a diverse audience of stakeholders participating within transmission interconnection processes. The roadmap is a result of the Interconnection Innovation e-Xchange (i2X) program launched by the U.S. Department of Energy (DOE) in June 2022 to convene stakeholders and address interconnection challenges. The roadmap is organized into four primary goal areas, each important to the overall i2X mission to enable a simpler, faster, and fairer interconnection of clean energy resources while enhancing the reliability, resiliency, and security of our electric grid. The first goal aims to improve interconnection data transparency, to aid interconnection customers’ ability to screen and site potential projects, better enable third-party modeling, facilitate more process automation, enhance competition while ensuring equitable outcomes, and enable benchmarking, tracking, and auditing of interconnection processes and reforms. The second goal covers solutions to improve queue management practices, affected system studies, fair processes, and workforce development. The third goal incorporates solutions that aim to improve cost allocation, reduce costs to electricity consumers, enhance the coordination between transmission planning and the interconnection process, and optimize the rightsizing of transmission investment through improvements in interconnection studies. The fourth and final goal aims to reduce the performance issues not identified during interconnection studies by updating technical requirements within interconnection studies, models, and tools while also improving industry interconnection standards.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Small Hydropower Interconnections: State Interconnection Processes

Small hydropower projects with rated power output between 0 to 20 MW have been the predominant source of hydropower growth over the past decade in the United States (DOE 2016; Johnson et al. 2018). However, interconnection to electricity distribution and transmission grids is a persistent barrier. Interconnection of an electricity generating unit is overseen by the distribution or transmission owner, who use interconnection standards and requirements that vary by state. The differences between standards in standards may affect the final cost, timeline, and success of a small hydropower project. Small hydropower project developers across the United States have found interconnection procedures to be fraught with cost surprises and schedule overruns. System operators have struggled to understand impacts to overburdened or rapidly evolving transmission and distribution grids. The results of these shortcomings have been stranded costs and unrealized small hydropower potential. Though regulatory actions and policy recommendations at the state level have increased the situational awareness of interconnection challenges, the remote locations of small hydropower resources and the relatively small revenues associated with energy production through small hydropower facilities continue to make interconnection processes and requirements confusing and costly. Noting these challenges, the U.S. Department of Energy Water Power Technologies Office enlisted Pacific Northwest National Laboratory (PNNL) and Oak Ridge National Laboratory (ORNL) to investigate the small hydropower interconnection landscape across the United States. The second in a series, this paper investigates the interconnection process in each state in the U.S. to compare their attributes. Subsequent papers in the series will analyze these interconnection processes (“Small Hydropower Interconnections: Analysis of Interconnection Processes”) and present best practices (“Small Hydropower Interconnections: Best Practices”) that will help overcome barriers to future small hydropower development. The first paper in the series examined the state of small hydropower projects in the United States (“Small Hydropower Interconnections: Small Hydropower in the United States”) to understand the industry characteristics.

13 HYDRO ENERGY↗

A Retrospective Analysis of Distributed Solar Interconnection Timelines and Related State Mandates

Most distributed residential photovoltaic (PV) systems must secure an interconnection agreement prior to operation that ensures the local electrical system will operate safely within the broader electrical grid. PV installers generally submit an interconnection application to the local utility that provides all the necessary details the utility needs to evaluate the proposed system. To encourage timely execution of this process, many states’ utility commissions have established mandates that limit the maximum number of days allowed for utility review and approval of interconnection for certain small, often residential applications. In this paper, we derive the median and range of cycle times for the pre-installation approval phase of the interconnection process (i.e., from application submission to approval by the utility) across 24 U.S. states, using a data set of approximately 170,000 projects. We evaluate the percentage of projects that are approved within respective state-mandated timelines from 2017– 2019. We further evaluate how timelines have evolved since 2012 for a subset of five states: Arizona, California, Colorado, New Jersey, and New York. The analyses are divided into two size ranges: systems that are ≤10 kilowatts (kW), and systems that are 11–50 kW.

14 SOLAR ENERGY↗

Electrical interconnect structure using metal bridges to interconnect die

A multichip module comprises a carrier, a plurality of chips, an electrical insulating layer, and an electrical interconnect structure. The carrier includes a bottom wall and four side walls defining an internal cavity. The chips are positioned in the internal cavity, with each chip including a plurality of bond pads. The electrical insulating layer is formed from electrically insulating material and is positioned on an upper surface of the carrier and the chips. The electrical interconnect structure includes a plurality of interconnect traces, with each interconnect trace formed from electrically conductive material and electrically connected to a first bond pad on a first chip and a second bond pad on a second chip. Each interconnect trace includes a bridge having a segment that is spaced apart from, and positioned above, the electrical insulating layer.

Young, Barbara Diane↗

A Framework for Streamlining Large Load Interconnection: An Assessment of Current Practices and Emerging Strategies for Fair and Efficient Load Interconnection Processes

This report focuses on current perceptions, challenges, and processes related to interconnection of LELs to the grid; while these loads include several types of entities, the primary focus of this work is on data centers, the largest current driver of this growth. It begins by summarizing relevant context related to load growth in the United States, including key stakeholder perceptions as data center deployment drive historic load growth nationwide. It then reviews the current landscape of large load interconnection processes and challenges and then proposes a framework of potential strategies intended to support a more consistent, streamlined, and fair approach to load interconnection. This framework is adapted from solutions proposed or adopted to address similar challenges faced in generator interconnection queues as well as notable reforms currently being proposed or enacted for large loads that could be more widely adopted.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Rates and Reversibilities in Interconnected Reaction Networks

Mathematical relations prescribing unidirectional forward and reverse rates originally derived based on single-path reaction sequences do not apply to interconnected reaction networks. The presence of branches in reaction networks, leading to alternative stable products, decreases unidirectional rates in reference to those calculated by single-path functional forms, as shown by simulated isotopic exchange rates, but impacts the unidirectional forward and reverse rates equally such that the functional form of effective reversibility remains unchanged. Regardless of stoichiometric numbers and network connectivity, the application of the pseudo-steady-state hypothesis on reactive intermediates in conjunction with consideration of unidirectional rates toward the product of interest and all alternative stable products results in mathematical expressions that accurately reflect simulated isotopic exchange rates. Further analyses based on kinetic resistance, a property akin to electrical resistance, illustrate the manifestation of nodal resistances in addition to the single-path kinetic resistance for interconnected reaction networks. The generalized formalism for assessing rates and reversibilities in interconnected networks derived herein enables us to demonstrate that unidirectional rates cannot be assessed solely from effective reversibilities and net rates of generation of stable species in such networks. Furthermore, isotopic exchange rates, under the condition that each elementary step in the overall reaction sequence forms a unique reactive intermediate that is consumed solely by the subsequent step, can be utilized to determine unidirectional rates and can serve to validate postulated reaction pathways in highly interconnected reaction networks (e.g., CO x hydrogenation).

42 ENGINEERING↗

Grid Application and Controls Development for Medium-Voltage SiC-Based Grid Interconnects

This paper studies, the grid-interconnection requirements of directly connected medium-voltage (MV) Silicon Carbide-based (SiC-based) converters and details the necessary control implementations. These power electronic converters follow the interconnection standard IEEE 1547-2018, but can also have additional controls supported by the microgrid standards in IEEE 2030.7, which is demonstrated in this work. Additionally, this paper defines the grid applications realized by these directly connected medium-voltage power electronic converters at the distribution scale and demonstrates results. The controls for the studied grid applications are then developed and implemented on the controller. The paper also includes details of the control algorithm development and validations of the control algorithm through hardware-in-the-loop results.

28 EE - Advanced Manufacturing Office (EE-5A)↗

Monolithically interconnected GaAs solar cells: A new interconnection technology for high voltage solar cell output

Photovoltaic linear concentrator arrays can benefit from high performance solar cell technologies being developed at AstroPower. Specifically, these are the integration of thin GaAs solar cell and epitaxial lateral overgrowth technologies with the application of monolithically interconnected solar cell (MISC) techniques. This MISC array has several advantages which make it ideal for space concentrator systems. These are high system voltage, reliable low cost monolithically formed interconnections, design flexibility, costs that are independent of array voltage, and low power loss from shorts, opens, and impact damage. This concentrator solar cell will incorporate the benefits of light trapping by growing the device active layers over a low-cost, simple, PECVD deposited silicon/silicon dioxide Bragg reflector. The high voltage-low current output results in minimal 12R losses while properly designing the device allows for minimal shading and resistance losses. It is possible to obtain open circuit voltages as high as 67 volts/cm of solar cell length with existing technology. The projected power density for the high performance device is 5 kW/m for an AMO efficiency of 26% at 1 5X. Concentrator solar cell arrays are necessary to meet the power requirements of specific mission platforms and can supply high voltage power for electric propulsion systems. It is anticipated that the high efficiency, GaAs monolithically interconnected linear concentrator solar cell array will enjoy widespread application for space based solar power needs. Additional applications include remote man-portable or ultra-light unmanned air vehicle (UAV) power supplies where high power per area, high radiation hardness and a high bus voltage or low bus current are important. The monolithic approach has a number of inherent advantages, including reduced cost per interconnect and increased reliability of array connections. There is also a high potential for a large number of consumer products. Dual-use applications can include battery chargers and remote power supplies for consumer electronics products such as portable telephones/beepers, portable radios, CD players, dashboard radar detectors, remote walkway lighting, etc.

Dinetta, L. C.↗

A Grassroots Network and Community Roadmap for Interconnected Autonomous Science Laboratories for Accelerated Discovery

Scientific discovery is being revolutionized by AI and autonomous systems, yet current autonomous laboratories remain isolated islands unable to collaborate across institutions. We present the Autonomous Interconnected Science Lab Ecosystem (AISLE), a grassroots network transforming fragmented capabilities into a unified system that shorten the path from ideation to innovation to impact and accelerates discovery from decades to months. AISLE addresses five critical dimensions: (1) cross-institutional equipment orchestration, (2) intelligent data management with FAIR compliance, (3) AI-agent driven orchestration grounded in scientific principles, (4) interoperable agent communication interfaces, and (5) AI/ML-integrated scientific education. By connecting autonomous agents across institutional boundaries, autonomous science can unlock research spaces inaccessible to traditional approaches while democratizing cutting-edge technologies. This paradigm shift toward collaborative autonomous science promises breakthroughs in sustainable energy, materials development, and public health.

Ferreira da Silva, Rafael [Oak Ridge National Labo↗

Policy and Cost Allocation Considerations for Large Electric Load Interconnections: Emerging Policy Trends in Rate Structures, Interconnection, and Cost Impacts on Other System Users

Load growth in the United States is rapidly increasing: load from data centers alone has tripled over the past decade, and this growth is forecasted to continue accelerating. These and other large electric loads (LELs) promise economic benefits at the state and local level, but their deployment has also led to increasing concerns about grid impacts and potential cost shifts onto other ratepayers. Legislators, regulators, and other stakeholders are increasingly proposing and enacting policies in effort to balance these and other considerations. This white paper reviews state-level legislation, selected utility rate cases, and relevant federal orders in an effort to describe and categorize relevant trends in policies related to LEL cost allocation, interconnection, and deployment. Policy categories identified through this review include tax incentives, rate actions, and requirements related to interconnection, permitting, and reporting. By offering a taxonomy of policies, this white paper aims to offer a resource to policymakers and other stakeholders navigating this transformative moment for the grid.

24 POWER TRANSMISSION AND DISTRIBUTION↗